Attachment_2C_Additive_Details_20240422_0003.pdf
PDF 779 KB Posted
- Solicitation number
- 140L0624R0026
About this file
This document appears to be an addendum or attachment that provides detailed information about various additive items for a federal contract opportunity. The additive items include the construction of a perimeter fence (in three segments totaling approximately 4.6 miles), interpretive loop shade structures, an amphitheater shade structure, a dumpster site with a screen wall, future electrical gate stub-out installation, installation of electric vehicle charging stations, and additional perimeter fencing.
The related federal contract opportunity is Solicitation Number 140L0624R0026 for the "SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGATED DESIGN" issued by the Department of the Interior Bureau of Land Management National Office. The document provides specific details on the scope, location, and requirements for each additive item, as well as pricing, scheduling, and other relevant information. Contractors are required to bid on these additive items as part of the overall contract opportunity.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIVE DETAILS
Revised 22 April 2024
ADDITIVE 1:
Perimeter Fence A
- Bid shall include all labor, materials and tools to complete the work.
- Fence to be metal post with 2 cable fence. Reference detail below.
- 2.5 miles (approximately) of metal post and cable fence
- 1- 14’ gate to be installed at approximately 35.916825, -115.124134
- Priority #1 Point A to Point E o Point A: 35.91684, -115.126166 (Distance from A to B ~0.34 miles) o Point B: 35.916858, -115.132178 (Distance from B to C ~0.15 miles) o Point C: 35.918689, -115.132250(Distance from C to D ~1.3 miles) o Point D: 35.919158, -115.154083(Distance from D to E ~0.71 miles) o Point E: 35.911489, -115.162514
ADDITIVE 2:
Interpretive Loop Shade structures
- Design is to match Trail Head Shade Structure. Refer to detail 4/A 052 and 3/A 052.
- Structures are to be placed at each of the interpretive signage pull-outs (4)
- Size approx. 25’x10’
- Bid shall include all labor, materials and tools to complete the work.
ADDITIVE 3:
Design and Construct Amphitheater Shade Structure – metal
- Design to match Trail Head Shade Structure. Refer to detail 4/A 052 and 3/A 052.
- Shall shade both the seating area and the stage
- Designed by a licensed Engineer.
- Contractor shall comply with local, state and federal code.
ADDITIVE 4:
Construction of dumpster site with screen wall
- Screen walls shall be on 3 sides and match the Sloan Canyon NCA Theme
- Access gate to the dumpster closure to match 6’ tall gate details in contract.
- Location TBD but will need to be inside the drive loop, not to affect drainage, ADA or parking and at an easy truck dump access.
- See detail below.
ADDITIVE 5:
Future Electrical Gate Stub-out Installation
- Run 2” conduit for future electric gates from building to entrance of parking loop.
- Location east side of travel lane, near cross walk bars on sheet C109.
ADDITIVE 6:
Installation Electrical Vehicle Charging Station
- Shall be located to span an ADA and regular parking stall.
- EV Station shall be CT4000 Level 2 Commercial Charging Station 1833mm 6ft Dual Port Bollard
Mount (CT4021-GW1) including Power Management Kit (CT4000-PMGMT) Bollard Concrete Mounting Kit (CT4001-CCM) Software and Services ChargePoint Commercial Service Plan (CPCLD-COMMERCIAL-1) Station Activation and Configuration (CPSUPPORT-ACTIVE) or equal.
- EV Station shall be on its own circuit.
ADDITIVE 7:
Perimeter Fence B
- Bid shall include all labor, materials and tools to complete the work.
- Fence to be metal post with 2 cable fence. Reference detail below.
- 1.6 miles (approximately) of metal post and cable fence
- Priority #2 Point G to Point K o Point G: 35.916831, -115.125942 (Distance from G to H ~0.40 miles) o Point H: 35.916808, -115.119169 (Distance from H to I ~0.18 miles) o Point I: 35.918656, -115.119200 (Distance from I to J ~0.50 miles) o Point J: 35.918489, -115.110550 (Distance from J to K ~0.50 miles) o Point K: 35.925756, -115.110583
ADDITIVE 8:
Perimeter Fence C
- Bid shall include all labor, materials and tools to complete the work.
- Fence to be metal post with 2 cable fence. Reference detail below.
- 0.5 miles (approximately) of metal post and cable fence
- Priority #3 Point E to Point F o Point E: 35.911489, -115.162514 (Distance from E to F ~0.50 miles) o Point F: 35.904125, -115.162872
ADDITIVE 4 – Dumpster Site Detail
ADDITIVE 1, 7 and 8 – Perimeter Fence
Perimeter Fence A 2.5 miles
Perimeter Fence B
1.6 miles
Perimeter Fence C
0.5 miles