This document contains a past performance rating form for the Army Training and Range Operations Maintenance Services (ATROMS) contract solicitation. The rating form collects information on a contractor's past performance for six criteria: quality of service, schedule, cost control, business relations, management of personnel, and utilization of small business. Raters are asked to provide an adjectival rating and additional comments for each criterion. The solicitation number is W900KK-23-R-0029 and is issued by the Department of the Army Materiel Command Contracting Command Orlando Contracting Center for the ATROMS contract.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

ATTENTION

Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.

ATTENTION

All individuals handling this information are required to protect it from unauthorized disclosure.

Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.

allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.

Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002

CUI

Controlled by: Army Controlled by: ACC-ORL CUI Category: General Procurement and Acquisition Distribution/Limited Dissemination Control: FEDCON POC: Daniel Steinhauer, 407-208-5820

CUI//FEDCON

ATROMS

SOLICITATION NO.

AMENDMENT NO.: 00

Section X.X., Attachment (7)

CUI//FEDCON

PAST PERFORMANCE RATING FORM

PAST PERFORMANCE PROJECT IDENTIFICATON (To be filled out by the Offeror):

CONTRACTOR NAME: Click here to enter text.

CONTRACT or ORDER NUMBER: Click here to enter text.

PROJECT TITLE: Click here to enter text.

TOTAL PERIOD OF PERFORMANCE,

INCLUDING OPTIONS

Click here to enter text.

PAST PERFORMANCE REFERENCE INFORMATION (To be filled out by the Rater):

NAME: Click here to enter text.

TITLE: Click here to enter text.

AGENCY or CUSTOMER: Click here to enter text.

PHONE: Click here to enter text.

E-MAIL Click here to enter text.

For each of the Six (6) criteria listed below, the rater must choose One (1) Adjectival Rating by checking the box, as applicable. At a minimum, for any rating that is checked Marginal or Unsatisfactory, please submit additional comments to substantiate the rating. If Cost Control of Utilization of Small Business is N/A, Please explain why. Rater: Please submit completed form as part of Volume 3 (Reference RFP Amendment 0001 Section L for submittal requirements).

1. QUALITY OF SERVICE

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit.

The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit.

The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective

Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory

Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

ADDITIONAL COMMENTS:

mailto:usarmy.orlando.peo-stri.mbx.mtccs@mail.mil

SOLICITATION NO.

AMENDMENT NO.: 00

Section X.X., Attachment (7)

CUI//FEDCON

Click here to enter text.

2. SCHEDULE

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit.

The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit.

The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective

Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory

Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

ADDITIONAL COMMENTS:

Click here to enter text.

3. COST CONTROL

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit.

The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit.

The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective

SOLICITATION NO.

AMENDMENT NO.: 00

Section X.X., Attachment (7)

CUI//FEDCON

Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory

Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

Not Applicable

ADDITIONAL COMMENTS:

Click here to enter text.

4. BUSINESS RELATIONS

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit.

The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit.

The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective

Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory

Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

Click here to enter text.

SOLICITATION NO.

AMENDMENT NO.: 00

Section X.X., Attachment (7)

CUI//FEDCON

5. MANAGEMENT OF PERSONNEL

RATING Adjectival Rating

Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit.

The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit.

The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective

Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory

Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

ADDITIONAL COMMENTS:

Click here to enter text.

6. UTILIZATION OF SMALL BUSINESS

RATING Adjectival

Rating Definition

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit.

The element being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit.

The element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective

Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory

Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.

SOLICITATION NO.

AMENDMENT NO.: 00

Section X.X., Attachment (7)

CUI//FEDCON

Not Applicable

Click here to enter text.

CUI_Coversheet
Attachment (2) Past Performance Rating Form

File details come from the government source that posted it. Updated .