This document contains a submittal register for a federal contract to replace the HVAC system at Building 896. The contract involves demolishing and preparing for replacement of two 5-ton and two 15-ton air cooled down-flow Computer Room Air Conditioning Units, along with their condensers, fire alarm components, electrical feeds and circuits. The contractor must provide a 100% replacement of the computer room HVAC system with a new, engineered and more energy efficient CRAC system. The contractor is required to inspect, test and audit the existing HVAC system and provide a comprehensive design analysis and design documents to 100% interim for final check. The contractor must also provide temporary air conditioning to meet space requirements during construction. Relevant specifications sections and submittal items are listed along with classification, schedule dates and approval information.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| KELL170119 R&R HVAC B896 | |||||||||||||||||||
| CONTRACTOR | |||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O. | T R A N S M I T T A L | ||||||||||||||||||
| N O. | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | ACTION CODE | DATE OF ACTION | |||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 01 11 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Salvage Plan, all materials and | G | ||||||||||||||||||
| finishes | |||||||||||||||||||
| 01 14 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| list of Contract Personnel | 1.4.1.1 | G | |||||||||||||||||
| Installation Access | 1.4.1.2 | ||||||||||||||||||
| 01 30 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Proposed Laydown Yard and Temporary HVAC layout | 1.2 | G | |||||||||||||||||
| Progress and Completion | 1.3 | G | |||||||||||||||||
| Pictures and Weekly Inspection Reports | |||||||||||||||||||
| 01 32 01.00 10 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Project Schedule CPM | |||||||||||||||||||
| GA | |||||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Construction Schedule | 1.2 | G | |||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Monthly Updates | 1.4 | ||||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Submittal Register | 1.7 | G | |||||||||||||||||
| 01 35 13.30 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Digital Photos | |||||||||||||||||||
| SD-02 Shop Drawings | |||||||||||||||||||
| One Line Drawings |
| 01 35 29 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 01 35 29 | Accident Prevention Plan (APP) | 1.5 | |||||||||||||||||
| GA | |||||||||||||||||||
| Activity Hazard Analysis (AHA) | 1.6 | G | |||||||||||||||||
| Crane Critical Lift Plan | G | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Confined Space Entry Permit | |||||||||||||||||||
| Hot work permit | |||||||||||||||||||
| 01 35 30 | SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Site Safety and Health Plan | G | ||||||||||||||||||
| SD-09 Manufacturer’s Field | |||||||||||||||||||
| Reports | |||||||||||||||||||
| 01 35 35 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| ENVIRONMENTAL | 1.6 | ||||||||||||||||||
| PROTECTION PLAN | |||||||||||||||||||
| Environmental Permits as | |||||||||||||||||||
| applicable; G | |||||||||||||||||||
| Equipment Inventory | 3.7.2 | ||||||||||||||||||
| 01 45 00.00 10 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Contractor Quality Control (CQC) | 3.2 | G | |||||||||||||||||
| Plan | |||||||||||||||||||
| 01 45 00.00 20 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Contractor Quality Control (CQC) | G | ||||||||||||||||||
| Plan | |||||||||||||||||||
| 01 50 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Construction Site Plan | 1.3 | G | |||||||||||||||||
| Traffic Control Plan | G | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| SD-06 Test Reports | |||||||||||||||||||
| Backflow Preventer Tests | |||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Backflow Tester | |||||||||||||||||||
| Backflow Preventers | 1.4 | ||||||||||||||||||
| 01 54 23.00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| For each type of product | G | ||||||||||||||||||
| indicated | |||||||||||||||||||
| 01 57 20 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| ENVIRONMENTAL | 1.6 | ||||||||||||||||||
| PROTECTION PLAN | |||||||||||||||||||
| 01 78 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| Warranty Management Plan | 1.4.1 | G | |||||||||||||||||
| SD-04 Samples | |||||||||||||||||||
| Warranty Tags | G | ||||||||||||||||||
| 01 80 00.10 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Manufacturers Certification Statement (prior to start of construction). | |||||||||||||||||||
| Statement of Appointment of Control Inspector (prior to start of construction) | |||||||||||||||||||
| Warranty Tag | |||||||||||||||||||
| Warranties | |||||||||||||||||||
| GA | |||||||||||||||||||
| 01 83 13.07 40 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Material, Equipment, and Fixture Lists | G |
| h | |||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 01 83 13.07 40 | Quality Control Plan | G | |||||||||||||||||
| SD-02 Shop Drawings | |||||||||||||||||||
| Connection Diagrams | G | ||||||||||||||||||
| Fabrication Drawings | G |
| SD-03 Product Data | |||||||||||||||||||
| Manufacturer's Catalog Data | G | ||||||||||||||||||
| Specific Equipment Data | G | ||||||||||||||||||
| Spare Parts List | G | ||||||||||||||||||
| Warranty | 1.5 | G | |||||||||||||||||
| SD-05 Design Data | |||||||||||||||||||
| Design Analysis including Calculations | G | ||||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Alignment Test, motor/shaft as applicable | G | ||||||||||||||||||
| NEBB or ABB Test Balance Report | G | ||||||||||||||||||
| Point Verification Test | |||||||||||||||||||
| Factory Representative Start-up Test and Report | G | ||||||||||||||||||
| Point Verification Test | |||||||||||||||||||
| 03 30 00 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Concrete Curing Plan | 1.6.3.1 | ||||||||||||||||||
| 03 30 00 | Quality Control Plan | 1.6.6 | G | ||||||||||||||||
| Quality Control Personnel | 1.6.7 | G | |||||||||||||||||
| Certifications | |||||||||||||||||||
| Quality Control Organizational | 1.6.7 | ||||||||||||||||||
| Chart | |||||||||||||||||||
| Laboratory Accreditation | 1.6.9 | G | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| Warranty Test | G | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Form Removal Schedule | 1.6.2.1 | G | |||||||||||||||||
| Maturity Method Data | 3.3.10 | ||||||||||||||||||
| SD-02 Shop Drawings | |||||||||||||||||||
| Formwork | 1.6.2.1 | ||||||||||||||||||
| Reinforcing Steel | 1.6.2.2 | G | |||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| Joint Sealants | 2.4.5 | ||||||||||||||||||
| Joint Filler | 2.4.4 | ||||||||||||||||||
| Formwork Materials | 2.1 | ||||||||||||||||||
| Recycled Aggregate Materials | 2.3.3.3 | ||||||||||||||||||
| Cementitious Materials | 2.3.1 | ||||||||||||||||||
| Vapor Retarder [and Vapor | 2.4.6 | ||||||||||||||||||
| Barrier] | |||||||||||||||||||
| Concrete Curing Materials | 2.4.1 | ||||||||||||||||||
| Reinforcement | 2.6 |
| Warranty Test | G | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Certificates; | G | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | |||||||||||||||||||
| Manufacturer's Instructions | G | ||||||||||||||||||
| SD-11 Closeout Submittals | |||||||||||||||||||
| Record Drawings | G | ||||||||||||||||||
| Acceptance Documentation | G | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 23 00 00 | SD-02 Shop Drawings | ||||||||||||||||||
| Detail Drawings | 1.4.4 | G | |||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| 23 00 00 | Insulated Nonmetallic Flexible | 2.9.1.2 | |||||||||||||||||
| Duct Runouts | |||||||||||||||||||
| Duct Connectors | 2.9.1.2 | ||||||||||||||||||
| Ozone Depleting Substances | 1.4.3 | ||||||||||||||||||
| Technician Certification | |||||||||||||||||||
| SD-08 Manufacturer’s Instructions | |||||||||||||||||||
| Manufacturer's Installation | 3.2 | ||||||||||||||||||
| Instructions | |||||||||||||||||||
| Operation and Maintenance | 3.15.2 | ||||||||||||||||||
| Training | |||||||||||||||||||
| SD-10 Operation and Maintenance | |||||||||||||||||||
| Data | |||||||||||||||||||
| Operation and Maintenance | 3.15.1 | ||||||||||||||||||
| Manuals | |||||||||||||||||||
| Electric Panels | |||||||||||||||||||
| SD-11 Closeout Submittals | |||||||||||||||||||
| Indoor Air Quality During | 3.13 | S | |||||||||||||||||
| Construction | |||||||||||||||||||
| 23 05 15 | SD-01 Preconstruction Submittals | ||||||||||||||||||
| Material, Equipment, and Fixture | 1.2 | G | |||||||||||||||||
| Lists | |||||||||||||||||||
| SD-02 Shop Drawings | |||||||||||||||||||
| Record Drawings | 1.2 | G |
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 23 05 15 | Connection Diagrams | 1.2 | G | ||||||||||||||||
| Coordination Drawings Discipline Specific | 1.2 | G | |||||||||||||||||
| Fabrication Drawings Discipline Specific | 1.2 | G | |||||||||||||||||
| Installation Drawings | 3.1 | G | |||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| Pipe and Fittings | 2.2 | G | |||||||||||||||||
| Piping Specialties | 2.3 | G | |||||||||||||||||
| Valves | 2.4 | G | |||||||||||||||||
| Miscellaneous Materials | G | ||||||||||||||||||
| Supporting Elements | 2.6 | G | |||||||||||||||||
| Equipment Foundation Data | 1.2 | G | |||||||||||||||||
| SD-04 Samples | |||||||||||||||||||
| Manufacturer's Standard Color | 1.2 | G | |||||||||||||||||
| Charts | |||||||||||||||||||
| SD-05 Design Data | |||||||||||||||||||
| Pipe and Fittings | 2.2 | G | |||||||||||||||||
| Piping Specialties | 2.3 | G | |||||||||||||||||
| Valves | 2.4 | G | |||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Hydrostatic Tests | 3.1 | G | |||||||||||||||||
| Refrigerant Tests | 3.1 | G | |||||||||||||||||
| 23 23 00 | SD-02 Shop Drawings | ||||||||||||||||||
| Refrigerant Piping System | 2.3 | G | |||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| Refrigerant Piping System | 2.3 |
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 23 23 00 | Spare Parts | 1.5.2 | G | ||||||||||||||||
| Qualifications | 1.3.1 | G | |||||||||||||||||
| Refrigerant Piping Tests | 3.5 | G | |||||||||||||||||
| Verification of Dimensions | 3.1 | G | |||||||||||||||||
| SD-06 Test Reports | G | ||||||||||||||||||
| Refrigerant Piping Tests | 3.5 | G | |||||||||||||||||
| SD-07 Certificates | G | ||||||||||||||||||
| Service Organization | 2.1 | G | |||||||||||||||||
| SD-10 Operation and Maintenance | G | ||||||||||||||||||
| Data | G | ||||||||||||||||||
| Maintenance | 1.5 | G | |||||||||||||||||
| Operation and Maintenance Manuals | 3.4 | G |
| Demonstrations | 3.4 | G | |
| 23 31 13.00 40 | SD-01 Preconstruction Submittals | ||
| Material, Equipment, and Fixture | Part 2 | G | |
| Lists | |||
| Records of Existing Conditions | 2.1.1 | G | |
| SD-02 Shop Drawings | |||
| Connection Diagrams | 2.1 | G | |
| Offset Fitting Configurations | 2.2.1 | G | |
| SD-03 Product Data | |||
| Equipment and Performance Data | 2.1.1 | G |
23 31 13.00 40 Brazing Materials 2.3.2 G
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 23 41 13.00 40 | SD-02 Shop Drawings | ||||||||||||||||||
| Installation Drawings | 3.1.1 | ||||||||||||||||||
| SD-03 Product Data | |||||||||||||||||||
| Air Filters | 2.1 | G | |||||||||||||||||
| Filter Sensor | 2.2 | G | |||||||||||||||||
| Manometers | 2.2 | G | |||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| Test Reports | 3.2 | ||||||||||||||||||
| SD-07 Certificates |
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 23 81 23.00 20 | SD-03 Product Data | ||||||||||||||||||
| Computer room air conditioning | 2.1 | G | |||||||||||||||||
| units | |||||||||||||||||||
| Space temperature control | 2.3.2 | G | |||||||||||||||||
| system drawings | |||||||||||||||||||
| Filters | 2.1.4 | ||||||||||||||||||
| Refrigerants | 1.4 | ||||||||||||||||||
| SD-06 Test Reports | |||||||||||||||||||
| CRACU Production Schedule | 2.6.2 | G | |||||||||||||||||
| and Factory Test Schedule | |||||||||||||||||||
| Manufacturer's Factory Test | 2.6.1 | G | |||||||||||||||||
| Plans | |||||||||||||||||||
| Factory Test Reports | 2.6.5 | G | |||||||||||||||||
| Field Test Schedule | 3.3.2 | G | |||||||||||||||||
| Manufacturer's Field Test Plans | 3.3.1 | G | |||||||||||||||||
| Field Test Reports | 3.3.6 | G | |||||||||||||||||
| Aquatic Toxicity | 2.1.2 | ||||||||||||||||||
| SD-07 Certificates | |||||||||||||||||||
| Certificate of Specification | 2.2 | G | |||||||||||||||||
| Compliance | |||||||||||||||||||
| Credentials of the Manufacturer's | 3.3.3 | G | |||||||||||||||||
| Field Test Representative |
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | ||
| 23 81 23.00 20 | Ozone Depleting Substances | 1.5.1 | |||||||||||||||||
| Technician Certification | |||||||||||||||||||
| SD-08 Manufacturer’s Instructions | |||||||||||||||||||
| Installation Manual for Each Type | 3.1.2 | ||||||||||||||||||
| of CRACU | |||||||||||||||||||
| SD-10 Operation and Maintenance | |||||||||||||||||||
| Data | |||||||||||||||||||
| Computer Room Air Conditioning | 2.1 | G | |||||||||||||||||
| Units | |||||||||||||||||||
| SD-11 Closeout Submittals | |||||||||||||||||||
| Indoor Air Quality During | 3.2 | S | |||||||||||||||||
| Construction |
| SUBMITTAL REGISTER | CONTRACT NO. | ||||||||||||||||||
| TITLE AND LOCATION | |||||||||||||||||||
| R&R HVAC B896 | CONTRACTOR | ||||||||||||||||||
| A C T I V I T Y | |||||||||||||||||||
| N O | T R A N S M I T T A L | ||||||||||||||||||
| N O | S P E C | ||||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R AGRAPH NO. | |||||||||||||||||
| GOV'T CLASSIFICATION OF REVIEW | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | ||||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTHER REVIEWER | A C T I O N | ||||||||||||||||
| C O D E | DATE OF ACTION | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |