ATTACHMENT 7 - Drawings - Part 6.pdf
PDF 14 MB Posted
- Solicitation number
- 36C77623B0029
About this file
This file attachment relates to a federal solicitation for construction services. The Bay Pines Veterans Affairs Medical Center is seeking a general contractor to construct a new Dental Clinic, including general construction, mechanical, electrical and plumbing work. The project scope also involves demolition of an existing modular building, selected site utilities and concrete work, a gravel parking lot with permeable pavement, and select landscaping including trees. Responses are due under Solicitation Number 36C77623B0029 by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The selected contractor will be responsible for furnishing all labor, materials, equipment and supervision to complete the dental clinic construction project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Concrete Slab
Finish Ceiling
Structure Above
S1.0S1.1S1.2S2.0S4.0-F
E1.0E2.0E3.1 E3.0
2-HR Fire Rated Barrier
UL U419
Exterior Interior
9.21
5.06
9.21
7.13
7.827.82
7.827.82
7.827.82
7.827.82
7.14
5.07
9.219.21
7.827.82
7.827.82
7.13
5.06
9.219.21
10.24
4 7/8"
3 5/8"6"
7 1/4"
3 5/8"
5 3/16"
3 5/8"
4 1/4" 3 5/8"
6 1/8"
7.82
9.21
5.06
7.13
7.827.82
9.219.21 9.219.21
9.02
7.13
10 1/4"
7 5/8"
7.12
4.13
7.12
4.15
9.05
7.23
Exterior Interior
11 5/8"
1'-3 3/4"
Exterior Interior
6"
8 1/4"
6.19
5.07
6.19
9.42
9.21
7.12
5.07 7.14
7.14
6.19
9.42
5.03
6"
11 5/8"
Exterior Interior
S1.0-N
9.21
9.02
9.21
7.13
7.827.82
7.827.82
4 7/8"
3 5/8"
Non-Rated Smoke PartitionS1.3
7.827.82
7.82
7.13
5.06
9.219.219.21
3 5/8"
5 1/2"
S2.1
3 5/8"
4 7/8"
7.82
9.21
5.06
7.13
9.21
UL 752 Level 2 Bullet Resistant Barrier
E2.1
7.12
3.06
9.05
7.23
Exterior Interior
1'-4 1/8"
1'-0"
7.37 7.37
9.42
7.37
7.37
7.37
Conference, Break Room, Toilet Room Side
Corridor & Office Side
UL: HW-D-#### Series Fire Proofing
5.039.04
7.35
7.73 7.73 9.049.049.049.047.827.829.049.049.04
Exterior Interior
M1.0
E2.2
7.12
3.06
7.34
Exterior Interior
1'-2"
Exterior Interior
6"
10 3/4"
9.21
7.12
5.07
6.19
5.03
7.34
7.14
E4.0
1'-0"
7 5/8"
11 1/8"
4.13
9.05
6.19
7.12
7.827.82
Exterior Interior
M1.1
7 5/8"
9 1/8"
4.13
9.05
6.19
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:3
:4
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
WALL TYPES
AE001
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
3.06 Concrete building frame. See Structural Drawings.
4.13 8" concrete masonry unit. See Structural Drawings.
4.15 12" concrete masonry unit. See Structural Drawings.
5.03 Metal deck. See Structural Drawings.
5.06 3-5/8" cold formed metal framing @ 16" O.C. See Structural Drawings.
5.07 6" cold formed metal framing @ 16" O.C. See Structural Drawings.
6.19 5/8" exterior glass matt gypsum board sheathing. Seal all joints.
7.12 Rigid thermal wall insulation, R-12 min.
7.13 Batt thermal wall insulation. R-11 min.
7.14 Batt thermal wall insulation. R-19 min.
7.23 Fiber cement rain screen.
7.34 KEE single-ply roofing membrane.
7.35 Mineral wool insulation
7.37 Continuous fluid-applied air and moisture barrier.
7.73 Spray-applied fireproofing, as required by UL listing.
7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.04 Slip type deflection track.
9.05 7/8" Aluminum hat channel furring @ 16" O.C.
9.21 5/8" Type X gypsum board.
9.42 STP water-resistive barrier on 3 coats of white stucco (Brown, Scratch, Finish), on metal lath.
10.24 5/16" bullet resistant fiberglass panel, UL 752 level-2 min.
Install to manufacturer's specification.
DETAIL NOTES
Scale: 1" = 1'-0"
WALL TYPES
Revisions Date
AE301
AE301
B2
B2
B3
B3
B4
B4
B5
B5
B6
B6
A2 A2
A3 A3
B7
B7
B.5
A.5 A.5
A4.5 A4.5
B8
B8
A1
A1.5
A3.5
A4 A4
Waiting
Special Needs Treatment
Treatment
Treatment
Treatment
Treatment
Treatment
Treatment
Treatment
Oral Surgery
Oral Surgery
Equipment Storage
Mechanical
Medical Mechanical
Dental Laboratory
Mens Locker Room
Staff Toilet
133A
Staff Toilet
135A
Supervisor Office
111A
AO Office
111B
Assistant Director Office
111C
HAC
Dirty Storage
Clean Linen
Data
Sterile Instrument
Storage
Treatment
Treatment
Treatment
Treatment
Treatment
Treatment
Treatment
Clean Storage
Vestibule
100A
Corridor
C-2
Corridor
C-1
Corridor
C-3
Corridor
C-4
B1
B1
A2.7
A2.3
AE301
AE301
CT/Cone Beam
Radiographic Panoramic
Reception
Workstation
111N
Workstation
111M
Workstation
111L
Workstation
111K
Workstation
111J
Workstation
111I
Business Office
Unisex Toilet
Unisex Toilet
Conference
111G
Elec
Director's Office
111D
Break Room
111F
Staff Toilet
111E
Workstation
111O Womens Locker Room
Alcove
111Q
Align Align
Align
A lig n
Wheelchair Alcove
100B
Roof Hatch
/2
/8
/1
/1
/8
/8
/8
/8
/8
/8
/8
/8
5'-8" 9'-11 5/8" 2'-8 3/8" 4'-0" 4'-4 1/4"
4'-0" R.O.
3'-3"
3'-7 7/8" 4'-0" R.O.
3'-3 5/8" 3'-7 1/4"
4'-0" R.O.
3'-3"
3'-7 7/8" 4'-0" R.O.
3'-3"
3'-7 7/8" 4'-0" R.O.
3'-3" 3'-7 7/8"
4'-0" R.O.
3'-3 5/8" 3'-7 1/4"
4'-0" R.O.
3'-3"
24'-11 1/2" 1'-11 5/8"
4'-0" R.O.
3'-4"
4'-0" R.O.
3'-4"
4'-0" R.O.
1'-5 5/8"
17'-10 3/8"
1'-8" 5'-0" 5'-0" 5'-0"
1'-8"
4'-11 5/8"
3'-4 5/8"
4'-0" R.O.
3'-3"
3'-7 7/8"
4'-0" R.O.
3'-3"
3'-7 7/8"
4'-0" R.O.
3'-3" 3'-7 7/8"
4'-0" R.O.
3'-3" 3'-7 7/8"
4'-0" R.O.
3'-3" 3'-7 7/8"
4'-0" R.O.
3'-3"
3'-7 7/8"
4'-0" R.O.
3'-3"
3'-7 7/8"
4'-0" R.O.
3'-3"
14'-0 5/8" 16'-1 3/8" 15'-3 7/8" 8'-6 3/8"
1'-5 3/4" 5'-6 1/4"
3'-3 5/8" 8'-0 3/8"
/8
/8
/8
/2
/4
/8
/8
/4
/2
/8
/2
Align
3'-10 1/2" 4'-1 3/8"
1'-0 3/8"
6'-0 5/16"
1'-0 3/8"
10'-2 15/16" 9'-11 5/8" 10 5/8" 10 5/8" 10'-1 3/8" 9'-11 1/8"
10 5/8"
5 3/4" 12'-1" 8'-4 3/8"
10 5/8" 10 5/8"
10'-6 7/8" 6'-0" 6'-8 7/8"
10 1/2" 10 1/2"
11'-0 1/8" 7'-4 7/8" 2'-8 3/8" 16'-5 9/16" 1'-2 3/8"
/8
/8
T y p
/8
/8
/2
/2
/8
/8
/8
T y p
/8
/8
/4
/4
/8
/4
/8 " 1
/8
/8
5'-10 7/8" 3'-4 1/8" 10 5/8"
3'-10 1/2" 4'-1 3/8" 1'-0 3/8"
6'-0 5/16"
1'-1"
10'-4 3/8" 4'-0" 4'-5 1/2" 9 15/16"
1'-4 3/4" 11 1/8" 7'-2 9/16" 11'-11 7/16"
1'-8 5/8" 10 5/8" 11'-8 1/8" 7'-10 1/2"
1'-4 1/2" 3'-7 1/2" 7'-10" 6'-0" 3'-8 1/2"
3'-10 7/8"
5 3/4" 9'-4 7/8" 9'-4 7/8"
2'-8 3/8"
4'-6" 6'-0" 5'-11 9/16" 1'-2 3/8"
12'-6"
/8
/4
/8
/8
/8
8'-4 3/16" 1'-8 1/2"
8'-4 3/16"
/8
/8
/8
/8
10 1/2" 10 1/2"
7'-8 7/8"
2'-7 1/2"
4'-0" 5 1/2" 4'-0"
2'-7 1/2"
7'-8 7/8"
/8
3 13/16" EQ. EQ.EQ. EQ. EQ. EQ.
2 7/16"
3 13/16" 2 7/16"EQ. 3 13/16"
/1
/1 "3 13/16"6'-2 5/16"3 13/16"
5 13/16"
EQ.EQ.EQ.EQ.EQ. EQ.EQ. EQ.
7 13/16"
/8
/1
/1
/2
R
.O
/8
/2
R
.O
/8
10'-1 9/16" 11 1/8"
3"
6" 4' - 0"
22' - 4" 102' - 0" 39' - 11 5/8"
/4
R .O
R .O
/4
/2
R .O
/8
R .O
/4
R .O
/8
R .O
/4
18' - 4" 106' - 0" 39' - 11 5/8"
/2
1'-7 5/8"
/2
1'-7 5/8"
/2
/4
/8
/8
3'-3 7/8"
1'-6 1/16"
4 1/4" 1/2"
3 13/16"
3 13/16" 6'-5 7/16"
/1
/4
/2
/1
/1
/1
/1
/2
/4
/1
A2
A3
A1.5
A3.5
A4
B1
A2.7
A2.3
AE301
AE301
AE301
AE301
Waiting
10'-4"
A lig n
/1
6 13/16"
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:3
:4
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
DIMENSION PLAN
AE101-D
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
N Scale: 1/8" = 1'-0"1 Dimension Plan
GENERAL PLAN NOTES
N Scale: 1/8" = 1'-0"2 Clerestory - Waiting Room
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All blocking to be metal stud.
D. First floor level 100'-0" equals 11'-0" NAVD.
E. All partitions shall be type 'S1.0' unless noted otherwise.
F. Contractor to assume gridlines are located on metal stud or unit masonry centerlines.
UP
AE301
AE301
B2
B2
B3
B3
B4
B4
B5
B5
B6
B6
A2 A2
A3 A3
Waiting
Special Needs Treatment
Treatment
Oral Surgery
Oral Surgery
Equipment Storage
Mechanical
Medical Mechanical
Dental Laboratory
Mens Locker Room
Staff Toilet
133A
Staff Toilet
135A
Supervisor Office
111A
AO Office
111B
Assistant Director Office
111C
HAC
Dirty Storage
Clean Linen
Data
Clean Storage
Vestibule
100A Corridor
C-2
Corridor
C-1
Corridor
C-3
Corridor
C-4
B7
B7
B.5
A.5 A.5
A4.5 A4.5
B8
B8
A1 A1
A1.5
A3.5
A4 A4
B1
A2.7
A2.3
CT/Cone Beam
Radiographic Panoramic
Reception
Business Office
Unisex Toilet
Unisex Toilet
Conference
111G
Elec
Director's Office
111D
Break Room
111F
Staff Toilet
111E
AE301
AE301
AE301
AE301
AI402
A
Treatment
Treatment
Treatment
Treatment
Treatment
Treatment
Sterile Instrument
Storage
Treatment
Treatment
Treatment
Treatment
Treatment
Treatment
Treatment
AI402
C
AI401
C
AI402
B
Alcove
111Q
Womens Locker Room
100B
C-2
121A
140 136
103A 111I
111B 111C111A
103B
111J
111H
111E
111G
111D 111F
C-4B
135A
135133
133A
J J J
H
H
G
G
H
F
E D
C
A
K
L
Workstation
111N
Workstation
111M
Workstation
111L
Workstation
111K
Workstation
111J
Workstation
111I
Workstation
111O
Resident Workstations
111P
9.45
9.45
9.46 9.46
9.459.46
9.45 9.45
9.45 9.46
AI401
A
A I4
AI402
AE311
AI401
B
Wheelchair Alcove
100B
111CD
9.45 9.45
9.45 9.45
9.459.45 9.459.45
22.07
22.07
22.07
Roof Hatch
9.45
111Q
120 124 126
C-1 C-4A
I
M M M M M M M
M M M M M M M M
AE314
E2.1
E2.0
E2.0
E2.0
E2.0
E2.0
E2.0
E2.0
E1.0
E1.0
E1.0
E1.0
E1.0
E1.0
E1.0
E1.0
E1.0
E1.0
E1.0
E1.0
S2.0
S2.0 S2.0
S2.0
S2.0
S2.0
S2.0
S2.0 S2.0S2.0
S2.0
S2.0
S1.1
S2.0S2.0
S2.0S2.0 S2.0 S2.0S2.0
S2.1
S1.3
S2.1
S1.3
S1.3S1.3 S1.3S1.3
S1.3S1.3
S2.0
S2.0
S2.0 S2.0
S1.2
S1.2
S1.2
S1.2
S2.0
S4.0-FS4.0-FS4.0-F
S2.0
S2.0S2.0 S2.0
S1.0-NS1.0-N
S2.0
S1.1S1.0-N
S1.0-N S1.0-N
S1.0-NS1.0-NS1.0-N
S1.0-N
S1.1
S1.0-NS1.0-NS4.0-FS4.0-FS4.0-F
S2.0
S2.0
S2.0
100A
S2.0
S2.0
E1.0S2.0
S2.0
S1.0-N
S1.0-N
S2.0 S2.0
S2.0
S1.0-NS1.0-N
S1.2
S1.2S1.2
S2.0
P P
S1.3
3 sides
3 sides
3 sides
All sides of Chase
All sides of Chase
All sides of HAC
3 sides
10.03
10.40
10.40 10.40
10.4010.40
10.2610.26
10.26 10.26
10.26
10.2610.26
137A
A I4
AE314
AI402
C
AI403
B Sim.
AI403
B Sim.
AI403
A Sim.
AI403
A Sim.
Typ.
Treatment Rooms
M1.0
AE101-N
5.175.175.175.17
L1
L2
AI403
B
10.30
S1.3
C.J. C.J. C.J. C.J. C.J. C.J. C.J. C.J.
C.J. C.J. C.J.
C.J.
C.J.
C.J.
C.J.
C.J.
C.J.C.J.
C.J.C.J.
C.J.C.J.C.J.C.J.C.J.C.J.C.J.C.J.
AE313
Waiting
/4
1/4" / 12"
S2.0S2.0S2.0S2.0 6.276.276.276.27
L3
S1.1
S1.1
M1.1 S2.0
S2.0
M1.1
M1.1 M1.1
S2.0
M1.1M1.1M1.1
M1.1 S2.0S2.0S2.0
M1.1
S2.0
S2.0
S2.0
A2
A3
A1.5
A3.5
A4
B1
A2.7
A2.3
AE301
AE301
AE301
AE301
Waiting
B
S2.0
9.249.249.249.24
S2.0
E2.2
7.307.307.30
7.53
7.53
B6
A2
10" 1'-4"
10" 6"
S1.0-NS1.0-N
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:3
:5
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
NOTE PLAN
AE101-N
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
N Scale: 1/8" = 1'-0"1 Note Plan
5.17 1-1/2" I.D. Stainless Steel handrail. See Sheet AE/311.
6.27 Install Data equipment on 3/4" Fire Retardant Plywood
Sheathing, approved by VA. Coordinate plywood install with Data Contractor.
7.30 KEE roofing assembly. See Roof General Notes on Sheet
AE103.
7.53 Prefinished 6" aluminum gravel stop fascia. Install to
Manufacture's Specifications. Color to chosen from Manufacture's full color spectrum.
9.24 Double 5/8" gypsum board on 362S162 metal stud, 16" O.C.
Paint on top side of gypsum board "DO NOT STAND OR
STORE ITEMS"
9.45 Vertical gypsum control joint extending from corner of door frame.
9.46 Vertical gypsum control joint full height of wall. Control joint every 20'-0" O.C.of gypsum board.
10.03 8' x 4' x 1" Opaque Resin Wall. Mount wall to floor and ceiling using manufacturer provided mounting hardware. Contractor to coordinate etched relief design with VA, installation with Casework installation, and additional ceiling support with steel stud contractor.
10.26 UL 752 ballistic paneling to be installed uninterrupted behind wall..
10.30 Mop/Broom Holder with shelf and hooks.
10.40 Recessed fire extinguisher cabinet.
22.07 Countertop mounted Emergency Eyewash. See Plumbing
Drawings.
PLAN NOTES
GENERAL PLAN NOTES
N Scale: 1/8" = 1'-0"2 Clerestory - Waiting Room
N Scale: 1/4" = 1'-0"3 Enlarged Plan - Roof Access
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All blocking to be metal stud.
D. First floor level 100'-0" equals 11'-0" NAVD.
E. All partitions shall be type 'S1.0' unless noted otherwise.
F. Contractor to assume gridlines are located on metal stud or unit masonry centerlines.
AE301
AE301
B2
B2
B3
B3
B4
B4
B5
B5
B6
B6
A2 A2
A3 A3
B7
B7B.5
B.5
A.5
A4.5
B8
B8
A1
A1.5
A3.5
A4 A4
B1
B1
A2.7
A2.3
AE301
AE301
AE301
AE301
/8
AE103
AE103
AE103
1/4" / 12"
/4
/4
/4
/4
3/8" / 12" 5/16" / 12"
1/4" / 12"
1/4" / 12"5/16" / 12"
5/16" / 12"
5/16" / 12"
3/8" / 12"
8" / 12"
8" / 12"
8" / 12"
/4
1/4" / 12"
/4
1/4" / 12"
AE311
1/4" / 12"
/4
/4
/4
/4
/4
/4
/4
/4
/4
7.307.307.307.30 7.30
22.03
22.03 22.03
22.03 22.03
22.03
7.307.307.30
7.53
7.537.53
7.53
7.53
7.53
22.03
22.03
7.517.51
7.517.51 7.67
7.677.67
7.677.677.677.67
7.67
8.18
/4
/4
/4
/4
7.537.53
7.53
7.537.53
7.53
7.537.53
7.53E3.1
5.18
5.18
5.18
1/4" / 12"
/4
/4
/4
/4
/4
10.04 10.04 10.04 10.04
10.0410.0410.04
10.0410.0410.04
AE313
/4
1/4" / 12"
1/4" / 12"
/4
1/4" / 12"
1/4" / 12"
/4
1/4" / 12" 1/4" / 12"
/4
1/4" / 12"
1/4" / 12"
/4
1/4" / 12"
1/4" / 12"
7.307.307.307.30
7.307.307.307.30
7.24 7.24 7.24 7.24 7.24 7.24
22.10 22.10 22.10 22.10 22.10
23.05
23.0523.05
23.05
23.05 23.05
23.05
B3
B3
AE301
AE301
E4.0
E4.0
N
E4.0
8" / 12"
7.307.307.307.30
AE314
AE314
AE301
AE301
A2
A3
AE301
AE301
E4.0
E4.0
O
O
E4.0
AE314
8" / 12"
7.307.307.307.30
AE314
AE314
A2
A3
AE301
AE301
E4.0
E4.0
E4.0
O
O
8" / 12"
7.307.307.307.30
AE314
AE314
AE314
AE301
AE301
B2
B2
B3
B3
B4
B4
B5
B5
B6
B6
A2 A2
A3 A3
B7
B7B.5
B.5
A.5
A4.5
B8
B8
A1
A1.5
A3.5
A4 A4
B1
B1
A2.7
A2.3
AE301
AE301
AE301
AE301
AE3116
AE3135
/8
1/4" / 12"
/4
/4
/4
/4
5/16" / 12" 5/16" / 12"
3/8" / 12"
/4
1/4" / 12"
/4
1/4" / 12"
/4
/4
/4
/4
/4
/4
7.307.307.307.30 7.30
22.03
22.03 22.03
22.03 22.03
22.03
7.307.307.30
7.53
7.537.53
7.53
7.53
7.53
22.03
22.03
7.517.51
7.517.51 7.67
7.677.67
7.677.677.677.67
7.67
8.18
/4
/4
E3.1
5.18
5.18
5.18
/4
1/4" / 12"
1/4" / 12"
/4
1/4" / 12"
1/4" / 12"
/4
1/4" / 12" 1/4" / 12"
/4
1/4" / 12"
1/4" / 12"
/4
1/4" / 12"
1/4" / 12"
7.307.307.307.30
7.307.307.307.30
7.24 7.24 7.24 7.24 7.24 7.24
22.10 22.10 22.10 22.10 22.10
3/8" / 12"
/4
/4
5/16" / 12"
/4
/4
1/4" / 12"
23.0523.05
23.05
23.05
23.05
23.05
23.05
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:5
:5
P M
CONSTRUCT DENTAL CLINIC
02/03/2023
ROOF PLAN
AE103
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
N Scale: 1/8" = 1'-0"1 Roof Plan
5.18 Galvanized Metal Rod. See Structural Drawings
7.24 Prefinished 4" W x 2" H Metal Scupper. Install to Manufacture's Specifications. Color to match front fascia metal. Coordinate Final location with Roof Insulation and Roof Membrane Contractors.
7.30 KEE roofing assembly. See Roof General Notes on Sheet
AE103.
7.51 Prefinished Aluminum Coping. Color to match exterior Stucco.
Wood blocking is prohibited in Project. Coordinate install with roofing membrane contractor.
7.53 Prefinished 6" aluminum gravel stop fascia. Install to
Manufacture's Specifications. Color to chosen from Manufacture's full color spectrum.
7.67 Prefinished aluminum Coping. Color to match Canopy
breakmetal and chosen from Manufacturer's full spectrum of colors. Wood blocking is prohibited in Project. Coordinate install with roofing membrane contractor.
8.18 Roof Hatch and Ladder. 36" x 36"
10.04 Prefinished aluminum bahama style shutters.
22.03 Roof drain and overflow drain. See Plumbing Drawings.
22.10 Scupper roof drain with secured angle clamp. See Plumbing Drawings. Install to Manufacturer's Specifications.
23.05 Mechanical Equipment. See Mechanical Drawings. Cricket roof insulation and membrane around equipment as necessary to prevent ponding or moisture build up.
PLAN NOTES
Scale: 1/8" = 1'-0"2 Roof Monitor
Scale: 1/8" = 1'-0"3 Roof Monitor
Scale: 1/8" = 1'-0"4 Roof Monitor
GENERAL ROOF NOTES
A. All roofing KEE roofing assemblies: KEE single-ply roofing membrane fully adhered to 5/8" exterior-grade gypsum board cap sheet. Cap Sheet fully adhered to polyiso roof insulation. First layer of insulation to be mechanically fastened to metal deck roof. Subsequent layers of insulation to be fully adhered with mechanical fasteners, as needed.
B. Min. 5" Polyiso insulation on building roof. Min 2 layers of insulation.
Stagger insulation joints in all directions.
C. Min. Polyiso insulation thickness on canopy roofs to be as needed for proper drainage to roof drains.
D. All roofs to be sloped 1/4" / 12", unless noted otherwise.
E. Roof Monitors and Clerestory Windows to be removed in Bid Item 3 (Bid Deduct 2). Refer to General Requirements Specification Section
N Scale: 1/8" = 1'-0"5 Roof Plan - Bid Deduct 2
Level 1 100'-0"
Roof - Main 114'-8"
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
B2B3B4B5B6B7 B.5B8 B1
Roof - Waiting 118'-0"
Window Head 108'-0"
ED
J J J
M M M M M M M
7.519.427.239.477.537.34 9.42
9.479.479.479.479.479.479.479.479.479.47
9.47full length of facade full height of wall. Typ.
7.53
5.18
7.67
7.537.53 7.347.34
10' - 10 7/8"10' - 10 7/8"12' - 4 1/4"7' - 4"7' - 4"8' - 10 1/4"
31.0131.0131.01
9.47
22.09 22.09
10.04 10.0410.04
10.04 10.04 10.04 10.04
10.04
10.04 10.04
7.47
Level 1 100'-0"
Roof - Main 114'-8"
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
A2 A3A.5 A4.5A1 A1.5 A3.5 A4A2.7A2.3
Roof - Waiting 118'-0"
Window Head 108'-0"
HHGGHF
7.51
7.677.67
9.42 9.47
9.479.47
9.47
9.42
2.07
7.25
7.53
7.47
5.17
31.0131.0131.01
7.237.237.23 7.237.237.23
10.0410.04
T y p
Level 1 100'-0"
Roof - Main 114'-8"
Parapet - Wating 120'-0"
Grade 98'-0"
Parapet - Main Roof 116'-8"
B2 B3 B4 B5 B6 B7B.5 B8B1
Roof - Waiting 118'-0"
Window Head 108'-0"
C
B
100A
A
M M M M M M M M
7.51 9.42 7.23 9.47
7.23
31.0131.0131.01
5.175.175.175.17
9.47
7.53 7.53 7.53
9.47 9.47 9.479.47
7.34
9.47 9.47 9.47
7.34 7.34
9.47 9.47 9.47
9.479.47 full height of wall. Typ.
full length of facade
7.25
7.53
7.47
5.18
7.53
9' - 4 1/2" 10' - 8" 10' - 8" 9' - 4 1/2"
10' - 11 1/2" Typ.
7.24 7.24 7.24 7.24 7.24
7.47
Level 1 100'-0"
Roof - Main 114'-8"
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
A2A3 A.5A4.5 A1A1.5A3.5A4 A2.7 A2.3
Roof - Waiting 118'-0"
Window Head 108'-0"
I
O O
2.07
L1
L2
137A
C-4A
31.0131.0131.01
9.42 7.67 7.51
9.47 full length of facade
9.42 7.537.34 9.427.51
9.47full height of wall. Typ.
9.47 9.47
9.47 9.47
7.25
5.185.185.18
7.53 10.04
7.47
7.24
7.53
7.47
7.24
L3
T y p
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:0
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
EXTERIOR ELEVATIONS
AE201
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
2.07 Existing solar panel and structure to remain.
5.17 1-1/2" I.D. Stainless Steel handrail. See Sheet AE/311.
5.18 Galvanized Metal Rod. See Structural Drawings
7.23 Fiber cement rain screen.
7.24 Prefinished 4" W x 2" H Metal Scupper. Install to Manufacture's Specifications. Color to match front fascia metal. Coordinate Final location with Roof Insulation and Roof Membrane Contractors.
7.25 Roof Termination, flashing, and counterflashing.
7.34 KEE single-ply roofing membrane.
7.47 3-piece finished break metal aluminum fascia. Color: Tan to match fiber cement boards.
7.51 Prefinished Aluminum Coping. Color to match exterior Stucco.
Wood blocking is prohibited in Project. Coordinate install with roofing membrane contractor.
7.53 Prefinished 6" aluminum gravel stop fascia. Install to
Manufacture's Specifications. Color to chosen from Manufacture's full color spectrum.
7.67 Prefinished aluminum Coping. Color to match Canopy
breakmetal and chosen from Manufacturer's full spectrum of colors. Wood blocking is prohibited in Project. Coordinate install with roofing membrane contractor.
9.42 STP water-resistive barrier on 3 coats of white stucco (Brown, Scratch, Finish), on metal lath.
9.47 1/2" Stucco Control Joint. Align with masonry control joint..
Coordinate with Project Mason.
10.04 Prefinished aluminum bahama style shutters.
22.09 Downspout Nozzle. See Plumbing Drawings.
31.01 Grade shown for reference only. Refer to Civil Drawings for final Grading.
ELEVATION NOTES
Scale: 1/8" = 1'-0"2 North Elevation
Scale: 1/8" = 1'-0"3 West Elevation
Scale: 1/8" = 1'-0"1 South Elevation
Scale: 1/8" = 1'-0"4 East Elevation
N.T.S.Scale:
Key Plan
GENERAL EXTERIOR ELEVATION NOTES
A. Verify all conditions prior to fabrication, erection, and installation.
B. See Structural Drawings for depth of foundations, footings, column sizes, and locations.
C. Align Stucco Control Joints with Masonry Control Joints.
Roof - Main 114'-8"
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
A2 A3A.5 A4.5A1 A1.5 A3.5 A4
Roof - Waiting 118'-0"
Window Head 108'-0"
Treatment
Business Office
111 Corridor
C-2
Corridor
C-1 Treatment
AE311
Sim
AE311
Sim
9.579.579.579.57
Level 1 100'-0"
Roof - Main 114'-8"
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
B2 B3 B4 B5 B6 B7B.5 B8B1
Roof - Waiting 118'-0"
Window Head 108'-0"
AE312
3 AE312
AE313
AE313
AE312
AE313
AE313
Waiting
100 Reception
Workstation
111N
Workstation
111M
Workstation
111L
Workstation
111K
Workstation
111J
Business Office
Conference
111G
Corridor
C-3
Dirty Storage
Mens Locker Room
Womens Locker Room
Mechanical
AE313
9.579.579.57 9.579.579.57 9.579.579.57
Level 1 100'-0"
Roof - Main 114'-8"
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
A2 A3A.5 A4.5A1 A1.5 A3.5 A4A2.7A2.3
Roof - Waiting 118'-0"
Window Head 108'-0"
AE311
Waiting
100 Vestibule
100A
9.46 9.46 9.46
AE313
9.579.579.579.57
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:1
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
BUILDING SECTIONS
AE301
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
9.46 Vertical gypsum control joint full height of wall. Control joint every 20'-0" O.C.of gypsum board.
9.57 5/8" Type X Gypsum Board. Level 5 Finish.
SECTION NOTES
Scale: 1/8" = 1'-0"3 Building Section
Scale: 1/8" = 1'-0"1 Building Section
Scale: 1/8" = 1'-0"2 Building Section
Parapet - Main Roof 116'-8"
Window Head 108'-0"
S2.0
E1.0
1/2"
M
/4
5'-6 7/8" 4 1/4"
/8
AE313
AE313
AE313
AE313
AE313
Scupper
7.307.30
9.41
3.023.02 S2.0 E1.0
3.03
9.55
9.48
5.035.03
3.25
AE313
Scupper
Level 1 100'-0"
Parapet - Wating 120'-0"
Grade 98'-0"
Parapet - Main Roof 116'-8"
M1.0
E3.0
/4
1'-0" 3'-0" 1'-0"
T Y
P
/2
AE313
AE313
Sim
AE313
AE313
AE313
7.307.30
26.01
S2.0S2.0
9.28
B
A
100A
L
100B
3.023.02
4.15
3.03
1/2"
3.25
9.55
/4
T y p
2' - 1"
5.17
3.093.093.093.09
3.10
7.217.307.307.30
9.489.48
/4
/4
/4
/4
3.25
1/2" 1'-0"
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:1
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
WALL SECTIONS
AE311
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
3.02 Concrete slab on grade over vapor barrier over 2" Polyiso Rigid insulation over compacted aggregate base. See Structural Drawings.
3.03 Concrete footing. See Structural Drawings
3.09 Concrete Slab-on-grade. See Structural Drawings. Broom finish.
3.10 Concrete Stairs. Slab-on-grade. Broom finished.
3.25 1/2" expansion material.
4.15 12" concrete masonry unit. See Structural Drawings.
5.03 Metal deck. See Structural Drawings.
5.17 1-1/2" I.D. Stainless Steel handrail. See Sheet AE/311.
7.21 KEE Roofing Assembly. KEE single-play roofing membrane fully adhered to cap sheet. 5/8" gypsum board cap sheet fully adhered to polyiso tapered roof insulation. First layer of tapered roof insulation to be mechanically fastened to metal deck roof.
Subsequent layers of insulation to be fully adheared with mechanical fasteners, as needed. Tapered insulation to be 1/4"/12" slope.
7.30 KEE roofing assembly. See Roof General Notes on Sheet
AE103.
9.28 Gypsum board ceiling.
9.41 Suspended acoustic ceiling tile/grid. See Room Finish
Schedule.
9.48 Linear 6" wide, exterior metal panels and horizontal carriers.
Every other panel running along the edge to be vented. Install to manufacture's specifications to meet Structural windload requirements. See Structural Drawings.
9.55 Epoxy-Acrylate Resin Weather Proofing. Texture and Color to match Stucco.
26.01 Light fixture. See Electrical Drawings.
SECTION NOTES
Scale: 3/4" = 1'-0"1 Wall SectionScale: 3/4" = 1'-0"2
Wall Section
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
B1
Window Head 108'-0"
E3.1
S2.0
8 3/8"
7.307.30
7.30
M in
7.30
9.41
E4.0
5.05
5.19
5.01
7.59
7.25
9.49
7.85
/2
/2
"7.36
7.59
7.51
9.02
9.28
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
B3
E4.0
AE313
AE313
S1.0 S1.0
26.01
9.41
26.01
/8
26.01
9.41
7.307.30
5.19 7.14
N
5.01
5.01
9.02
9.02
108'-11"
5.07
5.05
9.57
9.57 9.57
Level 1 100'-0"
Parapet - Main Roof 116'-8"
B8
Window Head 108'-0"
9'-10 1/4"
AE313
AE313
AE313
AE313
Scupper
8'-0 5/8"
S2.0 E1.0
1/2"3.023.02
4.13
3.03
3.093.09
9.48
7.307.30
5.18
7.307.30
1/2"
3.253.25
AE313
Scupper
1/4" / 12"
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:1
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
WALL SECTIONS
AE312
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
3.02 Concrete slab on grade over vapor barrier over 2" Polyiso Rigid insulation over compacted aggregate base. See Structural Drawings.
3.03 Concrete footing. See Structural Drawings
3.09 Concrete Slab-on-grade. See Structural Drawings. Broom finish.
3.25 1/2" expansion material.
4.13 8" concrete masonry unit. See Structural Drawings.
5.01 Structural steel frame. See Structural Drawings.
5.05 Steel angle. See Structural Drawings.
5.07 6" cold formed metal framing @ 16" O.C. See Structural Drawings.
5.18 Galvanized Metal Rod. See Structural Drawings
5.19 Steel HSS. See Structural Drawings.
7.14 Batt thermal wall insulation. R-19 min.
7.25 Roof Termination, flashing, and counterflashing.
7.30 KEE roofing assembly. See Roof General Notes on Sheet
AE103.
7.36 Run KEE roofing membrane and gypsum coverboard up back
side and over the top of parapet wall. Wood blocking prohibited on project. Coordinate termination of roofing membrane with coping/fascia Contractor.
7.51 Prefinished Aluminum Coping. Color to match exterior Stucco.
Wood blocking is prohibited in Project. Coordinate install with roofing membrane contractor.
7.59 Fiber board cant.
7.85 Continuous sealant.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.28 Gypsum board ceiling.
9.41 Suspended acoustic ceiling tile/grid. See Room Finish
Schedule.
9.48 Linear 6" wide, exterior metal panels and horizontal carriers.
Every other panel running along the edge to be vented. Install to manufacture's specifications to meet Structural windload requirements. See Structural Drawings.
9.49 Stucco weep screed.
9.57 5/8" Type X Gypsum Board. Level 5 Finish.
26.01 Light fixture. See Electrical Drawings.
SECTION NOTES
Scale: 3/4" = 1'-0"3 Wall Section
Scale: 3/4" = 1'-0"2 Wall Section
Scale: 3/4" = 1'-0"1 WS - Rear Overhang
Window Head 108'-0"
/8
/4
/4
/4
/8
7.307.30
5.05
6.19
7.36
7.65 7.53
5.19
9.48
7.47
7.43
5.06
5.28
9.21
9.51
5.065.06
Window Head 108'-0"
E1.0
S2.0
1/2"
9.41
9.21
7.81
8.26
9.52
9.42
7.81
6.03
9.48
5.19
5.05
7.217.21
7.59
7.25
5"
5.06
12.03
9.49
7.85
5.06
M in
2 1/8"
M in
7.53
7.58
8.34
8.26
7.81
9.51
5.07
7.34
7.14
7.307.30
5.19 5.07
7.14
9.21
5.19
5.05
Roof - Main 114'-8"
116'-8"
S1.0
E4.0
8.26
7.50
7.60
7.59
7.66
7.34
7.307.30
5.05
5.01
5.06 12
2"
Parapet - Main Roof 116'-8"
7.307.30
7.59
7.36
/2
/2
S2.0 E1.0
7.67
5.05
4.32
Level 1 100'-0"
/8
5" for S.F. Typ. I
10 1/2"
7.61
8.26
7.81
9.55
4.15
7.85
3.25
3.023.02
Parapet - Main Roof 116'-8"
/8
10 1/2"
M1.0 S2.0
7.37
9.42
7.37
5.07
6.19
9.28
5.06
7.85
8.26
9.52
7.38
8.34
7.81
1/2"
12.03
23.01
Window Head 108'-0"
S2.0 E2.2
9.249.24
9.48
5.19
9.21
8.26
7.85 7.81
9.48
5.19
5.05
7.217.21
7.60
7.50
7.81
8.26
10 1/2"
9.21
7.85
1/2"
9.02
5.065.06
3/4"
5"
S2.0 E1.0
9.53
9.54
3.18
7.81
8.26 7.85
6.28
1/2"
Window Head 108'-0"
/8
/8
7.68
/4
8.26
7.81 9.48
7.81
9.249.24
5.19
9.21 5.06
9.21
5.19
7.13
9.21
7.53
5"
9.029.02
Roof - Main 114'-8"
M i n
8.19
7.59
7.307.30
S1.0-N
5.01
5.05
9.21
5.07 7.14
9.04 Window Head
108'-0"
9.51
9.48
9.519.51
5.19
7.307.30
5.05
7.657.65
/8
/4
/4
/4
/8
/8
7.53
5.06
9.21
7.47
5.28
7.43
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
Roof - Waiting 118'-0"
/2
/2
7.307.30
5.05
7.59
7.36
7.51
E3.0
5.285.28
3.06
9.42
6.19
5.07
7.37
Parapet - Wating 120'-0"
Parapet - Main Roof 116'-8"
/2
/2
E3.0
7.51
5.28
5.28
7.307.30
7.59
7.36
9.52
5.05
5.05
9.42
6.19
5.07
7.37
5.01
Window Head 108'-0"
1/2"
M in
S2.0 E1.0
7.85
9.49
7.25
22.10
7.65
7.65
7.65
7.65
7.307.30
5.19
5.05
5.065.06
9.48
9.47
4.30
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:2
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
SECTION DETAILS
AE313
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
Scale: 1 1/2" = 1'-0"5
SECTION DETAIL - FASCIA
3.02 Concrete slab on grade over vapor barrier over 2" Polyiso Rigid insulation over compacted aggregate base. See Structural Drawings.
3.06 Concrete building frame. See Structural Drawings.
3.18 Precast CMU Sill.
3.25 1/2" expansion material.
4.15 12" concrete masonry unit. See Structural Drawings.
4.30 Grout Solid.
4.32 Masonry Anchor. See Structural Drawings.
5.01 Structural steel frame. See Structural Drawings.
5.05 Steel angle. See Structural Drawings.
5.06 3-5/8" cold formed metal framing @ 16" O.C. See Structural Drawings.
5.07 6" cold formed metal framing @ 16" O.C. See Structural Drawings.
5.19 Steel HSS. See Structural Drawings.
5.28 Clip Angle. See Structural Drawngs.
6.03 Composite Plastic Board
6.19 5/8" exterior glass matt gypsum board sheathing. Seal all joints.
6.28 Solid surface sill.
7.13 Batt thermal wall insulation. R-11 min.
7.14 Batt thermal wall insulation. R-19 min.
7.21 KEE Roofing Assembly. KEE single-play roofing membrane
fully adhered to cap sheet. 5/8" gypsum board cap sheet fully adhered to polyiso tapered roof insulation. First layer of tapered roof insulation to be mechanically fastened to metal deck roof.
Subsequent layers of insulation to be fully adheared with mechanical fasteners, as needed. Tapered insulation to be 1/4"/12" slope.
7.25 Roof Termination, flashing, and counterflashing.
7.30 KEE roofing assembly. See Roof General Notes on Sheet
AE103.
7.34 KEE single-ply roofing membrane.
7.36 Run KEE roofing membrane and gypsum coverboard up back
side and over the top of parapet wall. Wood blocking prohibited on project. Coordinate termination of roofing membrane with coping/fascia Contractor.
7.37 Continuous fluid-applied air and moisture barrier.
7.38 Continuous Fluid-Applied Membrane Flashing all way around rough opening.
7.43 Metal panel closure trim by panel manufacturer. Color to match panel color.
7.47 3-piece finished break metal aluminum fascia. Color: Tan to match fiber cement boards.
7.50 Aluminum sill flashing and counterflashing with end dams.
Finish to match storefront mullions.
7.51 Prefinished Aluminum Coping. Color to match exterior Stucco.
Wood blocking is prohibited in Project. Coordinate install with roofing membrane contractor.
7.53 Prefinished 6" aluminum gravel stop fascia. Install to
Manufacture's Specifications. Color to chosen from Manufacture's full color spectrum.
7.58 Hot weld membrane flashing along all rough opening edges of clerestory storefronts.
7.59 Fiber board cant.
7.60 Termination Bar
7.61 Aluminum sill flashing w/ end dams. Color to match storefront.
7.65 Hot weld membrane flashing.
7.66 Run membrane flashing underneath aluminum sill flashing, from termination bar to back of aluminum sill. Hot weld to steel frame.
7.67 Prefinished aluminum Coping. Color to match Canopy
breakmetal and chosen from Manufacturer's full spectrum of colors. Wood blocking is prohibited in Project. Coordinate install with roofing membrane contractor.
7.68 3-piece prefinished aluminum fascia. Color to match gravel stop.
7.81 Continuous sealant over backer rod.
7.85 Continuous sealant.
8.19 Prefinished 36" X 36" roof hatch.
8.26 5" Aluminum storefront window system.
8.34 Aluminum window flashing. Aluminum finish to match storefront aluminum mullions.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.04 Slip type deflection track.
9.21 5/8" Type X gypsum board.
9.24 Double 5/8" gypsum board on 362S162 metal stud, 16" O.C.
Paint on top side of gypsum board "DO NOT STAND OR
STORE ITEMS"
9.28 Gypsum board ceiling.
9.41 Suspended acoustic ceiling tile/grid. See Room Finish
Schedule.
9.42 STP water-resistive barrier on 3 coats of white stucco (Brown, Scratch, Finish), on metal lath.
9.47 1/2" Stucco Control Joint. Align with masonry control joint..
Coordinate with Project Mason.
9.48 Linear 6" wide, exterior metal panels and horizontal carriers.
Every other panel running along the edge to be vented. Install to manufacture's specifications to meet Structural windload requirements. See Structural Drawings.
9.49 Stucco weep screed.
9.51 5/8" exterior-grade gypsum board.
9.52 Stucco casing bead.
9.53 Stucco control joint.
9.54 1" thick white stucco sill. Color to match exterior stucco.
9.55 Epoxy-Acrylate Resin Weather Proofing. Texture and Color to match Stucco.
12.03 Solar shade assembly w/ fascia. Install per all manufacturers instructions. Motorized solar shade is Waiting Room, manual solar shade in rest of project.
22.10 Scupper roof drain with secured angle clamp. See Plumbing Drawings. Install to Manufacturer's Specifications.
23.01 Mechanical Equipment. See Mechanical Drawings.
PLAN NOTES
Scale: 1 1/2" = 1'-0"7
SECTION DETAIL - HEAD
Scale: 1 1/2" = 1'-0"15
SECTION DETAIL - HEAD
Scale: 1 1/2" = 1'-0"10
SECTION DETAIL - SILL
Scale: 1 1/2" = 1'-0"12
SECTION DETAIL - PARAPET
Scale: 1 1/2" = 1'-0"3
SECTION DETAIL - SILL
Scale: 1 1/2" = 1'-0"13
SECTION DETAIL - HEAD
Scale: 1 1/2" = 1'-0"8
SECTION DETAIL - HEAD/SILL
Scale: 1 1/2" = 1'-0"2
SECTION DETAIL - SILL
Scale: 1 1/2" = 1'-0"9
SECTION DETAIL - HEAD
Scale: 1 1/2" = 1'-0"4
SECTION DETAIL - ROOF HATCH
Scale: 1 1/2" = 1'-0"1
SECTION DETAIL - SCUPPER
Scale: 1 1/2" = 1'-0"11
SECTION DETAIL - PARAPET
Scale: 1 1/2" = 1'-0"14
SECTION DETAIL - HEAD
A. Verify all conditions prior to fabrication, erection, and installation.
B. See Structural Drawings for depth of foundations, footings, column sizes, and locations.
C. Align Stucco Control Joints with Masonry Control Joints.
GENERAL DETAIL NOTES
Scale: 1 1/2" = 1'-0"6 SD - Scupper Roof Drain
5.19
8.26
7.81
8.34
6.19
6.03
8.26
7.81
9.21
7.12
A3.5
5/8"6 1/8"
1/2"
S2.0E2.0
E2.0
/2
7.85
8.26
7.38
7.82
7.39
7.40
7.81
7.28
5.17
/2
E2.0
S2.0
/2
8.32
7.38
7.81
7.85
7.40
7.39
7.85
7.85
/2
10 1/2"
8.33
8.32
8.32
5.19
3"
M1.0
E1.0
S2.0
8.32
7.85
7.81
7.85
A4
S2.0
E1.0
6.03 8.26
7.81
7.85
6.28
9.21
M1.0
S2.0
8.26
7.81
9.02
S2.0
M1.1
A3.5
S2.0
/2
S2.0
E2.1
8.26
9.02
5"
8.26
5.19
8.35
8.26
5"
E4.0
7.58
5.19
5.03
8.34
7.81
8.26
7.85
A3.5
E2.1
S2.0
/2
8.32
7.81
7.85
7.38
7.40
7.39
7.85
/2
/2
2 1/8"
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:2
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
PLAN DETAILS
AE314
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
5.03 Metal deck. See Structural Drawings.
5.17 1-1/2" I.D. Stainless Steel handrail. See Sheet AE/311.
5.19 Steel HSS. See Structural Drawings.
6.03 Composite Plastic Board
6.19 5/8" exterior glass matt gypsum board sheathing. Seal all joints.
6.28 Solid surface sill.
7.12 Rigid thermal wall insulation, R-12 min.
7.28 Fiber Cement board corner trim by Fiber Cement board
manufacture. Install to manufacturer's specifications. Color to be chosen from manufacturer's full spectrum of colors.
7.38 Continuous Fluid-Applied Membrane Flashing all way around rough opening.
7.39 Rainscreen system trim, by rainscreen manufacture.
7.40 Aluminum rainscreen trim. Aluminum finish to match curtainwall aluminum mullions. Extend trim into curtainwall rough opening.
See Detail 12/AE314 for profile.
7.58 Hot weld membrane flashing along all rough opening edges of clerestory storefronts.
7.81 Continuous sealant over backer rod.
7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.
7.85 Continuous sealant.
8.26 5" Aluminum storefront window system.
8.32 10-1/2" Aluminum curtainwall system.
8.33 Aluminum corner trim by curtain wall manufacture. Color to match curtainwall mullions.
8.34 Aluminum window flashing. Aluminum finish to match storefront aluminum mullions.
8.35 Aluminum corner trim by storefront manufacture. Finish to match storefront mullions.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.21 5/8" Type X gypsum board.
PLAN NOTES
GENERAL PLAN NOTES
Scale: 1 1/2" = 1'-0"9
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"4 SD - CMU Corner
Scale: 1 1/2" = 1'-0"7
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"8
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"1
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"11
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"5
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"3
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"6
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"10
PLAN DETAIL - JAMB
Scale: 1 1/2" = 1'-0"2
PLAN DETAIL - JAMB
Scale: 3" = 1'-0"12
PLAN DETAIL - TRIM PROFILE
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All blocking to be metal stud.
D. First floor level 100'-0" equals 11'-0" NAVD.
E. All partitions shall be type 'S1.0' unless noted otherwise.
F. Contractor to assume gridlines are located on metal stud or unit masonry centerlines.
A. Verify all conditions prior to fabrication, erection, and installation.
B. See Structural Drawings for depth of foundations, footings, column sizes, and locations.
C. Align Stucco Control Joints with Masonry Control Joints.
GENERAL DETAIL NOTES
X
X
Toilet Accessory
Equipment
Signage
Keynote
Material Finish
SYMBOL LEGEND
37 3843b
RES-1
3'-0" 2'-9" 2'-9"
W3.1 W3.1 W3.1
44b
44a
3'-0" 2'-9" 2'-9" 3'-6" 3'-6" 2'-6" 3'-6" 3'-6"
43ax2
SS-1
B1.1 B1.1 B1.1 B1.1 B3.1 B1.1 B1.1 x3 x3 61 62 42 39 40b 40ax2 x2
MT-1
M-1
P-1
12.36
J J J
G J
SS-1
MT-1
M-1
48c 48b 48a
2'-6" 3'-0" 3'-0" 3'-0"
B3.1 B2.1
3'-0" 6'-0"
G E
P-1 W3.1
22.07
12.36
J
RES-1
12.38
12.37
5150 51 5252 50
P-1
RES-1
RES-1
50 14
3'-0"3'-0"3'-0"3'-0"
B3.1B3.1
1'-3"3'-5"1'-3"
W3.1 W3.1 W3.1 W3.1
SS-1
F55
12.36
C1.1 C1.1
SS-1
P-1
46 x3 45
RES-1
C1.1
P-1
RF-1
J
E
F
G
Open
P-2
P-2
CG-1 RF-1
3 Sides
P-1
P-3
P-1
RF-1
P-3P-3
P-1
RF-1
AI401
A I4
AI401
A I4
22G
FEJ
A I4
F
E
J
G
Open
P-2
RF-1
P-1
RF-1
P-1
P-3 P-1
RF-1
RF-1RF-1
P-3
P-1
RF-1
AI401
A I4
AI401
A I4
F E J 13 G22
14 12
A I4
1'-3"
B3
P
P-3
PL-1
SS-1
B3
P-3
P
1'-3"
PL-1
SS-1
RF-1
AI401
A I4
AI401
A I4
51 52 50 x4 x3 x4x4 x414
43b 43ax2 x3 37 38 61 62 40b 40ax2 x2
Dental Laboratory
138 47
48b
44b 44a x3
48c
48a
A I4
A I4
F
E
G
G
J
J
43a
1'-6"
B3.1
MT-1
SS-1
OpenOpen
P-1
2'-9"1'-6"
B3.1 B1.1
MT-1
SS-1
43a 37
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:4
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
INTERIOR ELEVATIONS
AI401
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
12.36 Sloped top. Metal to match Metal Manufacture's finish.
12.37 Flammable storage metal cabinet.
12.38 Acid storage metal cabinet.
22.07 Countertop mounted Emergency Eyewash. See Plumbing
Drawings.
ELEVATION NOTES
3 2 1
1516 14 13 C
Scale: 1/4" = 1'-0"
Dental Lab
Scale: 1/4" = 1'-0"
Panoramic Radiology
Scale: 1/4" = 1'-0"
CT: Cone Beam
11 10 9 8 B7
A
GENERAL INTERIOR ELEVATION NOTES
A. See Sheet AI403 for typical mounting height of Accessories.
B. See Sheet AI511 for Casework Details.
C. See Sheet AF101 for Floor Finish Plan and Finish Materials Legend.
D. See Sheet QH701 for Equipment List
E. Provide Water-Resistant Gyp. board tile substrate in all Toilet rooms
F. Paint Hollow Metal doorframes P-6, unless otherwise noted.
X
Toilet Accessory
Equipment
Signage
Keynote
Material Finish
SYMBOL LEGEND
P-1
RF-1
4'-7 3/8" 3'-0"
5c
P-3
E
J
F
G
P-1
RF-1
3'-0"
4'-6"
5a PL-2
PL-25b
SS-2
G FJE
P-1
RF-1
4'-6"
5aPL-2
3'-0"
5b
PL-2
SS-2
P-3
RF-1
M
P-3
M
RF-1
P-3
G
E
J F
PL-2
RF-1
P-1
4'-6"
PL-2
3'-0"
SS-2
5a
5b11
P-3
Open Open
/8
PL-2
PL-2P-3
5c
G 13 FJ
E
P-1
RF-1
1"4'-6"
PL-2
SS-2
3'-0"
PL-2
5a
5b
E
J
F
G
F
J
E
G
A I4
AI402
AI402
A I4
26 10
6'-1 3/8"4 1/4"3"
A I4
A I4
AI402
AI402
G
E
J
F
F
J
G
E
3'-9"3'-0"3'-9"
5'-3 5/16" 5'-3 5/16"
CL
AI402
A I4
AI402
A I4
6 G13 E
EG
42021
5'-4"
J
J
12 6 G
E
SS-1
RF-1
3'-0"
7c PL-2
P-1
J
P-1
SS-1
6.32
2'-0" 3'-6" 3'-6" 3'-6" 2'-0"
3'-6" 3'-6" 3'-6"
7a 7a 7aPL-2
7b 7b7b7b7b
PL-1
E
G
20 2126
RF-1
SS-1
22 33
3'-0"
7c
P-3
J
P-3
RF-1
B3B2
W1 W1
2'-6"3'-0"
4'-7 11/16"2'-6"3'-0"0" Filler
PL-1
SS-1
PL-1
B4
P-2
P-2
P-2
GJ
A D
A
11 Lockers @ 1'-3" ea. = 13'-9" Total
10.53
P-1
PL-3
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:0
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
INTERIOR ELEVATIONS
AI402
ACMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
4 13 2
8 7 6 5
A
B
Scale: 1/4" = 1'-0"
Special Treatment Room
Scale: 1/4" = 1'-0"
Typ. Treatment Room
C
Scale: 1/4" = 1'-0"
Oral Surgery Plan
12 11 10 9
Scale: 1/4" = 1'-0"
Break Room
Scale: 1/4" = 1'-0"
Typical Locker Room
6.32 Sloped top. Finish to match wall cabinet.
10.53 Sloped top by locker manufacturer.
ELEVATION NOTES
GENERAL INTERIOR ELEVATION NOTES
A. See Sheet AI403 for typical mounting height of Accessories.
B. See Sheet AI511 for Casework Details.
C. See Sheet AF101 for Floor Finish Plan and Finish Materials Legend.
D. See Sheet QH701 for Equipment List
E. Provide Water-Resistant Gyp. board tile substrate in all Toilet rooms
8"
1' - 0"
3' - 0"
Note: Flush valve located on accessible side
6"
1' - 6"
B
A
M
IN
D
C
Note:
Beginning of reflective surface
MIN.
7"
E
T o D is p e n s e r
O p e n in g
A D
A
A c c e s s ib le
T o O p e ra b le
M e c h a n is m
G
K
J
Finish Floor
T o O p e ra b le
M e c h a n is m
F H in
T o ile ts in
T o ile ts in
T o ile ts
A
B
K D
PT-1
SS-3
P-2
H
F
PT-1
SS-3
P-2
PT-1
SS-3
P-2
G
J
E
C
PT-1
SS-3
P-2
A-4
AI403
A-1
A I4
A-3
A I4
A-2
AI403
Unisex Toilet
C
B
K
D
A
H F
E
G
J
1'-6" 1'-3"
X
X
X
Toilet Accessory
Equipment
Signage
Keynote
Material Finish
SYMBOL LEGEND
B5
B-1
A I4
B-4
AI403
B-3
A I4
B-2
AI403
Staff Toilet
111E
E
G
F
H
B A D K B
C
J
C
PT-1
SS-3
P-1E
1' - 6"2' - 0"
H
F
P-1
SS-3
PT-1
G
PT-1
SS-3
P-1
J
P-2
SS-3
PT-1
A
B
K
D
Do not provide Sanitary Napkin Disposal "K" in 'Staff Toilet 133A'
Paint Wall P-1 in Staff Toilets 133A and 135A.
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:0
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
INTERIOR ELEVATIONS - TOILET
ACCESSORIES
AI403
BMMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
TOILET ACCESSORIES SCHEDULE
MARK ITEM
MANUFACTUR
ER MODEL
PROVIDED BY INSTALLED BY
O W
N E
R
C O
N T
R A
C T
O R
O W
N E
R
C O
N T
R A
C T
O R
A Grab Bar - 18" Length BOBRICK B-6806 X 18 X X
B Grab Bar - 42" Length BOBRICK B-6806 X 42 X X
C Grab Bar - 36" Length BOBRICK B-6806 X 36 X X
D Toilet Tissue Dispenser BOBRICK B-2888 X X
E Mirror - Stainless Steel Frame - 18" x 36" BOBRICK B-290 X X
F Hand Sanitizer Dispenser, Wall Mounted, Hands-Free Purell 7830 X X
G Paper Towel Dispenser, Wall-Mounted Scott 39730 X X
H Robe Hook - - X X
J Soap Dispenser, Wall Mounted, Hands Free Purell 7830 X X
K Sanitary Napkin Disposal BOBRICK B-5270 X X
Scale: 1/4" = 1'-0"
Typical Mounting Heights - Toilet Accessories
A-1A-2A-3A-4 A
Scale: 1/4" = 1'-0"
Typ. Public Unisex Toilet
ELEVATION NOTES
GENERAL INTERIOR ELEVATION NOTES
BB-3 B-1B-2B-4
Scale: 1/4" = 1'-0"
Typ. Staff Toilet
A. See Sheet AI403 for typical mounting height of Accessories.
B. See Sheet AI511 for Casework Details.
C. See Sheet AF101 for Floor Finish Plan and Finish Materials Legend.
D. See Sheet QH701 for Equipment List
E. Provide Water-Resistant Gyp. board tile substrate in all Toilet rooms
9.60
12.31
12.22
12.29
12.20
12.19
12.21
Drawer
B1B2
Sink
12.27
12.20
22.06
12.19
9.60
12.31 12.29
12.21
B4
12.31
12.21
12.20
12.19
Microwave
C1.1
12.19
12.32
12.20
12.34
Drawer
Drawer
File Drawer
B3
9.60
12.19
12.21
12.19
12.19
DRAWER
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
B1.1B2.1
CABINET
CABINET
W1.1
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
12.20
12.08
12.52
DRAWER
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
SINK
/2
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
/8
B3.1
2' - 1"
/8
1' - 0 3/4"
2' - 1"
12.1012.10
12.61
12.20
12.08
9.61
12.05
9.61
12.20
22.01 2' - 1"
12.08
DRAWER
DRAWER
12.0512.0512.05
9.61
12.19 12.19
12.19
12.07
W1
26.02
12.29
12.31
12.22
12.21
9.27
12.36
12.09
12.06
12.52
12.52
12.05
12.06
26.02
12.19
12.19
22.01
12.29
1' - 2"
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
2' - 1"
M in
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
2' - 1"
11" 5" 8"
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
2' - 1"2' - 1"
S E
E I N
T E
R
IO
R E
L E
V A
T
IO
N S
2' - 1"
10 3/8" 6 3/4" 4 3/4"
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:0
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
CASEWORK SECTIONS & DETAILS
AI511
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
A. See Interior Elevations on Sheets AI401, AI402, and AI403 for further information.
B. Wood blocking prohibited on Project. Provide metal blocking and anchorage as required by Casework Manufacturer's
9.27 Gypsum board soffit.
9.60 Resilient base. See Room Finish Schedule.
9.61 Resilient flash cove base. See Room Finish Schedule.
12.05 Metal Pull Handle
12.06 Wood prohibited on project. Anchor cabinet to wall to Manufacture Specifications.
12.07 Integral solid surface sink. See Plumbing Drawings.
12.08 Metal base cabinet.
12.09 Metal wall cabinet.
12.10 Metal Panel apron and panel
12.19 Applied solid surface backsplash.
12.20 Solid surface material over 3/4" plywood, with 1/4" eased edge.
12.21 Plastic laminate over 3/4" particle board.
12.22 Adjustable shelf. Plastic laminate over 3/4" particle board.
12.27 Removable panel with concealed fasteners: Plastic laminate over 3/4" plywood.
12.29 4" wire pull.
12.31 Concealed hinge.
12.32 Wire management grommet. Coordinate exact location with
COR.
12.34 Heavy-duty bracket.
12.36 Sloped top. Metal to match Metal Manufacture's finish.
12.52 Adjustable Shelf.
12.61 Metal panel end panel.
22.01 Plumbing fixture. See Plumbing Drawings.
22.06 Undermount solid surface sink bowl.
26.02 Under cabinet light fixture provided by lab casework
manufacturer. Coordinate with MEP.
N.T.S.Scale:
Sections - Plastic Laminate Casework
DETAIL NOTES
GENERAL CASEWORK NOTES
N.T.S.Scale:
Sections - Metal Casework
H1
J1
8.02
9.219.80
8.02
9.09
9.219.80
9.08
7.82
7.82
J2
9.09
9.219.80
7.82
H2
8.09
9.219.80
9.08
7.82
1/2"
1/2"
SEE WALL TYPE
5.10
10.24
1/2" 1/2"
SEE WALL TYPE
1/2"1/2"
8.09 5.10
10.24
SEE WALL TYPE
8.14
8.14
1/2"1/2"
H3
9.21
9.02 7.13
7.12
9.08
4.19
9.42
7.37
9.49
4.16
J3
4.13
9.42
7.37
9.49
4.16
H5
9.21
9.80 9.02
7.12
9.08
4.19
9.42
7.37
A lig n
8.15
6.03
7.857.85
8.28 5 3/4"
5"
/2
J5
6.03
7.857.85
8.28
5"
/2 " 2
5 3/4"
9.21
7.85
7.85
9.02 7.13
7.12
9.21
9.02 7.13
7.12 9.42
7.37
4.13
H6
9.219.80
9.08
7.82
SEE WALL TYPE
8.02
8.24
8.25
8.30
SEE WALL TYPE
1/2"
1/2"
J6
2" 2"
/2
/2
/4
9.09
9.589.58
9.21
7.13
8.02
7.82
8.248.02
8.15
H4
9.21
9.02 7.69
9.08
4.19
J4
4.13
4.17
5 3/4"
5 3/4"
9.21
7.85
7.85
9.02 7.69
SEE WALL TYPE
1/2" SEE WALL TYPE
4.17
9.05
9.21
7.85
SEE WALL TYPE
1/2" SEE WALL TYPE
SEE WALL TYPE
1/2" SEE WALL TYPE
9.05
9.21
SEE WALL TYPE
1/2" SEE WALL TYPE
SEE WALL TYPE
1/2" SEE WALL TYPE
SEE WALL TYPE
1/2" SEE WALL TYPE
2"
SEE
SCHED. 2"
S E
E S
C H
E D
U L E
2"
SEE
SCHED. 2"
S E
E S
C H
E D
U L E
SEE SCHED.
S E
E S
C H
E D
U L E
SEE SCHED.
5" 5"
S E
E S
C H
E D
U L E
8" 8"
SEE SCHED.
S E
E S
C H
E D
U L E
8"
SEE SCHED.
S E
E S
C H
E D
U L E
FFGNG
8"
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
R O G E
R
A. REP
S T I E N
AR0012462
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/3
/2
:4
:1
P
M
CONSTRUCT DENTAL CLINIC
02/03/2023
DOOR SCHEDULE, TYPES, AND
DETAILS
AI601
BRMD
516-349
BAY PINES VAMC
AMBER MILTON
100% Construction Set 21005.00
DOOR SCHEDULE
DOOR
BETWEEN DOOR DESCRIPTION FRAME DESCRIPTION
FIRE
RATING
HDWE
SET REMARKSRM RM TYPE MAT'L
SIZE
TYPE MAT'L HEAD JAMB# W H T
100A 100A FG ALUM 2 3'-0" 7'-8
1/2"
1 1/2" - ALUM H5 - 12 Blast-Rated, Card Reader and Automatic Operator
100B 100 100A FG ALUM 2 3'-0" 7'-9
5/8"
1 1/2" - ALUM - - 13 Automatic Operator
101 100 101 F WD 1 3'-0" 7'-0" 1 3/4" 1 HM H1 J1 03 ASTM E90 sound rated door. Min. STC rating of 45.
102 C-2 102 G WD 1 3'-6" 7'-0" 1 3/4" 1 HM H1 J1 01
103A C-2 103 F WD 1 3'-0" 7'-0" 1 3/4" 1 HM H4 J4 17…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .