Attachment_2C_Additives_Details_20240328_0001.pdf

PDF 987 KB Posted

Attached to
SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGA
Solicitation number
140L0624R0026
Issued by

About this file

This document appears to be an attachment containing details on various additive items related to a federal contract opportunity for the construction of a Sloan Canyon Contact Station.

The additive items include: 1) Perimeter Fence A - approximately 2.5 miles of metal post and cable fence, 2) Interpretive Loop Shade Structures - 4 structures matching the Trail Head Shade Structure, 3) Design and construction of an Amphitheater Shade Structure, 4) Construction of a dumpster site with a screen wall, 5) Future electrical gate stub-out installation, 6) Installation of an electrical vehicle charging station, 7) Perimeter Fence B - approximately 1.6 miles of metal post and cable fence, and 8) Perimeter Fence C - approximately 0.5 miles of metal post and cable fence.

The related federal contract opportunity is Solicitation Number 140L0624R0026 for the "SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGATED DESIGN", issued by the Department of the Interior Bureau of Land Management National Office.

View the file

Other files

File Type Posted
Attachment_2C_Additive_Details_20240422_0003.pdf PDF
Sol_140L0624R0026_Amd_0003.pdf PDF
Attachment_14_Final_EA_July2021_0003.pdf PDF
Attachment_11A_Questions_and_Answers_2_0003.pdf PDF
SF30_Continuation_Pages_Amend_3_0003.pdf PDF
Sol_140L0624R0026_Amd_0002.pdf PDF
Attachment_13_Consulting_Firms_Tortoise_0001.pdf PDF
Attachment_11_Questions_Answers_1_26_20240402_0001.pdf PDF
Attachment_1_SOW_Amendment_1_20240328_0001.pdf PDF
Attachment_12_Site_Visit_Sign_In_20240401_0001.pdf PDF
SF1442_Continuation_Pages_Amend_1_0001.pdf PDF
Sol_140L0624R0026_Amd_0001.pdf PDF
Attachment_10_SF1442_Completion_Instructions.pdf PDF
Attachment_3C_Amended_Sewer_Specifications.pdf PDF
Attachment_6_Price_Breakout.pdf PDF
Attachment_3A_Construction_Specifications_1.pdf PDF
Attachment_2A_Contsruction_Drawings_Compressed.pdf PDF
Attachment_7_Drainage_Report.pdf PDF
Attachment_9_Lim_on_SubK_Breakout.xlsx XLSX spreadsheet
Attachment_8_Fire_supression.pdf PDF
Attachment_3B_Construction_Specifications_2.pdf PDF
Attachment_2B_Amended_Sewer_Drawings.pdf PDF
Attachment_5_Wage_Determination_NV20240038.pdf PDF
Attachment_4_Delegated_Water_Service_Design_Info.pdf PDF
Sol_140L0624R0026.pdf PDF
Attachment_1_SOW_240110.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDITIVES DETAILS

ADDITIVE 1:

Perimeter Fence A

‐ Bid shall include all labor, materials and tools to complete the work.

‐ Fence to be metal post with 2 cable fence. Reference detail below.

‐ 2.5 miles (approximately) of metal post and cable fence ‐ 1- 14’ gate to be installed at approximately 35.916825, -115.124134 ‐ Priority #1 Point A to Point E o Point A: 35.91684, -115.126166 (Distance from A to B ~0.34 miles) o Point B: 35.916858, -115.132178 (Distance from B to C ~0.15 miles) o Point C: 35.918689, -115.132250(Distance from C to D ~1.3 miles) o Point D: 35.919158, -115.154083(Distance from D to E ~0.71 miles) o Point E: 35.911489, -115.162514

ADDITIVE 2:

Interpretive Loop Shade structures

‐ Design is to match Trail Head Shade Structure ‐ Structures are to be placed at each of the interpretive signage pull-outs (4) ‐ Size approx. 25’x10’ ‐ Bid shall include all labor, materials and tools to complete the work.

ADDITIVE 3:

Design and Construct Amphitheater Shade Structure – metal

‐ Design to match Trail Head Shade Structure ‐ Shall shade both the seating area and the stage ‐ Designed by a licensed Engineer.

‐ Contractor shall comply with local, state and federal code.

‐ Bid shall include all labor, materials and tools to complete the work.

ADDITIVE 4:

Construction of dumpster site with screen wall

‐ Screen walls shall be on 3 sides and match the Sloan Canyon NCA Theme ‐ Access gate to the dumpster closure to match 6’ tall gate details in contract.

‐ Location TBD but will need to be inside the drive loop, not to affect drainage, ADA or parking and at an easy truck dump access.

‐ See detail below.

‐ Bid shall include all labor, materials and tools to complete the work.

ADDITIVE 5:

Future Electrical Gate Stub-out Installation

‐ Run 2” conduit for future electric gates from building to entrance of parking loop ‐ Contractor shall comply with local, state and federal code.

‐ Bid shall include all labor, materials and tools to complete the work.

ADDITIVE 6:

Installation Electrical Vehicle Charging Station

‐ Shall be located to span an ADA and regular parking stall.

‐ EV Station shall be CT4000 Level 2 Commercial Charging Station 1833mm 6ft Dual Port Bollard

Mount (CT4021-GW1) including Power Management Kit (CT4000-PMGMT) Bollard Concrete Mounting Kit (CT4001-CCM) Software and Services ChargePoint Commercial Service Plan (CPCLD-COMMERCIAL-1) Station Activation and Configuration (CPSUPPORT-ACTIVE) or equal.

‐ EV Station shall be on its own circuit.

‐ Contractor shall comply with local, state and federal code.

‐ Bid shall include all labor, materials and tools to complete the work.

ADDITIVE 7:

Perimeter Fence B

‐ Bid shall include all labor, materials and tools to complete the work.

‐ Fence to be metal post with 2 cable fence. Reference detail below.

‐ 1.6 miles (approximately) of metal post and cable fence ‐ Priority #2 Point G to Point K o Point G: 35.916831, -115.125942 (Distance from G to H ~0.40 miles) o Point H: 35.916808, -115.119169 (Distance from H to I ~0.18 miles) o Point I: 35.918656, -115.119200 (Distance from I to J ~0.50 miles) o Point J: 35.918489, -115.110550 (Distance from J to K ~0.50 miles) o Point K: 35.925756, -115.110583

ADDITIVE 8:

Perimeter Fence C

‐ Bid shall include all labor, materials and tools to complete the work.

‐ Fence to be metal post with 2 cable fence. Reference detail below.

‐ 0.5 miles (approximately) of metal post and cable fence ‐ Priority #3 Point E to Point F o Point E: 35.911489, -115.162514 (Distance from E to F ~0.50 miles) o Point F: 35.904125, -115.162872

Additive 9 – Dumpster Site Detail

Additives 1, 7 and 8 – Perimeter Fence

Perimeter Fence A 2.5 miles

Perimeter Fence B

1.6 miles

Perimeter Fence C

0.5 miles