Attachment 7 - As Built Record EHRM_Part III (1).pdf

PDF 10 MB Posted

Attached to
656-26-702 EHRM DDPO 2. 0 Federal contract opportunity
Solicitation number
36C26326B0028
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23

About this file

Summary of EHRM Infrastructure Upgrades - Building 49 Telecommunications Record Documents

This file comprises record documents for the EHRM Infrastructure Upgrades project at the St. Cloud VA Health Care System in St. Cloud, Minnesota, specifically for Building 49 telecommunications work. The project, numbered 656-21-235, involves upgrading telecommunications infrastructure including data cabling demolition, new cabling installation, and telecom room equipment. The documents are dated June 21, 2024, and serve as record drawings prepared based on Designer of Record drawings with contractor markups through the construction phase under VA direction. Key construction involves a primary telecom room (Room 001) in the basement and supporting existing rooms (139 and 241) on the first and second floors, with data cabling distribution throughout the facility's basement, first, and second floors.

The telecommunications scope includes demolishing existing data cabling limits on the second and third floors, installing new CAT6A copper cabling and OM4/OS2 fiber optic backbone infrastructure, provisioning two-rack and single-rack configurations with patch panels, fiber distribution panels, network switches (VA OIT-provided 1U 48-port units), 5KW rack-mounted UPS systems, vertical cable management, and bonding bus bars. The project specifies conduit sizing (2-inch to 4-inch), cable tray configurations (12"x2" to 18"x4"), and dedicated cooling, power (NEMA L21-20R receptacles), humidity, temperature monitoring, and sensor systems for equipment rooms. Construction infection control risk assessments classify the work as Class II with Groups 1 and 3 risk designations, requiring 1-hour fire-rated partitions and specialized containment procedures for occupied areas during day-shift construction.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A -O

-V

DN

UP

DN

UP

A200

TELECOM

ROOM

1-TN300

1-TN300

LIMITS OF DATA CABLING DEMOLITION

1-TN300

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAP

WAP

WAP

4D

4D

4D

4D

4D

4D

4D

4D

4D

4D 4D

6D

1D6D

4D 4D

1D

4D

1D

4D

4D

4D

4D

4D 4D

1D6D

4D

4D

4D

4D

4D

3D/1V 4D

4D 2D 4D 2D

4D

4D

1V

4D

4D

1D 4D

4D

4D

4D

4D

4D

3D/1V

4D

4D 4D

4D

4D 4D 4D 4D 4D

4D

4D

4D

4D

4D

4D

4D

4D

4D

4D

4D

4D

4D

E

E E

E

E E

E

E

E

EE

EE

E

E

E

E

E

E E

E

E

E

E

E E

E

E E E E

E

E E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E E E

E

E

E

E

E

E

E

E

E

EE

E

E

E

E

E

E

E E EEE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E E E E E

E EE

E E

E

E

E

E

E

E

E

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

4D

4D

4D

4D

D

4D

4D

3D

4D

4D

4D

4D

4D 4D 4D 4D

4D

4D 4D

4D

4D 4D

3D

4D 2D

1V

1V

1V

4D E

E

D

"x

2"

"x

2"

12"x2"

E E

E

D

"x

2"

12"x2" 12"x2"

E

E E E

12"x4"

"x

4"

D D

D

E

E

"x

4"

"x 4"

E E

EE

E E

12"x4"

"x

4"

"x

4"

12"x4"

12"x4"12"x4"

D

EE

E

"x

4"

12"x2"

D

D

D D

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:1

P

M

1-TD120

SECOND FLOOR PLAN -

TELECOM - DEMOLITION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"1

SECOND FLOOR PLAN - TELECOM - DEMOLITION

N

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

SHEET NOTES:

1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.

REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING

ROUTES.

CONVECTORCONVECTOR

CONVECTOR CONVECTOR CONVECTOR CONVECTORCONVECTOR

ATTIC ROOF

OFFICE

PURPOSE

MULTI

STAIR

PHONE

OFFICE

OFFICE

OFFICE

BATH

HAC

OFFICE

MED. DIR.

ACCESS

ATTIC

C3C

CORRIDOR

OFFICE

DN

STAIR A

CONVECTOR CONVECTOR CONVECTOR CONVECTORCONVECTOR

ATTIC ROOF

OFFICE

PURPOSE

MULTI

STAIR

PHONE

OFFICE

OFFICE

OFFICE

BATH

HAC

OFFICE

MED. DIR.

ACCESS

ATTIC

C3C

CORRIDOR

OFFICE

DN

STAIR A

LIMITS OF DATA CABLING DEMOLITION

E EE E

8"x2"

8" x2

8"x2"

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:1

P

M

1-TD130

THIRD FLOOR PLAN -

TELECOM - DEMOLITION

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

THIRD FLOOR PLAN - TELECOM - DEMOLITION

N

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

SHEET NOTES:

1. REMOVE AND REPLACE EXISTING DATA CABLE: REMOVE ALL EXISTING DATA CABLES AND JACKS THROUGHOUT THIS AREA. REPLACE CABLES AND JACKS 1 FOR 1, AS REQUIRED BY THE NEW WORK PLANS.

REFER TO NEW WORK PLANS FOR SERVING COMMUNICATIONS ROOM LOCATION AND NEW CABLING

ROUTES.

52.1183

52.1183 36.0000

AEC

CB1

DACC

GAC

LCC

CR

4D

BATH 4C

LOCKER

MALE

C0C

CORRIDOR

PHONE

LOBBY

HAC

HEALTH

OCC.

HAC

LOCKER

4A

LOCKER

FEMALE

4B

BATH

STOR

STAIR

12A

ELECTRICAL

MECHANICAL

MECHANICAL

ELECTRICAL

C0N

CORR

18A

MECHANICAL

19A

MECH

ELEV

MECAHNICAL

HEATER

EXAM ROOM

RADIOLOGY

SOUND

ULTRA

EXAM

32A

BATH

STAIR

OFFICE

X-RAY 1

UNEXCAVATED35

MECH

PROCESSING

FILM

37A

EQUIP

X-RAY 2

WAITING

CHANGE 38A

BATH

CLOSET

33A

EQUIP

OFFICE29

STOR

C0W

CORR

30A

MECH

STAIR

OFFICE

5A

OFFICE

PHYSICIAN

5C

CORR

5B

MECH

OFFICE

5D

ROOM

MECH

C0-B2

CORR

A01

HAC

A02

EQUIP

ELEV

C0-B1

CORR

A06

ELECTRICAL

A05A

MECHANICAL

A05B

STORAGE

ASB

STAIR

C0-B4

CORR

C0-B3

CORR

A10

SPACE

MECH.

E-A1

ELEV

A03

PHONE

36D

CONTROL

36E

EQUIP

36C

CT SCAN

CORRIDOR

36B

TOILET

36A

CHANGE

IMAGING

RT CLINIC

ABG LAB/

PFT LAB

HAC

LAB CLASSROOM

APAP/CPAP

EKG LAB

EDUCATION

RT CLINIC/

SOILED

CP

WORKROOM

STAFF

STORAGE

PROSTHETICS

OFFICE

LINEN

CLEAN

A60

OFFICE

A61

OFFICE

A62

OFFICE

A59

STORAGE

SUPPLY

A63

HEMA/COAG

CHEM/URINE/

A67

LOUNGE

CONF./

A68

BANK

BLOOD

A64

MICROBIOLOGY

A56

RECEP.

A58A

PHLEB

A58B

PHLEB

A58C

PHLEB

A58H

PHLEB

A58I

PHLEB

A58J

PHLEB

A58G

PHLEB

A58D

PHLEB

A58K

PHLEB

A58F

PHLEB

A58E

PHLEB

A57A

TOILET

A57B

TOILET

A57C

TOILET

A57C

COLLECTION

A66

LOCKER

A65

TOILET

C0-B1

WAITING

C0-H1

CORR

C0-H5

CORR

C0-C2

CORR C0-H2

CORR

C0-H4

CORR

C0-H3

CORR

A58

PHLEB

A58

PHLEB

C0-H6

CORR

C0-H7

CORR

2C

RECEPTION

WAITING

2A

MEN 2B

WOMEN

53A

STOR

E-01

ELEV

E-02

ELEV

16A

ROOM

MG

10B

HEALTH

OCC.

10A

HEALTH

OCC.

HEALTH

OCC.

30B

OFFICE

30C

OFFICE

8D

EQUIP

8I

MECHANICAL

8A

MRI

7F

INTAKE

7E

INTAKE

7D

HAC

7C

TOILET

7B

CHANGING

7A

CHANGING

COE

CORRIDOR

7G

FOYER

8H

VESTIBULE

8B

CONTROL

8C

HALL

8E

LINEN

8F

SOIL

8G

CLEAN

52.1183

52.1183 36.0000

AEC

CB1

DACC

GAC

LCC

CR

4D

BATH 4C

LOCKER

MALE

C0C

CORRIDOR

PHONE

LOBBY

HAC

HEALTH

OCC.

HAC

LOCKER

4A

LOCKER

FEMALE

4B

BATH

STOR

STAIR

12A

ELECTRICAL

MECHANICAL

MECHANICAL

ELECTRICAL

C0N

CORR

18A

MECHANICAL

19A

MECH

ELEV

MECAHNICAL

HEATER

EXAM ROOM

RADIOLOGY

SOUND

ULTRA

EXAM

32A

BATH

STAIR

OFFICE

X-RAY 1

UNEXCAVATED35

MECH

PROCESSING

FILM

37A

EQUIP

X-RAY 2

WAITING

CHANGE 38A

BATH

CLOSET

33A

EQUIP

OFFICE29

STOR

C0W

CORR

30A

MECH

STAIR

OFFICE

5A

OFFICE

PHYSICIAN

5C

CORR

5B

MECH

OFFICE

5D

ROOM

MECH

C0-B2

CORR

A01

HAC

A02

EQUIP

ELEV

C0-B1

CORR

A06

ELECTRICAL

A05A

MECHANICAL

A05B

STORAGE

ASB

STAIR

C0-B4

CORR

C0-B3

CORR

A10

SPACE

MECH.

E-A1

ELEV

A03

PHONE

36D

CONTROL

36E

EQUIP

36C

CT SCAN

CORRIDOR

36B

TOILET

36A

CHANGE

IMAGING

RT CLINIC

ABG LAB/

PFT LAB

HAC

LAB CLASSROOM

APAP/CPAP

EKG LAB

EDUCATION

RT CLINIC/

SOILED

CP

WORKROOM

STAFF

STORAGE

PROSTHETICS

OFFICE

LINEN

CLEAN

A60

OFFICE

A61

OFFICE

A62

OFFICE

A59

STORAGE

SUPPLY

A63

HEMA/COAG

CHEM/URINE/

A67

LOUNGE

CONF./

A68

BANK

BLOOD

A64

MICROBIOLOGY

A56

RECEP.

A58A

PHLEB

A58B

PHLEB

A58C

PHLEB

A58H

PHLEB

A58I

PHLEB

A58J

PHLEB

A58G

PHLEB

A58D

PHLEB

A58K

PHLEB

A58F

PHLEB

A58E

PHLEB

A57A

TOILET

A57B

TOILET

A57C

TOILET

A57C

COLLECTION

A66

LOCKER

A65

TOILET

C0-B1

WAITING

C0-H1

CORR

C0-H5

CORR

C0-C2

CORR C0-H2

CORR

C0-H4

CORR

C0-H3

CORR

A58

PHLEB

A58

PHLEB

C0-H6

CORR

C0-H7

CORR

2C

RECEPTION

WAITING

2A

MEN 2B

WOMEN

53A

STOR

E-01

ELEV

E-02

ELEV

16A

ROOM

MG

10B

HEALTH

OCC.

10A

HEALTH

OCC.

HEALTH

OCC.

30B

OFFICE

30C

OFFICE

8D

EQUIP

8I

MECHANICAL

8A

MRI

7F

INTAKE

7E

INTAKE

7D

HAC

7C

TOILET

7B

CHANGING

7A

CHANGING

COE

CORRIDOR

7G

FOYER

8H

VESTIBULE

8B

CONTROL

8C

HALL

8E

LINEN

8F

SOIL

8G

CLEAN

1-TN400

1-TN401

A003

EXIST RM

005F

TELECOM ROOM

005D

MECH

005E

LOCKER

005C

CORRIDOR

A05C

TELECOM ROOM

A05A

MECH

LIMITS OF DATA CABLING

REPLACEMENT FROM

ROOM 005F

LIMITS OF DATA CABLING

REPLACEMENT FROM ROOM A05C

2V

2V

2D/2V

2V

E

E

E

E

4D

4D

E

E

2D/2V

2D/2V

4D

4D

E

E

E

E

WAP

WAP

E

E

WAP

WAP

E

E

4D

4D E

E 4D

4D

4D 4D

EE

E

E

WAP

E 4D 4D

2D/2V 2D/2V 2D/2V 3D/1V

E E

E E E E

4D

4D 4D

EE

E

E

WAP

C5 126"

2"

2"

WAP

WAP

WAP

WAP

WAP

WAP

E

E

E

E

E

E 4D 4D

4D

4D

4D 4D

4D 4D

4D 4D 4D 4D

4D4D

4D 4D

4D 4D 4D 4D 4D 4D 2D

2D

2D

4D4D

4D

4D

E E E E E E E E E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

4D

4D

4D

4D

4D

4D 4D

4D

4D

4D

4D

6D 4D

4D

4D

4D

4D

4D

4D4D

E

E

E

E

E

E

E

E

E

E

E E

E E

E

E

E

EE E

2D/1V

2D/1V

2D/1V

2D/1V

2D

2D

2D

4D

4D

4D

6D

2D

4D4D

1V

4D

4D

4D

4D

4D 1V

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

4D E

WAP

WAP

WAP

WAP

WAP

WAP

E

E

E

E

E

E

2D

4D 2D

2D 1V

4D 2D

3D

E

E E

EE

E

E E

WAP

WAP

E

E

2D E

4D

4D

1V

4D

4D

1V

4D

4D

4D

4D

4D

4D

4D1V

4D

4D

4D

4D

4D

4D

4D

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E E

E E

4D 4D E E

4D

4D

3D/1V

3D/1V

2D/1V

2D/1V

2D/2V

E

E

E

E

E E

E

4D

4D

4D

4D

4D

4D

4D 4D

4D E

E E

E E

E

E

E

E

2"

2"

2"

2"

2"

2"

2"

2"2"

C5 126"

C4 126"

12"x4"

E E

"x

4"

12"x4"

"x 4"

"x

4"

"x

4"

"x

4"

12"x4" 12"x4"

12"x4"

"x

4"

12"x4"

"x

2"

E

2 2"

"x

4"

12"x4"

"x

4"

12"x4"

2"

2"

2"

C4

C4

C4

(2) 2" CONDUIT

1 A-SIDE, 1

SPARE

4" CONDUIT B-SIDE

(2) 2" CONDUIT TO A101

EMPTY 2" CONDUIT UP TO 2ND

FLOOR TR A216 (FOR A-SIDE)

NEED TO RUN A 2"

CONDUIT FOR A-SIDE.

2" 12"x4"

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:1

P

M

1-TN100

BASEMENT FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

SHEET NOTES:

1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING TELECOM CABLE TRAY.

2. PROVIDE JUNCTION BOX TO CONNECT FIBER CONDUIT ENTRY TO EXTEND CONDUIT PATHWAY TO THE NEW

TELECOM ROOM.

3. NEW B SIDE FIBER TO BE PULLED TO A03, USING CURRENT B SIDE ROUTE, THEN PULLED TO THE NEW TRS.

1/8" = 1'-0"1

BASEMENT FLOOR PLAN - TELECOMMUNICATIONS

N

0 8' 16'4'

GENERAL NOTES:

A. REFER TO GENERAL NOTES ON SHEET T000 FOR ADDITIONAL SCOPE.

FRIDGE

24X26

SCALE

COPIER

PRINTER

F R

O N

T

ENTRY

128A

RECEPTION

STAIR120

WAITING

STAIR

MAA

REGISTRATION

REGISTRATION168

EXAM

EXAM

STOR

WHCHR

LOBBY

ELEV

C1NC

CORR

127A

PHONE

MECH

128B

V.I.C.

128C

OUT

CHECK

STOR

C1WI

CORR

EXAM

EXAM

EXAM

EXAM

STATION

NURSE

173A

MED

EXAM

EXAM165

NURSING

EXAM

EXAM

NURSING

160B

BATH

INTAKE

PROCEDURE

SPECIAL

160A

UTILITY

CLEAN

173B

INTAKE

C1WH

CORR

C1WG

CORR

ELEC

MECH

EXAM

INT

C1WF

CORR

EXAM

INT

EXAM

INT

EXAM

INT

EXAM

INT

EXAM

INT

STAIR

C1WJ

CORR

COPY

CONSULT

PHARM.

STAIR

C1WA

CORR

MALE

FEMALE

CHASE

WAITING

BATH

UTILITY

CLEAN

EXAM

EXAM

CONSULT

PHARM.

C1WD

CORR

EXAM

EXAM

UTILITY

CLEAN

CHART

NURSE/

OFFICE

NURSE

EXAM

EXAM

C1WB

CORR

EXAM

EXAM

EXAM

NURSING

EXAM

WAITING

152A

MED

C1WE

CORR

C1WC

CORR

ROOF

A111

VEST

TRIAGE

A110

OFFICE A109

EXAM

E-A1

ELEV

A-1

STAIR A108

STAFF

A107A

DICTATION

A107B

CLOSET

C0-2

CORR

A106

HAC A105

CONSULT

PHARM

A104

NURSING

A103

NURSING

C0-1

CORRIDOR

A127A

CHECK-OUT

A126

INTAKE

A125

EXAM

CO-5

CORR

A124

EXAM

A123

EXAM

A122

EXAM

A121

OFFICE

A120

UTIL

SOILED

A118

ALCOVE

NURSE

A117

MED

CO-3

CORRIDOR

A112

EXAM

A113

EXAM

A116

UTILITY

SOILED

A119

EXAM

C0-4

CORRIDOR

A114

EXAM

A115

EXAM

AS1

STAIR

A141

STORAGE

EQUIP.

A140

EXAM

A139

EXAM

A138

EXAM

A137

DICTATION

A136

EXAM

A135

EXAM

A134

OUT

CHECK

A133

PASSAGE

STAFF A132

STORAGE

CO-7

CORRIDOR

A142

STORAGE

CLEAN

A143

EXAM

A144

EXAM

A145

EXAM CO-3

CORR

A146

EXAM

A147

STORAGE

A127D

ROOM

MED A127C

STATION

NURSE

A127B

IN

CHECKCO-6

CORR

A131

MEN A130

CHASE

A129

WAITING

A128

WAITING

A102B

CHASE

A102A

WOMEN

A101

COMM

TELE-

A112A

LINEN

REGISTRATION

INTAKE

INTAKE

STAFF

111A

M.O.D.

111C

EQUIPMENT

SUPPLY

111D

PURPOSE

MULTI

111B

TOILET

WAITING

101A

TOILET

UNISEX

HAC

UTILITIES

CLEAN

UTILITIES

SOILED

LOCKERS

MED

STATION

NURSE

108A

TELEMETRY

108B

TELEMETRY

108C

TOILET

108D

TELEMETRY

108E

TELEMETRY

109C

TELEMETRY

PROCEDURE/

109B

TELEMETRY

109A

TELEMETRY

109D

TOILET

AMBULANCE

C1EC

CORRIDOR

C1EA

CORRIDOR

NOUR

C1ED

CORRIDOR

111E

CAMERAS

HOLDING/

111F

ANTE

HOLDING/

TOILET

C1EB

CORRIDOR

TOILET

STAFF

E-01

ELEV

E-02

ELEV

A117A

UNISEX

ROOF

FLAT

DECONTAM

1-TN402

LIMITS OF DATA CABLING

REPLACEMENT FROM ROOM A101

3D

3D

3D

3D

3D

3D

3D

3D 3D

4D

3D

3D

3D 3D

3D

3D

3D

3D

3D

3D

3D3D 4D

3D

2D

4D

WAP

WAP

WAP

WAP

WAP

WAP

WAP

4D 3D

3D

3D

3D

3D4V

1D

2D/2V

2D/2V

2D

2D/2V2D/2V 2V

4D

2D/3V

WAP

WAP

WAP

4D4D5D

2D

2D

2D

2D/2V

3D

6D5D

3D3D3D 3D

3D

3D/1V1D/2V

4D

2V 2D

2D

3D

WAP

WAP

WAP

WAP

4D

4D 4D

4D

1D

4D

4D

4D

4D 4D

4D

4D

4D

4D 4D 4D

4D

4D

4D

4D

4D4D

4D

4D

4D

4D

5D4D

4D

4D

4D

4D

4D

4D

4D

4D

WAP

WAP

WAP

WAP

WAPWAP

3D 3D3D

3D

3D2D 3D

3D

3D

4D

3D

3D

3D 3D

3D

3D

2D

2D

2D

2V2V

2V

2V

2V

2V

1D1D 1D

1D

1D

1D

1D

1D 1D

1D

2D/2V

4D

4D

WAP

3D 3D

1D

1D

2D/2V

2D/2V2D/2V 4D4D

4D4D

4D

4D

4D

4D 4D

4D

4D

4D

3D

4D

4D

2V

D

2V 2V 2V

D

2V

3D

2V

D

2V 2V

D

2V

D

D

2V

2V

2V

D

D

2V

2D

3V

WAP

WAP

WAP

WAP

WAP

D

D

2V

2V

D 2V

2V

D

2V

D

D D

2V

2V

2D/V

2D

D

4D

2D

2V

2D

2V D

2V

D

2VD

D

D

D

2V D D 2V

D

4D 2V

2V

E

E E E E

E

E

E E

E

E

E

EE

E

E E

E E

E

E

E

E

EE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E E E

E

E

E

E

E E

E E E E E

E

E E

E

E

E

EE

E E E E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E E E

E

E

E

E E

E

E

E

E

E

E

E

E

E E E

E

E

E

E E E

E

E

E

E

E

E

E

E

EE

E

EE

EE

E

E E

E

E E

EE

E

E E

E

EE

E E

E E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

EE

E

E

E

E

E

E

E

E E

E

E

E

E

E

E E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E

E

E E

E

E

E

E

E

E

E EEE

E

E E

E

E E

E E

E

E

E

E

E E

E

2V

D

E

E

2V E

D 2V

2V E

EE

E

E

12"x4"

"x

4"

"x

4"

12"x4"

12"x4"

12"x4"

"x

4"12 "x

4"

12"x4"

6" x4

"x

2"

12"x2"

12"x2"

6" x4

"x

2"

12"x4"

12"x4"

"x

4"

12"x4"

12"x4"

"x

4"

2" C

DOWN

2" C

UP

1"

C4

C4

C4

B-SIDE TO A216

4"

E

E E

E E

E E

E

E

E

E

E

4"4"4"

E

E

E

2"

4"4"4"

12"x4"

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:1

P

M

1-TN110

FIRST FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

FIRST FLOOR PLAN - TELECOMMUNICATIONS

N

0 8' 16'4'

SHEET NOTES:

1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING TELECOM CABLE TRAY.

2. PROVIDE JUNCTION BOX TO CONNECT EXISTING FIBER CONDUIT TO EXTEND CONDUIT PATHWAY TO THE

NEW TELECOM ROOM.

3. NEW B SIDE FIBER TO BE PULLED TO 127, USING CURRENT B SIDE ROUTE, THEN PULLED TO THE NEW TRS.

INSIDE dgsf = 26,040 S.F.

-O

-V

DN

UP

DN

UP

INSIDE dgsf = 26,040 S.F.

A -O

-V

DN

UP

DN

UP

1-TN403

A216

EXIST RM

A200

TELECOM ROOM

EXIST RM

A225

EXIST RM

LIMITS OF DATA CABLING

REPLACEMENT FROM

ROOM A200

HORIZONTAL AND

VERTICAL CABLE ROUTES

TO A200

WAP

4D

4D

4D

4D

4D

4D 4D

4D 4D

4D

6D 1D

6D 1D

E

E E

E

E E

E

E

E

EE

EE

E

4D

4D

1D

E

E

E

4D

6D 1D

4D

4D

4D 4D

4D 4D

4D

4D

3D/1V 4D

4D

4D

4D

4D

4D

4D

2D4D2D4D

E

E E

E

E

E

E

E E

E

E E E E

E

E E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

4D

4D

4D

1D 4D

1V E

E

E

E E E

4D

4D

4D

4D

4D E

E

E

E

E

3D/1V

4D

4D 4D

4D

4D

E

E

E

E

EE

4D

4D

4D

4D

4D

4D

E

E

E

E

E

E

4D

4D

4D

4D

4D

4D 4D 4D

4D

4D 4D

E E EEE

E

E

E

E

E

E

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

2"

2"

2"

4D

4D

4D

4D

E

E

E

E

WAP

E

WAP

WAP

WAP

WAP

WAP

WAP

WAP

E

E

E

E

E

E

E 4D

4D

4D

4D 4D

4D

D E

E

E

E

E

E E

3D

4D

4D 4D

4D

4D 4D 4D 4D 4D 4D E E E E E E

E EE

E E

4D

3D E

E

1V

2D

1V

1V

E

E

E

E

WAP

E

4D E

E

E E E

"x

4"

12"x4"

"x

4"

"x 4"

E

E

E

E E

EE

E E

12"x4" 12"x4"

12"x4"12"x4"

"x

4"

"x

4"

E

EE

E

"x

4"

E

E

12"x4"

"x

4"

12"x4"

"x

4"

12"x4"

"x

4"

C4 126"

C4

C4

C4

C4

C4 126"

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:1

P

M

1-TN120

SECOND FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"1

SECOND FLOOR PLAN - TELECOMMUNICATIONS

N

0 8' 16'4'

SHEET NOTES:

1. CONTRACTOR TO PROVIDE NEW WIRE BASKET, AS NEEDED, TO MAINTAIN A 50% OR LESS FILL OF

THE CABLE TRAY SYSTEM FOR THE FLOOR. THE NEW WIRE BASKET WILL MATCH THE SIZE AND

DISTANCE, EITHER BESIDE OR BELOW THE EXISTING CABLE TRAY, TO MATCH THE EXISTING

TELECOM CABLE TRAY.

2. PROVIDE JUNCTION BOX TO CONNECT EXISTING FIBER CONDUIT TO EXTEND CONDUIT PATHWAY

TO THE NEW TELECOM ROOM.

3. NEW B SIDE FIBER TO BE PULLED TO 229, USING CURRENT B SIDE ROUTE, THEN PULLED TO THE

NEW TRS.

ATTIC ROOF

OFFICE

PURPOSE

MULTI

STAIR

PHONE

OFFICE

OFFICE

OFFICE

BATH

HAC

OFFICE

MED. DIR.

ACCESS

ATTIC

C3C

CORRIDOR

OFFICE

DN

STAIR A

CONVECTORCONVECTOR

CONVECTOR CONVECTOR CONVECTOR CONVECTORCONVECTOR

ATTIC ROOF

OFFICE

PURPOSE

MULTI

STAIR

PHONE

OFFICE

OFFICE

OFFICE

BATH

HAC

OFFICE

MED. DIR.

ACCESS

ATTIC

C3C

CORRIDOR

OFFICE

DN

STAIR A

LIMITS OF DATA CABLING

REPLACEMENT FROM

ROOM A200

HORIZONTAL AND

VERTICAL CABLE ROUTES

TO A200

C1 126"

F1

12" LADDER

E EE E

8"x2"8"x2"

8"x2"

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:1

P

M

1-TN130

THIRD FLOOR PLAN -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/8" = 1'-0"

THIRD FLOOR PLAN - TELECOMMUNICATIONS

N

0 8' 16'4'

SHEET NOTES:

1. PROVIDE NEW FLOOR PENETRATION, VERTICAL CABLE TRAY, HORIZONTAL CABLE TRAY, AND WALL SLEEVE ASSEMBLY TO ACCOMMODATE ROUTING OF HORIZONTAL CABLING FROM SOURCE COMMUNICATIONS ROOM

LOCATED ON SECOND FLOOR.

5 2.1183 5 2.1183 3 6.0000

AEC

CB1

DACC

GAC

LCC

C R

4D

BATH 4C

LOCKER

MALE

C0C

CORRIDOR

PHONE

LOBBY

HAC

HEALTH

OCC.

HAC

LOCKER

4A

LOCKER

FEMALE

4B

BATH

STOR

STAIR

12A

ELECTRICAL

MECHANICAL

MECHANICAL

ELECTRICAL

C0N

CORR

18A

MECHANICAL

19A

MECH

ELEV

MECAHNICAL

HEATER

EXAM ROOM

RADIOLOGY

SOUND

ULTRA

EXAM

32A

BATH

STAIR

OFFICE

X-RAY 1

UNEXCAVATED35

MECH

PROCESSING

FILM

37A

EQUIP

X-RAY 2

WAITING

CHANGE 38A

BATH

CLOSET

33A

EQUIP

OFFICE29

STOR

C0W

CORR

30A

MECH

STAIR

OFFICE

5A

OFFICE

PHYSICIAN

5C

CORR

5B

MECH

OFFICE

5D

ROOM

MECH

C0-B2

CORR

A01

HAC

A02

EQUIP

ELEV

C0-B1

CORR

A06

ELECTRICAL

A05A

MECHANICAL

A05B

STORAGE

ASB

STAIR

C0-B4

CORR

C0-B3

CORR

A10

SPACE

MECH.

E-A1

ELEV

A03

PHONE

36D

CONTROL

36E

EQUIP

36C

CT SCAN

CORRIDOR

36B

TOILET

36A

CHANGE

IMAGING

RT CLINIC

ABG LAB/

PFT LAB

HAC

LAB CLASSROOM

APAP/CPAP

EKG LAB

EDUCATION

RT CLINIC/

SOILED

CP

WORKROOM

STAFF

STORAGE

PROSTHETICS

OFFICE

LINEN

CLEAN

A60

OFFICE

A61

OFFICE

A62

OFFICE

A59

STORAGE

SUPPLY

A63

HEMA/COAG

CHEM/URINE/

A67

LOUNGE

CONF./

A68

BANK

BLOOD

A64

MICROBIOLOGY

A56

RECEP.

A58A

PHLEB

A58B

PHLEB

A58C

PHLEB

A58H

PHLEB

A58I

PHLEB

A58J

PHLEB

A58G

PHLEB

A58D

PHLEB

A58K

PHLEB

A58F

PHLEB

A58E

PHLEB

A57A

TOILET

A57B

TOILET

A57C

TOILET

A57C

COLLECTION

A66

LOCKER

A65

TOILET

C0-B1

WAITING

C0-H1

CORR

C0-H5

CORR

C0-C2

CORR C0-H2

CORR

C0-H4

CORR

C0-H3

CORR

A58

PHLEB

A58

PHLEB

C0-H6

CORR

C0-H7

CORR

2C

RECEPTION

WAITING

2A

MEN 2B

WOMEN

53A

STOR

E-01

ELEV

E-02

ELEV

16A

ROOM

MG

10B

HEALTH

OCC.

10A

HEALTH

OCC.

HEALTH

OCC.

30B

OFFICE

30C

OFFICE

8D

EQUIP

8I

MECHANICAL

8A

MRI

7F

INTAKE

7E

INTAKE

7D

HAC

7C

TOILET

7B

CHANGING

7A

CHANGING

COE

CORRIDOR

7G

FOYER

8H

VESTIBULE

8B

CONTROL

8C

HALL

8E

LI NEN

8F

SOI L

8G

CL EA N

5 2.1183 5 2.1183 3 6.0000

AEC

CB1

DACC

GAC

LCC

C R

4D

BATH 4C

LOCKER

MALE

C0C

CORRIDOR

PHONE

LOBBY

HAC

HEALTH

OCC.

HAC

LOCKER

4A

LOCKER

FEMALE

4B

BATH

STOR

STAIR

12A

ELECTRICAL

MECHANICAL

MECHANICAL

ELECTRICAL

C0N

CORR

18A

MECHANICAL

19A

MECH

ELEV

MECAHNICAL

HEATER

EXAM ROOM

RADIOLOGY

SOUND

ULTRA

EXAM

32A

BATH

STAIR

OFFICE

X-RAY 1

UNEXCAVATED35

MECH

PROCESSING

FILM

37A

EQUIP

X-RAY 2

WAITING

CHANGE 38A

BATH

CLOSET

33A

EQUIP

OFFICE29

STOR

C0W

CORR

30A

MECH

STAIR

OFFICE

5A

OFFICE

PHYSICIAN

5C

CORR

5B

MECH

OFFICE

5D

ROOM

MECH

C0-B2

CORR

A01

HAC

A02

EQUIP

ELEV

C0-B1

CORR

A06

ELECTRICAL

A05A

MECHANICAL

A05B

STORAGE

ASB

STAIR

C0-B4

CORR

C0-B3

CORR

A10

SPACE

MECH.

E-A1

ELEV

A03

PHONE

36D

CONTROL

36E

EQUIP

36C

CT SCAN

CORRIDOR

36B

TOILET

36A

CHANGE

IMAGING

RT CLINIC

ABG LAB/

PFT LAB

HAC

LAB CLASSROOM

APAP/CPAP

EKG LAB

EDUCATION

RT CLINIC/

SOILED

CP

WORKROOM

STAFF

STORAGE

PROSTHETICS

OFFICE

LINEN

CLEAN

A60

OFFICE

A61

OFFICE

A62

OFFICE

A59

STORAGE

SUPPLY

A63

HEMA/COAG

CHEM/URINE/

A67

LOUNGE

CONF./

A68

BANK

BLOOD

A64

MICROBIOLOGY

A56

RECEP.

A58A

PHLEB

A58B

PHLEB

A58C

PHLEB

A58H

PHLEB

A58I

PHLEB

A58J

PHLEB

A58G

PHLEB

A58D

PHLEB

A58K

PHLEB

A58F

PHLEB

A58E

PHLEB

A57A

TOILET

A57B

TOILET

A57C

TOILET

A57C

COLLECTION

A66

LOCKER

A65

TOILET

C0-B1

WAITING

C0-H1

CORR

C0-H5

CORR

C0-C2

CORR C0-H2

CORR

C0-H4

CORR

C0-H3

CORR

A58

PHLEB

A58

PHLEB

C0-H6

CORR

C0-H7

CORR

2C

RECEPTION

WAITING

2A

MEN 2B

WOMEN

53A

STOR

E-01

ELEV

E-02

ELEV

16A

ROOM

MG

10B

HEALTH

OCC.

10A

HEALTH

OCC.

HEALTH

OCC.

30B

OFFICE

30C

OFFICE

8D

EQUIP

8I

MECHANICAL

8A

MRI

7F

INTAKE

7E

INTAKE

7D

HAC

7C

TOILET

7B

CHANGING

7A

CHANGING

COE

CORRIDOR

7G

FOYER

8H

VESTIBULE

8B

CONTROL

8C

HALL

8E

LI NEN

8F

SOI L

8G

CL EA N

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:1

P

M

1-TN200

BASEMENT FLOOR PLAN -

TELECOM - CABLE DISTANCE

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1" = 30'-0"

BASEMENT FLOOR PLAN - TELECOMMUNICATIONS - CABLE DISTANCE

N

0 30' 60'15'

FRIDGE

24X26

SCALE

COPIER

PRINTER

F R

O N

T

ENTRY

128A

RECEPTION

STAIR120

WAITING

STAIR

MAA

REGISTRATION

REGISTRATION168

EXAM

EXAM

STOR

WHCHR

LOBBY

ELEV

C1NC

CORR

127A

PHONE

MECH

128B

V.I.C.

128C

OUT

CHECK

STOR

C1WI

CORR

EXAM

EXAM

EXAM

EXAM

STATION

NURSE

173A

MED

EXAM

EXAM165

NURSING

EXAM

EXAM

NURSING

160B

BATH

INTAKE

PROCEDURE

SPECIAL

160A

UTILITY

CLEAN

173B

INTAKE

C1WH

CORR

C1WG

CORR

ELEC

MECH

EXAM

INT

C1WF

CORR

EXAM

INT

EXAM

INT

EXAM

INT

EXAM

INT

EXAM

INT

STAIR

C1WJ

CORR

COPY

CONSULT

PHARM.

STAIR

C1WA

CORR

MALE

FEMALE

CHASE

WAITING

BATH

UTILITY

CLEAN

EXAM

EXAM

CONSULT

PHARM.

C1WD

CORR

EXAM

EXAM

UTILITY

CLEAN

CHART

NURSE/

OFFICE

NURSE

EXAM

EXAM

C1WB

CORR

EXAM

EXAM

EXAM

NURSING

EXAM

WAITING

152A

MED

C1WE

CORR

C1WC

CORR

ROOF

A111

VEST

TRIAGE

A110

OFFICE A109

EXAM

E-A1

ELEV

A-1

STAIR A108

STAFF

A107A

DICTATION

A107B

CLOSET

C0-2

CORR

A106

HAC A105

CONSULT

PHARM

A104

NURSING

A103

NURSING

C0-1

CORRIDOR

A127A

CHECK-OUT

A126

INTAKE

A125

EXAM

CO-5

CORR

A124

EXAM

A123

EXAM

A122

EXAM

A121

OFFICE

A120

UTIL

SOILED

A118

ALCOVE

NURSE

A117

MED

CO-3

CORRIDOR

A112

EXAM

A113

EXAM

A116

UTILITY

SOILED

A119

EXAM

C0-4

CORRIDOR

A114

EXAM

A115

EXAM

AS1

STAIR

A141

STORAGE

EQUIP.

A140

EXAM

A139

EXAM

A138

EXAM

A137

DICTATION

A136

EXAM

A135

EXAM

A134

OUT

CHECK

A133

PASSAGE

STAFF A132

STORAGE

CO-7

CORRIDOR

A142

STORAGE

CLEAN

A143

EXAM

A144

EXAM

A145

EXAM CO-3

CORR

A146

EXAM

A147

STORAGE

A127D

ROOM

MED A127C

STATION

NURSE

A127B

IN

CHECKCO-6

CORR

A131

MEN A130

CHASE

A129

WAITING

A128

WAITING

A102B

CHASE

A102A

WOMEN

A101

COMM

TELE-

A112A

LINEN

REGISTRATION

INTAKE

INTAKE

STAFF

111A

M.O.D.

111C

EQUIPMENT

SUPPLY

111D

PURPOSE

MULTI

111B

TOILET

WAITING

101A

TOILET

UNISEX

HAC

UTILITIES

CLEAN

UTILITIES

SOILED

LOCKERS

MED

STATION

NURSE

108A

TELEMETRY

108B

TELEMETRY

108C

TOILET

108D

TELEMETRY

108E

TELEMETRY

109C

TELEMETRY

PROCEDURE/

109B

TELEMETRY

109A

TELEMETRY

109D

TOILET

AMBULANCE

C1EC

CORRIDOR

C1EA

CORRIDOR

NOUR

C1ED

CORRIDOR

111E

CAMERAS

HOLDING/

111F

ANTE

HOLDING/

TOILET

C1EB

CORRIDOR

TOILET

STAFF

E-01

ELEV

E-02

ELEV

A117A

UNISEX

ROOF

FLAT

DECONTAM

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:1

P

M

1-TN210

FIRST FLOOR PLAN -

TELECOM - CABLE DISTANCE

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1" = 30'-0"

FIRST FLOOR PLAN - TELECOMMUNICATIONS - CABLE DISTANCE

INSIDE dgsf = 26,040 S.F.

-O

-V

DN

UP

DN

UP

INSIDE dgsf = 26,040 S.F.

A -O

-V

DN

UP

DN

UP

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:2

P

M

1-TN220

SECOND FLOOR PLAN -

TELECOM - CABLE DISTANCE

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1" = 30'-0"

SECOND FLOOR PLAN - TELECOMMUNICATIONS - CABLE DISTANCE

ATTIC ROOF

OFFICE

PURPOSE

MULTI

STAIR

PHONE

OFFICE

OFFICE

OFFICE

BATH

HAC

OFFICE

MED. DIR.

ACCESS

ATTIC

C3C

CORRIDOR

OFFICE

DN

STAIR A

CONVECTORCONVECTOR

CONVECTOR CONVECTOR CONVECTOR CONVECTORCONVECTOR

ATTIC ROOF

OFFICE

PURPOSE

MULTI

STAIR

PHONE

OFFICE

OFFICE

OFFICE

BATH

HAC

OFFICE

MED. DIR.

ACCESS

ATTIC

C3C

CORRIDOR

OFFICE

DN

STAIR A

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:2

P

M

1-TN230

THIRD FLOOR PLAN -

TELECOM - CABLE DISTANCE

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1" = 30'-0"

THIRD FLOOR PLAN - TELECOMMUNICATIONS - CABLE DISTANCE

52. 1183

52. 1183

4B

5C

CORR

MECH

52. 1183

52. 1183

4B

5C

CORR

MECH

NURSING A102A

A101

COMM

TELE-

NURSING A102A

A101

COMM

TELE-

C

C

A C

C

A03

PHONE

A03

PHONE

C

AC

C

RECEPTION

127A

PHONE

MECH

BAS

E

TW

D

D

R

E

SP

E

DATA RACKS

E

A200

TELECOM

ROOM

E

R E

E

DDD

LOW V CABINET

DATA

RACKS

D

E

E

TW

TW

DATA

RACKS

CABLE

TRAY

R

R

E

A003

EXIST RM

E

R

D

E

R

E

D

E

LOW V

CABINET

TW

CABLE

TRAY

DATA

RACK

A225

EXIST RM

D

DATA RACK

D

D

E

E

R E

E

IL1-4

IL

1-

1A

TW

DATA

RACKS

CABLE

TRAY

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:2

P

M

1-TN300

ENLARGED PLANS -

TELECOMMUNICATIONS -

DEMO

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/4" = 1'-0"

ENLARGED PLAN - TR A05C - TELECOM - DEMO

1/4" = 1'-0"

ENLARGED PLAN - TR 005F - TELECOM - DEMO

1/4" = 1'-0"

ENLARGED PLAN - TR A101 - TELECOM - DEMO

0 4' 8'2'

0 4' 8'2'0 4' 8'2'

0 4' 8'2'

N

N N

N

1/4" = 1'-0"

ENLARGED PLAN - TR A200 & A216 - TELECOM - DEMO

N

N

N

0 4' 8'2'

0 4' 8'2'0 4' 8'2' 1/4" = 1'-0"

ENLARGED PLAN - RM 229 & 229A - TELECOM - DEMO

1/4" = 1'-0"1

ENLARGED PLAN - TR A03 - TELECOM - DEMO

1/4" = 1'-0"

ENLARGED PLAN - RM A225 - TELECOM - DEMO

1/4" = 1'-0"4

ENLARGED PLAN - RM 127 & 127A - TELECOM - DEMO

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

SHEET NOTES:

1. EXISTING TELECOMMUNICATIONS CAGE AND RACK SHALL BE INCLUDED WITHIN THE SCOPE OF DEMOLITION.

EXISTING CABLING AND ASSOCIATED OUTLETS SHALL BE REMOVED AND REPLACED 1 FOR 1 AND REFED FROM DISTRIBUTION EQUIPMENT LOCATED WITHIN THE NEW TELECOMMUNICATIONS ROOM. REFER TO GENERAL CABLING NOTES FOR APPROXIMATE QUANTITIES. REFER TO NEW WORK PLANS FOR SERVING

COMMUNICATIONS ROOM LOCATION AND NEW CABLING ROUTES.

2. EXISTING CABLE TRAY, SECURITY CAMERAS, GROUND BUS BARS, AND RACKS FROM DECOMMISSIONED

ROOMS ARE TO BE REUSED, WHEN POSSBILE, IN NEW CONSTRUCTION TRS.

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE. THE CABLE

RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE PRESENT IN THE SPACE AT THE COMPLETION OF THE

PROJECT.

1. ROOM A003

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 299

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

2. ROOM A101

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 212

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

3. ROOM 127

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 650

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

4. ROOM A216

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 215

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

5. ROOM A225

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 30

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

6. ROOM 229

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 295

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

0 4' 8'2'

C

R

A C

1-TN400

1 - a b

1 - c d

C5 126"

A05C

TELECOM ROOM

CABLE

TRAY

DATA

RACKS

W

KEYPAD

2"

CABLE

TRAY

E

AC1

R

12"x4"

CABLE

TRAY

2"

"x

4"

"x

4"

NEMA L21-20R (TYP)

RACK 1

RACK 1

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

6U SPACE FOR FUTURE USE.

PROVIDE BLANK PANELS FOR UNUSED SPACES.

6U 5KW RACK MOUNT UPS

D

PROVIDE DATA CABLE TO RACK

MOUNTED UPS FOR CONNECTION

TO MONITORING SYSTEM

VERTICAL CABLE

MANAGEMENT (TYP)

NEMA L21-20R (TYP)

RACK 2

1U BONDING BUS BAR (BACK) 1U ANGLED BLANKING PANEL (FRONT)

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

RACK 2

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

6U SPACE FOR OIT PROVIDED EQUIPMENT.

PROVIDE BLANKING PANELS FOR UNUSED SPACES.

6U 5KW RACK MOUNT UPS

D

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U BONDING BUS BAR (BACK) 1U ANGLED BLANKING PANEL (FRONT)

SPACE FOR FUTURE HORIZONTAL CABLE

DISTRIBUTION. PROVIDE ANGLED BLANKING PANELS

FOR UNUSED SPACES.

NOTES:

1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.

2. COORDINATE EXACT RACK LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.

3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.

4. RACK ELEVATION SHOWS A FULLY CONFIGURED SAMPLE RACK. CONTRACTOR TO PROVIDE REQUIRED EQUIPMENT TO

SUPPORT THE FINAL DATA COUNT FROM THE ENLARGED NEW SHEET.

5. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.

6. CONTRACTOR IS RESPONSIBLE FOR FINAL CABLE COUNT, QUANTITY OF PATCH PANELS, SWITCHES, FIBER ENCLOSURES, BLANKING PANELS, CABLE MANAGEMENT, TR PATCH CABLES, AND MOUNTING HARDWARE NOT MARKED AS “OIT PROVIDED”.

7. PUNCH DOWN COPPER BACKBONE CABLE TO RACK MOUNT PATCH PANEL. TERMINATE ONE (1) PAIR PER PATCH PANEL PORT.

4 POST CHANNEL

RACK (TYP)

1U 144 STRAND OM4 AND OS2 DISTRIBUTION PANEL

1U 48 PORT CAT5E BACKBONE ANGLED PATCH PANEL

SPACE FOR FUTURE HORIZONTAL CABLE

DISTRIBUTION. PROVIDE ANGLED BLANKING PANELS

FOR UNUSED SPACES.

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:2

P

M

1-TN400

ENLARGED PLANS -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

1/2" = 1'-0"

ENLARGED PLAN - TR A05C - TELECOM - CABLE TRAY AND DATA

N

0 2' 4'1'

1/4" = 1'-0"2 1 - a

1/4" = 1'-0"3 1 - b

1/4" = 1'-0"4 1 - c

1/4" = 1'-0"

1 - d 0 4' 8'2' 0 4' 8'2' 0 4' 8'2' 0 4' 8'2'

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

1. ROOM A05C

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 299 FROM A003

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6A): 299

DATA (CAT6): 0

NOT TO SCALE6

COMMUNICATIONS - TYPICAL TWO RACK ELEVATION WITH RACK MOUNT UPS - TR A05C

SHEET NOTES:

1. PROVIDE A NEW ACCESS CONTROL PANEL TO BE INSTALLED IN THE TELECOM ROOM. THE CARD READER AND KEYPAD FOR THIS ROOM TO BE WIRED TO THE NEW ACCESS CONTROL PANEL. EXISTING CARD READERS AND

KEYPADS WILL BE MOVED TO THE NEW CONTROL PANEL UNDER A DIFFERENT PROJECT.

R

A C

1-TN401

2 - a b

2 - c

-d

C4 126"

W 005F

TELECOM ROOM

"x

4"

DATA RACKS

CABLE TRAY

KEYPAD

4D E

AC

R

12"x4"

2"

WAP

C4 126"

2"

NEMA L21-20R (TYP)

RACK 1

RACK 1

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

6U SPACE FOR FUTURE USE.

PROVIDE BLANK PANELS FOR UNUSED SPACES.

6U 5KW RACK MOUNT UPS

D

PROVIDE DATA CABLE TO RACK

MOUNTED UPS FOR CONNECTION

TO MONITORING SYSTEM

VERTICAL CABLE

MANAGEMENT (TYP)

1U BONDING BUS BAR (BACK) 1U ANGLED BLANKING PANEL (FRONT)

NOTES:

1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.

2. COORDINATE EXACT RACK LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.

3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.

4. RACK ELEVATION SHOWS A FULLY CONFIGURED SAMPLE RACK. CONTRACTOR TO PROVIDE REQUIRED EQUIPMENT TO

SUPPORT THE FINAL DATA COUNT FROM THE ENLARGED NEW SHEET.

5. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.

6. CONTRACTOR IS RESPONSIBLE FOR FINAL CABLE COUNT, QUANTITY OF PATCH PANELS, SWITCHES, FIBER ENCLOSURES, BLANKING PANELS, CABLE MANAGEMENT, TR PATCH CABLES, AND MOUNTING HARDWARE NOT MARKED AS “OIT PROVIDED”.

7. PUNCH DOWN COPPER BACKBONE CABLE TO RACK MOUNT PATCH PANEL. TERMINATE ONE (1) PAIR PER PATCH PANEL PORT.

4 POST CHANNEL

RACK (TYP)

1U 144 STRAND OM4 AND OS2 DISTRIBUTION PANEL

1U 48 PORT CAT5E BACKBONE ANGLED PATCH PANEL

SPACE FOR FUTURE HORIZONTAL CABLE

DISTRIBUTION. PROVIDE ANGLED BLANKING PANELS

FOR UNUSED SPACES.

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:2

P

M

1-TN401

ENLARGED PLANS -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

N

0 2' 4'1'

0 4' 8'2' 0 4' 8'2' 0 4' 8'2' 0 4' 8'2'

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

1. ROOM 005F

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 325 FROM ROOM 127

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6A): 325

DATA (CAT6): 0

1/2" = 1'-0"

ENLARGED PLAN - TR 005F - TELECOM - CABLE TRAY AND DATA

1/4" = 1'-0"

2 - a 1/4" = 1'-0"

2 - b

1/4" = 1'-0"

2 - c 1/4" = 1'-0"

2-d

NOT TO SCALE6

COMMUNICATIONS - TYPICAL ONE RACK ELEVATION WITH RACK MOUNT UPS - TR A005F

SHEET NOTES:

1. PROVIDE A NEW ACCESS CONTROL PANEL TO BE INSTALLED IN THE TELECOM ROOM. THE CARD READER AND

C R

C

NURSING A102A

A101

COMM

TELE-

1-TN402

3 - a b

3 - c d

TW

BAS

SP

E

E

E

12"x4"

DATA RACKS

CABLE TRAY

4"4"4"

E

W

R

2" C

DOWN

2" C

UP

12"x4"

12"x4"

AC

12"x4"

4"4"4"4"

E

"x

4"

12"x4"

2"

1"

CABLE TRAY

KEYPAD

NEMA L21-20R (TYP)

RACK 1

RACK 1

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

6U SPACE FOR FUTURE USE.

PROVIDE BLANK PANELS FOR UNUSED SPACES.

6U 5KW RACK MOUNT UPS

D

PROVIDE DATA CABLE TO RACK

MOUNTED UPS FOR CONNECTION

TO MONITORING SYSTEM

VERTICAL CABLE

MANAGEMENT (TYP)

NEMA L21-20R (TYP)

RACK 2

1U BONDING BUS BAR (BACK) 1U ANGLED BLANKING PANEL (FRONT)

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

RACK 2

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

6U SPACE FOR OIT PROVIDED EQUIPMENT.

PROVIDE BLANKING PANELS FOR UNUSED SPACES.

6U 5KW RACK MOUNT UPS

D

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U BONDING BUS BAR (BACK) 1U ANGLED BLANKING PANEL (FRONT)

SPACE FOR FUTURE HORIZONTAL CABLE

DISTRIBUTION. PROVIDE ANGLED BLANKING PANELS

FOR UNUSED SPACES.

NOTES:

1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.

2. COORDINATE EXACT RACK LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.

3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.

4. RACK ELEVATION SHOWS A FULLY CONFIGURED SAMPLE RACK. CONTRACTOR TO PROVIDE REQUIRED EQUIPMENT TO

SUPPORT THE FINAL DATA COUNT FROM THE ENLARGED NEW SHEET.

5. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.

6. CONTRACTOR IS RESPONSIBLE FOR FINAL CABLE COUNT, QUANTITY OF PATCH PANELS, SWITCHES, FIBER ENCLOSURES, BLANKING PANELS, CABLE MANAGEMENT, TR PATCH CABLES, AND MOUNTING HARDWARE NOT MARKED AS “OIT PROVIDED”.

7. PUNCH DOWN COPPER BACKBONE CABLE TO RACK MOUNT PATCH PANEL. TERMINATE ONE (1) PAIR PER PATCH PANEL PORT.

4 POST CHANNEL

RACK (TYP)

1U 144 STRAND OM4 AND OS2 DISTRIBUTION PANEL

1U 48 PORT CAT5E BACKBONE ANGLED PATCH PANEL

SPACE FOR FUTURE HORIZONTAL CABLE

DISTRIBUTION. PROVIDE ANGLED BLANKING PANELS

FOR UNUSED SPACES.

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:2

P

M

1-TN402

ENLARGED PLANS -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

N

0 2' 4'1'

0 4' 8'2' 0 4' 8'2' 0 4' 8'2' 0 4' 8'2'

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

1. ROOM A101

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 212

DATA (CAT5): 0

DATA (CAT3): 0

CABLE RELOCATION COUNT

DATA (CAT6): 0

DATA (CAT5e): 325 FROM ROOM 127

DATA (CAT5): 0

DATA (CAT3): 0

EXISTING CABLE TO REMAIN

DATA (CAT6): 0

DATA (CAT5e): 0

DATA (CAT5): 0

DATA (CAT3): 0

FINAL CABLE COUNT

DATA (CAT6A): 537

DATA (CAT6): 0

1/2" = 1'-0"

ENLARGED PLAN - TR A101 - TELECOM - CABLE TRAY AND DATA

1/4" = 1'-0"

3 - a 1/4" = 1'-0"

3 - b

1/4" = 1'-0"

3 - c 1/4" = 1'-0"

3 - d

NOT TO SCALE6

COMMUNICATIONS - TYPICAL TWO RACK ELEVATION WITH RACK MOUNT UPS - TR A101

SHEET NOTES:

1. PROVIDE A NEW ACCESS CONTROL PANEL TO BE INSTALLED IN THE TELECOM ROOM. THE CARD READER AND

C

C R

1-TN403

4 - a b

4 - c d

W

"x

4"

A200

TELECOM ROOM

2"

DATA RACKS

CABLE TRAY

E

K E

Y P

A D

2"

AC1

R

C4 126"

18"x4"

C4 126"

18"x4"

NEMA L21-20R (TYP)

RACK 1

RACK 1

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

6U SPACE FOR FUTURE USE.

PROVIDE BLANK PANELS FOR UNUSED SPACES.

6U 5KW RACK MOUNT UPS

D

PROVIDE DATA CABLE TO RACK

MOUNTED UPS FOR CONNECTION

TO MONITORING SYSTEM

VERTICAL CABLE

MANAGEMENT (TYP)

NEMA L21-20R (TYP)

RACK 2

1U BONDING BUS BAR (BACK) 1U ANGLED BLANKING PANEL (FRONT)

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

RACK 2

V E

R T

IC

A

L R

A C

K P

D U

V E

R T

IC

A

L R

A C

K P

D U

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

6U SPACE FOR OIT PROVIDED EQUIPMENT.

PROVIDE BLANKING PANELS FOR UNUSED SPACES.

6U 5KW RACK MOUNT UPS

D

1U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

VA OIT PROVIDED 1U 48 PORT SWITCH

2U CABLE MANAGEMENT

1U BONDING BUS BAR (BACK) 1U ANGLED BLANKING PANEL (FRONT)

SPACE FOR FUTURE HORIZONTAL CABLE

DISTRIBUTION. PROVIDE ANGLED BLANKING PANELS

FOR UNUSED SPACES.

NOTES:

1. REFER TO NEW WORK PLAN FOR RACK LOCATIONS.

2. COORDINATE EXACT RACK LOCATION WITH OWNER PRIOR TO PERMANENT INSTALLATION.

3. SEE PROJECT SPECIFICATIONS FOR ADDITIONAL RACK COMPONENTS.

4. RACK ELEVATION SHOWS A FULLY CONFIGURED SAMPLE RACK. CONTRACTOR TO PROVIDE REQUIRED EQUIPMENT TO

SUPPORT THE FINAL DATA COUNT FROM THE ENLARGED NEW SHEET.

5. COORDINATE FINAL RACK COMPONENT LAYOUT WITH OWNER'S IS/IT REPRESENTATIVE.

6. CONTRACTOR IS RESPONSIBLE FOR FINAL CABLE COUNT, QUANTITY OF PATCH PANELS, SWITCHES, FIBER ENCLOSURES, BLANKING PANELS, CABLE MANAGEMENT, TR PATCH CABLES, AND MOUNTING HARDWARE NOT MARKED AS “OIT PROVIDED”.

7. PUNCH DOWN COPPER BACKBONE CABLE TO RACK MOUNT PATCH PANEL. TERMINATE ONE (1) PAIR PER PATCH PANEL PORT.

4 POST CHANNEL

RACK (TYP)

1U 144 STRAND OM4 AND OS2 DISTRIBUTION PANEL

1U 48 PORT CAT5E BACKBONE ANGLED PATCH PANEL

SPACE FOR FUTURE HORIZONTAL CABLE

DISTRIBUTION. PROVIDE ANGLED BLANKING PANELS

FOR UNUSED SPACES.

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

1U 48 PORT CAT6A ANGLED DATA PATCH PANEL

RECORD DOCUMENTS

No DATEREVISION

DRAWING TITLE

CHECKED BY

ST.CLOUD, MN 56303

VA MEDICAL CENTER

BUILDING No

LOCATION

DRAWING NO.DRAWN

DWG. OF

PROJECT TITLE

PLOT SCALE

PROJECT NO.

DATE:

CONSULTANT ARCHITECT/ENGINEER OF RECORD

FULLY

SPRINKLERED

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

-RECORD DOCUMENT-

June 21, 2024

This Record Document has been prepared based on

Designer of Record drawings with Contractor provided markups through the construction phase of the project at the direction of the VA.

While the construction information is believed to be reliable, Architect/Engineer cannot assure its accuracy, and is not responsible for the accuracy of this Record Document. Those relying on this Record

Document are advised to independently verify its accuracy before applying it for any purpose.

RECORD DOCUMENTS 06/21/24

B

IM

/2

.0

V A

S t C lo u d E

H R

M I n fr a s tr u c tu re U p g ra d e s /6

-2

.B

.T

R

.r v t

/4

/2

:2

:2

P

M

1-TN403

ENLARGED PLANS -

TELECOMMUNICATIONS

EHRM INFRASTRUCTURE

UPGRADES

656‐21‐235

03/30/2022

KSB SSK

16305

N

0 2' 4'1'

0 4' 8'2' 0 4' 8'2' 0 4' 8'2' 0 4' 8'2'

GENERAL NOTES:

A. REFER TO GENERAL DEMOLITION NOTES ON SHEET T000 FOR ADDITIONAL DEMOLITION SCOPE.

CABLING NOTE:

CABLING NOTES:

A. THE EXISTING CABLE COUNT ARE THE CABLES CURRENTLY PRESENT IN THE SPACE.

THE CABLE RELOCATION COUNT ARE THE NEW OR RELOCATED CABLES TO BE FED

FROM THE SPACE. THE FINAL CABLE COUNT ARE THE CABLES THAT WILL BE

PRESENT IN THE SPACE AT THE COMPLETION OF THE PROJECT.

1. ROOM A200

EXISTING CABLE COUNT

DATA (CAT6): 0

DATA (CAT5e): 0

DATA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .