This document provides details for a federal contract opportunity for construction services. The Solicitation Number 140L0624R0026 is for the Sloan Canyon Contact Station Construction and Delegated Design project with the Department of the Interior Bureau of Land Management National Office as the contracting agency. The opportunity involves construction and delegated design services to build the Sloan Canyon Contact Station. No further information is provided on response dates, award dates, pricing terms, set asides or other contract details.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINAL DRAINAGE REPORT
SLOAN CANYON NATIONAL
CONSERVATION AREA VISITOR
CENTER CONTACT STATION
2 9 9 8 N A W G H A W P O A R O A D
H E N D E R S O N , N E V A D A 8 9 044
P R E P A R E D F O R U N I T E D S T A T E S D E P A R T M E N T O F
T H E I N T E R I O R B U R E A U O F L A N D M A N A G E M E N T
P R E P A R E D B Y S H O R T E L L I O T T H E N D R I C K S O N , I N C .
( S E H , I N C . ) S E H P r o j e c t N u m b e r : 1 4 8 0 4
August 16, 2021
A P P L I C A N T I N F O R M A T I O N
Owner: U.S. Bureau of Land Management
Prepared by: Short Elliott Hendrickson, Inc. (SEH) 2000 South Colorado Boulevard, Suite 6000 Denver, CO 80222-7938
E N G I N E E R I N G S T A T E M E N T S
ENG IN E ER ’S STAT EM E N T
This report for the drainage design for the Sloan Canyon National Conservation Area Visitor Center Contact Station was prepared by me (or under my supervision) in accordance with the provisions of Clark County Region Flood Control District Hydrologic Criteria and Drainage Design Manual and was designed to comply with the provisions therein.
By: James D. Hayson
Licensed Professional Engineer
State of Nevada No. 019781
Table of Contents
Sloan Canyon Visitor Center – Final Drainage Report
E X E C U T I V E S U M M A R Y
Table of Contents
Introduction
A. Site Location
Figure 1 – Project Location Map
B. Site Description
C. Proposed Project Description
D. Flood Hazard
Historic Drainage
A. Existing Basins
Proposed Drainage
A. Proposed Basins
B. Basin Hydraulic Analysis
Table 1 – 1-hr Rainfall Depths Based on CCRFCD Criteria and included NOAA
Atlas 2 figure
Table 2 – Proposed Peak Flow Results
C. Water Quality and Detention
Conclusion
References
List of Tables
Table 1 – 1-hr Rainfall Depths Based on CCRFCD Criteria and included NOAA Atlas 2 figure
Table 2 – Proposed Peak Flow Results
List of Figures
Figure 1 – Project Location Map 4
List of Appendices
Appendix A – Soil Map
Appendix B – Flood Hazard Map
Appendix C – Existing Drainage Basin Map
Appendix D – Proposed Drainage Basin Map
Appendix E – Hydrologic and Hydraulic Calculations
Sloan Canyon Visitor Center – Conceptual Drainage Study Page 4 of 12
INTR O DU CT IO N
The purpose of this Final Drainage Report is to present the design methodology and results for a drainage study and improvements associated with the construction of a new Visitor Center Contact Station at Sloan Canyon National Conservation Area. As feasible, the improvement design meets the drainage requirements outlined in the Clark County Region Flood Control District Hydrologic Criteria and Drainage Design Manual (Clark County Reginal Flood Control District, 2014).
The project is also subject to the criteria in Section 438 of the Energy Independence and Security Act (EISA 438).
The document, Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438 (December 2009) has two options to address storm water. The first is to retain the 95th percentile (20-year) Storm and allow it to infiltrate. The second is to use a site specific hydrologic analysis to limit release rates to historic values. Option two was chosen as it is more in line with the Clark County Region Flood Control District Hydrologic Criteria (CCRFCD) and Drainage Design Manual and soil type and depth to bedrock do not lend the site to infiltration. The CCRFCD criteria was used to carry out the site specific analysis.
A. Site L oc ation
The project is located in Henderson, Clark County, Nevada. Nawghaw Poa Road up to the parking lot is in within the City of Henderson Limits. The Visitor Center is located within unincorporated Clark County, approximately 0.7 miles south of Democracy Drive. The site is located within the southwest ¼ of Section 26, Township 23 South, Range 61 West. The general project location is shown in Figure 1.
Figure 1 – Project Location Map
B. Site Desc ription
The Visitor Center Contact Station at Sloan Canyon National Conservation Area currently consists of approximately 19 parking spaces supporting a mobile trailer as the visitor center. The facility sits on a ridge near the top of the drainage basin. The existing two lane paved Nawghaw Poa Road (the access road) with adjacent 10-12 foot paved trail provides access to the facility. The access road runs from the building along
Project Location
Democracy Drive
Sloan Canyon Visitor Center – Conceptual Drainage Study Page 5 of 12 the same ridge to the north and connects to Democracy Drive. The facility sits on the edge of the Sloan Canyon National Conservation Area. The surrounding terrain is generally undeveloped desert typically with hydrologic group D soil. Soil Map can be found in Appendix A.
C. Prop osed P rojec t D escrip tion
A permanent Visitor Center and Amphitheater is proposed to be constructed along with a paved surface parking lot to support the facility. The parking improvements will tie in to the existing access road. A water line will be installed along the road to supply the facility with water for domestic and fire. A pump station will be needed near Democracy Drive to provide pressure necessary at the facility. A septic system will be installed to the north of the facility. A sanitary line for future use will be installed along the access road to be stubbed out near Democracy Drive. A detention pond will be constructed in the available space with in the parking lot to provide flood attenuation and water quality.
D. Flood H az ard
The project site is located in a FEMA flood Zone X. Zone X is defined as the 500-year flood zone, areas in the 100 year flood zone with average depth less than one foot, or with drainage areas of less than one square mile.
The project area is split between Firm Map 32003C2925D and 32003C2950D. These maps have not been printed by FEMA, therefore Firmette maps have been created from FEMA’s National Flood Hazard Layer Viewer and have been included in Appendix B.
HIS T OR IC DR A IN AG E
The site is currently surrounded by undeveloped naturally draining land. The site in located on a ridge and the access road generally runs down the same ridge to Democracy Drive. Drainage is divided at the facility due to the ridge with approximately 70% of the study area headed to the northeast and the 30% to the northwest. The flow along the road generally spits at the road centerline and continues east or west to the natural drainage ways. The access road intersects Democracy Drive at a high point and all flows on the east head east along Democracy Drive in a roadside swale. All flows west of the intersection continue along Democracy Drive west and turn north to join the main drainage path.
A. Existing Basins
Existing basins were delineated within the same overall footprint as the proposed basins to examine the affect the proposed site will have on existing drainage. This basin was then subdivided into two sub-basins along the ridge. The overall existing site is 13.2% impervious. The Existing Drainage Basin Map can be found in Appendix C.
Basin EX1 is a 1.42-acre area on the east half of the existing site. It consists of undeveloped desert and the majority of the existing paved parking lot and road. The basin is 38.2% impervious.
Basin EX2 is a 3.62-acre area on the west half of the existing site. It consists mostly of undeveloped desert with a small portion of the existing paved parking lot and road. The basin is 3.4% impervious.
PR OPOS E D DR AIN AG E
The major affect the project will have on existing drainage is an increase in imperviousness. Proposed conditions will have an impervious value of 38.4% which is a considerable increase from the existing 13.2%. The majority of flows will be conveyed to a constructed pond on the north end of the parking lot. Flows will then be discharged to the east and west from an outlet structure with dual pipes to preserve the existing historic flow split. The Proposed Drainage Basin Map can be found in Appendix D.
A. Prop osed Basins
Basin A1 is a 0.89-acre basin on the eastern half of the site. It contains offsite undeveloped desert to the south, the proposed building, and the eastern half of the parking lot. The basin has an impervious value of 67.7%.
Runoff from the offsite portion flow onsite and is joined by onsite flows and continue north to the proposed pond.
Sloan Canyon Visitor Center – Conceptual Drainage Study Page 6 of 12
Basin A2 is a 0.70-acre basin on the western half of the site. It contains offsite undeveloped desert to the south and western half of the parking lot. The basin has an impervious value of 91.5%. Runoff from the offsite portion flow onsite and is joined by onsite flows and continue north to the proposed pond.
Basin A3 is the 0.86-acre encompassing the proposed detention pond. It contains a portion of the parking lot, the sidewalk adjacent to the pond and the pond. It has an impervious value of 44.7%. Flow are collected in the pond where flood attenuation and water quality will be provided
Basin A4 is a 0.31-acre basin consisting of the majority of the roof of the visitor center, the surrounding walks, and desert area. The basin has an impervious value of 50.5%. Runoff is collected by proposed roof drains and area inlets and directed to the proposed pond via 8” HDPE landscaping drain. Pipe capacity calculations can be found in Appendix E.
Basin B1 is a 0.23-acre basin consisting of the asphalt roadway to the north of the pond. The basin has an impervious value of 100%. This portion cannot be captured due to the topography and will flow down the road.
Flows will spread off the road to the east and west and into the adjacent drainages on either side of the roadway as flows do in the existing condition.
Basin C1 is a 0.79-acre basin consisting of the area that drains to the amphitheater. The majority of the basin is undeveloped desert and the concrete amphitheater. The basin has an impervious value of 9.6%. This portion cannot be directed due to the topography and will flow down the road. Runoff will be collected in the low spot of the amphitheater by an area drain and will be carried east via a proposed storm pipe that will be conveyed to a proposed riprapped settling basin that will help trap sediment and spread flows to prevent erosion at the outlet of the proposed storm pipe.
Basin OS1 is the 1.96-acre basin to the south and west of the site. The basin is entirely undeveloped desert land that drains to the south side of the site parking lot and will be diverted around the site to the west via a proposed diversion channel. The channel will discharge to a level spreader allowing runoff to continue to the existing drainage. The flow from this basin will be diverted around the site to historic drainage paths and will have no adverse effects on the downstream system. The proposed diversion swale has been sized to carry the 100-year flow from the basin of 3.94 cfs.
Basin OS2 is the basin that drains to and around the building as well as the slopes grading back to existing along the east edge of the facility. These flows will be released undetained to follow historic drainage paths.
Due to topography these flows could not be kept on site but are not anticipated to cause any detrimental effects.
B. Basin H yd raul ic Analysis
Maximum discharge for each basin was calculated using the Rational Method as directed by Clark County Region Flood Control District (CCRFCD) Hydrologic Criteria and Drainage Design Manual (HCDDM) section
500. Rainfall depths are based on the NOAA Atlas 2 maps provided in the HCDDM figures 501-512. These figures are used in conjunction with CCRFCD Standard From 3 and the methodology laid out in section 502 of the HCDDM to compute the design storm depths. CCRFCD uses 10-year and 100-year as the minor and major respective storms for design. Runoff coefficients and Peak flows for these storms can be found in Table 2 below.
Table 1 – 1-hr Rainfall Depths Based on CCRFCD Criteria and included NOAA Atlas 2 figure
Design Storm
Rainfall Depth (in)
10-yr 1.39
100-yr 2.35
Sloan Canyon Visitor Center – Conceptual Drainage Study Page 7 of 12
Table 2 – Proposed Peak Flow Results
Basin Summary
Basin
ID
Contributing Area (AC)
Runoff Coefficient Peak Runoff Flow (cfs)
Design Point
% Impv C10 C100 Q10 Q100
A1 1 0.89 67.7 0.69 0.79 1.12 2.16
A2 2 0.70 91.5 0.85 0.89 1.33 2.36
A3 3 0.86 44.7 0.54 0.69 1.12 2.42
A4 4 0.31 50.5 0.59 0.71 0.44 0.89
B1 5 0.23 100.0 0.90 0.93 0.50 0.88
C1 6 0.79 9.6 0.31 0.54 0.38 1.11
OS1 7 1.96 0.0 0.25 0.50 1.17 3.94
OS2 0.48 0.0 0.25 0.50 0.29 0.97
Hydrologic and Hydraulic calculations used to find these values can be found in Appendix E.
C. Water Q u ality and Detention
Water quality and detention have been provided for Basin A1, A2, A3 and A4. The HCDDM requires a 24-hour minimum drain time for the water quality event and the 100-year storm event. The 100-year storm is to be released at historic rates. The methods for water quality and detention calculations from the HCDDM sections
1203.1.2 and 1207.1 were used. It was calculated that a volume of 0.049 acre-ft is needed for water quality and 0.180 acre-ft for 100-year detention to meet the required drain times and release rates. Section 1207 of the HCDDM suggests Denver Urban Drainage Flood Control District as a location for water quality and detention basin outlet structure sizing. The pond outlet structure was sized using Mile High Flood District (formerly Denver Urban Drain Flood Control District) MHFD-Detenion_v4.03 spreadsheet. Mile High Flood District suggests a 40-hour drain time for the water quality and 100-year events. The 40-hour drain time was selected for this design. The outlet structure will have dual outlet 18” HDPE pipes such that the flows can be directed to both sides of the ridge as they are under existing conditions. The outlet pipes from the pond will each release to a level spreader and 12” D50 riprap to mitigate erosion at discharge points. Pond sizing calculations can be found in Appendix E.
CONC LU S I ON
The proposed improvements to Sloan Canyon National Conservation Area Visitor Center Contact Station increase the imperviousness of the study area from 10.7% to 33.5%. A proposed detention pond will meet the EISA 438 and CCRFCD HCDDM drain time and release rate criteria for improvements and will provide adequate flood protection and water quality during the design events. The proposed site will not have adverse drainage effects on adjacent or downstream properties.
Sloan Canyon Visitor Center – Conceptual Drainage Study Page 8 of 12
REF ER ENC ES
Clark County Regional Flood Control District. (August 1999). Hydrologic Criteria and Drainage Design
Manual, Volume 2, Structures, Storage, and Recreation. Las Vegas, Nevada: Clark County Regional Flood
Control District (with September 2014 updates).
United States Environmental Protection Agency. (December 2009). Technical Guidance on Implementing the Stormwater Runoff Requirements for Federal Projects under Section 438. Washington, DC: Office of
Water (4503T)
Sloan Canyon Visitor Center – Conceptual Drainage Study
Appendix A – Soil Map
Soil Map—Las Vegas Valley Area, Nevada, Part of Clark County
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
5/15/2019
668600 668700 668800 668900 669000 669100 669200 669300 669400 669500 669600 669700
668700 668800 668900 669000 669100 669200 669300 669400 669500 669600 669700
35° 55' 37'' N
5°
' 5 3'
' W 35° 55' 37'' N
5°
' 7
'' W
35° 54' 48'' N
5°
' 5
3' ' W
35° 54' 48'' N
5°
' 7
'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 350 700 1400 2100
Feet 0 100 200 400 600
Meters Map Scale: 1:7,360 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) Area of Interest (AOI)
Soils Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features Streams and Canals
Transportation Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background Aerial Photography
The soil surveys that comprise your AOI were mapped at 1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map measurements.
Source of Map: Natural Resources Conservation Service Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Las Vegas Valley Area, Nevada, Part of Clark County Survey Area Data: Version 13, Sep 14, 2018
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: May 7, 2011—Oct 1, The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Soil Map—Las Vegas Valley Area, Nevada, Part of Clark County
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
5/15/2019
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
150 Cave very stony sandy loam, 0 to 4 percent slopes
12.8 8.0%
152 Cave gravelly fine sandy loam, 0 to 4 percent slopes
146.7 92.0%
Totals for Area of Interest 159.5 100.0%
Soil Map—Las Vegas Valley Area, Nevada, Part of Clark County
Natural Resources Conservation Service
Web Soil Survey National Cooperative Soil Survey
5/15/2019
Appendix B– Flood Hazard Map
USGS The National Map: Orthoimagery. Data refreshed April, 2019.
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250 Feet
Ü
5°
7'5 2.6
6"W 35°55'13.27"N
115°7'15.20"W
35°54'44.13"N
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE) Zone A, V, A99
With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes. Zone X Area with Flood Risk due to Levee Zone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline Profile Baseline Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study Jurisdiction Boundary
Digital Data Available No Digital Data Available Unmapped
This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 5/15/2019 at 8:39:17 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time.
This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
1:6,000
B 20.2
The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location.
0 500 1,000 1,500 2,000250 Feet
Ü
5°
7'4 7.4
2"W 35°55'31.38"N
115°7'9.96"W
35°55'2.24"N
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE) Zone A, V, A99
With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes. Zone X Area with Flood Risk due to Levee Zone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline Profile Baseline Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study Jurisdiction Boundary
Digital Data Available No Digital Data Available Unmapped
This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 5/15/2019 at 8:43:40 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time.
This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
1:6,000
B 20.2
The pin displayed on the map is an approximate
0 500 1,000 1,500 2,000250 Feet
Ü
5°
7'4 3.8
6"W 35°55'47.27"N
115°7'6.41"W
35°55'18.13"N
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE) Zone A, V, A99
With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes. Zone X Area with Flood Risk due to Levee Zone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood Hazard Zone D
Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline Profile Baseline Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study Jurisdiction Boundary
Digital Data Available No Digital Data Available Unmapped
This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 5/15/2019 at 8:42:52 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time.
This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
1:6,000
B 20.2
The pin displayed on the map is an approximate
Appendix C– Existing Drainage Basin Map
Appendix D– Proposed Drainage Basin Map
Appendix E– Hydrologic and Hydraulic Calculations
From CCRFCD Criteria Manual Section 502.2
X1 = 1.00
X2 = 1.20
X3 = 2.20
X4 = 3.10
Y2 = 0.774
Y100 = 1.672774194
2-year 0.76 1 0.76
5-year 0.98 1.16 1.1368
10-year 1.12 1.24 1.3888
25-year 1.31 1.33 1.7423
50-year 1.48 1.39 2.0572
100-year 1.64 1.43 2.3452
Duration Ratio 2-year 5-year 10-year 25-year 50-year 100-year
(min) Inc Depth Intensity Inc Depth Intensity Inc Depth Intensity Inc Depth Intensity Inc Depth Intensity Inc Depth Intensity
5 0.29 0.22 2.64 0.33 3.96 0.40 4.83 0.51 6.06 0.60 7.16 0.68 8.16
10 0.45 0.34 2.05 0.51 3.07 0.62 3.75 0.78 4.70 0.93 5.55 1.06 6.33
15 0.57 0.43 1.73 0.65 2.59 0.79 3.17 0.99 3.97 1.17 4.69 1.34 5.35
30 0.79 0.60 1.20 0.90 1.80 1.10 2.19 1.38 2.75 1.63 3.25 1.85 3.71
60 1 0.76 0.76 1.14 1.14 1.39 1.39 1.74 1.74 2.06 2.06 2.35 2.35
Adj Factor
Adj 1-Hr
Depth 3Depth
1Y2 and Y100 are plotted and connected on Standard Form 3 from CCRFCS Criteria manual to find intermediate depths
2 Depths from Standard Form 3 are multiplied by Adjustment factor from from CCRFCS Criteria manual
Table 501
Where:
Y2 = 2-yr 1-hr estimated value
Y100 = 100-yr 1-hr estimated value
X1 = 2-yr 24-hr value from Figure 501
X2 = 2-yr 24-hr value from Figure 506
X3 = 100-yr 24-hr value from Figure 507
Adjusted 1-Hour Depths are multiplied by the ratios in CCRFCS Criteria manual Table 504 to obtain rainfall depth durations less than 1-hour.
The depths are converted to intensities (in/hr) by dividing by the duration
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
0 10 20 30 40 50 60 70
In te n si ty in /h r)
Time (min)
Time-Intensity Frequency Cruve
2-year 5-year 10-year 25-year 50-year 100-year
Site Location - 0.99"
Site Location - 1.35"
Site Location - 1.49"
Site Location - 1.80"
Site Location - 1.90"
Site Location - 2.20"
Site Location - 1.19"
Site Location - 1.65"
Site Location - 1.96"
Site Location -2.45"
Site Location - 2.79"
Site Location - 3.20"
1.5
2.5
1.5
0.5
0.98 1.31
1.12
1.48
0.76
1.64
Sloan Canyon Visitor Center
Intensity
Time
(min)
I2
(in/hr)
I5
(in/hr)
I10
(in/hr)
I50
(in/hr)
I100
(in/hr) Basin ID
Tc
(min)
I2
(in/hr)
I5
(in/hr)
I10
(in/hr)
I50
(in/hr)
I100
(in/hr)
* 5 2.645 3.956 4.833 7.159 8.161
6 2.526 3.779 4.616 6.838 7.795 EX1 18.16 1.62 2.42 2.96 4.39 5.00
7 2.408 3.601 4.400 6.517 7.430 EX2 18.88 1.60 2.39 2.92 4.32 4.92
8 2.289 3.424 4.183 6.196 7.064
9 2.171 3.247 3.966 5.875 6.698
* 10 2.052 3.069 3.750 5.554 6.332
11 1.988 2.974 3.633 5.382 6.135
12 1.924 2.878 3.516 5.209 5.938
13 1.860 2.783 3.400 5.036 5.741
14 1.797 2.687 3.283 4.863 5.544
* 15 1.733 2.592 3.166 4.690 5.347
16 1.697 2.539 3.102 4.594 5.238
17 1.662 2.486 3.037 4.498 5.128
18 1.626 2.433 2.972 4.402 5.019
19 1.591 2.380 2.907 4.306 4.909 2 1 0.76 0.76
20 1.555 2.327 2.842 4.210 4.800 5 1.16 0.98 1.14
21 1.520 2.274 2.778 4.114 4.690 10 1.24 1.12 1.39
22 1.485 2.221 2.713 4.018 4.581 25 1.33 1.31 1.74
23 1.449 2.167 2.648 3.922 4.472 50 1.39 1.48 2.06
24 1.414 2.114 2.583 3.826 4.362 100 1.43 1.64 2.35
25 1.378 2.061 2.518 3.730 4.253 Notes:
26 1.343 2.008 2.454 3.634 4.143 1 - CCRFCD Precipitation Adjustment Ratios Table 501
27 1.307 1.955 2.389 3.538 4.034 2 - Calculated depth from CCRFCD Standard Form 3
28 1.272 1.902 2.324 3.442 3.924 3 - Adjusted Depths = Precip Ratio x Depth
29 1.236 1.849 2.259 3.346 3.815
* 30 1.201 1.796 2.194 3.250 3.705
31 1.186 1.774 2.167 3.211 3.660
32 1.171 1.752 2.141 3.171 3.615
33 1.157 1.730 2.114 3.131 3.569
34 1.142 1.708 2.087 3.091 3.524
35 1.127 1.686 2.060 3.052 3.479
36 1.113 1.664 2.033 3.012 3.433
37 1.098 1.642 2.006 2.972 3.388
38 1.083 1.620 1.980 2.932 3.343
39 1.069 1.598 1.953 2.892 3.297
40 1.054 1.576 1.926 2.853 3.252
41 1.039 1.554 1.899 2.813 3.207
42 1.024 1.532 1.872 2.773 3.161
43 1.010 1.510 1.845 2.733 3.116
44 0.995 1.488 1.818 2.694 3.071
45 0.980 1.466 1.792 2.654 3.025
46 0.966 1.444 1.765 2.614 2.980
47 0.951 1.423 1.738 2.574 2.935
48 0.936 1.401 1.711 2.534 2.889
49 0.922 1.379 1.684 2.495 2.844
50 0.907 1.357 1.657 2.455 2.799
51 0.892 1.335 1.630 2.415 2.753
52 0.878 1.313 1.604 2.375 2.708
53 0.863 1.291 1.577 2.336 2.663
54 0.848 1.269 1.550 2.296 2.617
55 0.833 1.247 1.523 2.256 2.572
56 0.819 1.225 1.496 2.216 2.527
57 0.804 1.203 1.469 2.177 2.481
58 0.789 1.181 1.443 2.137 2.436
59 0.775 1.159 1.416 2.097 2.391
60 0.760 1.137 1.389 2.057 2.345
Notes:
Intensities calculated per CCRFCD Section 500
Return
Period
Precip
Ratios 1 Depth
Adj
Depths
Sloan Canyon Visitor Center BY: DH
Proposed Composite C and Imperviousness DATE: 5/22/2019
CHECKED BY: SJ
DATE: 5/22/2019
Sub-Basin Data
Basin ID Description
Total
Area (ac) C10 C100 I(%) C10 C100
I(%)
Area
(ac) C10 C100 I(%)
Area
(ac) C10 C100 I(%)
Area
(ac) C10 C100 I(%)
Area
(ac)
0.90 0.93 100.00 0.88 0.89 95.00 0.85 0.87 90.00 0.25 0.50 0.00
EX1 2.62 0.39 0.59 20.8 0.90 0.93 100.00 0.54 0.88 0.89 95.00 0.85 0.87 90.00 0.25 0.50 0.00 2.07
EX2 3.62 0.27 0.51 3.4 0.90 0.93 100.00 0.12 0.88 0.89 95.00 0.85 0.87 90.00 0.25 0.50 0.00 3.50
Total Project Total 6.23 0.32 0.55 10.7 0.90 0.93 100.00 0.67 0.88 0.89 95.00 0.00 0.85 0.87 90.00 0.00 0.25 0.50 0.00 5.57
Notes:
Percent Imperviousness, I(%) is from CCRFCD Table 601
C5 is from CCRFCD Table 601
C10 is from CCRFCD Table 601
Composite C & I Paved Roads Drives and Walks Roofs Undeveloped Areas
BY: DH
Sloan Canyon Visitor Center DATE: 5/22/2019
Time of Concentration SJ
5/22/2019
Tc
C10
L1
(ft)
S
Ti
(min)
LTotal
(ft)
L2
(ft)
Sw
(ft/ft)
V
(ft/s)
Tt
(min)
Ti+Tt
(min)
EX1 2.62 0.39 440 4.0 17.0 640 200 0.020 2.8 1.2 18.2
EX2 3.62 0.27 350 4.0 17.7 550 200 0.020 2.8 1.2 18.9
Average basin slope calculated from site topographic mapping
CCRFCD Hydrologic Criteria and Drainage Design Manual (Eq 602)
CCRFCD Hydrologic Criteria and Drainage Design Manual (Fig 602)
Length / Velocity
Summation of Initial Overland Time and Travel Time (minimum 5 min)
CHECKED BY:
DATE:
INITIAL / OVERLAND TIME (Ti) OVERLAND TRAVEL TIME (Tt)
BASIN ID
AREA
(acre)
P:\AE\B\BLMNS\148049\99 Civil and Survey\5-final-dsgn\50-final-dsgn\10-Civil\Drainage\Sloan Rational EX.xlsx 3 of 4
Sloan Canyon Visitor Center DATE: 5/22/2019
Flow Rates for the 10-Year and 100-Year Storm Events CHECKED BY: SJ
DATE: 5/22/2019
BASIN ID
AREA
(acre) C10 C100
I10
(in/hr)
I100
(in/hr)
Q10
(cfs)
Q100
(cfs)
EX1 2.62 0.390 0.590 2.96 5.00 1.51 3.9
EX2 3.62 0.270 0.510 2.92 4.92 1.42 4.5
Q=KCIA where K is a local adjustment factor. K = 0.5 for the CCRFCD area per CCRFCD Criteria Manual Section 604 Time-Intensity-Frequency Cuver with Tc used to determine Intensities
P:\AE\B\BLMNS\148049\99 Civil and Survey\5-final-dsgn\50-final-dsgn\10-Civil\Drainage\Sloan Rational EX.xlsx 4 of 4
Sloan Canyon Visitor Center
Intensity
Time
(min)
I2
(in/hr)
I5
(in/hr)
I10
(in/hr)
I50
(in/hr)
I100
(in/hr) Basin ID
Tc
(min)
I2
(in/hr)
I5
(in/hr)
I10
(in/hr)
I50
(in/hr)
I100
(in/hr)
* 5 2.645 3.956 4.833 7.159 8.161
6 2.526 3.779 4.616 6.838 7.795 A1 10.99 1.99 2.98 3.63 5.38 6.14
7 2.408 3.601 4.400 6.517 7.430 A2 6.52 2.46 3.69 4.50 6.67 7.61
8 2.289 3.424 4.183 6.196 7.064 A3 5.00 2.64 3.96 4.83 7.16 8.16
9 2.171 3.247 3.966 5.875 6.698 A4 5.00 2.64 3.96 4.83 7.16 8.16
* 10 2.052 3.069 3.750 5.554 6.332 B1 5.00 2.64 3.96 4.83 7.16 8.16
11 1.988 2.974 3.633 5.382 6.135 C1 16.11 1.69 2.53 3.09 4.58 5.23
12 1.924 2.878 3.516 5.209 5.938 OS1 5.36 2.60 3.89 4.76 7.04 8.03
13 1.860 2.783 3.400 5.036 5.741 OS2 5.36 2.60 3.89 4.76 7.04 8.03
14 1.797 2.687 3.283 4.863 5.544
* 15 1.733 2.592 3.166 4.690 5.347
16 1.697 2.539 3.102 4.594 5.238
17 1.662 2.486 3.037 4.498 5.128
18 1.626 2.433 2.972 4.402 5.019
19 1.591 2.380 2.907 4.306 4.909 2 1 0.76 0.76
20 1.555 2.327 2.842 4.210 4.800 5 1.16 0.98 1.14
21 1.520 2.274 2.778 4.114 4.690 10 1.24 1.12 1.39
22 1.485 2.221 2.713 4.018 4.581 25 1.33 1.31 1.74
23 1.449 2.167 2.648 3.922 4.472 50 1.39 1.48 2.06
24 1.414 2.114 2.583 3.826 4.362 100 1.43 1.64 2.35
25 1.378 2.061 2.518 3.730 4.253 Notes:
26 1.343 2.008 2.454 3.634 4.143 See Hydrology Sheet for Detailed calculations
27 1.307 1.955 2.389 3.538 4.034 1 - CCRFCD Precipitation Adjustment Ratios Table 501
28 1.272 1.902 2.324 3.442 3.924 2 - Calculated depth from CCRFCD Standard Form 3
29 1.236 1.849 2.259 3.346 3.815 3 - Adjusted Depths = Precip Ratio x Depth
* 30 1.201 1.796 2.194 3.250 3.705
31 1.186 1.774 2.167 3.211 3.660
32 1.171 1.752 2.141 3.171 3.615
33 1.157 1.730 2.114 3.131 3.569
34 1.142 1.708 2.087 3.091 3.524
35 1.127 1.686 2.060 3.052 3.479
36 1.113 1.664 2.033 3.012 3.433
37 1.098 1.642 2.006 2.972 3.388
38 1.083 1.620 1.980 2.932 3.343
39 1.069 1.598 1.953 2.892 3.297
40 1.054 1.576 1.926 2.853 3.252
41 1.039 1.554 1.899 2.813 3.207
42 1.024 1.532 1.872 2.773 3.161
43 1.010 1.510 1.845 2.733 3.116
44 0.995 1.488 1.818 2.694 3.071
45 0.980 1.466 1.792 2.654 3.025
46 0.966 1.444 1.765 2.614 2.980
47 0.951 1.423 1.738 2.574 2.935
48 0.936 1.401 1.711 2.534 2.889
49 0.922 1.379 1.684 2.495 2.844
50 0.907 1.357 1.657 2.455 2.799
51 0.892 1.335 1.630 2.415 2.753
52 0.878 1.313 1.604 2.375 2.708
53 0.863 1.291 1.577 2.336 2.663
54 0.848 1.269 1.550 2.296 2.617
55 0.833 1.247 1.523 2.256 2.572
56 0.819 1.225 1.496 2.216 2.527
57 0.804 1.203 1.469 2.177 2.481
58 0.789 1.181 1.443 2.137 2.436
59 0.775 1.159 1.416 2.097 2.391
60 0.760 1.137 1.389 2.057 2.345
Notes:
Intensities calculated per CCRFCD Section 500
Return
Period
Precip
Ratios 1 Depth
Adj
Depths
Sloan Canyon Visitor Center BY: DH
Proposed Composite C and Imperviousness DATE: 6/22/2021
CHECKED BY: JH
DATE: 6/22/2021
Sub-Basin Data
Basin ID Description
Total
Area (ac) C10 C100 I(%) C10 C100
I(%)
Area
(ac) C10 C100 I(%)
Area
(ac) C10 C100 I(%)
Area
(ac) C10 C100 I(%)
Area
(ac)
0.90 0.93 100.00 0.88 0.89 95.00 0.85 0.87 90.00 0.25 0.50 0.00
A1 Design Point 1 0.89 0.69 0.79 67.7 0.90 0.93 100.00 0.46 0.88 0.89 95.00 0.13 0.85 0.87 90.00 0.03 0.25 0.50 0.00 0.28
A2 Design Point 2 0.70 0.85 0.89 91.5 0.90 0.93 100.00 0.47 0.88 0.89 95.00 0.17 0.85 0.87 90.00 0.25 0.50 0.00 0.05
A3 Design Point 3 0.86 0.54 0.69 44.7 0.90 0.93 100.00 0.32 0.88 0.89 95.00 0.07 0.85 0.87 90.00 0.25 0.50 0.00 0.47
A4 Design Point 4 0.31 0.59 0.71 50.5 0.90 0.93 100.00 0.88 0.89 95.00 0.12 0.85 0.87 90.00 0.04 0.25 0.50 0.00 0.14
B1 Design Point 5 0.23 0.90 0.93 100.0 0.90 0.93 100.00 0.23 0.88 0.89 95.00 0.85 0.87 90.00 0.25 0.50 0.00
C1 Design Point 6 0.79 0.31 0.54 9.6 0.90 0.93 100.00 0.88 0.89 95.00 0.08 0.85 0.87 90.00 0.25 0.50 0.00 0.71
OS1 Design Point 7 1.96 0.25 0.50 0.0 0.90 0.93 100.00 0.88 0.89 95.00 0.85 0.87 90.00 0.25 0.50 0.00 1.96
OS2 0.48 0.25 0.50 0.0 0.90 0.93 100.00 0.88 0.89 95.00 0.85 0.87 90.00 0.25 0.50 0.00 0.48
Pond Project Total 2.76 0.67 0.77 64.6 0.90 0.93 100.00 1.25 0.88 0.89 95.00 0.50 0.85 0.87 90.00 0.07 0.25 0.50 0.00 0.94
Total Project Total 6.23 0.47 0.64 33.5 0.90 0.93 100.00 1.48 0.88 0.89 95.00 0.57 0.85 0.87 90.00 0.07 0.25 0.50 0.00 4.10
Notes:
Percent Imperviousness, I(%) is from CCRFCD Table 601
C5 is from CCRFCD Table 601
C10 is from CCRFCD Table 601
Composite C & I Paved Roads Drives and Walks Roofs Undeveloped Areas
Sloan Canyon Visitor Center DATE: 6/22/2021
Time of Concentration JH
6/22/2021
Tc
C10
L1
(ft)
S
Ti
(min)
LTotal
(ft)
L2
(ft)
Sw
(ft/ft)
V
(ft/s)
Tt
(min)
Ti+Tt
(min)
A1 0.89 0.69 440 4.0 9.8 640 200 0.020 2.8 1.2 11.0
A2 0.70 0.85 350 4.0 5.3 550 200 0.020 2.8 1.2 6.5
A3 0.86 0.54 10 2.0 2.5 45 35 0.020 2.8 0.2 5.0
A4 0.31 0.90 25 2.0 1.4 100 75 0.030 3.5 0.4 5.0
B1 0.23 0.90 5 4.0 0.5 225 220 0.020 2.8 1.3 5.0
C1 0.79 0.31 275 4.0 14.9 475 200 0.020 2.8 1.2 16.1
OS1 1.96 0.25 50 10.0 5.1 100 50 0.020 2.8 0.3 5.4
OS2 0.48 0.25 50 10.0 5.1 100 50 0.020 2.8 0.3 5.4
Average basin slope calculated from site topographic mapping
CCRFCD Hydrologic Criteria and Drainage Design Manual (Eq 602)
CCRFCD Hydrologic Criteria and Drainage Design Manual (Fig 602)
Length / Velocity
Summation of Initial Overland Time and Travel Time (minimum 5 min)
CHECKED BY:
DATE:
INITIAL / OVERLAND TIME (Ti) OVERLAND TRAVEL TIME (Tt)
BASIN ID
AREA
(acre)
P:\AE\B\BLMNS\148049\99 Civil and Survey\5-final-dsgn\50-final-dsgn\10-Civil\Drainage\Sloan RationalPR.xlsx 3 of 4
Sloan Canyon Visitor Center DATE: 6/22/2021
Flow Rates for the 10-Year and 100-Year Storm Events CHECKED BY: JH
DATE: 6/22/2021
BASIN ID
AREA
(acre) C10 C100
I10
(in/hr)
I100
(in/hr)
Q10
(cfs)
Q100
(cfs)
A1 0.89 0.69 0.79 3.63 6.14 1.12 2.16
A2 0.70 0.85 0.89 4.50 7.61 1.33 2.36
A3 0.86 0.54 0.69 4.83 8.16 1.12 2.42
A4 0.31 0.59 0.71 4.83 8.16 0.44 0.89
B1 0.23 0.90 0.93 4.83 8.16 0.50 0.88
C1 0.79 0.31 0.54 3.09 5.23 0.38 1.11
OS1 1.96 0.25 0.50 4.76 8.03 1.17 3.94
OS2 0.48 0.25 0.50 4.76 8.03 0.29 0.97
Q=KCIA where K is a local adjustment factor. K = 0.5 for the CCRFCD area per CCRFCD Criteria Manual Section 604 Time-Intensity-Frequency Curve with Tc used to determine Intensities
P:\AE\B\BLMNS\148049\99 Civil and Survey\5-final-dsgn\50-final-dsgn\10-Civil\Drainage\Sloan RationalPR.xlsx 4 of 4
SLOAN CANYON POND CALCULATIONS BY: DH
DATE: 5/22/2019
WQCV CALCULATIONS CHECKED BY: SJ
DATE: 5/22/2019
i A a C P6 Po V
(%/100) (acres) unitless (in.) (in.) (in.) (acre-ft)
Total (A1+A2+A3+A4) 0.646 2.76 1.299 0.446 0.370 0.214 0.049
WQCV Volume = 0.049 acre-ft
100-YEAR DETENTION CALCULATIONS
tc Q V V
(min) (cfs) (ft ) (acre-ft)
Total (A1+A2+A3+A4) 16.7 7.84 7855.680 0.180
100-Year Detention Volume = 0.180 acre-ft
Basin
Basin
From CCRFCD Criteria Maunal Section 1207.1
C= 0.858i3-0.78i2+0.774i +0.04
Po=(a x C)*P6
WQCV: Water quality capture volume (watershed in.)
i: Impervious (%/100) a: constant, for event maximization, drain times 24 hours
C= runoff cofficient
From CCRFCD Criteria Maunal Section 1203.1.2
V=60(tc*Q)
V: Detention Volume ft2 tc: Time of concentration in minutes
P:\AE\B\BLMNS\148049\99 Civil and Survey\5-final-dsgn\50-final-dsgn\10-Civil\Drainage\Sloan Pond Volumes 20201002.xlsx
Project:
Basin ID:
Depth Increment = 0.50 ft
Watershed Information Top of Micropool -- 0.00 -- -- -- 0 0.000
Selected BMP Type = EDB 0 -- 0.50 -- -- -- 1,645 0.038 411 0.009
Watershed Area = 2.76 acres 0 -- 1.00 -- -- -- 2,923 0.067 1,553 0.036
Watershed Length = 640 ft 0 -- 1.50 -- -- -- 3,361 0.077 3,124 0.072
Watershed Length to Centroid = 280 ft 0 -- 2.00 -- -- -- 3,799 0.087 4,914 0.113
Watershed Slope = 0.035 ft/ft 0 -- 2.50 -- -- -- 4,390 0.101 6,961 0.160
Watershed Imperviousness = 33.50% percent 0 -- 3.00 -- -- -- 4,981 0.114 9,304 0.214
Percentage Hydrologic Soil Group A = 0.0% percent 0 -- 3.50 -- -- -- 5,643 0.130 11,960 0.275
Percentage Hydrologic Soil Group B = 0.0% percent 0 -- 4.00 -- -- -- 6,304 0.145 14,947 0.343
Percentage Hydrologic Soil Groups C/D = 100.0% percent 0 -- 4.50 -- -- -- 7,033 0.161 18,281 0.420
Target WQCV Drain Time = 40.0 hours 0 -- 5.00 -- -- -- 7,761 0.178 21,980 0.505
Location for 1-hr Rainfall Depths = User Input 0 -- 5.50 -- -- -- 9,872 0.227 26,388 0.606
0 -- 7.00 -- -- -- 14,332 0.329 44,541 1.023
Optional User Overrides -- -- -- --
Water Quality Capture Volume (WQCV) = 0.049 acre-feet 0.049 acre-feet -- -- -- --
Excess Urban Runoff Volume (EURV) = 0.085 acre-feet acre-feet -- -- -- --
2-yr Runoff Volume (P1 = 0.76 in.) = 0.046 acre-feet 0.76 inches -- -- -- --
5-yr Runoff Volume (P1 = 1.14 in.) = 0.096 acre-feet 1.14 inches -- -- -- --
10-yr Runoff Volume (P1 = 1.39 in.) = 0.143 acre-feet 1.39 inches -- -- -- --
25-yr Runoff Volume (P1 = 1.74 in.) = 0.232 acre-feet 1.74 inches -- -- -- --
50-yr Runoff Volume (P1 = 2.06 in.) = 0.304 acre-feet 2.06 inches -- -- -- --
100-yr Runoff Volume (P1 = 2.35 in.) = 0.381 acre-feet 2.35 inches -- -- -- --
500-yr Runoff Volume (P1 = 3.14 in.) = 0.566 acre-feet inches -- -- -- --
Approximate 2-yr Detention Volume = 0.047 acre-feet -- -- -- --
Approximate 5-yr Detention Volume = 0.091 acre-feet -- -- -- --
Approximate 10-yr Detention Volume = 0.109 acre-feet -- -- -- --
Approximate 25-yr Detention Volume = 0.133 acre-feet -- -- -- --
Approximate 50-yr Detention Volume = 0.146 acre-feet -- -- -- --
Approximate 100-yr Detention Volume = 0.180 acre-feet -- -- -- --
Define Zones and Basin Geometry -- -- -- --
Zone 1 Volume (WQCV) = 0.049 acre-feet -- -- -- --
Zone 2 Volume (10-year - Zone 1) = 0.060 acre-feet -- -- -- --
Zone 3 Volume (100-year - Zones 1 & 2) = 0.071 acre-feet -- -- -- --
Total Detention Basin Volume = 0.180 acre-feet -- -- -- --
Initial Surcharge Volume (ISV) = user ft 3 -- -- -- --
Initial Surcharge Depth (ISD) = user ft -- -- -- --
Total Available Detention Depth (Htotal) = user ft -- -- -- --
Depth of Trickle Channel (HTC) = user ft -- -- -- --
Slope of Trickle Channel (STC) = user ft/ft -- -- -- --
Slopes of Main Basin Sides (Smain) = user H:V -- -- -- --
Basin Length-to-Width Ratio (RL/W) = user -- -- -- --
Initial Surcharge Area (AISV) = user ft 2 -- -- -- --
Surcharge Volume Length (LISV) = user ft -- -- -- --
Surcharge Volume Width (WISV) = user ft -- -- -- --
Depth of Basin Floor (HFLOOR) = user ft -- -- -- --
Length of Basin Floor (LFLOOR) = user ft -- -- -- --
Width of Basin Floor (WFLOOR) = user ft -- -- -- --
Area of Basin Floor (AFLOOR) = user ft 2 -- -- -- --
Volume of Basin Floor (VFLOOR) = user ft 3 -- -- -- --
Depth of Main Basin (HMAIN) = user ft -- -- -- --
Length of Main Basin (LMAIN) = user ft -- -- -- --
Width of Main Basin (WMAIN) = user ft -- -- -- --
Area of Main Basin (AMAIN) = user ft 2 -- -- -- --
Volume of Main Basin (VMAIN) = user ft 3 -- -- -- --
Calculated Total Basin Volume (Vtotal) = user acre-feet -- -- -- --
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional
Override
Area (ft 2)
Length
(ft)
Optional
Override
Stage (ft)
Stage
(ft)
Stage - Storage
Description
Area
(ft 2)
Width
(ft)
Sloan Canyon Visitor Center Detention Pond
MHFD-Detention, Version 4.03 (May 2020)
Volume
(ft 3)
Volume
(ac-ft)
Area
(acre)
After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure.
Example Zone Configuration (Retention Pond)
MHFD-Detention_v4 03.xlsm, Basin 6/23/2021, 10:28 AM
1 User Defined Stage-Area Booleans for Message
1 Equal Stage-Area Inputs Watershed L:W
1 CountA Watershed Lc:L
Watershed Slope
0 Calc_S_TC Booleans for CUHP
1 CUHP Inputs Complete
H_FLOOR 1 CUHP Results Calculated
L_FLOOR_OTHER
0.00 ISV 0.00 ISV
0.00 Floor 0.00 Floor
1.20 Zone 1 (WQCV) 1.20 Zone 1 (WQCV)
1.96 Zone 2 (10-year) 1.96 Zone 2 (10-year)
2.70 Zone 3 (100-year) 2.70 Zone 3 (100-year)
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
MHFD-Detention, Version 4.03 (May 2020)
0.000
0.260
0.520
0.780
1.040
0.000
0.085
0.170
0.255
0.340
0.00 2.00 4.00 6.00 8.00
V o lu m e a c-ft
A re a a cr e s)
Stage (ft.)
Area (acres) Volume (ac-ft)
10800
14400
0.00 2.00 4.00 6.00 8.00
A re a sq .f t.
Le n g th
, W id th ft
Stage (ft)
Length (ft) Width (ft) Area (sq.ft.)
MHFD-Detention_v4 03.xlsm, Basin 6/23/2021, 10:28 AM
Project:
Basin ID:
Estimated Estimated
Stage (ft) Volume (ac-ft) Outlet Type
Zone 1 (WQCV) 1.20 0.049 Orifice Plate
Zone 2 (10-year) 1.96 0.060 Rectangular Orifice
Zone 3 (100-year) 2.70 0.071 Weir&Pipe (Restrict)
Total (all zones) 0.180
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP) Calculated Parameters for Underdrain
Underdrain Orifice Invert Depth = N/A ft (distance below the filtration media surface) Underdrain Orifice Area = N/A ft
Underdrain Orifice Diameter = N/A inches Underdrain Orifice Centroid = N/A feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP) Calculated Parameters for Plate
Invert of Lowest Orifice = 0.00 ft (relative to basin bottom at Stage = 0 ft) WQ Orifice Area per Row = 2.292E-03 ft
Depth at top of Zone using Orifice Plate = 1.20 ft (relative to basin bottom at Stage = 0 ft) Elliptical Half-Width = N/A feet
Orifice Plate: Orifice Vertical Spacing = N/A inches Elliptical Slot Centroid = N/A feet
Orifice Plate: Orifice Area per Row = 0.33 sq. inches (diameter = 5/8 inch) Elliptical Slot Area = N/A ft
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)
Row 1 (required) Row 2 (optional) Row 3 (optional) Row 4 (optional) Row 5 (optional) Row 6 (optional) Row 7 (optional) Row 8 (optional)
Stage of Orifice Centroid (ft) 0.00 0.40 0.80
Orifice Area (sq. inches) 0.33 0.33 0.33
Row 9 (optional) Row 10 (optional) Row 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 (optional) Row 16 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
User Input: Vertical Orifice (Circular or Rectangular) Calculated Parameters for Vertical Orifice
Zone 2 Rectangular Not Selected Zone 2 Rectangular Not Selected
Invert of Vertical Orifice = 1.20 N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Area = 0.17 N/A
Depth at top of Zone using Vertical Orifice = 1.96 N/A ft (relative to basin bottom at Stage = 0 ft) Vertical Orifice Centroid = 0.08 N/A
Vertical Orifice Height = 2.00 N/A inches
Vertical Orifice Width = 12.00 inches
User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir (and No Outlet Pipe) Calculated Parameters for Overflow Weir grate Zone 3 Weir Not Selected Zone 3 Weir Not Selected
Overflow Weir Front Edge Height, Ho = 1.96 N/A ft (relative to basin bottom at Stage = 0 ft) Height of Grate Upper Edge, Ht = 2.71 N/A
Overflow Weir Front Edge Length = 3.00 N/A feet Overflow Weir Slope Length = 3.09 N/A
Overflow Weir Grate Slope = 4.00 N/A H:V Grate Open Area / 100-yr Orifice Area = 33.54 N/A
Horiz. Length of Weir Sides = 3.00 N/A feet Overflow Grate Open Area w/o Debris = 6.49 N/A
Overflow Grate Open Area % = 70% N/A %, grate open area/total area Overflow Grate Open Area w/ Debris = 3.25 N/A
Debris Clogging % = 50% N/A %
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
Zone 3 Restrictor Not Selected Zone 3 Restrictor Not Selected
Depth to Invert of Outlet Pipe = 0.37 N/A ft (distance below basin bottom at Stage = 0 ft) Outlet Orifice Area = 0.19 N/A
Outlet Pipe Diameter = 18.00 N/A inches Outlet Orifice Centroid = 0.15 N/A
Restrictor Plate Height Above Pipe Invert = 3.00 inches Half-Central Angle of Restrictor Plate on Pipe = 0.84 N/A
User Input: Emergency Spillway (Rectangular or Trapezoidal) Calculated Parameters for Spillway
Spillway Invert Stage= 2905.50 ft (relative to basin bottom at Stage = 0 ft) Spillway Design Flow Depth= 0.17 feet
Spillway Crest Length = 20.00 feet Stage at Top of Freeboard = 2906.67 feet
Spillway End Slopes = 15.00 H:V Basin Area at Top of Freeboard = 0.33 acres
Freeboard above Max Water Surface = 1.00 feet Basin Volume at Top of Freeboard = 1.02 acre-ft
Max Ponding Depth of Target Storage Volume = 3.07 feet Discharge at Top of Freeboard = 2.50 cfs
Routed Hydrograph Results
Design Storm Return Period = WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year
One-Hour Rainfall Depth (in) = N/A N/A 0.76 1.14 1.39 1.74 2.06 2.35
CUHP Runoff Volume (acre-ft) = 0.049 0.085 0.046 0.096 0.143 0.232 0.304 0.381
Inflow Hydrograph Volume (acre-ft) = N/A N/A 0.046 0.096 0.143 0.232 0.304 0.381
CUHP Predevelopment Peak Q (cfs) = N/A N/A 0.0 0.4 0.8 1.9 2.6 3.4 OPTIONAL Override Predevelopment Peak Q (cfs) = N/A N/A
Predevelopment Unit Peak Flow, q (cfs/acre) = N/A N/A 0.01 0.13 0.30 0.69 0.96 1.24
Peak Inflow Q (cfs) = N/A N/A 0.6 1.2 1.8 3.2 4.1 5.0
Peak Outflow Q (cfs) = 0.0 0.5 0.0 0.3 0.6 1.4 1.6 1.7
Ratio Peak Outflow to Predevelopment Q = N/A N/A N/A 1.0 0.7 0.8 0.6 0.5
Structure Controlling Flow = Vertical Orifice 1 Vertical Orifice 1 Plate Vertical Orifice 1 Vertical Orifice 1 Outlet Plate 1 Outlet Plate 1 Outlet Plate 1
Max Velocity through Grate 1 (fps) = N/A N/A N/A N/A N/A 0.1 0.1 0.1
Max Velocity through Grate 2 (fps) = N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) = 38 39 38 40 37 33 31 29
Time to Drain 99% of Inflow Volume (hours) = 41 43 40 44 43 42 41 39
Maximum Ponding Depth (ft) = 1.20 1.67 1.08 1.44 1.72 2.19 2.56 3.07
Area at Maximum Ponding Depth (acres) = 0.07 0.08 0.07 0.08 0.08 0.09 0.10 0.12 Maximum Volume Stored (acre-ft) = 0.049 0.085 0.041 0.066 0.089 0.129 0.166 0.221
The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF).
DETENTION BASIN OUTLET STRUCTURE DESIGN
MHFD-Detention, Version 4.03 (May 2020)
Sloan Canyon Visitor Center Detention Pond
Example Zone Configuration (Retention Pond)
MHFD-Detention_v4 03.xlsm, Outlet Structure 6/23/2021, 10:30 AM
COUNTA for Basin Tab = 1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2
Count_Underdrain = 0 0.11(diameter = 3/8 inch) 2 3 1
Count_WQPlate = 1 0.14(diameter = 7/16 inch)
Count_VertOrifice1 = 1 0.18(diameter = 1/2 inch) Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean
Count_VertOrifice2 = 0 0.24(diameter = 9/16 inch) 4 1 5yr, <72hr 0
Count_Weir1 = 1 0.29(diameter = 5/8 inch) >5yr, <120hr 0
Count_Weir2 = 0 0.36(diameter = 11/16 inch) Max Depth Row
Count_OutletPipe1 = 1 0.42(diameter = 3/4 inch) WQCV 121 Watershed Constraint Check
Count_OutletPipe2 = 0 0.50(diameter = 13/16 inch) 2 Year 109 Slope 0.035
COUNTA_2 (Standard FSD Setup)= 1 0.58(diameter = 7/8 inch) EURV 168 Shape 3.41
Hidden Parameters & Calculations 0.67(diameter = 15/16 inch) 5 Year 145
MaxPondDepth_Error? FALSE 0.76 (diameter = 1 inch) 10 Year 173 Spillway Depth
Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches) 25 Year 220 0.17
WQ Plate Flow at 100yr depth = 0.05 0.97(diameter = 1-1/8 inches) 50 Year 257
CLOG #1= 35% 1.08(diameter = 1-3/16 inches) 100 Year 308 1 Z1_Boolean
Cdw #1 = 0.89 1.20(diameter = 1-1/4 inches) 500 Year 410 1 Z2_Boolean
Cdo #1 = 0.69 1.32(diameter = 1-5/16 inches) Zone3_Pulldown Message 1 Z3_Boolean
Overflow Weir #1 Angle = 0.245 1.45(diameter = 1-3/8 inches) 1 Opening Message
CLOG #2= 0% 1.59(diameter = 1-7/16 inches) Draintime Running
Cdw #2 = #VALUE! 1.73(diameter = 1-1/2 inches) Outlet Boolean Outlet Rank Total (1 to 4)
Cdo #2 = #VALUE! 1.88(diameter = 1-9/16 inches) Vertical Orifice 1 1 1 2
Overflow Weir #2 Angle = #VALUE! 2.03(diameter = 1-5/8 inches) Vertical Orifice 2 0 0 Boolean
Underdrain Q at 100yr depth = 0.00…