ATTACHMENT 7 - Past Performance Information Sheet.pdf
PDF 601 KB Posted
- Attached to
- Replace HVAC at BLDG 896 Federal contract opportunity
- Solicitation number
- FA3016-20-R-0027
About this file
This document contains a past performance information sheet template and details of a federal contract opportunity for replacement of HVAC systems. The past performance template requests information on the offeror and details of relevant prior contracts, including customer and contracting officer contacts, descriptions of work, contract status and issues, and corrective actions taken. The federal contract opportunity is for the United States Air Force to replace two 5-ton and two 15-ton computer room air conditioning units and associated components at Building 896 at an Air Force training school. The scope includes inspection and audit of the existing systems, provision of design analysis and replacement design, and installation of temporary AC to meet load requirements during replacement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI ATCH 2_KELL170119_FA3016_20_R_0027 B896 Basic Fl Plan.pdf | ||
| Solicitation Amendment FA301620R00270002 SF 30.pdf | ||
| RFI ATCH 1_Site Location Img MPLS 17_0119_ B896.pdf | ||
| RFI Responses_Redacted.pdf | ||
| Solicitation Amendment FA301620R00270001 SF 30.pdf | ||
| ATTACHMENT 5 - Instructions to Offeror 4May20.pdf | ||
| ATTACHMENT 8 - Construction - Design Experience Project.pdf | ||
| ATTACHMENT 4 - Material Submittal.xlsx | XLSX spreadsheet | |
| ATTACHMENT 9 - Climatology Report.pdf | ||
| ATTACHMENT 5 - Instructions to Offeror 13Mar2020.pdf | ||
| ATTACHMENT 3 - DD 1354 Aug 2013.pdf | ||
| ATTACHMENT 2 - General Decision TX20200231 14Feb2020.pdf | ||
| ATTACHMENT 6 - Evaluation Factors 13Mar2020.pdf | ||
| Solicitation - FA301620R0027 .pdf | ||
| ATTACHMENT 1 - SOW v4.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA301620R0027 Page 1 of 5
Attachment # 7 - PAST
PERFORMANCE INFORMATION
FORM (PPIF)
Past Performance Reference No.
Provide the information requested in this form for each one of the present or past contracts you have identified. Provide a separate completed form for each contract identified. Attach a separate sheet if additional space is needed.
A. Current Offeror (Company/Division):
CAGE Code:
DUNS Number:
(NOTE: If the company or division performing this past or present effort is different from the current Offeror, note this fact below. Refer to the "Organizational Structure Change History" you provided as part of your Past Performance Volume).
B. Project Title:
C. Contract Specifics:
1. Complete Name of Customer:
2. Customer Address and Telephone #:
3. Contract Number or Citation:
4. Type of Contract:
5. Period of Performance:
6. Initial Contract Price: $
7. Final Amount Invoiced/Amount Invoiced to Date: $
8. Original completion date:
9. Current scheduled completion date:
10. Estimated completion date:
OR Estimated Percent Completion:
11. Number of contract modifications:
12. Enter primary cause for contract changes below:
FA301620R0027 Page 2 of 5
D. Description of Work Prime or Subcontractor.
E. Describe how the work under this contract relates to the experience cited by the Offeror in its present proposal.
FA301620R0027 Page 3 of 5
F. Self-Assessment of past performance record. Provide information of any problems encountered and your corrective actions.
I. Address below any technical (or other) issues about this contract considered particularly relevant to the current solicitation.
J. Summarize contract issues relative to the number and severity of quality deficiencies recorded/contract discrepancy reports issued, cure notices, show cause letters, termination for default or cause, disputes, claims, latent defects; and corrective actions taken for this contract reference.
FA301620R0027 Page 4 of 5
G. Current Status of Contract (Select as applicable):
[ ] Work Continuing – On Schedule
[ ] Work Continuing – Behind Schedule
[ ] Work Completed – Litigation Pending or Underway
[ ] Work Completed – No Further Action Pending or Underway
[ ] Work Completed – Routine Administrative Action Pending or Underway
[ ] Request For Equitable Adjustment(s) Negotiations Pending or Underway
[ ] Claims Negotiations Pending or Underway
[ ] Terminated for Convenience
[ ] Terminated for Default
[ ] Other (Explain)
H. Primary customer points of contact. (For Government contracts/orders, provide current information on all three individuals. For commercial contracts, provide points of contact filling these same roles.)
1. Program Manager and/or Site Manager
2. Procurement Contracting Officer
3. Administrative Contracting Officer
Name:
Office:
Address:
Telephone:
FAX #:
E-Mail:
FA301620R0027 Page 5 of 5
Additionally, for those efforts where the offeror is cognizant of unfavorable and/or marginal past performance ratings/reports previously assessed by customers or clients, but feel that significant progress has been made but not yet credited or formally documented, provide the program name, contract number, customer location and a narrative explaining "fixes" made to date, or any other information regarding the unfavorable/marginal assessment.
It is not presumed that the offeror's performance has been perfect. Rather, the proposal should contain evidence of the offeror's ability to isolate the root causes of problems and should describe programs or actions taken to resolve those causes. Demonstrated corrective actions (not just planned or promised), and the overall work record will be considered. Problems not addressed by the offeror, but found by the Government during the evaluation of the information in this volume, will be assumed to still exist. Note: In the case of Contractor Performance Assessment Report System (CPARS), if your input has already been provided and the rationale/circumstances have not changed, DO NOT repeat them here.
| Past Performance Reference NoAttachment 9 PAST PERFORMANCE INFORMATION FORM PPIF: |
| Provide the information requested in this form for each one of the present or past contracts you have identified Provide a separate completed form for each contract identified Attach a separate sheet if additional space is neededRow1: |
| A Current Offeror CompanyDivision: |
| CAGE Code: |
| DUNS Number: |
| NOTE If the company or division performing this past or present effort is different from the current Offeror note this fact below Refer to the Organizational Structure Change History you provided as part of your Past Performance Volume: |
| B Project Title: |
| 1 Complete Name of Customer: |
| 2 Customer Address and Telephone: |
| 3 Contract Number or Citation: |
| 4 Type of Contract: |
| 5 Period of Performance: |
| fill_20: |
| fill_21: |
| 8 Original completion date: |
| 9 Current scheduled completion date: |
| 10 Estimated completion date: |
| OR Estimated Percent Completion: |
| 11 Number of contract modifications: |
| D Description of Work Prime or SubcontractorRow1: |
| E Describe how the work under this contract relates to the experience cited by the Offeror in its present proposalRow1: |
| F SelfAssessment of past performance record Provide information of any problems encountered and your corrective actionsRow1: |
| I Address below any technical or other issues about this contract considered particularly relevant to the current solicitationRow1: |
| J Summarize contract issues relative to the number and severity of quality deficiencies recordedcontract discrepancy reports issued cure notices show cause letters termination for default or cause disputes claims latent defects and corrective actions taken for this contract referenceRow1: |
| 1 Program Manager andor Site ManagerName: |
| 2 Procurement Contracting OfficerName: |
| 3 Administrative Contracting OfficerName: |
| 3 Administrative Contracting OfficerOffice: |
| 1 Program Manager andor Site ManagerAddress: |
| 2 Procurement Contracting OfficerAddress: |
| 3 Administrative Contracting OfficerAddress: |
| 1 Program Manager andor Site ManagerTelephone: |
| 2 Procurement Contracting OfficerTelephone: |
| 3 Administrative Contracting OfficerTelephone: |
| 1 Program Manager andor Site ManagerFAX: |
| 2 Procurement Contracting OfficerFAX: |
| 3 Administrative Contracting OfficerFAX: |
| 1 Program Manager andor Site ManagerEMail: |
| 2 Procurement Contracting OfficerEMail: |
| 3 Administrative Contracting OfficerEMail: |
| Additionally for those efforts where the offeror is cognizant of unfavorable andor marginal past performance ratingsreports previously assessed by customers or clients but feel that significant progress has been made but not yet credited or formally documented provide the program name contract number customer location and a narrative explaining fixes made to date or any other information regarding the unfavorablemarginal assessment It is not presumed that the offeror s performance has been perfect Rather the proposal should contain evidence of the offeror s ability to isolate the root causes of problems and should describe programs or actions taken to resolve those causes Demonstrated corrective actions not just planned or promised and the overall work record will be considered Problems not addressed by the offeror but found by the Government during the evaluation of the information in this volume will be assumed to still exist Note In the case of Contractor Performance Assessment Report System CPARS if your input has already been provided and the rationalecircumstances have not changed DO NOT repeat them hereRow1: |
| Check Box1: Off |
| Check Box2: Off |
| Text3: |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| 1 Program Manager andor Site ManagerOffice: |
| 2 Procurement Contracting OfficerOffice: |
File details come from the government source that posted it. Updated .