This document appears to be an attachment containing details on various additive items related to a federal contract opportunity for the construction of a Sloan Canyon Contact Station.
The additive items include: 1) Perimeter Fence A - approximately 2.5 miles of metal post and cable fence, 2) Interpretive Loop Shade Structures - 4 structures matching the Trail Head Shade Structure, 3) Design and construction of an Amphitheater Shade Structure, 4) Construction of a dumpster site with a screen wall, 5) Future electrical gate stub-out installation, 6) Installation of an electrical vehicle charging station, 7) Perimeter Fence B - approximately 1.6 miles of metal post and cable fence, and 8) Perimeter Fence C - approximately 0.5 miles of metal post and cable fence.
The related federal contract opportunity is Solicitation Number 140L0624R0026 for the "SLOAN CANYON CONTACT STATION CONSTRUCTION & DELEGATED DESIGN", issued by the Department of the Interior Bureau of Land Management National Office.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIVES DETAILS
ADDITIVE 1:
Perimeter Fence A
‐ Bid shall include all labor, materials and tools to complete the work.
‐ Fence to be metal post with 2 cable fence. Reference detail below.
‐ 2.5 miles (approximately) of metal post and cable fence ‐ 1- 14’ gate to be installed at approximately 35.916825, -115.124134 ‐ Priority #1 Point A to Point E o Point A: 35.91684, -115.126166 (Distance from A to B ~0.34 miles) o Point B: 35.916858, -115.132178 (Distance from B to C ~0.15 miles) o Point C: 35.918689, -115.132250(Distance from C to D ~1.3 miles) o Point D: 35.919158, -115.154083(Distance from D to E ~0.71 miles) o Point E: 35.911489, -115.162514
ADDITIVE 2:
Interpretive Loop Shade structures
‐ Design is to match Trail Head Shade Structure ‐ Structures are to be placed at each of the interpretive signage pull-outs (4) ‐ Size approx. 25’x10’ ‐ Bid shall include all labor, materials and tools to complete the work.
ADDITIVE 3:
Design and Construct Amphitheater Shade Structure – metal
‐ Design to match Trail Head Shade Structure ‐ Shall shade both the seating area and the stage ‐ Designed by a licensed Engineer.
‐ Contractor shall comply with local, state and federal code.
‐ Bid shall include all labor, materials and tools to complete the work.
ADDITIVE 4:
Construction of dumpster site with screen wall
‐ Screen walls shall be on 3 sides and match the Sloan Canyon NCA Theme ‐ Access gate to the dumpster closure to match 6’ tall gate details in contract.
‐ Location TBD but will need to be inside the drive loop, not to affect drainage, ADA or parking and at an easy truck dump access.
‐ See detail below.
‐ Bid shall include all labor, materials and tools to complete the work.
ADDITIVE 5:
Future Electrical Gate Stub-out Installation
‐ Run 2” conduit for future electric gates from building to entrance of parking loop ‐ Contractor shall comply with local, state and federal code.
‐ Bid shall include all labor, materials and tools to complete the work.
ADDITIVE 6:
Installation Electrical Vehicle Charging Station
‐ Shall be located to span an ADA and regular parking stall.
‐ EV Station shall be CT4000 Level 2 Commercial Charging Station 1833mm 6ft Dual Port Bollard
Mount (CT4021-GW1) including Power Management Kit (CT4000-PMGMT) Bollard Concrete Mounting Kit (CT4001-CCM) Software and Services ChargePoint Commercial Service Plan (CPCLD-COMMERCIAL-1) Station Activation and Configuration (CPSUPPORT-ACTIVE) or equal.
‐ EV Station shall be on its own circuit.
‐ Contractor shall comply with local, state and federal code.
‐ Bid shall include all labor, materials and tools to complete the work.
ADDITIVE 7:
Perimeter Fence B
‐ Bid shall include all labor, materials and tools to complete the work.
‐ Fence to be metal post with 2 cable fence. Reference detail below.
‐ 1.6 miles (approximately) of metal post and cable fence ‐ Priority #2 Point G to Point K o Point G: 35.916831, -115.125942 (Distance from G to H ~0.40 miles) o Point H: 35.916808, -115.119169 (Distance from H to I ~0.18 miles) o Point I: 35.918656, -115.119200 (Distance from I to J ~0.50 miles) o Point J: 35.918489, -115.110550 (Distance from J to K ~0.50 miles) o Point K: 35.925756, -115.110583
ADDITIVE 8:
Perimeter Fence C
‐ Bid shall include all labor, materials and tools to complete the work.
‐ Fence to be metal post with 2 cable fence. Reference detail below.
‐ 0.5 miles (approximately) of metal post and cable fence ‐ Priority #3 Point E to Point F o Point E: 35.911489, -115.162514 (Distance from E to F ~0.50 miles) o Point F: 35.904125, -115.162872
Additive 9 – Dumpster Site Detail
Additives 1, 7 and 8 – Perimeter Fence
Perimeter Fence A 2.5 miles
Perimeter Fence B
1.6 miles
Perimeter Fence C
0.5 miles