Attachment 6 - MAHG211131C Division Street Basin DWG 14 Jul 22.pdf
PDF 1 MB Posted
- Attached to
- Construct Division Street Sidewalks
- Solicitation number
- FA301022R0040
About this file
This solicitation package includes construction drawings and specifications for a federal contract opportunity to construct sidewalks, a monument wall, and repair a catch basin at Keesler Air Force Base. The work will be conducted as a HUBZone small business set-aside utilizing performance price trade-off procedures. Interested HUBZone small businesses may submit a proposal for this acquisition, which has an estimated value between $500,000 and $1,000,000. The solicitation is anticipated to be posted on August 15th with a closing date of September 14th and a 120-day period of performance following award. The contracting agency is the Department of the Air Force Air Education and Training Command. All contractors must register in SAM prior to award. Questions should be directed to the named contracting specialist and contracting officer.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SET NO. BMA No. 3772
DETENTION BASIN IMPROVEMENTS
BILOXI, MISSISSIPPI
PREPARED FOR
FOR
CONSTRUCTION PLANS
JULY, 2022
D
IV
IS
IO
N
S
TR
EE
T-
KA
FB
D
ET
EN
TIO
N
B A
SI
N
IM
PR
O V
EM
EN
TS
SHEET INDEX
LOCATION MAP
DIVISION STREET-KAFB
C -0
DESCRIPTION SHEET NO.
TITLE / LOCATION MAP / SHEET INDEX
EXISTING CONDITIONS/DEMOLITION PLAN
SITE LAYOUT PLAN
C-001
C-111
C-121
BROWN, MITCHELL
& ALEXANDER, INC.
CONSULTING ENGINEERSPascagoula, MS 39567
(228)864-7612
3221 Market Street
131 Rue Magnolia Biloxi, MS 39530 (228)436-7612
401 Cowan Road, Suite A, Gulfport, MS 39507 (228)864-7612
I-1
KEESLER
AIR FORCE
BASE
HIGHWAY 90
DIVISION ST.
FO
R
R
ES
T A
VE
LA
R
C H
ER
B
LV
D
BACK BAY OF BILOXI
CSX RAILROAD
C
AI
LL
AV
ET
S
T.
PROJECT
LOCATION
MISSISSIPPI SOUND
KEESLER A.F.B.
BILOXI, MS 39534
AutoCAD SHX Text N O R T H
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text 14208
AutoCAD SHX Text 7/14/22
BM6
27+00 28+00 29+00 30+00 31+00 32+00
BM3
BM5
APPROX. 400 S.F. RIP RAP FILL MATERIAL
TO BE EXCAVATED
NOTES:
1. CONTRACTOR TO REMOVE ALL TREES, SHRUBS, AND BRUSH
FROM DETENTION BASIN. ALL DEBRIS SHALL BE REMOVED FROM
PROJECT AREA PRIOR TO PROJECT COMPLETION.
2. EXISTING RIPRAP TO BE RELOCATED TO END OF EXISTING PIPE
OUTFALLS IN BASIN AND PLACED IN A UNIFORM MANNER TO ENSURE
TIRE EQUIPMENT CAN MANEUVER OVER RIPRAP. C-111
EX
IS
TIN
G
C O
N D
ITI
O
N S/
D
EM
O
LI
TIO
N
P
LA
N
1" = 20'
BEARINGS, DISTANCES, AND COORDINATE VALUES ARE
BASED ON THE MISSISSIPPI STATE PLANE GRID
COORDINATE SYSTEM, NAD '83, EAST ZONE (2301), U.S.
SURVEY FEET, AND WERE DERIVED USING A TOPCON
HIPER VR SERIES GPS RECEIVER UTILIZING THE REAL
TIME NETWORK ADMINISTERED BY EARL DUDLEY, INC.
ELEVATIONS ARE NAVD '88, (EPOCH 2009.55), GEOID 18.
BVN
BJS
07/14/2022
DWG\3772 - DTN BASIN
CAD
ENG
DATE
SCALE
BMA#
FILE
D
IV
IS
IO
N S
TR
EE
T
- K
A
FB
D
ET
EN
TIO
N B
A
SI
N
IM
PR
O
V
EM
EN
TS
BI
LO
XI
, M
IS
SI
SS
IP
PI
w w w .b m a e n g in e e rs .c o m
SHEET
REV BY
SEAL
BR
O
W N
, M
ITC
H
EL
L
A
LE
XA
N
D
ER
, I N
C
C O
N
SU
LT
IN
G E
N G
IN
EE
R S
DATE
P a sc a g o u la
M
S
(2 )8
-7
M a rk e t
S tr e e t
R u e
M a g n o lia B ilo xi
M
S
(2 )4
-7
C o w n
R o a d
Su ite
A
G u lfp o rt
M
S
(2 )8
-7
SEE NOTE 1 SEE NOTE 1
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
GEN. PAD
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text
GEN. PAD
AutoCAD SHX Text
GEN. PAD
AutoCAD SHX Text ±585'
AutoCAD SHX Text ±715'
AutoCAD SHX Text
EXIST. DETENTION BASIN
AutoCAD SHX Text
EXIST. PERIMETER FENCE
AutoCAD SHX Text
EXIST. CONCRETE FLUME
AutoCAD SHX Text
RIP RAP FILL MATERIAL
AutoCAD SHX Text
WASHOUT AREA
AutoCAD SHX Text
WASHOUT AREA
AutoCAD SHX Text
WASHOUT AREA
AutoCAD SHX Text COORDINATES & ELEVATIONS ARE BASED ON THE MISSISSIPPI STATE PLANE GRID, EAST ZONE (2301), NAD '83 U.S. FEET, GEOID 2012B
AutoCAD SHX Text
SITE CONTROL / BENCH MARK TABLE
AutoCAD SHX Text N O R T H
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 1" = 20'
AutoCAD SHX Text
BM3 MAG NAIL SET IN PAVEMENT N= 328,331.19 E= 960,518.05 ELEV= 15.27'
AutoCAD SHX Text
BM5 IRON ROD SET N= 328,146.36 E= 961,802.66 ELEV= 14.08'
AutoCAD SHX Text
BM6 IRON ROD SET N= 328,119.55 E= 961,111.67 ELEV= 16.88'
AutoCAD SHX Text THE PROFESSIONAL ENGINEERING SERVICES PROVIDED BY BROWN, MITCHELL & ALEXANDER, INC.,(BMA) ARE RELATIVE TO THESE FINAL DRAWINGS AS SHOWN. ANY MODIFICATIONS TO THE DRAWINGS & ASSOCIATED SPECIFICATIONS AS PREPARED BY BMA WITHOUT THE WRITTEN CONSENT OF BMA, SHALL RELIEVE BMA OF ANY & ALL LIABILITY AS A RESULT OF ANY SUCH MODIFICATIONS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"=10'
AutoCAD SHX Text 1"=20'
AutoCAD SHX Text 1"=30'
AutoCAD SHX Text 1"=40'
AutoCAD SHX Text 1"=50'
AutoCAD SHX Text 1"=60'
AutoCAD SHX Text 1"=100'
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text 14208
7/14/22
BM6
27+00 28+00 29+00 30+00 31+00 32+00
BM3
BM5
75.00'
.0
0'
.0
0'
.0
0'
45.00'
RE-ESTABLISH SLOPE & PROVIDE
SLOPE TREATMENT
(SEE DETAIL)
N= 328094.40 E= 961291.94
N= 328113.34 E= 961253.44
N= 328150.24 E= 960886.81
BEGIN NEW 5' WIDE FLUME
N= 328081.51 E= 961190.64
5.00'RE-ESTABLISH SLOPE & PROVIDE
SLOPE TREATMENT
(SEE DETAIL)
NEW 5' WIDE
FLUME REQ'D
END NEW 5' WIDE FLUME
N= 328083.97 E= 961389.02
±3.50'
15.00'
CONC. FLUME AND RIPRAP
REQ'D (TYP.)
30.00'
CONC. FLUME AND RIPRAP
REQ'D (TYP.)
C-121
SI
TE
L A
YO
UT
P
LA
N
1" = 20'
BEARINGS, DISTANCES, AND COORDINATE VALUES ARE
BASED ON THE MISSISSIPPI STATE PLANE GRID
COORDINATE SYSTEM, NAD '83, EAST ZONE (2301), U.S.
SURVEY FEET, AND WERE DERIVED USING A TOPCON
HIPER VR SERIES GPS RECEIVER UTILIZING THE REAL
TIME NETWORK ADMINISTERED BY EARL DUDLEY, INC.
ELEVATIONS ARE NAVD '88, (EPOCH 2009.55), GEOID 18.
BVN
BJS
07/14/2022
DWG\3772 - DTN BASIN
CAD
ENG
DATE
SCALE
BMA#
FILE
D
IV
IS
IO
N S
TR
EE
T
- K
A
FB
D
ET
EN
TIO
N B
A
SI
N
IM
PR
O
V
EM
EN
TS
BI
LO
XI
, M
IS
SI
SS
IP
PI
w w w .b m a e n g in e e rs .c o m
SHEET
REV BY
SEAL
BR
O
W N
, M
ITC
H
EL
L
A
LE
XA
N
D
ER
, I N
C
C O
N
SU
LT
IN
G E
N G
IN
EE
R S
DATE
P a sc a g o u la
M
S
(2
)8
-7
M a rk e t
S tr e e t
R u e
M g n o lia B ilo xi
M
S
(2 )4
-7
C o w n
R o a d
Su ite
A
G u lfp o rt
M
S
(2 )8
-7
4" TOPSOIL REQ'D
STRAW ROLL REQ'D
UNTIL VEGETATION
HAS ESTABLISHED
CONC. FLUME
REQ'D
±10'
±3.50' ±30.00'
BORROW MATERIAL REQ'D
TO RE-ESTABLISH
PLAN SLOPE
A
NOTES:
1. CONTRACTOR SHALL INSPECT BASIN SLOPES AND BOTTOM AND RE-GRADE
AS NEEDED TO ENSURE A SMOOTH SURFACE, FREE OF GRADE CHANGES
UNSUITABLE FOR LOW PROFILE MAINTENANCE EQUIPMENT.
2. CONTRACTOR SHALL SOD AND STAKE ALL AREAS WITHIN PROJECT LIMITS
WHERE GROUND COVER IS INSUFFICIENT TO PREVENT SOIL EROSION.
10.00'
(TYP.) 10
.0 0'
(T
YP
SOD ALL DISTURBED
AREAS. SOD STAKES
REQ'D.
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
GEN. PAD
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text
GEN. PAD
AutoCAD SHX Text
GEN. PAD
AutoCAD SHX Text ±585'
AutoCAD SHX Text ±715'
AutoCAD SHX Text
EXIST. DETENTION BASIN
AutoCAD SHX Text
EXIST. PERIMETER FENCE
AutoCAD SHX Text
EXIST. CONCRETE FLUME
AutoCAD SHX Text COORDINATES & ELEVATIONS ARE BASED ON THE MISSISSIPPI STATE PLANE GRID, EAST ZONE (2301), NAD '83 U.S. FEET, GEOID 2012B
AutoCAD SHX Text
SITE CONTROL / BENCH MARK TABLE
AutoCAD SHX Text N O R T H
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text 1" = 20'
AutoCAD SHX Text
BM3 MAG NAIL SET IN PAVEMENT N= 328,331.19 E= 960,518.05 ELEV= 15.27'
AutoCAD SHX Text
BM5 IRON ROD SET N= 328,146.36 E= 961,802.66 ELEV= 14.08'
AutoCAD SHX Text
BM6 IRON ROD SET N= 328,119.55 E= 961,111.67 ELEV= 16.88'
AutoCAD SHX Text THE PROFESSIONAL ENGINEERING SERVICES PROVIDED BY BROWN, MITCHELL & ALEXANDER, INC.,(BMA) ARE RELATIVE TO THESE FINAL DRAWINGS AS SHOWN. ANY MODIFICATIONS TO THE DRAWINGS & ASSOCIATED SPECIFICATIONS AS PREPARED BY BMA WITHOUT THE WRITTEN CONSENT OF BMA, SHALL RELIEVE BMA OF ANY & ALL LIABILITY AS A RESULT OF ANY SUCH MODIFICATIONS.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"=10'
AutoCAD SHX Text 1"=20'
AutoCAD SHX Text 1"=30'
AutoCAD SHX Text 1"=40'
AutoCAD SHX Text 1"=50'
AutoCAD SHX Text 1"=60'
AutoCAD SHX Text 1"=100'
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text 14208
AutoCAD SHX Text 7/14/22
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
FLUME SECTION
AutoCAD SHX Text 5'
AutoCAD SHX Text 3-#4 BARS CONTINUOUS w/ #4 TIES AT 24"
AutoCAD SHX Text
WASH-OUT OR RIP-RAP FILLED WASH-OUT AREAS (SEE PLAN)
AutoCAD SHX Text
EXIST. FENCE WITH MOW STRIP
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
TREATMENT DETAIL
AutoCAD SHX Text
BASIN SLOPE
AutoCAD SHX Text NOTES: 1. REFER TO PLANS FOR LIMITS OF TREATMENT. REFER TO PLANS FOR LIMITS OF TREATMENT. 2. EROSION CONTROL MATERIAL AND STRAW ROLLS SHALL EXTEND 3 EROSION CONTROL MATERIAL AND STRAW ROLLS SHALL EXTEND 3 TIMES THE WIDTH OF WASH-OUT 3. MATERIALS: MATERIALS: *BORROW MAT'L SHALL BE GRANULAR MATERIAL WITH MAX % PASSING #200 SIEVE = 35% MAX. PI = 20 *TOPSOIL MAT'L SHALL BE A WELL-GRADED SOIL OF UNIFORM WORKABLE QUALITY, FREE OF DEBRIS, REFUSE, OR ANY MATERIALS HARMFUL TO PLANT LIFE *EROSION CONTROL BLANKET SHALL BE A DOUBLE-NET EROSION CONTROL BLANKET OF 100% AGRICULTURAL STRAW WITH FUNCTIONAL LONGEVITY OF 12 MONTHS, AND MEETING SPECIFICATION REQUIREMENTS OF TYPE 2.D FABRIC BY EROSION CONTROL TECHNOLOGY COUNCIL *STRAW ROLL SHALL BE 9" DIAMETER, 25' LONG ROLLS, AND CERTIFIED WEED FREE. WATTLES SHALL BE SHALL BE STAKED @ 4' O.C.
AutoCAD SHX Text
CONC. FLUME
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
FLUME SECTION AT SLOPE
AutoCAD SHX Text
MATCH SLOPE OF BASIN
AutoCAD SHX Text
RIPRAP REQ'D
AutoCAD SHX Text
GEOTEXTILE FABRIC REQ'D
AutoCAD SHX Text A
AutoCAD SHX Text A
1. GEOTEXTILE FABRIC SHALL BE A NON-WOVEN FABRIC MEETING AASHTO CLASS 1 REQUIREMENTS AND HAVING AN UNIT WEIGHT OF 7 OZ/SY. 2. RIPRAP SHALL BE 50 LBS NOMINAL SIZE STONE WITH NO STONES LARGER THAN 150 LBS AND NO MORE THAN 10% OF TOTAL WEIGHT LESS THAN 2 LBS.
| 3772 - DTN BASIN-C-001 |
| Sheets and Views |
| C-001 |
| 3772 - DTN BASIN-C-111 |
| Sheets and Views |
| C-111 |
| 3772 - DTN BASIN-C-121 |
| Sheets and Views |
| C-121 |
File details come from the government source that posted it. Updated .