Attachment 8 - Divisional Price Breakout.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C26025R0078
About this file
The file is a Price Schedule Breakdown Instructions document for a Veterans Affairs construction project at Mann-Grandstaff VA Medical Center in Spokane, WA. The document provides a detailed pricing template for RFQ 36C26025R0016, covering a campus wayfinding replacement project with line items organized by Construction Specification Institute (CSI) divisions ranging from General Requirements to Utilities. The pricing template requires contractors to break down costs across 33 different construction divisions, with specific instructions that all pricing is fixed-price and field office overhead will be applied only once to the contract and any potential changes.
The related federal contract opportunity (Solicitation 36C26025R0078) is for a separate but similar project at the same VA facility, specifically involving roof replacement for Building 33. The project has a 90-calendar day performance period beginning with the Notice to Proceed, classified under NAICS code 238160 for Roofing Contractors and product service code Z1DA for Maintenance of Hospitals and Infirmaries. The project is being conducted by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 20, with the specific project number identified as 668-25-107.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| RFQ: 36C26025R0016 |
Project Number / Title: 668-24-104 Replace Wayfinding for Entire Campus Project Location: Mann-Grandstaff VA Medical Center, Spokane, WA
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements | ||
| Division 2 Existing Conditions | ||
| Division 3 Concrete | ||
| Division 4 Masonry | ||
| Division 5 Metals | ||
| Division 6 Woods, Plastic and Composites | ||
| Division 7 Thermal and Moisture Protection | ||
| Division 8 Openings | ||
| Division 9 Finishes | ||
| Division 10 Specialties | ||
| Division 11 Equipment | ||
| Division 12 Furnishings | ||
| Division 13 Special Construction | ||
| Division 14 Conveying Equipment | ||
| Division 21 Fire Suppression | ||
| Division 22 Plumbing | ||
| Division 23 HVAC | ||
| Division 25 Integrated Automation | ||
| Divison 26 Electrical | ||
| Division 27 Communications | ||
| Divison 28 Electronic Safety and Security | ||
| Division 31 Earthwork | ||
| Division 32 Exterior Improvements | ||
| Division Item 33 Utilities |
SubTotals N/A $0.00
Period of Performance (FAR 52.211-10) ________ days
| Mobilization / Demobilization | ||
| Insurance / Bonds | ||
| Taxes / Other Fees (provide itemized list) | ||
| O&M Manuals and Red Line Drawings | ||
| Overhead | Rate _______% | |
| Overhead (daily rate) | Per Day $0.00 | |
| SubContract Mark-Up | Rate _______% | |
| Profit | Rate _______% | |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00
File details come from the government source that posted it. Updated .