ATTACHMENT 3 - Drawings - Part 2.pdf
PDF 14 MB Posted
- Solicitation number
- 36C77623B0029
About this file
This document provides details for a federal contract solicitation to construct a dental clinic at the Bay Pines VA Medical Center. The solicitation seeks a general contractor to provide all labor, materials, equipment, and supervision required to construct the new clinic, including general construction, mechanical, electrical and plumbing work. The project scope also involves demolishing an existing modular building, installing site utilities and a new generator, and constructing a gravel parking lot and driveway with permeable pavement. Interested contractors should respond to solicitation number 36C77623B0029 by the specified deadline. The selected contractor will be awarded a contract by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas to complete the dental clinic construction project at the Bay Pines VA Medical Center.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10.5810.75
10.45
10.94 11.25
10.43
9.14
9.148.88
8.81
9.25
9.25
9.25
7.59
7.53 7.47
7.54
8.92 8.96
9.08
8.88
8.328.60
8.32
8.62
9.06
9.45
9.11
8.79
9.08
8.92
9.65 9.46
9.14
9.02 8.80
8.72
9.18
9.369.31
9.25
10.09
9.94 9.88 9.65
9.9110.24
9.8310.14
9.71 9.81
9.96
10.0610.1510.40
10.31
10.40 10.42
10.54
10.65 10.46
10.01
10.08
10.66
10.64
9.93
9.52
9.38
9.28
9.71
9.24
9.39
8.98
9.23
9.29
9.29
9.33
9.38
9.51
9.77
9.89
9.78 9.69
9.73
9.779.56
9.8410.04
9.68
10.15
9.69
10.22 10.5710.56
9.96
10.16
9.99
9.528.99 9.55
9.88
10.37
10.48
10.07
10.03
9.349.58
9.579.30
9.13
9.329.48
10.59
10.38
10.04 9.77
9.52
9.29
9.6810.0510.5011.07
11.77
9.13
10.02
10.04
9.29 9.24
9.33 9.44
9.45
9.33
9.65
9.49
9.91
10.43
10.03 9.59
9.679.99
10.07 9.68
9.35
9.94
10.37
10.32
10.28
10.5410.4811.05
9.72
8.69
9.45 9.35
9.69
9.23
13.339.03
9.07
8.86
8.94
8.81
8.86
8.82
8.78
8.81
9.21
9.19 9.48
9.45
8.96
8.93
8.76
8.95
8.92
8.76
8.67
8.75
9.14
8.79
9.18
8.56
8.71 8.72
8.68
8.86
8.98
8.79
9.10
8.98 9.03
8.85
9.00
9.22
9.38
9.13
8.96
9.01
9.00
8.86
9.07
8.88
8.74
8.908.96
8.88
8.84
9.06
9.38
9.40
9.31
9.45 9.34
9.32 9.32
9.88 9.88
9.89
12.50
9.43 9.65
9.61
9.53
9.83
9.37
9.36
9.41 9.61
9.47
9.22
9.24
9.16
9.01
8.88
8.87
8.75
8.80
9.14
9.08 9.58
9.76
9.58
9.24
9.37
9.22 9.43
9.32
9.12
9.30
9.21
9.56
9.49
9.50
9.70
8.63
8.58
8.73
8.88
8.96
9.14
9.40
9.21
9.49
9.42
9.31
9.07
9.02
9.05
13.339.01
9.12
9.39
9.35
10.699.67
10.1510.19
10.85 10.28
9.27
9.34
9.37
9.42
9.36
9.27
9.22
9.28
9.0513.34
13.359.02
9.07
9.22
9.52
9.45
9.02
9.39
9.37
9.83
9.35
9.55 10.08
9.65
10.01
10.21 10.77
9.359.38
9.479.38
9.389.49
9.48
9.41
9.43
9.35
9.31
9.97
10.23
9.40
9.27
9.77
9.84
9.92
9.35
9.93
10.60 10.71
11.1511.05
9.48
9.52
10.07
10.08
9.82
9.429.43
9.33
9.37
10.10 9.97
9.40
9.10
9.27
9.87
9.39
9.28
9.27
10.13 9.83
10.18
10.04
9.59
10.1210.09
9.479.69 10.05
10.19
10.17 10.12 9.57
9.45
9.46
9.79
9.93
9.41
9.26
9.31
9.25 9.26
9.33 9.36 9.35
9.34
9.04
8.87
9.30
9.14
9.61
9.54
9.74
9.74
9.71
9.46
9.40
9.29
9.57
9.53
9.73
9.41
9.32
9.97
9.25
9.53
8.49 8.54
9.08
8.54
8.55
8.61
8.75
8.67
8.52
8.60
8.40 8.92
9.19
9.06 9.11
9.45 9.45
9.48
9.73
9.11
9.91
9.66
9.15
9.06 9.15 9.09
9.07 8.97
8.95 8.89 8.99
8.92 8.93
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
A-3
DRI-1
A-2
B-2
B-4
B-3
B-1
DROP INLET
GRATE EL 8.39
NW 12" RCP INV 5.41
DROP INLET
GRATE EL 8.51
SE 12" RCP INV 6.31
NW 12" RCP INV 6.47
NW 4" PVC INV 5.12
RIM EL 10.25
N 18" RCP INV 5.04 (DU)
SE 12" RCP INV 6.52
SE 4" PVC INV 5.11
SW 15" RCP INV 5.10
DROP INLET
GRATE EL 7.75
N 8" PVC INV 5.34
NE 15" RCP INV 5.21
S 18" RCP INV 5.22 (DU)
SW 12" PVC INV 5.45
NW 6" PVC INV 5.41
DROP INLET
GRATE EL 8.75
NE 18" RCP INV 4.44 (DU)
W 18" RCP INV 3.75 (DU)
6" PVC
E INV 8.40
W INV 8.51
9"
CP W
ATER
(2.
' D P)
4"
PVC SANITARY FORCE M
AIN
(4.
' D P)
9 9
PROPOSED SILT
FENCE
PROPOSED SILT
FENCE
PROPOSED SILT
FENCE
PROPOSED SILT
FENCE
RCE
EXISTING LEGEND
EXISTING MANHOLES
EXISTING COMMUNICATION, UNDERGROUND
EXISTING NATURAL GAS, UNDERGROUND
EXISTING POWER, UNDERGROUND
EXISTING SANITARY SEWER, UNDERGROUND
EXISTING STORM SEWER, UNDERGROUND
EXISTING STORM SEWER, ROOF DRAIN
EXISTING SOLAR PANEL
EXISTING WATER, UNDERGROUND
EXISTING CURB
EXISTING EDGE OF PAVEMENT
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING TREES
EXISTING BOLLARD
BORING LOCATION
EXISTING SIGN
EXISTING LIGHT
EXISTING UTILITY POLE
EXISTING FENCE
EXISTING BUILDING
EXISTING SPOT ELEVATION100.55
EXISTING STORM SEWER, INLET
EXISTING SANITARY SEWER, CLEAN-OUT
EXISTING JUNCTION BOX
EXISTING WATER STRUCTURES
EXISTING VALVES
EXISTING SIDEWALK
PROJECT BOUNDARY LIMITS
EXISTING ASPHALT DRIVEWAY
EXISTING GRAVEL PAVEMENT
EXISTING OVERHEAD ELECTRIC
EXISTING OVERGROWTH
EXISTING TRANSFORMER
EXISTING SUPPORT POST
EXISTING GROUNDING ROD
EXISTING CURB STOP
EXISTING DIRT DRIVE
Revisions DateRevisions Date
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
CONSTRUCT
DENTAL CLINC
09/06/2022 APJS
516-349
BAY PINES, FL
BUILDING
100% 21001.00
Revisions Date
PENNONI ASSOCIATES INC.
5755 Rio Vista Dr
Clearwater, FL 33760 T 727.451.9561
Florida COA: 7819
1 65% DESIGN 05/24/2022
CONSTRUCTION SET
GC - 051_____________
EROSION CONTROL PLAN
00 20' 40'
N O
R
TH
SITE INFORMATION:
ADDRESS: 10000 BAY PINES BLVD
BAY PINES, FL 33744
CONTRACTING U.S. DEPT. OF VETERANS AFFAIRS
OFFICER: 10000 BAY PINES BLVD
BAY PINES, PINELLAS COUNTY, FL 33744
ENGINEER: PENNONI
JASON SHERIDAN, PE
5755 RIO VISTA DRIVE
CLEARWATER, FL 33760
1. SILT FENCES (SYNTHETIC FILTER) CAN BE USED FOR 60 DAYS OR LONGER
DEPENDING ON ULTRAVIOLET STABILITY AND MANUFACTURER’S
RECOMMENDATIONS. HOWEVER, SILT FENCES GENERALLY HAVE A USEFUL LIFE OF
ONE SEASON, AND SHOULD BE PERIODICALLY REPLACED ON LONGER DURATION
CONSTRUCTION PROJECTS.
2. THE CONTRACTOR IS REQUIRED TO OBTAIN A NPDES PERMIT PRIOR TO
CONSTRUCTION COMMENCEMENT.
3. CONTRACTOR MUST PROVIDE EVIDENCE THAT THE CONSTRUCTION TEAMS COMPLY
WITH THE FLORIDA STORMWATER, EROSION, AND SEDIMENTATION CONTROL
INSPECTOR TRAINING AND CERTIFICATION.
4. REMOVE SEDIMENT AND CLEAN OUT EROSION AND SEDIMENT CONTROL MEASURES
WHEN SEDIMENT ACCUMULATION HAS REACHED 1/3 OF THE HEIGHT MEASURED.
5. INSPECT EROSION AND SEDIMENT CONTROLS AFTER ALL RAINFALL EVENTS
PRODUCING 1/2" RAINFALL OR MORE.
EROSION CONTROL NOTES:
PROPOSED SILT FENCE
STAGE 1
SEQUENCE OF CONSTRUCTION:
1. INSTALL ORANGE SAFETY FENCE COINCIDENT WITH THE LIMIT OF DISTURBANCE
LINE AS ILLUSTRATED ON THE PLANS. CONSTRUCTION ACTIVITY IS NOT TO
OCCUR BEYOND THE ORANGE SAFETY FENCE.
2. INSTALL ROCK CONSTRUCTION ENTRANCES AS ILLUSTRATED ON THE PLANS.
ACCESS WILL BE LIMITED TO THESE ENTRANCES.
3. INSTALL INLET PROTECTION AS SHOWN ON THE EROSION AND SEDIMENT
CONTROL PLAN.
4. INSTALL SILT FENCE AS ILLUSTRATED ON THE PLANS.
5. PRIOR TO PROCEEDING WITH CONSTRUCTION, CONFIRM LOCATION AND
ELEVATION OF EXISTING UTILITIES. MAINTAIN AND PROTECT EXISTING UTILITIES
TO REMAIN. EXISTING FIRE HYDRANTS TO REMAIN ACCESSIBLE AND ACTIVE
THROUGHOUT CONSTRUCTION.
6. BEGIN CLEARING AND GRUBBING AND DEMOLITION ACTIVITIES, REMOVE AND
DISPOSE OF ALL MATERIAL IN AN ACCEPTABLE MANNER.
7. CONSTRUCT TEMPORARY POWER SERVICE (SEE ELECTRICAL PLANS).
8. RELOCATE ELECTRICAL FEEDS TO AND FROM THE SOLAR PANEL INVERTER (SEE
ELECTRICAL PLANS).
9. COMMENCE BULK EARTHWORK FOR ALL UTILITY, BUILDING, DRIVEWAY, AND
PARKING LOT CONSTRUCTION. EXCAVATION SHALL BE LIMITED TO THE MINIMUM
AREA REQUIRED TO CONSTRUCT BUILDINGS.
10. COMMENCE CONSTRUCTION OF BUILDING.
11. CONSTRUCT POND-1
12. CONSTRUCT DRIVEWAY AND PARKING LOT TO BASE COURSE
13. CONSTRUCT UTILITIES NECESSARY TO SUPPORT BUILDINGS AND PROVIDE STUBS
FOR BUILDING CONNECTIONS. CONTRACTOR SHALL EXCAVATE ONLY ENOUGH
TRENCH WHICH PIPE CAN BE INSTALLED AND TRENCH BACKFILLED BY THE END
OF EACH WORKING DAY.
14. PRIOR TO REMOVAL OR CONVERSION OF EROSION CONTROL MEASURES A SITE
INSPECTION IS REQUIRED FROM THE CONSERVATION DISTRICT.
15. REMOVAL OF EROSION CONTROL MEASURES SHALL OCCUR ONLY UPON 75%
UNIFORM STABILIZATION OF DISTURBED AREA OF CONTROL. STABILIZATION
SHALL BE CONSIDERED IN THE FORM OF VEGETATION, STONE, PAVING, OR UNIT
CONSTRUCTION.
PROJECT LIMITS
PROJECT LIMITS
PROPOSED
STORMWATER
POND-1
PROPOSED
TRANSFORMER PAD
(SEE ELEC PLANS)
PROJECT LIMITS
BUILDING
FF EL 11.27
SOLAR PANEL INVERTER
METAL STAIRS
ON CONC PAD
(TYP)
LANDSCAPED
AREA (TYP)
LANDSCAPED
AREA (TYP)
EXISTING
OVERGROWTH
CONC
BASKETBALL
COURT
8" POLE
(TYP)
EXERCISE
AREA
2" METAL
POST
2" METAL PIPE
6" CURB
AROUND PLANTER
4.7'
1.
2'
1.
2'
4.7'
4.
7'
4.
7'
1.2'
4.7'
1.
2'
1.2' 4.
7'
4.
8'
1.
2'4.7'
4.7' 1.
1'
4.
7'
1.1'
4.7'
1.
2'
4.7' 1.
2'
5.1' 1.
2'
1.2'
5.
2'
4.
7'1.2'
4.
7'1.2'
4.7'
1.
2'
1.2'
4.
7'4.
7'1.2'
.2
18.6'
19.6' 4.
8' 44.1' 5.
9' 17.1'
.4
65.5'
.2
6.0'
.1
23.4'
.6
81.8'6.
0'
17.3'
.7
45.8'
.0
12"
10"
20" TWIN
14"
24"
20"
10"
12"
38"
12"
8"
10"
9" TWIN
18"
28"
12"
13"
14"
22"
6"
7" 7"
9" TWIN
36"
10"
34"
12" 12"
SOLAR PANEL
SOLAR PANEL
SOLAR PANEL
SOLA
R PANEL
SOLAR PANEL
EQUIPMENT
4.9'
4.7' 1.2'
4.7' 1.
1'
1.2'
HALLWAY TO
ANOTHER BUILDING
CONC WALK
(TYP)
CONC WALK
(TYP)
COVERED
AREA (TYP)
ASPHALT
DRIVEDROP INLET (TYP)
POST
(TYP)
GROUNDING ROD
(TYP)
16"
18" A-3
DRI-1
A-2
B-2
B-4
B-3
B-1
9 9
PIV
FDC
PROPOSED SILT
FENCE
PROPOSED SILT
FENCE
PROPOSED SILT
FENCE
PROPOSED SILT
FENCE
RCE
PROPOSED SILT
FENCE
PROPOSED INLET
PROTECTION
(TYP)
PROPOSED
FLUME (TYP.)
101 LF 18" HDPE
@ 0.005 FT/FT
DMH-2
RIM: 10.25
INV IN 5.10 (S)
INV IN 6.88 (E)
INV IN 5.10 SW (EX)
INV OUT 5.04 N (EX)
CO-2
RIM: 10.40
INV: 7.40
8" ROOF DRAIN
8" ROOF DRAIN
CO-3
RIM: 10.35
INV: 7.05
CO-2
RIM: 10.35
INV: 7.00
EXISTING LEGEND
EXISTING MANHOLES
EXISTING COMMUNICATION, UNDERGROUND
EXISTING NATURAL GAS, UNDERGROUND
EXISTING POWER, UNDERGROUND
EXISTING SANITARY SEWER, UNDERGROUND
EXISTING STORM SEWER, UNDERGROUND
EXISTING STORM SEWER, ROOF DRAIN
EXISTING SOLAR PANEL
EXISTING WATER, UNDERGROUND
EXISTING CURB
EXISTING EDGE OF PAVEMENT
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING TREES
EXISTING BOLLARD
BORING LOCATION
EXISTING SIGN
EXISTING LIGHT
EXISTING UTILITY POLE
EXISTING FENCE
EXISTING BUILDING
EXISTING SPOT ELEVATION100.55
EXISTING STORM SEWER, INLET
EXISTING SANITARY SEWER, CLEAN-OUT
EXISTING JUNCTION BOX
EXISTING WATER STRUCTURES
EXISTING VALVES
EXISTING SIDEWALK
PROJECT BOUNDARY LIMITS
EXISTING ASPHALT DRIVEWAY
EXISTING GRAVEL PAVEMENT
EXISTING OVERHEAD ELECTRIC
EXISTING OVERGROWTH
EXISTING TRANSFORMER
EXISTING SUPPORT POST
EXISTING GROUNDING ROD
EXISTING CURB STOP
EXISTING DIRT DRIVE
PROPOSED LEGEND
PROPOSED CURB LINE
PROPOSED EDGE OF PAVEMENT
PROPOSED BUILDING OUTLINE
PROPOSED SIDEWALK
PROPOSED WATER MAIN
PROPOSED STORM SEWER
PROPOSED SANITARY SEWER
PROPOSED UNDERGROUND ELECTRIC
PROPOSED UNDERGROUND GAS
PROPOSED AREA DRAIN
PROPOSED DRAINAGE INLET
PROPOSED DRAINAGE MANHOLE
PROPOSED SANITARY MANHOLE
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED BUILDING OVERHANG
PROPOSED BAHIA SOD
PROPOSED ASPHALT PAVEMENT
PROPOSED CURB STOP
PROPOSED TREELINE
PROPOSED DETECTABLE WARNING
PROPOSED DRAINAGE PIPE
PROPOSED TREES
PROPOSED POROUS ASPHALT PAVEMENT
PROPOSED UNDERGROUND TELECOM
PROPOSED TELECOM MANHOLE
PROPOSED TELECOM HANDHOLE
PROPOSED SAND GROWN BAHIA SOD
Revisions DateRevisions Date
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
CONSTRUCT
DENTAL CLINC
09/06/2022 APJS
516-349
BAY PINES, FL
BUILDING
100% 21001.00
Revisions Date
PENNONI ASSOCIATES INC.
5755 Rio Vista Dr
Clearwater, FL 33760 T 727.451.9561
Florida COA: 7819
1 65% DESIGN 05/24/2022
CONSTRUCTION SET
GC - 052_____________
EROSION CONTROL PLAN
00 20' 40'
N O
R
TH
SITE INFORMATION:
ADDRESS: 10000 BAY PINES BLVD
BAY PINES, FL 33744
CONTRACTING U.S. DEPT. OF VETERANS AFFAIRS
5755 RIO VISTA DRIVE
CLEARWATER, FL 33760
EROSION CONTROL NOTES:
STAGE 2
SEQUENCE OF CONSTRUCTION:
1. INSTALL ORANGE SAFETY FENCE COINCIDENT WITH THE LIMIT OF DISTURBANCE
LINE AS ILLUSTRATED ON THE PLANS. CONSTRUCTION ACTIVITY IS NOT TO
OCCUR BEYOND THE ORANGE SAFETY FENCE.
2. INSTALL ROCK CONSTRUCTION ENTRANCES AS ILLUSTRATED ON THE PLANS.
ACCESS WILL BE LIMITED TO THESE ENTRANCES.
3. INSTALL INLET PROTECTION AS SHOWN ON THE EROSION AND SEDIMENT
CONTROL PLAN.
4. INSTALL SILT FENCE AS ILLUSTRATED ON THE PLANS.
5. PRIOR TO PROCEEDING WITH CONSTRUCTION, CONFIRM LOCATION AND
ELEVATION OF EXISTING UTILITIES. MAINTAIN AND PROTECT EXISTING UTILITIES
TO REMAIN. EXISTING FIRE HYDRANTS TO REMAIN ACCESSIBLE AND ACTIVE
THROUGHOUT CONSTRUCTION.
6. BEGIN CLEARING AND GRUBBING AND DEMOLITION ACTIVITIES, REMOVE AND
DISPOSE OF ALL MATERIAL IN AN ACCEPTABLE MANNER.
7. CONSTRUCT TEMPORARY POWER SERVICE (SEE ELECTRICAL PLANS).
8. RELOCATE ELECTRICAL FEEDS TO AND FROM THE SOLAR PANEL INVERTER (SEE
ELECTRICAL PLANS).
9. COMMENCE BULK EARTHWORK FOR ALL UTILITY, BUILDING, DRIVEWAY, AND
PARKING LOT CONSTRUCTION. EXCAVATION SHALL BE LIMITED TO THE MINIMUM
AREA REQUIRED TO CONSTRUCT BUILDINGS.
10. COMMENCE CONSTRUCTION OF BUILDING.
11. CONSTRUCT POND-1
12. CONSTRUCT DRIVEWAY AND PARKING LOT TO BASE COURSE
13. CONSTRUCT UTILITIES NECESSARY TO SUPPORT BUILDINGS AND PROVIDE STUBS
FOR BUILDING CONNECTIONS. CONTRACTOR SHALL EXCAVATE ONLY ENOUGH
TRENCH WHICH PIPE CAN BE INSTALLED AND TRENCH BACKFILLED BY THE END
OF EACH WORKING DAY.
14. PRIOR TO REMOVAL OR CONVERSION OF EROSION CONTROL MEASURES A SITE
INSPECTION IS REQUIRED FROM THE CONSERVATION DISTRICT.
15. REMOVAL OF EROSION CONTROL MEASURES SHALL OCCUR ONLY UPON 75%
UNIFORM STABILIZATION OF DISTURBED AREA OF CONTROL. STABILIZATION
SHALL BE CONSIDERED IN THE FORM OF VEGETATION, STONE, PAVING, OR UNIT
CONSTRUCTION.
1. SILT FENCES (SYNTHETIC FILTER) CAN BE USED FOR 60 DAYS OR LONGER
DEPENDING ON ULTRAVIOLET STABILITY AND MANUFACTURER’S
RECOMMENDATIONS. HOWEVER, SILT FENCES GENERALLY HAVE A USEFUL LIFE OF
ONE SEASON, AND SHOULD BE PERIODICALLY REPLACED ON LONGER DURATION
CONSTRUCTION PROJECTS.
2. THE CONTRACTOR IS REQUIRED TO OBTAIN A NPDES PERMIT PRIOR TO
CONSTRUCTION COMMENCEMENT.
3. CONTRACTOR MUST PROVIDE EVIDENCE THAT THE CONSTRUCTION TEAMS COMPLY
WITH THE FLORIDA STORMWATER, EROSION, AND SEDIMENTATION CONTROL
INSPECTOR TRAINING AND CERTIFICATION.
4. REMOVE SEDIMENT AND CLEAN OUT EROSION AND SEDIMENT CONTROL MEASURES
WHEN SEDIMENT ACCUMULATION HAS REACHED 1/3 OF THE HEIGHT MEASURED.
5. INSPECT EROSION AND SEDIMENT CONTROLS AFTER ALL RAINFALL EVENTS
PRODUCING 1/2" RAINFALL OR MORE.
Revisions DateRevisions Date
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
CONSTRUCT
DENTAL CLINC
09/06/2022 APJS
516-349
BAY PINES, FL
BUILDING
100% 21001.00
Revisions Date
PENNONI ASSOCIATES INC.
5755 Rio Vista Dr
Clearwater, FL 33760 T 727.451.9561
Florida COA: 7819
1 65% DESIGN 05/24/2022
CONSTRUCTION SET
GC - 053_____________
BORING LOGS
9 9
COVERED AREA
TO BE REMOVED
BUILDING
BUILDING
FF EL 12.49
FF EL 12.58
FF EL 11.27
FF EL 12.61 CONC RAMP
CONC W
ALK
ELEC DISTRIBUTION BOX
TO BE REMOVED
SOLAR PANEL INVERTER
METAL STAIRS
ON CONC PAD
(TYP)
LANDSCAPED
AREA (TYP)
LANDSCAPED
AREA (TYP)
EXISTING
OVERGROWTH
STONE DRIVE
CONC
BASKETBALL
COURT
EXERCISE
AREA
8' POLE
8" POLE
(TYP)
LIMITS OF
UTILITY
EQUIPMENT
METAL
PLATFORM
WATER
FOUNTAIN
BRICK
PLANTER
PLANTER
EXERCISE
AREA
LIMITS OF
UTILITY
EQUIPMENT
2" METAL
POST
16.3'x10.0'
SHED
2" METAL PIPE
6" CURB
AROUND PLANTER
4.7'
1.
2'
1.
2'
4.7'
4.
7'
4.
7'
1.2'
4.7'
1.
2'
1.2' 4.
7'
4.
8'
1.
2'4.7'
4.7' 1.
1'
4.
7'
1.1'
4.7'
1.
2'
4.7' 1.
2'
5.1' 1.
2'
1.2'
5.
2'
4.
7'1.2'
4.
7'1.2'
4.7'
1.
2'
1.2'
4.
7'4.
7'1.2'
.2
18.6'
19.6' 4.
8' 44.1' 5.
9' 17.1'
.4
65.5'
.2
6.0'
.1
23.4'
.6
81.8'6.
0'
17.3'
.7
45.8'
.0
12"
10"
20" TWIN
14"
24"
20"
10"
12"
12" TWIN
38"
12"
8"
10"
10"
12" CLUSTER
9" TWIN
18" 20"
28"
8" TWIN
28"
12"
13"
24"
26"
20" TWIN20" TWIN6"
14"
22"
12" TRIPLET
14"
6"
7" 7"
9" TWIN
36"
10"
34"
12" 12"
SOLAR PANEL
SOLAR PANEL
SOLAR PANEL
SOLA
R PANEL
SH
IP
PI
NG
C O
NT
AI
NE
R
CONC PAD
TO BE REMOVED
CONC
DECK
GRAVEL
CONC
SOLAR PANEL
EQUIPMENT
4.9'
4.7' 1.2'
4.7' 1.
1'
1.2'
HALLWAY TO
ANOTHER BUILDING
CONC WALK
(TYP)
CONC WALK
(TYP)
COVERED
AREA (TYP)
ASPHALT
DRIVEDROP INLET (TYP)
.1'
104.4'
.1'
104.4'
POST
(TYP)
GROUNDING ROD
(TYP)
BU
IL
D
IN
G
.4
METAL
STAIRS
(TYP)
17"
16"
18" A-3
DRI-1
A-2
B-2
B-4
B-3
B-1
DROP INLET
GRATE EL 8.39
NW 12" RCP INV 5.41
DROP INLET
GRATE EL 8.51
SE 12" RCP INV 6.31
NW 12" RCP INV 6.47
NW 4" PVC INV 5.12
RIM EL 10.25
N 18" RCP INV 5.04 (DU)
SE 12" RCP INV 6.52
SE 4" PVC INV 5.11
SW 15" RCP INV 5.10
DROP INLET
GRATE EL 7.75
N 8" PVC INV 5.34
NE 15" RCP INV 5.21
S 18" RCP INV 5.22 (DU)
SW 12" PVC INV 5.45
NW 6" PVC INV 5.41
DROP INLET
GRATE EL 8.75
NE 18" RCP INV 4.44 (DU)
W 18" RCP INV 3.75 (DU)
6" PVC
E INV 8.40
W INV 8.51
9"
CP W
ATER
(2.
' D P)
4"
PVC SANITARY FORCE M
AIN
(4.
' D P)
LIMITS OF
DEMOLITION
SOLAR PANELS,
SUPPORTS, AND
EQUIPMENT TO BE
MAINTAINED AND
PROTECTED (TYP.)
DRAINAGE
LINES TO BE
REMOVED
EXISTING
ELECTRIC
SERVICE TO BE
RELOCATED
ELECTRIC
EQUIPMENT
AND SOURCE
TO BE
REMOVED
ELECTRIC
EQUIPMENT TO
BE RELOCATED
EXISTING
ELECTRIC
SOURCE TO
BE REMOVED
EXISTING
HYDRANT AND
VALVE TO BE
REMOVED
EXISTING
WATER
SERVICE TO
BE REMOVED
EXISTING SANITARY
FORCE MAIN
TO BE REMOVED
EXISTING
BUILDING TO
BE DEMOLISHED
SIDEWALK TO
BE REMOVED
SIDEWALK TO
BE DEMOLISHED
STONE DRIVE TO
BE REMOVED
INLET TO BE
REMOVED
SHIPPING
CONTAINER TO
BE REMOVED
TO BE REMOVED
EXISITNG
BUILDING TO
BE REMOVED
WHEEL STOPS
TO BE REMOVED
(TYP.)
SOLAR PANELS,
SUPPORTS, AND
EQUIPMENT TO BE
MAINTAINED AND
PROTECTED (TYP.)
SAW CUT LIMIT
(2' FROM EOP)
SAW CUT LIMIT
(2' FROM EOP)
EXISTING
FENCE TO BE
REMOVED
SOLAR POWER EQUIPMENT
TO BE MAINTAINED AND
PROTECTED DURING
CONSTRUCTION
WHEEL STOPS
TO BE REMOVED
(TYP.)
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
EXISTING LEGEND
EXISTING MANHOLES
EXISTING COMMUNICATION, UNDERGROUND
EXISTING NATURAL GAS, UNDERGROUND
EXISTING POWER, UNDERGROUND
EXISTING SANITARY SEWER, UNDERGROUND
EXISTING STORM SEWER, UNDERGROUND
EXISTING STORM SEWER, ROOF DRAIN
EXISTING SOLAR PANEL
EXISTING WATER, UNDERGROUND
EXISTING CURB
EXISTING EDGE OF PAVEMENT
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING TREES
EXISTING BOLLARD
BORING LOCATION
EXISTING SIGN
EXISTING LIGHT
EXISTING UTILITY POLE
EXISTING FENCE
EXISTING BUILDING
EXISTING SPOT ELEVATION100.55
EXISTING STORM SEWER, INLET
EXISTING SANITARY SEWER, CLEAN-OUT
EXISTING JUNCTION BOX
EXISTING WATER STRUCTURES
EXISTING VALVES
EXISTING SIDEWALK
PROJECT BOUNDARY LIMITS
EXISTING ASPHALT DRIVEWAY
EXISTING GRAVEL PAVEMENT
EXISTING OVERHEAD ELECTRIC
EXISTING OVERGROWTH
EXISTING TRANSFORMER
EXISTING SUPPORT POST
EXISTING GROUNDING ROD
EXISTING CURB STOP
EXISTING DIRT DRIVE
Revisions DateRevisions Date
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
CONSTRUCT
DENTAL CLINC
09/06/2022 APJS
516-349
BAY PINES, FL
BUILDING
100% 21001.00
Revisions Date
PENNONI ASSOCIATES INC.
5755 Rio Vista Dr
Clearwater, FL 33760 T 727.451.9561
Florida COA: 7819
1 65% DESIGN 05/24/2022
CONSTRUCTION SET
CD - 071_____________
DEMOLITION PLAN
00 20' 40'
N O
R
TH
SITE INFORMATION:
ADDRESS: 10000 BAY PINES BLVD
BAY PINES, FL 33744
CONTRACTING U.S. DEPT. OF VETERANS AFFAIRS
5755 RIO VISTA DRIVE
CLEARWATER, FL 33760
1. SITE CONTRACTOR SHALL BE RESPONSIBLE FOR DISCONNECTION OF ALL UTILITIES ON SITE TO BE
REMOVED.
2. ALL DEMOLITION TO BE PERFORMED BY A QUALIFIED, LICENSED CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS. ALL DEBRIS TO BE REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. NO EXCAVATION OR FILLING MUST OCCUR IN THE CRITICAL ROOT ZONE. TREE PROTECTION
BARRIERS ARE TO REMAIN FOR THE DURATION OF CONSTRUCTION.
3. ALL UTILITIES SHALL BE DISCONNECTED AND REMOVED IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
4. ANY PUBLIC UTILITIES DAMAGED DURING DEMOLITION AND CONSTRUCTION SHALL BE REPAIRED AND/OR REPLACED IN KIND BY THE CONTRACTOR AT HIS OWN EXPENSE. UTILITY REMOVAL SHALL BE IN
ACCORDANCE WITH THE REQUIREMENTS OF THE UTILITY COMPANY.
5. ALL OPENINGS IN STORM SEWER STRUCTURES RESULTING FROM PIPE REMOVAL SHALL BE FILLED WITH
SEWER BRICK AND MORTAR OR REPLACED.
6. STORMWATER AND SANITARY LINES, STRUCTURES AND APPURTENANCES SHALL BE REMOVED IN THEIR
ENTIRETY.
7. ALL EXISTING BUILDING CONCRETE FOUNDATIONS AND FOOTINGS ARE TO BE REMOVED IN THEIR ENTIRETY. ALL SITE STRUCTURES AND IMPROVEMENTS WITHIN THE LIMIT OF DEMOLITION SHALL BE
REMOVED IN THEIR ENTIRETY, INCLUDING FOUNDATIONS UNLESS NOTED OTHERWISE.
8. TREES TO BE REMOVED SHALL INCLUDE REMOVAL AND DISPOSAL OF TREES AND STUMPS.
9. DUST CONTROL - DEMOLITION CONTRACTOR IS RESPONSIBLE FOR WETTING DUST GENERATING DEBRIS
FROM TIME OF FIRST CONTACT UNTIL PLACING INTO APPROPRIATE WASTE OR HAULING CONTAINERS OR
TRUCKS. DEBRIS SHALL NOT BE ALLOWED TO DRY BEFORE REMOVAL FROM SITE.
10.WATER FOR DUST CONTROL - DEMOLITION CONTRACTOR IS RESPONSIBLE FOR PROVIDING WATER TANK /
PUMP TRUCKS IF ON-SITE WATER FLOW OR PRESSURE IS NOT SUFFICIENT FOR OPERATIONS.
11.CONTAMINATED SOIL - IF UNUSUAL STAINS OR ODORS ARE DETECTED IN SOILS, CEASE OPERATIONS AND
NOTIFY THE EHS IMMEDIATELY.
12. ANY EXCAVATION OR IMPACTS TO THE ROOT SYSTEM OF ANY TREE TO REMAIN MAY REQUIRE ROOT PRUNING, EVEN IF IT IS OUTSIDE OF THE TREE BARRICADE AREA. DO NOT TRENCH UNDER TREES.
13.EROSION CONTROL IS PERFORMANCE BASED. ADDITIONAL EROSION CONTROL MAY BE REQUIRED IF
ANYTHING OTHER THAN CLEAN STORMWATER IS LEAVING THE SITE.
14. A PRE-CONSTRUCTION MEETING SHALL BE SET UP TO DISCUSS THESE AND OTHER ISSUES RESULTING IN THIS CONSTRUCTION PROJECT. THIS SHALL BE COORDINATED THROUGH THE CONSTRUCTION SITE
PROJECT MANAGER.
15.FIRE DEPARTMENT ACCESS AND WATER SUPPLY SHALL BE ESTABLISHED BEFORE ANY VERTICAL CONSTRUCTION BEINGS. THE CONNECTION SHALL MEET THE REQUIREMENTS OF NFPA 1 2015 EDITION, CHAPTER 18.
16.CONSTRUCTION SHALL MEET THE REQUIREMENTS OF NFPA 1 2013 EDITION CHAPTER 16 FIRE SPRINKLER PROTECTION. SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS TO INCLUDE BUT NOT BE LIMITED TO COMPLYING WITH NFPA 241, ESTABLISHING A FIRE PROTECTION PLAN, PROVIDING AND MAINTAINING ADEQUATE ESCAPE FACILITIES, PROVIDING AND MAINTAINING FIRE DEPARTMENT ACCESS ROADS THROUGHOUT THE ENTIRE PROJECT, PROVIDING STAIRS, STANDPIPE, AND FIRE SPRINKLER PROTECTION AS THE BUILDING PROGRESSES. A PRE-CONSTRUCTION MEETING SHALL BE SET UP TO DISCUSS THESE AND OTHER ISSUES RESULTING IN THIS CONSTRUCTION PROJECT. THIS SHALL BE COORDINATED THROUGH THE CONSTRUCTION SITE PROJECT MANAGER. WHERE UNDERGROUND WATER MAINS AND HYDRANTS ARE TO BE INSTALLED, THEY SHALL BE INSTALLED, COMPLETED AND IN SERVICE PRIOR TO CONSTRUCTION AS PER NFPA-241.ALL UNDERGROUND FIRE LINES MUST BE INSTALLED PER NFPA-24 2013 EDITION BY A LICENSED CLASS 1, 2, OR 5 FIRE PROTECTION SYSTEM CONTRACTOR WITH
SEPARATE PERMIT AND PLANS.
DEMOLITION NOTES:
SEDIMENT CONTAINMENT FILTER BAG
Revisions DateRevisions Date
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
CONSTRUCT
DENTAL CLINC
09/06/2022 APJS
516-349
BAY PINES, FL
BUILDING
100% 21001.00
Revisions Date
PENNONI ASSOCIATES INC.
5755 Rio Vista Dr
Clearwater, FL 33760 T 727.451.9561
Florida COA: 7819
1 65% DESIGN 05/24/2022
CONSTRUCTION SET
GK-072_____________
EROSION CONTROL
NOTES AND DETAILS
DETAIL- SOIL TRACKING PREVENTION DEVICEDETAIL-
N.T.S.
EROSION AND SEDIMENTATION CONTROL NOTES
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTROL AND PREVENT EROSION AND THE
TRANSPORTATION OF SEDIMENT TO SURFACE DRAINS AND OUTFALLS. REFER TO
CONSTRUCTION PLANS, DETAILS, SPECIFICATIONS AND APPROVED PERMITS FOR DETAILS.
SEDIMENT DEPOSITS SHALL BE REMOVED WHEN THEY REACH SIX INCHES ON AN EROSION
DEVICE.
2. DURING THE CONSTRUCTION OF DRAINAGE STRUCTURES, AND OTHER STRUCTURES REQUIRING
EXCAVATION, THE CONTRACTOR SHALL PLACE APPROVED BARRIERS OR OTHER APPROVED
DEVICES AROUND SUCH STRUCTURES TO PREVENT EROSION AND THE MIGRATION OF SEDIMENT
TO POINTS OUTSIDE THE CONSTRUCTION AREA. THE APPROVED BARRIERS OR OTHER
APPROVED DEVICES SHALL BE PLACED IN ACCORDANCE WITH REQUIREMENTS OF F.D.O.T. INDEX
NO. 102, FDEP, OR AS DIRECTED BY THE ENGINEER.
3. REQUIRED EROSION CONTROL MEASURES MUST REMAIN INTACT THROUGHOUT CONSTRUCTION.
FAILURE TO INSTALL OR PROPERLY MAINTAIN REQUIRED EROSION CONTROL WILL RESULT IN
ENFORCEMENT. ALL EROSION CONTROL MEASURES, SAND, SILT, AND DEBRIS SHALL BE
REMOVED FROM ALL DRAINAGE PIPES AND STRUCTURES AFTER CONSTRUCTION HAS BEEN
COMPLETED AND PRIOR TO COUNTY FINAL WALK-THROUGH.
4. OUTFALL PROTECTION - PROJECT PIPE OR DITCH DISCHARGES INTO OFF-SITE OUTFALLS SHALL
BE INSPECTED DAILY FOR POSSIBLE SEDIMENT BUILDUP OR TRANSPORT. OUTFALLS SHALL BE
PROTECTED THROUGH USE OF EROSION CONTROL FEATURES AS NECESSARY TO CONTAIN ANY
SEDIMENT LOSS TO THE IMMEDIATE AREA OF THE PROJECT. ANY SEDIMENT BUILDUP OR
TRANSPORT OFF-SITE SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMEDY. THE
CONTRACTOR SHALL USE APPROPRIATE MEASURES AS DIRECTED BY THE PROJECT ENGINEER
FOR OUTFALL PROTECTION.
5. APPROVED BARRIERS (OR OTHER APPROVED SEDIMENT CONTROL DEVICES): THESE SHALL BE
PLACED AT THE BASE OF ANY SLOPE WHERE A RAINFALL EVENT COULD ERODE A SLOPE AND
TRANSPORT SEDIMENTS OFF-SITE. APPROVED BARRIERS SHALL BE DOUBLE STAKED IN
ACCORDANCE WITH F.D.O.T. INDEX NO. 102 OR FDEP. IF EROSION DEPOSITS REACH THE TOP
ELEVATION OF EXISTING APPROVED BARRIERS, THEN SEDIMENTS SHOULD BE REMOVED. ANY
DAMAGED OR INEFFECTIVE APPROVED BARRIERS ARE TO BE REPLACED WITH NEW ONES. THE
LOCATION AND INSTALLATION OF APPROVED BARRIERS SHALL BE AS DIRECTED BY THE
PROJECT ENGINEER.
6. BACK OF SIDEWALK INLETS OR MEDIAN INLETS: THESE SHALL BE PROTECTED FROM SEDIMENT INTAKE UNTIL PROJECT IS COMPLETE. ELEVATION OF GROUND OUTSIDE INLET TOP SHALL NOT
BE HIGHER THAN INLET TOP. APPROVED BARRIERS OR OTHER APPROVED SEDIMENT CONTROL
DEVICES SHALL BE INSTALLED AROUND INLET TOP. A SECOND ROW OF APPROVED BARRIERS OR
OTHER APPROVED SEDIMENT CONTROL DEVICES SHALL BE PLACED AROUND INLET
APPROXIMATELY 4" OUTSIDE FIRST ROW. BETWEEN ROWS THERE SHALL BE A DEPRESSION TO
ACT AS A SEDIMENT BASIN. COMPLETED INLETS IN PAVED AREAS SHALL ALSO BE PROTECTED
WITH A SINGLE LINE OF APPROVED BARRIERS OR OTHER APPROVED SEDIMENT CONTROL
DEVICES TO PREVENT SEDIMENT INTAKE FROM OTHER AREAS.
7. STOCKPILED MATERIALS SHALL BE PROTECTED BY COVER, APPROVED BARRIERS OR OTHER
APPROVED SEDIMENT CONTROL DEVICES.
8. ALL DISTURBED AREAS SHALL BE STABILIZED WITHIN 3 DAYS AFTER 1/2" RAIN EVENT
DISTURBANCE.
9. CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE NECESSARY DEWATERING PERMITS FROM
THE LOCAL WATER MANAGEMENT DISTRICT OR OTHER REGULATORY AGENCY.
10. A DEWATERING PLAN MUST BE SUBMITTED AND APPROVED BY THE ENGINEER PRIOR TO
DISCHARGE.
11. IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL
STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION, OR OTHER ACCEPTABLE
METHODS.
12. THERE IS TO BE NO DISCHARGE (I.E. PUMPING, SHEET FLOW, SWALE, DITCH, ETC.) INTO EXISTING
DITCHES OR CANALS WITHOUT THE USE OF SETTLING PONDS OR DEVICES. IF THE
CONTRACTOR DESIRES TO DISCHARGE INTO EXISTING DITCHES OR CANALS A SETTLING PLAN
PREPARED BY THE CONTRACTOR MUST BE SUBMITTED TO AND APPROVED BY THE ENGINEER OF
RECORD AND LOCAL REGULATORY AGENCY PRIOR TO CONSTRUCTION.
13. WHERE APPLICABLE, SOIL TRACKING PREVENTION DEVICES SHALL BE PROVIDED AND
MAINTAINED PER F.D.O.T. INDEX NO. 106 OR FDEP.
14. ALL EROSION CONTROL FENCES, BARRIERS, AND SILTATION DEVICES SHALL BE ERECTED PRIOR
TO ANY LAND ALTERATIONS, SHALL BE MAINTAINED IN GOOD WORKING ORDER DURING
CONSTRUCTION, AND REMOVED FOLLOWING SOIL STABILIZATION AND FINAL DRESSING.
BUILT-UP SEDIMENT WILL BE REMOVED FROM SILT FENCES AND STAKED TURBIDITY BARRIERS
WHEN IT HAS REACHED ONE THIRD THE HEIGHT OF THE FENCE/BARRIER. STOCKPILE AREAS
SHALL INCLUDE SILT FENCE AROUND THE PERIMETER.
15. THE CONTRACTOR SHALL NOT RESTRICT OR BLOCK THE EXISTING DRAINAGE FLOW OVERLAND OR WITHIN RESHAPED SWALES. FLOW WITHIN EXISTING DRAINAGE PIPES SHALL BE MAINTAINED
AT ALL TIMES. STORMWATER WILL BE CONVEYED VIA EXISTING SWALES, DITCHES, OR
PROPOSED DITCHES, EXISTING AND PROPOSED STORM SEWERS.
16. DURING DEWATERING OPERATIONS, THE CONTRACTOR SHALL NOT DISCHARGE DIRECTLY TO
RECEIVING WATERS, EXISTING CONVEYANCES TO RECEIVING WATERS, OR WETLAND SYSTEMS.
TEMPORARY SEDIMENT BASINS, TRAPS, OR SILTATION REDUCTION DEVICES SHALL BE UTILIZED
TO COLLECT THE DISCHARGE FROM DEWATERING ACTIVITIES TO ELIMINATE THE POTENTIAL
FOR OFF-SITE SEDIMENT TRANSPORT AND TO INSURE THAT DIRECT DISCHARGE DOES NOT
OCCUR.
17. BANKS SHALL BE PROTECTED FROM EROSION OR COLLAPSE DURING CONSTRUCTION. BANK
PROTECTION MATERIAL SHALL BE CAREFULLY PLACED FROM THE BANK AND NOT DUMPED FROM
ABOVE IN AN UNCONTROLLED MANNER. EROSION CONTROL FABRIC SHALL BE USED FOR
EROSION PROTECTION WHERE SOD WILL NOT HOLD OR BECOME ESTABLISHED IN TIME TO
PROTECT THE BANKS. UNLESS OTHERWISE SPECIFIED IN THE PLANS, UPON COMPLETION OF
CONSTRUCTION, ALL BANKS AND WATERWAYS SHALL BE RESTORED TO THEIR PRE-
CONSTRUCTION CONFIGURATION AND PROTECTION FROM EROSION.
DETAIL- STAKED SILT BARRIER DETAILDETAIL-
N.T.S.
DETAIL- STAKED TURBIDITY BARRIER DETAILDETAIL-
N.T.S.
BUILDING
FF EL 11.27
4.7'
1.
2'
1.
2'
4.7'
4.
7'
4.
7'
1.2'
4.7'
1.
2'
1.2' 4.
7'
4.
8'
1.
2'4.7'
4.7' 1.
1'
4.
7'
1.1'
4.7'
1.
2'
4.7' 1.
2'
5.1' 1.
2'
1.2'
5.
2'
4.
7'1.2'
4.
7'1.2'
4.7'
1.
2'
1.2'
4.
7'4.
7'1.2'
.2
18.6'
19.6' 4.
8' 44.1' 5.
9' 17.1'
.4
65.5'
.2
6.0'
.1
23.4'
.6
81.8'6.
0'
17.3'
.7
45.8'
.0
4.9'
4.7' 1.2'
4.7' 1.
1'
1.2'
HALLWAY TO
ANOTHER BUILDING
COVERED
AREA (TYP)
PROPOSED 8' SIDEWALK
PROPOSED 6'
SIDEWALK, SEE DETAIL
ON SHEET CS-602
PROPOSED ASPHALT
DRIVEWAY
PROJECT LIMITS
PROJECT LIMITS
PROPOSED
TYPE 'F' CURB
.0'
9.3' 52.7'
.6'
2.7'
1.9
1.1
4.0'
.9'
75.3'
PROPOSED
DENTAL CLINIC
BUILDING
11,373 SF
FFE: 11.00
.0'
N1263725.73, E405471.79
PROPOSED
CONCRETE
SIDEWALK
N1263599.24, E405323.23
PROPOSED EOP
PROPOSED
STORMWATER
POND-1
N1263605.29, E405325.10
N1263631.94, E405390.15
N1263655.30, E405398.19
N1263671.92, E405344.35
N1263677.92, E405344.45
N1263866.35, E405367.39
N1263896.68, E405445.97
N1263755.06, E405515.68
N1263755.31, E405498.84
N1263735.28, E405530.07
N1263700.88, E405550.90
N1263695.01, E405568.56
N1263705.61, E405579.63
N1263698.11, E405586.81
N1263593.69, E405426.35
N1263603.70, E405729.49
N1263591.18, E405741.28
PROPOSED
TRANSFORMER PAD
(SEE ELEC PLANS)
PROPOSED ASPHALT
DRIVEWAY
N1263475.18, E405236.03
N1263467.28, E405237.70
N1263414.25, E405227.63
PROJECT LIMITS
N1263440.96, E405213.42
N1263876.61, E405374.13
N1263879.96, E405381.38
N1263491.92, E405273.77
N1263497.55, E405283.76
N1263445.57, E405520.95
N1263448.02, E405423.27
N1263446.44, E405323.24
N1263426.81, E405411.87
N1263443.20, E405373.08
N1263465.31, E405382.41
N1263464.32, E405505.82
N1263520.88, E405506.92
N1263560.30, E405409.90
N1263567.69, E405442.35
N1263602.94, E405335.97
N1263609.83, E405347.66
N1263597.01, E405333.54
N1263585.58, E405340.25
N1263572.23, E405447.10
N1263564.34, E405446.09
N1263627.80, E405498.89
N1263644.78, E405516.63
N1263587.84, E405457.14
N1263469.60, E405316.84
N1263586.36, E405349.60
N1263590.31, E405359.90
N1263597.30, E405357.98
N1263608.76, E405353.56
N1263671.64, E405356.38
N1263677.54, E405360.37
N1263684.65, E405370.18
N1263661.97, E405363.38
N1263864.57, E405374.29
N1263862.43, E405382.23
N1263729.17, E405383.60 N1263727.47, E405389.36
N1263519.18, E405597.64
N1263540.81, E405632.16
N1263484.61, E405277.01
N1263490.99, E405288.33
N1263505.35, E405308.92
N1263540.25, E405334.73
N1263511.91, E405304.34
N1263564.58, E405412.48
N1263866.00, E405475.79
N1263865.92, E405462.85
N1263882.31, E405445.09
N1263853.02, E405447.74
N1263803.72, E405453.11
N1263788.06, E405483.52
N1263861.94, E405371.33
N1263793.39, E405475.92
N1263796.47, E405425.04
N1263768.40, E405422.42
N1263735.79, E405463.98
N1263782.53, E405423.62
N1263736.54, E405449.43
N1263755.63, E405484.70
N1263703.73, E405626.45
N1263621.05, E405705.46
N1263687.80, E405623.24
N1263685.11, E405599.25
N1263686.27, E405618.12
N1263688.98, E405562.25
N1263617.34, E405467.61
N1263599.64, E405448.04
EXISTING LEGEND
EXISTING MANHOLES
EXISTING COMMUNICATION, UNDERGROUND
EXISTING NATURAL GAS, UNDERGROUND
EXISTING POWER, UNDERGROUND
EXISTING SANITARY SEWER, UNDERGROUND
EXISTING STORM SEWER, UNDERGROUND
EXISTING STORM SEWER, ROOF DRAIN
EXISTING SOLAR PANEL
EXISTING WATER, UNDERGROUND
EXISTING CURB
EXISTING EDGE OF PAVEMENT
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING TREES
EXISTING BOLLARD
BORING LOCATION
EXISTING SIGN
EXISTING LIGHT
EXISTING UTILITY POLE
EXISTING FENCE
EXISTING BUILDING
EXISTING SPOT ELEVATION100.55
EXISTING STORM SEWER, INLET
EXISTING SANITARY SEWER, CLEAN-OUT
EXISTING JUNCTION BOX
EXISTING WATER STRUCTURES
EXISTING VALVES
EXISTING SIDEWALK
PROJECT BOUNDARY LIMITS
EXISTING ASPHALT DRIVEWAY
EXISTING GRAVEL PAVEMENT
EXISTING OVERHEAD ELECTRIC
EXISTING OVERGROWTH
EXISTING TRANSFORMER
EXISTING SUPPORT POST
EXISTING DIRT DRIVE
PROPOSED LEGEND
PROPOSED CURB LINE
PROPOSED EDGE OF PAVEMENT
PROPOSED BUILDING OUTLINE
PROPOSED SIDEWALK
PROPOSED BUILDING OVERHANG
PROPOSED BAHIA SOD
5.7
4% PROPOSED SLOPE
PROPOSED SPOT ELEVATION
PROPOSED ASPHALT PAVEMENT
PROPOSED CURB STOP
PROPOSED TREE LINE
PROPOSED DETECTABLE WARNING
PROPOSED POROUS ASPHALT PAVEMENT
PROPOSED SAND GROWN BAHIA SOD
Revisions DateRevisions Date
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
CONSTRUCT
DENTAL CLINC
09/06/2022 APJS
516-349
BAY PINES, FL
BUILDING
100% 21001.00
Revisions Date
PENNONI ASSOCIATES INC.
5755 Rio Vista Dr
Clearwater, FL 33760 T 727.451.9561
Florida COA: 7819
1 65% DESIGN 05/24/2022
CONSTRUCTION SET
CS - 100_____________
GEOMETRIC CONTROL PLAN
SITE INFORMATION:
ADDRESS: 10000 BAY PINES BLVD
BAY PINES, FL 33744
CONTRACTING U.S. DEPT. OF VETERANS AFFAIRS
5755 RIO VISTA DRIVE
CLEARWATER, FL 33760
00 20' 40'
N O
R
TH
BUILDING
FF EL 11.27
SOLAR PANEL INVERTER
METAL STAIRS
ON CONC PAD
(TYP)
LANDSCAPED
AREA (TYP)
LANDSCAPED
AREA (TYP)
EXISTING
OVERGROWTH
CONC
BASKETBALL
COURT
8" POLE
(TYP)
EXERCISE
AREA
2" METAL
POST
2" METAL PIPE
6" CURB
AROUND PLANTER
4.7'
1.
2'
1.
2'
4.7'
4.
7'
4.
7'
1.2'
4.7'
1.
2'
1.2' 4.
7'
4.
8'
1.
2'4.7'
4.7' 1.
1'
4.
7'
1.1'
4.7'
1.
2'
4.7' 1.
2'
5.1' 1.
2'
1.2'
5.
2'
4.
7'1.2'
4.
7'1.2'
4.7'
1.
2'
1.2'
4.
7'4.
7'1.2'
.2
18.6'
19.6' 4.
8' 44.1' 5.
9' 17.1'
.4
65.5'
.2
6.0'
.1
23.4'
.6
81.8'6.
0'
17.3'
.7
45.8'
.0
12"
10"
20" TWIN
14"
24"
20"
10"
12"
38"
12"
8"
10"
9" TWIN
18"
28"
12"
13"
14"
22"
6"
7" 7"
9" TWIN
36"
10"
34"
12" 12"
SOLAR PANEL
SOLAR PANEL
SOLAR PANEL
SOLA
R PANEL
SOLAR PANEL
EQUIPMENT
4.9'
4.7' 1.2'
4.7' 1.
1'
1.2'
HALLWAY TO
ANOTHER BUILDING
CONC WALK
(TYP)
CONC WALK
(TYP)
COVERED
AREA (TYP)
ASPHALT
DRIVEDROP INLET (TYP)
POST
(TYP)
GROUNDING ROD
(TYP)
16"
18"
PROPOSED 8' SIDEWALK
PROPOSED 6'
SIDEWALK, SEE DETAIL
ON SHEET CS-602
PROPOSED ASPHALT
DRIVEWAY
PROJECT LIMITS
PROJECT LIMITS
PROPOSED
TYPE 'F' CURB
.0'
9.3' 52.7'
.6'
2.7'
1.9
1.1
4.0'
.9'
75.3'
PROPOSED
DENTAL CLINIC
BUILDING
11,373 SF
FFE: 11.00
.0'
PROPOSED
CONCRETE
SIDEWALK
PROPOSED EOP
PROPOSED
STORMWATER
POND-1
PROPOSED
TRANSFORMER PAD
(SEE ELEC PLANS)
PROPOSED
45° PARKING
(TYP)
PROPOSED
WHEEL STOP
(TYP)
PROPOSED
POROUS PAVEMENT
PARKING AREA
42 SPACES
PROPOSED DETECTABLE
WARNING SYSTEM
PROPOSED
FLUSH
SIDEWALK
PROPOSED
FLUSH
SIDEWALK
PROPOSED STEP
PROPOSED
TYPE-F CURB
PROPOSED
LOADING DOCK
PROPOSED
EDGE OF
PAVEMENT
PROPOSED
EDGE OF
PAVEMENT
PROPOSED ASPHALT
DRIVEWAY
PROJECT LIMITS
PROPOSED
FLUSH
SIDEWALK
EXISTING LEGEND
EXISTING MANHOLES
EXISTING COMMUNICATION, UNDERGROUND
EXISTING NATURAL GAS, UNDERGROUND
EXISTING POWER, UNDERGROUND
EXISTING SANITARY SEWER, UNDERGROUND
EXISTING STORM SEWER, UNDERGROUND
EXISTING STORM SEWER, ROOF DRAIN
EXISTING SOLAR PANEL
EXISTING WATER, UNDERGROUND
EXISTING CURB
EXISTING EDGE OF PAVEMENT
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING TREES
EXISTING BOLLARD
BORING LOCATION
EXISTING SIGN
EXISTING LIGHT
EXISTING UTILITY POLE
EXISTING FENCE
EXISTING BUILDING
EXISTING SPOT ELEVATION100.55
EXISTING STORM SEWER, INLET
EXISTING SANITARY SEWER, CLEAN-OUT
EXISTING JUNCTION BOX
EXISTING WATER STRUCTURES
EXISTING VALVES
EXISTING SIDEWALK
PROJECT BOUNDARY LIMITS
EXISTING ASPHALT DRIVEWAY
EXISTING GRAVEL PAVEMENT
EXISTING OVERHEAD ELECTRIC
EXISTING OVERGROWTH
EXISTING TRANSFORMER
EXISTING SUPPORT POST
EXISTING GROUNDING ROD
EXISTING DIRT DRIVE
PROPOSED LEGEND
PROPOSED CURB LINE
PROPOSED EDGE OF PAVEMENT
PROPOSED BUILDING OUTLINE
PROPOSED SIDEWALK
PROPOSED BUILDING OVERHANG
PROPOSED BAHIA SOD
5.7
4% PROPOSED SLOPE
PROPOSED SPOT ELEVATION
PROPOSED ASPHALT PAVEMENT
PROPOSED CURB STOP
PROPOSED TREE LINE
PROPOSED DETECTABLE WARNING
PROPOSED POROUS ASPHALT PAVEMENT
PROPOSED SAND GROWN BAHIA SOD
Revisions DateRevisions Date
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
CONSTRUCT
DENTAL CLINC
09/06/2022 APJS
516-349
BAY PINES, FL
BUILDING
100% 21001.00
Revisions Date
PENNONI ASSOCIATES INC.
5755 Rio Vista Dr
Clearwater, FL 33760 T 727.451.9561
Florida COA: 7819
1 65% DESIGN 05/24/2022
CONSTRUCTION SET
CS - 101_____________
SITE PLAN
SITE INFORMATION:
ADDRESS: 10000 BAY PINES BLVD
BAY PINES, FL 33744
CONTRACTING U.S. DEPT. OF VETERANS AFFAIRS
5755 RIO VISTA DRIVE
CLEARWATER, FL 33760
00 20' 40'
N O
R
TH
| Bay Pines VA Dental Clinic - 100% Construction Set - Civil Plans |
| VF-041 |
| GC-051 - Layout1 |
| GC-052 - Layout1 |
| GC-053 - Layout1 |
| CD-071 - Layout1 |
| GK-072 - Layout1 |
| CS-100 - Layout1 |
| CS-101 - Layout1 |
| CS-151 - Layout1 |
| CS-170 - CS-171 |
| CS-171 - Layout1 |
| LS-401 - LANDSCAPE PLAN |
| CS-401 - Layout1 |
| CS-402 - Layout1 |
| CK-601 - Layout1 |
| CK-602 - Layout1 |
File details come from the government source that posted it. Updated .