Attachment 3 - MAHG211131A Division Street Sidewalks MSS.pdf
PDF 98 KB Posted
- Attached to
- Construct Division Street Sidewalks
- Solicitation number
- FA301022R0040
About this file
This document contains a material submittals schedule and information on a federal contract opportunity to construct sidewalks at Keesler Air Force Base. The material submittals schedule lists items required for the project such as concrete, reinforcing fibers, joint sealant, and detectable warning surfaces. It requires the contractor to submit items such as certificates of compliance, shop drawings, test reports, samples, and warranties by specified return dates.
The federal contract opportunity is to construct a sidewalk, monument wall, and repair a catch basin for Division Street at Keesler AFB. Issued by the Department of the Air Force Air Education and Training Command, the solicitation number is FA301022R0040. As a HUBZone small business set aside using PPT procedures, interested HUBZone sources may submit a proposal. The NAICS code is 237310 and size standard is $39.5 million. The estimated value is between $500,000 and $1 million. The solicitation package and drawings will be posted on August 15th with a closing date of September 14th and 120 day performance period after award. Interested parties must register in SAM and check the website for amendments. Inquiries can be directed to the specified contracting specialist and officer.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
1 CONCRETE √ √
2 REINFORCING FIBERS √ √
3 JOINT SEALANT √
4 PRE-MOLDED EXPANSION JOINT
FILLER
5 CURING COMPOUND √
6 DETECTABLE WARNING
SURFACES
7 GATE WITH HARDWARE √ √ √ √
8 FENCE √ √ √ √
9 FENCE REINFORCING STEEL √ √
10 SILT FENCE √
11 INLET PROTECTION √
R et ur n Su sp en se D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
C ol or S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
W ar ra nt y- M an uf ac tu re r a nd /o r W or km an sh ip
C at al og
D at a
Project Number: Project Title:
KAFB - Sidewalk Project
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
R eq ui re d Su bm is si on
D at e
Item or Description of Item, Contract Reference, Type of Submittal
C er tif ic at e of C om pl ia nc e
Sh op
D ra w in gs
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
C on tra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required (if not electronically submitted)
D at e R ec ei ve d in C on tra ct in g
Fi el d R ep or ts
O pe ra tin g In st ru ct io ns
Sc he du le s, L is tin gs , R ep or ts , P la ns
Material Submittals Schedule
File details come from the government source that posted it. Updated .