The document is a Material Submittals Schedule for the MAHG231016 Repair NPS Dorms Elevators project at Keesler Air Force Base. The solicitation (FA301025R0024) is a Service-Disabled Veteran-Owned Small Business set-aside with a project value between $1,000,000 and $5,000,000. The schedule details 12 specific material submittal requirements, including hazardous material documentation, warranties, concrete, joint sealants, tile, resilient flooring, hydraulic passenger elevators, plumbing, and interior distribution systems.
Key submission requirements include providing three copies of each submittal, with most documents due 10 days following contract award or 5 days prior to the start date. Critical deadlines include a site visit on 11 August 2025 at 2:00 PM CDT, with specific access requirements involving valid driver's licenses, vehicle registration, and proof of insurance. The project is issued by the Department of the Air Force Air Education and Training Command, with a notable caveat that funds are not currently available and the government reserves the right to cancel the solicitation at any time.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| 231016 | Project Title: Repair NPS Dorm's Elevators | Solicitation / Contract Number: |
FA301025R0024
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 | HazMat Questionnaire | 3 | 3 | 5 Days Prior to Start Date | ||||||||
| 2 | HazMat MSDS | 3 | 3 | 5 Days Prior to Start Date | ||||||||
| 3 | HazMat Reporting Entry Form | 3 | 3 | 5 Days Prior to Start Date | Submit Final Quantities | |||||||
| 4 | HazMat Reporting entry Form | 3 | 3 | End of Contract | ||||||||
| 5 | Recycling and Landfill Report | 3 | 3 | End of Contract | ||||||||
| 6 | Warranty (Manufacture's) | 3 | 3 | End of Contract | ||||||||
| 7 | 1-Year Warranty (Contractor's) | 3 | 3 | End of Contract | ||||||||
| 8 | 03 30 00 Cast-In-Place Concrete | 3 | 3 | 10 Days Following Award | ||||||||
| 9 | 07 92 00 Joint Sealant | 3 | 3 | 10 Days Following Award | ||||||||
| 10 | 09 30 00 Tile and Accessories | 3 | 3 | 3 | 10 Days Following Award | |||||||
| 09 65 00 Resilient Flooring | 3 | 3 | 3 | 10 Days Following Award | ||||||||
| 14 24 23 Hydraulic Passenger Elevators | 3 | 3 | 3 | 3 | 3 | 10 Days Following Award | ||||||
| 11 | Sheet P101 Sump and Sump Pump | 3 | 3 | 3 | 3 | 10 Days Following Award | ||||||
| 22 00 00 General Plumbing | 3 | 10 Days Following Award | ||||||||||
| 12 | 26 20 00 Interior Distribution System | 3 | 3 | 10 Days Following Award | ||||||||
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 8 |
| 9 |
| 10 |
| 10 |
| 11 |
| 12 |
| 13 |
| 11 |
| 15 |
| 16 |
| 12 |
| 12 |
| 13 |
| 14 |
| 15 |
| 20 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).
&P of &N
File details come from the government source that posted it. Updated .