Attachment 3 - Building 1411 Lead.Asbestos Survey.pdf

PDF 297 KB Posted

Attached to
HAFB Storage Igloos Demolition
Solicitation number
24-Q-0031
Issued by

About this file

This document is a Lead-Based Paint and Asbestos Inspection Report for Building 1411 at Hill Air Force Base, Utah, prepared by the 75th Civil Engineering Squadron on February 15, 2023. The survey identified one lead-based paint component: a yellow floor line with a lead reading of 2.71 mg/cm², which is in poor condition and requires segregation or abatement prior to demolition. For asbestos, the report found 4,000 square feet of exterior wall coating, classified as a non-friable Category I asbestos-containing material, assumed to contain asbestos.

The report is part of the preparation for demolishing Building 1411, which was constructed in 1971. It specifies that any effort to disturb lead paint can create lead dust, and appropriate safety measures must be taken according to 29 CFR 1926.62. The inspection was conducted using an XRF Analyzer XL3T 600, and the report emphasizes that the quantities are estimates not to be used for bidding purposes. Contact information for the Asbestos/LBP Shop is provided for any questions or concerns about the inspection findings.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3: Building 1411 Lead & Asbestos Survey

WORK TASK/CAPITAL PROJECT #:

FACILITY:

REQUESTER:

08 February 2023

(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)

LEAD BASED PAINT

ASBESTOS

INSPECTION REPORT

Utah Certified State Inspector: Casey Devlin (ASB#-6734: Expires-9 Sept. 2023, PB#-2550: Expires-4 Nov. 2025)

INSPECTION DATE: 15 February 2023

Reference UDAQ R307-807-6

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

SIGNATURE:

PREPARED BY: Casey Devlin (ASB#-6734, PB#-2550)

DEMOLISH FACILITY

ORGANIZATION:

REQUESTED:

12531211

TAYLOR BRIMBERRY

THE QUANTITIES WITHIN THIS REPORT ARE ESTIMATES AND SHOULD

NOT BE USED FOR BIDDING PURPOSES

388 FW

FACILITY CONSTRUCTION DATE:

ASBESTOS

Assumed To Contain

This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by The Science and Engineering Laboratory (AIHA Acc.#-

101572) at Hill Air Force Base, Utah (R307-801-10.8.a-b).

Exterior Wall Coating, Black

*LOCATIONS FOUND

Category INon-Friable

Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing materials (ACM) that could potentially be encountered in the proposed area/areas. The information gathered from all current and previous inspections is shown below by homogenous area (R307-801-9-4).

ASBESTOS INSPECTION REPORT INFORMATION

RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or renovation project operations.

Locations found: Locations of building materials as described in this report indicate where they were found, but do not necessarily mean that these are the only locations where these materials may be encountered during the project.

Category II Non-Friable ACM: Any material, excluding Category I non- friable ACM, containing more than 1% asbestos as determined by using the methods specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM) that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.

Category I Non-Friable ACM: Asbestos-containing packings, gaskets, resilient floor coverings, or asphalt roofing products containing more than 1% asbestos as determined by using the method specified in 40 CFR Part 763, Subpart E, Appendix E, Section 1, Polarized Light Microscopy (PLM).

4,000 square Feet

*Per UDAQ definition.

DEPARTMENT OF THE AIR FORCE

75 CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

The quantities within this report are estimates and are not to be used for bidding purposes.

Table 1

SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND

MATERIAL TYPE

Exterior Walls

*RACM

*Category I *Category II

FRIABILITY QUANTITY

Demolish BuildingStatement of Work:

A total of 0 0

CONTACT INFORMATION

suspect materials assessed as part of the inspection.

Sample # samples reference the

Table 4.

POTENTIAL FOR ADDITIONAL MATERIALS:

This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of inspection (see title page for inspection date). Should the scope of the project be altered in any way or any materials found that are not identified in this report shall require additional assessment. This report cannot be used for any other projects within the building.

Any questions or concerns regarding this inspection report or if any new suspect asbestos containing material (ACM) is encountered, stop work and contact the personnel listed below for further assistance/assessment.

*LOCATIONS FOUND

N/A

The following is a list of the "Suspect Materials" that were sampled as part of this inspection:

N/A

The following table summarizes the sampling data.

N/A

Table 3.

Per EPA requirements, all materials analyzed as containing ≤10% asbestos are point counted utilizing EPA method 600/R-93/116 this information is summarized in Table 2.

Table 2.

ASBESTOS

Results

MATERIAL TYPE

Sample Location

QUANTITY

N/A

Cell: (801)940-2970 Supervisor: Taylor Brimberry: DSN: (801)586-7094

Asbestos/LBP Shop 75 CES(CEOHA)

Asbestos/LBP Shop Personnel

DSN:(801)777-8006

Homogenous Building Material, Description, Location, Quantity.

Per Hill AFB requirements, all materials containing any detectable amount of asbestos shall be handled as Asbestos Containing Material (ACM). Table 2 shows the summary of materials containing ≤1% that were identified via "Point Counting". Per EPA/UDAQ

≤1% is not considered to be an asbestos containing material, but special handling/packaging requirements are necessary per OSHA 29CFR 1926.1101 and

29CFR 1910.1001

SCOPE OF WORK:

XL Number Substrate Component Color Lead Reading Paint

Condition 964 Concrete Floor Line Yellow 2.71 Poor

XRF Analyzer Used: XRF Analyzer XL3T 600 (Serial #120021)

5-This inspection report only encompasses the areas/materials designated within the scope of work that was provided at the date of the inspection (see title page for date). This report must be modified should the scope of the project be altered in any way or additional materials not previously identified within this report are encountered. This report may not be used for any other projects within the building.

LEAD-BASED PAINT IDENTIFICATION REPORT INFORMATION

Table 1.

2-The condition column is the condition only of the painted/coated component (See final page for all readings/samples).

3-The U.S. Department of Housing and Urban Development defines Lead-based paint as any paint, varnish, stain, or other applied coating that has 1 mg/cm² as measured by an X-ray Fluorescence (XRF) Analyzer or laboratory analysis or 0.5 percent by weight (5,000 µg/g by dry weight) by laboratory analysis, or more of lead.

All other components tested were less than 0.80 mg/cm².

4-Any effort to disturb lead paint can create lead dust. Ensure that appropriate abatement, cleanup, and disposal will be accomplished and that appropriate safety measures are taken IAW 29 CFR 1926.62. If you have any questions concerning this report, contact the Asbestos/LBP Shop: Taylor Brimberry at 586-7094.

DEPARTMENT OF THE AIR FORCE

75TH CIVIL ENGINEERING (CEOHA)

HILL AIR FORCE BASE, UTAH

1-Table 1 below, summarizes the painted/coated building components that tested positive for Lead Based Paint/Coating. These components should be segregated or abated prior to renovation or demolition, and a composite TCLP taken of the waste before disposal.

Demolish Building

944 0.84 977 0.83 945 1.05 978 0.90

946 0.82 POS 979 1.15

Range: .8 to 1.2 Paint Range: .8 to 1.2 Side Condition Color PbL(mg/cm2) NEG/POS

Center Poor Yellow 2.71 POS Center Poor White 0.01 NEG West Poor Off-White 0.01 NEG West Poor Off-White 0.01 NEG West Poor Off-White 0.01 NEG West Poor Off-White 0.01 NEG

XL Number Room/Area Structure

966 Bay Door Frame

968 Bay Exterior Door Metal 969 Bay Door Hinge Metal

965 Bay Floor Line Concrete 964 Bay Floor Line Concrete

Pre Calibration PbL (mg/cm²) Calibration

Range Model# Serial #

Per 20 Second Reading

Calibration Range

Substrate

Bay Door Metal

Post Calibration

PbL (mg/cm²)XRF Analyzer XL3T 600 (Serial #120021)

Per 20 Second Reading

Metal

File details come from the government source that posted it. Updated .