Attachment 7 - VAPIHCS EHRM Project Manual Final Rev1.pdf
PDF 3 MB Posted
- Attached to
- C1AA--459-21-2-880-0014 EHRM (VA-21-00029828)
- Solicitation number
- 36C77621R0149
About this file
This federal contract opportunity notice provides information for an upcoming design-build solicitation from the Department of Veterans Affairs for infrastructure upgrades at the VA Pacific Islands Health Care System. The solicitation will be a request for proposal issued in accordance with FAR Part 36 for a single-award firm-fixed-price contract. The scope of work includes relocating or remodeling approximately 13 telecommunications rooms and one data center to meet Electronic Health Records Modernization standards. The period of performance is 540 calendar days from notice to proceed. The solicitation will be set aside as a total service-disabled veteran-owned small business opportunity with a NAICS code of 236220 and size standard of $39.5 million.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VISN 21 CM/PM Electronic Health
Records Modernization (EHRM) PHASE I Support Task
PO# 612C209
Pacific Islands Health Care System S p a r k M . M a t s u n a g a V A M e d i c a l C e n t e r
L e e w a r d O a h u V A C l i n i c
M o l o k a i V A C l i n i c
H i l o V A C l i n i c
G u a m V A C l i n i c
S a i p a n V A C l i n i c
F a l e o m a v a e g a E n i F a ’ a u a ’ a H u n k i n V A C l i n i c
P r i n c e J o n a h K u h i o K a l a n i a n a o l e F e d e r a l B u i l d i n g a n d
U S C o u r t h o u s e
A i r p o r t I n d u s t r i a l P a r k ( A I P A )
L a n a i O u t r e a c h C l i n i c
VHAHONPatacM Cross-Out
Ta b l e o f C o n t e n t s
Project TeamContributors:
Vicinity Map/Building Addresses
Vicinity Map/Building Addresses
Campus Map / Building Information
VAMC Fiber Distances
Door Security Requirements
Spark M. Matsunaga VAMC – Bldg. 30
First Floor Plan
Second Floor Plan
Third Floor Plan
Spark M. Matsunaga VAMC – Bldg. 110
First Floor Plan
Spark M. Matsunaga VAMC – Bldg. E-Wing
Basement
First Floor Plan
Second Floor Plan
Third Floor Plan
Fourth Floor Plan
Airport Industrial Park (AIPA)
Warehouse First Floor Plan
First Floor Plan
Second Floor Plan
Second Floor Plan (Cont’d)
Fourth Floor Plan
Leeward VA Clinic
First Floor Plan
Prince Jonah Kuhio Kalanianaole Federal Building
And US Courthouse
Third Floor Plan
Molokai VA Clinic
First Floor Plan
American Samoa
First Floor Plan
Identification of Network Spaces:
Hilo VA Clinic
First Floor Plan
Guam VA Clinic
First Floor Plan
Guam VA Clinic
First Floor Plan
Saipan VA Clinic
First Floor Map
Identification of Off Campus Network
Spaces:
Network Space Design:
Bldg. 30:
1-B11
Design Matrix
Enlarged Plan – Existing
Bldg. 30:
2-D16
Design Matrix
Enlarged Plan – Existing
Bldg. 30:
2-B45
Design Matrix
Enlarged Plan – Existing
Bldg. 30:
3-B15
Design Matrix
Enlarged Plan - Existing
Bldg. 30:
3-D26
Design Matrix
Enlarged Plan – Existing
Bldg. 110:
A102
Design Matrix
Enlarged Plan – Existing
Bldg. 110:
B103A
Design Matrix
Enlarged Plan – Existing
Bldg. 110:
B139C
Design Matrix
Enlarged Plan – Existing
VHAHONPatacM Cross-Out
Bldg. 110:
C114
Design Matrix
Enlarged Plan - Existing
Bldg. E-Wing:
B-A107
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
1-B104
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
1-C106
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
2-B104
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
2-C100C
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
3-B105C
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
3-C105C
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
3-C108D
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
4-B108B
Design Matrix
Enlarged Plan – Existing
Bldg. E-Wing:
4-C104
Design Matrix
Enlarged Plan - Existing
56 Federal Building & U.S. Courthouse:
Design Matrix
Enlarged Plan – Existing
AIPA Warehouse:
D1555
Design Matrix
Enlarged Plan – Existing
AIPA – Suite F-220-14:
Design Matrix
Enlarged Plan – Existing AIPA – Suite F-250:
Design Matrix
Enlarged Plan – Existing
49 61
Network Space Design (cont’d):
Ta b l e o f C o n t e n t s
Off Campus Network Space Design:
AIPA – Suite H-403:
Design Matrix
Enlarged Plan – Existing
AIPA – Suite I-540:
524b
Design Matrix
Enlarged Plan – Existing
Leeward VA Clinic:
Design Matrix
Enlarged Plan – Existing
American Samoa:
Design Matrix
Enlarged Plan – Existing
Hilo VA Clinic:
1-0011
Design Matrix
Enlarged Plan – Existing
Guam VA Clinic:
Design Matrix
Enlarged Plan – Existing
Guam HBPC:
HBPC
Design Matrix
Enlarged Plan – Existing
VHAHONPatacM Cross-Out
VHAHONPatacM Cross-Out
Saipan VA Clinic:
Design Matrix
Enlarged Plan – N/A
Molokai:
TEL A3
Design Matrix
Enlarged Plan – N/A
Ta b l e o f C o n t e n t s
Network Space Design (cont’d)
Appendix A – Power Installation Example
Appendix B – Compliance Requirements
Appendix C – Rack Labeling Standard
Appendix
P R O J E C T C O N TA C T D I R E C T O R Y
Concourse Federal Group
123 S. Royal Street Alexandria, Virginia 22314
Tim Hower, Project Manager ........................................................................................thower@concousefederal.com
Lorena Alvarez................................................................................................................IaIvarez@concousefederaI.com
Mike Olson ................................................................................................................... molson@concousefederal.com
Marshall Contino, Concourse A|E Vice President ....................................................... mcontino@concousefederal.com
DHE Engineering 3300 N. Central Ave. 3300 Tower Suite, 1520, Phoenix, AZ 85012
Jasper Lim, Electrical Engineer.................................................................................... jlim@dheeng.com
Kory Young, EIT, Senior Mechanical Engineer................................................................kyoung@dheeng.com
VA Pacific Islands Health Care System
Tyler Furukawa, Chief Engineer………………………………....................................................Tyler.Furukawa@va.gov
Darin Nakagawa, PE……………………….…...........................................................................Darin.Nakagawa@va.gov
V i c i n i t y M a p B u i l d i n g A d d r e s s e s
S p a r k M . M a t s u n a g a V A M e d i c a l C e n t e r
4 5 9 P a t t e r s o n R o a d
H o n o l u l u , H I 9 6 8 1 9
L e e w a r d O a h u V A C l i n i c
9 1 - 2 1 3 5 F o r t W e a v e r R o a d
S u i t e 5 0 1
E w a B e a c h , H I 9 6 7 0 6
A i r p o r t I n d u s t r i a l P a r k ( A I P A )
3 3 7 5 K o a p a k a S t r e e t
H o n o l u l u , H I 9 6 8 1 9
P r i n c e J o n a h K u h i o K a l a n i a n a o l e F e d e r a l B u i l d i n g a n d U S C o u r t h o u s e
3 0 0 A l a M o a n a B o u l e v a r d
H o n o l u l u , H I 9 6 8 5 0
M o l o k a i V A C l i n i c
2 8 0 H o m e O l u P l a c e
K a u n a k a k a i , H I 9 6 7 4 8
L a n a i O u t r e a c h C l i n i c
6 2 8 - B S e v e n t h S t r e e t
L a n a i C i t y , H I 9 6 7 8 3
H i l o V A C l i n i c
4 5 M o h o u l i S t r e e t
H i l o , H I 9 6 7 2 0
V i c i n i t y M a p B u i l d i n g A d d r e s s e s ( c o n t ’d )
1 0
1 1
S a i p a n V A C l i n i c , M a r i n a H e i g h t s B u s i n e s s P a r k
G a r a p a n , M H - I I B u i l d i n g S u i t e 1 0 0 a n d 2 0 6
S a i p a n , M P 9 6 9 5 0
G u a m V A C l i n i c
4 9 8 C h a l a n P a l a s y o
A g a n a H e i g h t s
G U 9 6 9 1 0 - 6 4 2 7
G u a m H B P C
R M . 3 0 3 , 3 R D F L O O R
F i r s t H a w a i i a n B a n k
M a i t e , G U 9 6 9 1 0
F a l e o m a v a e g a E n i F a ' a u a ' a H u n k i n V A C l i n i c
F i a t e l e T e o A r m y R e s e r v e B u i l d i n g
P a g o P a g o , A S 9 6 7 9 9
B u i l d i n g I n f o r m a t i o n
Bldg. # Bldg. Name TR Qty Levels
30 AMBULATORY CARE CLINIC 5 3
110 CENTER FOR AGING 4 1
T1 E-WING 10 5
Bldg. # Bldg. Name Data Ctr Levels
T1 E-WING 1 5
T1
VAMC FIBER DISTANCES
PACIFIC ISLANDS HEALTHCARE SYSTEM
VAMC Pacific Islands
Building Floor Room
Distance (Ft.) from New Fiber Hub (old PBX)
Fiber Type Notes Interior - 4" EMT
Exterior -Concrete Encased 4"
PVC or HDPE with (4) 1"
Interducts
30 - ACC 1 1-B11 400 1200 24 strand singlemode
30 - ACC 2 2-B45 415 1200 24 strand singlemode
30 - ACC 2 2-D16 615 1200 24 strand singlemode
30 - ACC 3 3-B15 445 1200 24 strand singlemode
30 - ACC 3 3-D26 645 1200 24 strand singlemode
110 1 A102 650 2620 24 strand multimode
110 1 B103A 485 2620 24 strand multimode
110 1 B139C 510 2620 24 strand multimode
110 1 C114 690 2620 24 strand multimode
E-WING B BA107 225 24 strand multimode
E-WING 1 1B-104 400 24 strand multimode
E-WING 1 1C-106 150 24 strand multimode
E-WING 2 2B-104 380 24 strand multimode
E-WING 2 2C-100C 130 24 strand multimode
E-WING 3 3B-105C 360 24 strand multimode
E-WING 3 3C-105C 120 24 strand multimode
E-WING 3 3C-108D Server Room
E-WING 4 4B-108B 380 24 strand multimode
E-WING 4 4C-104 130 24 strand multimode
AIPA D1555 1750 500 24 strand singlemode
AIPA 1-540 1770 500 24 strand singlemode
AIPA 213 1790 500 24 strand singlemode
AIPA F-250 1810 500 24 strand singlemode
AIPA H-403 1820 500 24 strand singlemode
DOOR SECURITY REQUIREMENTS
SPARK M. MATSUNAGA VA MEDICAL CENTER
I D E N T I F I C AT I O N O F N E T WO R K S PAC E S
BLDG: 30 (ACC)
LEVEL: 1
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
REMEDIATE IN PLACE
TELE
ROOM 1-B11
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
LEVEL: 2
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
REMEDIATE IN PLACE
TELE
ROOM 2-D16
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TELE
ROOM 2-B45
LEVEL: 3
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TELE
ROOM 3-B15
REMEDIATE IN PLACE
ROOM 3-D26
BLDG: 110 (CFA)
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TELE
ROOM A102
REMEDIATE IN PLACE
TELE
ROOM B103A
REMEDIATE IN PLACE
TEL
ROOM B139C
REMEDIATE IN PLACE
TEL.
ROOM C114
NOTE: THE ONLY ROOM VISITED BY RFP
DEVELOPER WAS B139C.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
BLDG: E-WING
LEVEL: BASEMENT
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
ROOM BA-107
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TELE
ROOM 1B-104
REMEDIATE IN PLACE
ROOM 1C-106
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TELE
ROOM 2B-104 REMEDIATE IN PLACE
ROOM 2C-100C
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TELE
ROOM 3B-105C
REMEDIATE IN PLACE
TELE
ROOM 3C-105C
REMEDIATE IN PLACE
SERVER
ROOM 3C-108D
LEVEL: 4
SCALE: 1/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TELE
ROOM 4B-108B REMEDIATE IN PLACE
ROOM 4C-104
I D E N T I F I C AT I O N O F O F F C A M P U S N E T WO R K S PAC E S
BLDG: AIPA (WAREHOUSE)
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
AIRPORT INDUSTRIAL PARK (AIPA)
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TELE
SUITE D1555
VHAHONPatacM Pencil
Pencil
BLDG: AIPA – I-540
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
AIRPORT INDUSTRIAL PARK (AIPA)
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
SERVER
ROOM 524b
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
VHAHONPatacM Pencil
BLDG: AIPA – F-220-14
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
AIRPORT INDUSTRIAL PARK (AIPA)
PACIFIC ISLANDS HEALTHCARE SYSTEM
ABANDON
IT
RELOCATE TO OFFICE 213
NEW IT ROOM
OFFICE 213
VHAHONPatacM Pencil
BLDG: AIPA F-250
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
AIRPORT INDUSTRIAL PARK (AIPA)
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
SERVER
ROOM 213
VHAHONPatacM Pencil
BLDG: AIPA – H-403
LEVEL: 4
SCALE: 1/16” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
AIRPORT INDUSTRIAL PARK (AIPA)
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
SERVER
ROOM 413
VHAHONPatacM Pencil
BLDG: LEEWARD VA CLINIC
SCALE: 3” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
LEEWARD VA CLINIC
PACIFIC ISLANDS HEALTHCARE SYSTEM
ABANDON
DATA
RELOCATE TO ROOM 580
NEW TR ROOM 580
VHAHONPatacM Pencil
BLDG: ADMIN FED BLDG.
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
PRINCE JONAH KUHIO KALANIANAOLE FEDERAL BUILDING
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
COMPUTER
ROOM 301
VHAHONPatacM Pencil
BLDG: MOLOKAI
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
MOLOKAI VA CLINIC
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TEL
A3
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
VERIFY LOCATION OF ROOM NUMBER A3
AND LOCATION OF TR.
NOT SHOWN ON EXISTING FLOOR PLAN.
VHAHONPatacM Pencil
BLDG: AMERICAN SAMOA
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
FALEOMAVAEGA ENI FA’AUA’A HUNKIN VA CLINIC
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
SIGNAL CLOSET
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
VHAHONPatacM Pencil
BLDG: HILO VA CLINIC
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
HILO VA CLINIC
PACIFIC ISLANDS HEALTHCARE SYSTEM
NEW TR ROOM
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
RELOCATE
EX. UTIL.
1-0011
VHAHONPatacM Pencil
BLDG: GUAM VA CLINIC
SCALE: 3” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
GUAM VA CLINIC
PACIFIC ISLANDS HEALTHCARE SYSTEM
REMEDIATE IN PLACE
TEL/SIGNAL
CLOSET
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
VHAHONPatacM Pencil
BLDG: GUAM HBPC
SCALE: 3/32” = 1’-0”
DATE: 12/22/2020
N
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
GUAM HBPC
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
REMEDIATE IN PLACE
IT
CLOSET
VHAHONPatacM Pencil
BLDG: SAIPAN VA CLINIC
SCALE: NTS
DATE: 12/22/2020
LEGEND
LOCATION OF EXISTING
TR /DC
POTENTIAL LOCATION
FOR RELOCATED TR
EXISTING TR LOCATION(S)
SAIPAN VA CLINIC
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
IT RACK IS LOCATED
ON THE EAST WALL OF
THE FIRST FLOOR
VHAHONPatacM Pencil
N E T WO R K S PAC E D E S I G N
N
BLDG: 3 0
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
1-B11
IRM
1-B11
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: TELECOM ROOMS IN BUILDING 30
(ACC) WILL NEED TO BE RECONFIGURED
AND REORGANIZED TO PROVIDE BETTER
EFFICIENCY.
Building 30 (ACC) Room 1-B11
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new equipment provide new rack as required.
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
2-D16
IRM
2-D16
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: TELECOM ROOMS IN BUILDING 30
(ACC) WILL NEED TO BE RECONFIGURED AND
REORGANIZED TO PROVIDE BETTER
EFFICIENCY.
Building 30 (ACC) Room 2-D16
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
x Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual x No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
x Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual x UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required x Micro condensate pump Commercial condensate pump
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
2-B45
IRM
2-B45
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: TELECOM ROOMS IN BUILDING 30
(ACC) WILL NEED TO BE RECONFIGURED
AND REORGANIZED TO PROVIDE BETTER
EFFICIENCY.
Building 30 (ACC) Room 2-B45
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
x Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
X Insufficient emergency circuits available.
Provide 200A, 208Y/120V, 42 circuit critical branch circuit electrical panel in a nearby electrical room to provide additional emergency power.
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual x No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
x Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual x UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required x Micro condensate pump Commercial condensate pump
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
3-B15
IRM
3-B15
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: TELECOM ROOMS IN BUILDING 30 (ACC)
WILL NEED TO BE RECONFIGURED AND
REORGANIZED TO PROVIDE BETTER EFFICIENCY.
Building 30 (ACC) Room 3-B15
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
3-D26
IRM
3-D26
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: TELECOM ROOMS IN BUILDING 30
(ACC) WILL NEED TO BE RECONFIGURED
AND REORGANIZED TO PROVIDE BETTER
EFFICIENCY.
Building 30 (ACC) Room 3-D26
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new
BLDG: 1 1 0
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
A102
TELE.
A102
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
Building 110 Room A102
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 57
Approximate total cable length = 8640'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
B103A
COM
B103A
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
Building 110 Room B103A
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 29
Approximate total cable length = 4320'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
Inadequate rack space for new
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
B139C
TEL.
B139C
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
Building 110 Room B139C
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 29
Approximate total cable length = 4320'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
C114
TEL.
C114
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NOTE: ROOM NOT VISITED BY RFP DEVELOPER.
SCOPE DERIVED FROM FACILITY SELF-ASSESSMENT
Building 110 Room C114
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
X Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 53
Approximate total cable length = 7920'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new
BLDG: E - W I N G
LEVEL: BASEMENT
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
B-A107
NEW
DEDICATED
TELECOM
ROOM
125 SF
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
NEW WALL
IRM
B-A107
Building E Wing Room BA107
C O
O
LI
N G
"X" EXISTING ISSUES
RECOMMENDED
SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room. Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire
NEMA L21-30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new
COMBINATION
temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack;
connect to BMS
Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X
Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA Telecommunications and
Special Telecommunications
Systems Design Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA
Telecommunications and Special
Telecommunications Systems
Design Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G x Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables =
TBD Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-
260' (70-80M)
X Inadequate rack space for new
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
1-B104
TELE
1-B104
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
Building E Wing Room 1B-104
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 116
Approximate total cable length = 17,280'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new
LEVEL: 1
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
1-C106
TELE
1-C106
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
Building E Wing Room 1-C106
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 144
Approximate total cable length = 21,600'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new
LEVEL: 2
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
2-B104
TELE
2-B104
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
Building E Wing Room 2B-104
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new
LEVEL: 2
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
2-C100C
TELE
2-C100C
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
Building E Wing Room 2C-100C
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required x Micro condensate pump Commercial condensate pump
Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = TBD
Approximate total cable length = TBD'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new
LEVEL: 3
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
3-B105C
TELE
3-B105C
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
Building E Wing Room 3B-105C
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications Systems Design
Manual
X No condensate leak detection Needs condensate leak detection X
TR ground bar not connected to
Telecom Main Ground Bar (TMGB) in the data room
Provide grounding cable to MDF ground bar.
X Remote Controlled battery thermostat Wired thermostat X
No telecommunications bonding backbone to other TR grounding bars
Provide grounding conductor to nearest TR per VA Telecommunications and Special
Telecommunications Systems Design
Manual
X UPS has no communication to
BMS
Provide NIC to communicate to BMS
C A
B
LI
N G
X Inadequate fiber optic cabling to TR Install new as required
X Micro condensate pump Commercial condensate pump
X Horizontal and/or patch data cabling below minimum Cat 5e.
Replace all cabling with Cat 6A.
Approximate number of cables = 159
Approximate total cable length = 23,760'
X Horizontal cable run not to exceed
292 feet
Conduct diamond analysis to verify maximum horizontal distance does not exceed 230-260' (70-80M)
X Inadequate rack space for new
LEVEL: 3
SCALE: 1/4” = 1’-0”
DATE: 12/22/2020
3-C105C
TELE
3-C105C
SPARK M. MATSUNAGA VA MEDICAL CENTER
PACIFIC ISLANDS HEALTHCARE SYSTEM
Building E Wing Room 3C-105C
C O
O
LI
N G
"X" EXISTING ISSUES RECOMMENDED SOLUTIONS
E
LE
C T
R
IC
A L
"X' EXISTING ISSUES RECOMMENDED SOLUTIONS
X Cooling inadequate
There is no air condition in this room.
Provide 1.5 ton ductless mini-split.
Condensing unit on roof.
Insufficient redundant power connections for network equipment.
Provide (2) 30A, 208V, 5 wire NEMA L21-
30R receptacles, each power from an independent power source, mounted near the equipment rack containing the zone
PDU
X Room Temperature/Humidity
Monitoring Inadequate
Room needs new COMBINATION temperature and humidity monitoring and/or controls from BMS
X Insufficient UPS power backup.
Provide UPS with minimum 20 minute run time capacity and redundant, hot swappable batteries.
X Rack Temperature/Humidity
Monitoring Inadequate
Provide one (1) temperature and humidity sensor per rack; connect to
BMS
Missing grounding bus bar Install copper grounding bus bar
Piping over equipment Relocate piping or pipe trough X Inadequate grounding connections to metal objects in TR
Provide bonding conductors to non-energized metal surfaces per VA
Telecommunications and Special
Telecommunications…