Attachment 7 - AFMC 260 First Article Requirements.pdf

PDF 54 KB Posted

Attached to
AN/MPN-14K Airport Surveillance Radar (ASR) Indicator Control Box (C-8625/T) “A-Box” - 48 Units
Solicitation number
FA810222R0004
Issued by

About this file

This solicitation requests offers for the development, testing, manufacture, and deployment of 48 indicator control box units for airport surveillance radars. Offerors must provide 40 production units, 4 first article test units, and 4 spare units, along with the complete technical data package. Site visits to field locations housing the radars may be requested by June 22nd. First article testing will be conducted in accordance with the requirements. Offerors must submit pricing for the units and data deliverables such as progress reports, meeting documents, acceptance test plans, travel reports, integrated schedules, engineering drawings, identification marking plans, and technical manuals. Questions are due by July 6th and proposals are due by July 20th, with award anticipated by September 2022. The Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base is the contracting agency.

View the file

Other files

File Type Posted
Exhibit H CDRL A008 Item Unique Identification (IUID) Marking Plan.pdf PDF
Exhibit B CDRL A002 Meeting Agenda.pdf PDF
Exhibit C CDRL A003 Meeting Minutes.pdf PDF
Exhibit E CDRL A005 Trip Travel Report.pdf PDF
Attachment 9 - MPN14K A-BOX TMCR (TM-86-01R) 15 APR 21.pdf PDF
Attachment 10 - CDRL Assertion Matrix.xlsx XLSX spreadsheet
Attachment 1 - Section L - Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 6 - Vendor Packaging Instructions.pdf PDF
Exhibit D CDRL A004 Acceptance Test Plan.pdf PDF
Attachment 4 - AFMC 807 Recommended Quality Assurance Provisions and Special Inspection Requirements.pdf PDF
Exhibit J CDRL A010 Technical Order (TO).pdf PDF
Exhibit A CDRL A001 Contractors Progress and Status Report.pdf PDF
Attachment 5 - AFMC 158 Packaging Requirements.pdf PDF
Exhibit G CDRL A007 Product Engineering Design Data and Associated Lists.pdf PDF
Attachment 3 - SOW Replacement of the ANMPN-14K The Indicator Control Box (C-8625T).pdf PDF
Exhibit I CDRL A009 Computer Program identificaiton Number (CPIN) Catalog.pdf PDF
RFP FA8102-22-R-0004.pdf PDF
Attachment 2 - Section M - Evaluation Factors for Award.pdf PDF
Section L ITO - Attachment 3 - Pricing Matrix.xlsx XLSX spreadsheet
Exhibit K CDRL A011 Preservation and Packing Data.pdf PDF
RFI SSS Q and As.pdf PDF
Exhibit F CDRL A006 Integrated Program Management Data and Analysis Report (IPMDAR) - Integrated Master Schedule (IMS).pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

1. DATE

FIRST ARTICLE REQUIREMENTS

(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3) (Additional Instructions on Page 3)

2. P/R/MIPR NUMBER

3. PART NUMBER

4. NSN

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS

UNIT(S) OF LOT/ITEM

AND WILL BE:

PART OF PRODUCTION QUANTITY

IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

7. LONG LEAD TIME ITEMS

SERVE AS A MANUFACTURING

STANDARD

REQUIRED

NOT REQUIRED

WILL

WILL NOT

(See FAR 52.209-3 or -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 or -4 Alternate I)

REQUIRED

NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST/INSPECTION REQUIREMENTS

F. FIRST ARTICLE DELIVERY:

A.

CONTRACTOR TESTING

GOVERNMENT TESTING

(1) Due within calendar days from date contract.

Performance or other characteristics which the First Articles must meet

(2) Notify calendar days prior to shipment.

are

(3) Delivered to government at B.

The detailed technical requirements for First Article approval tests are contained in (Set Forth Consignee and Address) (Cite Spec and Para number) Government written notice of approval/disapproval within days after receipt of first article package.

(4) C.

TEST PLAN REQUIRED

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

G. Estimated cost of government testing/inspection evaluation.

(3) Number of days for government approval/disapproval days.

D. Contractor's notification to ACO and (Requesting Activity) of test time and location due days prior to start of testing.

E.

TEST REPORT REQUIRED

(1) DD Form 1423 ELIN

(2) Due calendar days from date of contract.

(3) Forwarded to

(4) Government written notice of approval/disapproval due days after receipt of contractor's report.

Disapproved First Articles will be returned to the contractor/

10. DISPOSITION OF FIRST ARTICLES

will be retained by pending Approved First Articles will be forwarded to disposition instructions from the contractor On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

(insert quantity).FirstArticles will be expended intesting.

will be Residual components of dispproved FirstArticles will be retained by returned to the contractor/

a. Approved First Articles will be returned to the contractor for shipment with production item.

pending disposition instructions from the contractor.

b. Disposition of disapproved First Articles will remain the same as marked above.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

Other Disposition:

V-3

PREVIOUS EDITION IS OBSOLETE

AFMC IMT 260, 20200403

Prescribed by: AFMCI23-110

2. P/R/MIPR NUMBER

3. PART NUMBER

4. NSN

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the a.

Government, DoD, Air Force.

Offerors currently in production of the same or similar article for a received First Article approval under the existing contract.

Air Force contract and who have Government, DoD, b.

Government, DoD, Offerors who have previously furnished production quantities of the same or similar articles to the c.

Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d.

Provided not more than months have elapsed since completion of the contract.

First Article testing will not be waived.

e.

See Remarks in block 12 below.

f.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

B. CONTRACT NUMBER

C. DATE OF CONTRACT

D. SPECIFICATION NUMBER AND REVISION

A. PROCURING OFFICE

12. REMARKS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

AND/OR APPROVING TEST (Name, Organization, Phone)

14. PR INITIATOR (Name, Organization, Phone)

AFMC IMT 260, 20200403

Prescribed by: AFMCI23-110

INSTRUCTIONS FOR COMPLETION OF FIRST ARTICLE TEST REQUIREMENTS

(AFMC Form 260)

BLOCKS 1 - 4 AND 14. WILL BE COMPLETED BY THE INITIATOR OF PURCHASE REQUEST.

BLOCKS 5 THRU 11, AND 13. WILL BE COMPLETED BY THE ENGINEER AND/OR EQUIPMENT SPECIALIST. IF LOCAL PURCHASE, INITIATOR OF PURCHASE REQUEST SHALL COMPLETE.

BLOCKS 1 THRU 4. SELF-EXPLANATORY

BLOCK 6. INDICATE WHETHER OR NOT THE FIRST ARTICLE WILL SERVE AS A MANUFACTURING STANDARD. ( FAR 9.306(h)).

BLOCK 7. SEE FAR 52.209-3 OR -4, ALTERNATE II.

BLOCK 8. SEE FAR 9.308

BLOCK 9. MUST BE CHECKED TO INDICATE WHETHER THE CONTRACTOR OR THE GOVERNMENT IS TO PERFORM TESTING. (FAR 9.306) A. THE SPECIFIC PARAGRAPH(S) OF THE SPECIFICATION MUST BE INCLUDED OR THE PARTICULAR REQUIREMENTS CITED.

B. THE SPECIFIC PARAGRAPH(S) OF THE SPECIFICATION MUST BE INCLUDED OR THE PARTICULAR REQUIREMENTS CITED.

C. THIS PARAGRAPH IS OPTIONAL AND IS REQUIRED ONLY WHEN A TEST PLAN IS REQUIRED. THE REQUIRED ENTRIES ARE SELF-EXPLANATORY.

D. THE "NUMBER OF DAYS" ENTRY SHOULD BE FAR ENOUGH IN ADVANCE OF THE TESTING TO PERMIT ANY

GOVERNMENT REPRESENTATION AT THE TESTING SITE.

F. (1). THE DELIVERY DATE MUST BE REALISTIC AND INCLUDE ADEQUATE PRODUCTION AND ADMINISTRATIVE LEAD TIMES.

(2). THIS NOTIFICATION SHOULD BE NO LESS THAN TEN DAYS.

(3). ENTER ADDRESS WHERE FIRST ARTICLE IS TO BE DELIVERED FOR TESTING.

(4). THIRTY DAYS OR LONGER NOTIFICATION MUST BE CONSIDERED WHEN GOVERNMENT TESTING REQUIRES SPECIAL FIXTURE AND/OR AIRCRAFT.

BLOCK 11. SELF-EXPLANATORY. SIMILAR ARTICLES ARE THOSE WHICH, FOR PURPOSE OF MANUFACTURE, ARE SUBSTANTIALLY THE SAME AS THE ITEM BEING PURCHASED (For example, items that differ only in size or in place of operation (i.e., left vs right side of aircraft)).

G. THIS ESTIMATE SHOULD BE AS ACCURATE AS POSSIBLE AND INCLUDE GOVERNMENT LABOR COSTS FOR TESTS;

TOOLS/TEST EQUIPMENT; GOVERNMENT TEST FACILITY USE; TDY COSTS, TRANSPORTATION OF FIRST ARTICLE TO TEST

SITE; GOVERNMENT EVALUATION OF CONTRACTOR TEST REPORT; ETC.

BLOCK 10. APPLIES TO GOVERNMENT TESTING. APPLIES TO CONTRACTOR TEST ONLY IF ITEMS ARE NOT SUBMITTED AS PRODUCTION UNITS, IN THESE CASES CITE DISPOSITION.

E. THIS PARAGRAPH IS SELF-EXPLANATORY. (NOTE: All dates must be realistic and include adequate production and administrative lead times.)

BLOCK 5. INSERT QUANTITY OF FIRST ARTICLE TO BE TESTED. INDICATE WHETHER THE FIRST ARTICLE ITEM IS PART OF OR IN ADDITION TO THE PRODUCTION QUANTITY. (Normally the First Article in "Contractor Testing" are delivered (if not destroyed) with the production items.) PER FAR 9.301 FIRST ARTICLE MEANS PREPRODUCTION MODELS/SAMPLES, INITIAL PRODUCTION SAMPLES, TEST SAMPLES, FIRST LOTS, PILOT MODELS OR PILOT LOTS.

BLOCK 12. SELF-EXPLANATORY.

BLOCK 13 AND 14. SELF-EXPLANATORY.

AFMC IMT 260, 20200403

Prescribed by: AFMCI23-110 8.2.1.3158.1.475346.466429

partA: 1
Prdct: 0
will: 1
wilnot: 0
Reqir: 0
not: 0
B: 1
C: 0
Cntrc: 0
Govmt: 2
dsaprov: 1
retainC: 0
rtain: 0
rtrn: 0
dspo: After acceptance, approved FA to be shipped to TYAD
FIELD1: MPN-14K Program Manager

AFLCMC/HBAA

via PM's email which will be provided to contractor dlvrB: 260 ATCS Pease ANG 302 New Market ST., Bldg.247 Pease ANGB, NH 03803-0157

insertA: 0
prchs: 0
firstB: 1
other: 1
approv: 0
test: 1
Testc: 1
show date as yyyymmdd (e.g. 20000101): 2022-06-06
MIPR: TBD
PART: TBD
NSN: TBD
Use numbers only: 4
item: 48
dueD: 240
performA:
notify: 10
detail: AFLCMC/HBAA approved Contractor's test plan
daysE: 10
elin:
dlvr: 180
approvA: 10
cost: 4000.00
aco:
dueC:
elinB:
DueE: 270
DueF: 10
FirstA:
retainB: TBD
insert:
rtainA:
AFb: 0
dodC: 0
govtC: 0
dodB: 0
govtB: 0
DODa: 0
AFa: 0
govA: 0
AFc: 0
offer: 0
offerA: 0
Offrs: 0
mon: 0
testB: 1
See: 0
months:
procr:
NUMBER:
show date as yyyymmdd (e.g. 20000101):
spec:
REMARKS:
cog: Abel O. Wills, AFLCMC/HBAAB, (405) 734-2659
PR: Ember Alexander, AFLCMC/HBAAA, (405)734-4681
MIPR_2: TBD
PART_2: TBD
NSN_2: TBD

File details come from the government source that posted it. Updated .