Attachment 5 - MAHG211131B Division Street Monument Sign MSS.xls
XLS spreadsheet 55 KB Posted
- Attached to
- Construct Division Street Sidewalks Federal contract opportunity
- Solicitation number
- FA301022R0040
About this file
This document contains a federal contract opportunity for construction services. The Keesler Air Force Base is soliciting proposals from HUBZone small businesses to construct a sidewalk, monument wall, and repair a catch basin at the Division Street Gate Area for a price between $500,000 and $1,000,000. Interested vendors must register in the System for Award Management and submit a proposal by September 14, 2022. The contract performance period will be 120 days following award. The North American Industry Classification System code is 237310 and the Product Services Code is Y1LB. The solicitation and drawings will be posted on August 15, 2022 at beta.sam.gov. Questions should be directed to the identified contracting staff.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| [ enter here ] | Project Title: | ||
| KAFB ERG Monument Sign | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | Conduit | x | ||||||||||||||||||||
| 2 | Wiring | x | ||||||||||||||||||||
| 3 | Splice Block | x | ||||||||||||||||||||
| 4 | In-line Fust Holder | x | ||||||||||||||||||||
| 5 | Fuses | x | ||||||||||||||||||||
| 6 | In-ground Pull Box | x | x | |||||||||||||||||||
| 7 | Light fixtures | x | x | x | x | |||||||||||||||||
| 8 | Concrete | x | x | |||||||||||||||||||
| 9 | CMU Block | x | ||||||||||||||||||||
| 10 | Brick | x | x | x | ||||||||||||||||||
| 11 | Mortar | x | x | |||||||||||||||||||
| 12 | Aluminum Sign Panel | x | x | x | x | |||||||||||||||||
| 13 | Sign Lettering | x | x | x | x | |||||||||||||||||
| 14 | Stucco System | x | x | x | x | x | ||||||||||||||||
| 15 | Reinforcing Steel | x | x | |||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date