ATTACHMENT 8 - Construction - Design Experience Project.pdf

PDF 334 KB Posted

Attached to
Replace HVAC at BLDG 896 Federal contract opportunity
Solicitation number
FA3016-20-R-0027
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document includes an attachment template for construction and design experience project data and details of a federal contract opportunity to replace the HVAC system at Building 896 for the United States Air Force C5 Flight and Ground Training School.

The contract opportunity solicitation seeks the demolition and replacement of four air cooled computer room air conditioning units, their condensers, fire alarm components, electrical feeds and circuits at Building 896. Bidders must provide a 100% design to IFC including a comparison of the existing HVAC system and load, and a design for temporary air conditioning. The Department of the Air Force Air Education and Training Command is the contracting agency. The solicitation number is FA3016-20-R-0027 and opportunity type is listed as a solicitation. No response or award dates are included. The required work includes inspection, testing, auditing and investigation of the existing HVAC systems and a fully engineered and more energy efficient replacement design.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6 – Construction & Design Experience Project Data Sheet

(Present as many projects as requested by the agency in the RFP)

EXAMPLE PROJECT KEY NUMBER

Project No.

PROJECT SAMPLE REFERENCE FOR:

Prime Joint Venture Teaming Partner Designer of Record

Full Plans & Specs Other (explain):

TITLE AND LOCATION (City and State)

Contract No. Task Order (if applicable) DoD Agency or Private/Commercial Entity:

Project Title:

Location (i.e. JBSA Lackland, San Antonio, Texas)

COMPLETE THE TYPE OF PROJECT INFORMATION

Type of Construction Project:

Repair/Alteration Other (Explain):

Type of Design Project:

Design-Build Designer of Record RFP Development Other Engineering Services

Full Plans & Specs Other (explain):

Applicable Divisions:

Architectural Structural Electrical Civil Mechanical

PROJECT OWNER’S INFORMATION

A. Project Owner B. Point Of Contact Name C. Point Of Contact (Email & Telephone Number)

d. Award Date e. Completion Date f. Project Size (Sq. Ft)

g. If PoP had to be extended beyond original PoP on Awarde, please explain reason.

h. Award Amount i. Final Price

j. If Final Amount is different from Contract Amount, please explain reason.

RenovationNew Construction

k. Provide a detailed description of the project and the relevancy to the project requirements of this RFP. If design-build, include a description of the design-effort.

l..Provide a detailed description of what work your firm self-performed on this project.

m. Provide a detailed description of challenges faces, actions taken, and result achieved.

EXAMPLE PROJECT KEY NUMBER:
Project No:
PROJECT SAMPLE REFERENCE FOR:
Prime: Off
Joint Venture: Off
Teaming Partner: Off
Designer of Record: Off
Full Plans Specs Other explain: Off
TITLE AND LOCATION City and State:
Contract No Task Order if applicable DoD Agency or PrivateCommercial Entity Project Title Location ie JBSA Lackland San Antonio Texas:
New Construction: Off
Other Explain: Off
Renovation:
RepairAlteration: Off
DesignBuild: Off
Designer of Record_2: Off
RFP Development: Off
Other Engineering Services: Off
Full Plans Specs Other explain_2: Off
A Project OwnerRow1:
B Point Of Contact NameRow1:
C Point Of Contact Email Telephone NumberRow1:
d Award DateRow1:
e Completion DateRow1:
f Project Size Sq FtRow1:
g If PoP had to be extended beyond original PoP on Awarde please explain reasonRow1:
h Award AmountRow1:
i Final PriceRow1:
j If Final Amount is different from Contract Amount please explain reasonRow1:
k Provide a detailed description of the project and the relevancy to the project requirements of this RFP If designbuild include a description of the designeffortRow1:
lProvide a detailed description of what work your firm selfperformed on this projectRow1:
m Provide a detailed description of challenges faces actions taken and result achievedRow1:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Text6:
Text7:
Text8:
Text9:
Check Box10: Off
Check Box11: Off

File details come from the government source that posted it. Updated .