Attachment 7 - MAHG211131C Division Street Basin MSS.xls
XLS spreadsheet 54 KB Posted
- Attached to
- Construct Division Street Sidewalks Federal contract opportunity
- Solicitation number
- FA301022R0040
About this file
This document includes a material submittal schedule and details for a federal contract opportunity to construct sidewalks at Keesler Air Force Base. The contract is a HUBZone small business set-aside to furnish labor, materials, and equipment to construct a sidewalk, monument wall, and repair a catch basin with a magnitude between $500,000 and $1,000,000. Interested HUBZone sources may submit a proposal by 14 September 2022. The 120-day contract performance period will begin after award. The solicitation will be posted on https://www.sam.gov around 15 August 2022. Questions should be directed to the specified Contracting Specialist or Contracting Officer.
The material submittal schedule provides a template for contractors to submit required documents including certificates of compliance, shop drawings, samples, catalogs, warranties, and test reports for items like concrete, reinforcing steel, borrow material, topsoil, riprap, straw rolls, and sod by the specified due dates for review by the Contracting Office and return by the Civil Engineering office. Final approval dates are also to be tracked in the schedule.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| [ enter here ] | Project Title: KAFB Detention Basin Repairs | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | CONCRETE | X | X | |||||||||||||||||||
| 2 | REINFORCING STEEL | X | ||||||||||||||||||||
| 3 | BORROW MATERAIL | X | X | |||||||||||||||||||
| 4 | TOPSOIL | X | X | |||||||||||||||||||
| 5 | RIPRAP | X | ||||||||||||||||||||
| 6 | STRAW ROLL | X | ||||||||||||||||||||
| 7 | SOD | X | ||||||||||||||||||||
| 8 | ||||||||||||||||||||||
| 9 | ||||||||||||||||||||||
| 10 | ||||||||||||||||||||||
| 11 | ||||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .