Attachment 6 - WVP Septic Pumping and Rental Services Quality Assurance Surveillance Plan.docx

DOCX document 91 KB Posted

Attached to
Willamette Valley Project Waste Pumping & Chemical Toilet Rental
Solicitation number
W9127N26QA020
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for the Willamette Valley Project's waste pumping and rental services contract. The plan outlines performance management strategies for a contract covering waste pumping services at multiple locations including Cottage Grove, Dorena, Fern Ridge, and other sites. The solicitation is a small business set-aside under NAICS Code 562991 with a $9M size standard, issued by the U.S. Army Corps of Engineers in Portland, Oregon.

The QASP details performance requirements for five key tasks: administrative documentation, waste pumping, portable unit rental and servicing, emergency pumping, and activity reporting. Contractors must meet strict quality standards, with 100% inspection for each task and zero deviations from the Performance Work Statement. The solicitation requires vendors to self-perform at least 50% of the work, with proposals due by 12 FEB 2026 at 1:00 PM PST. Proposals must be submitted via email to two specific contract specialists, with performance evaluated through methods including 100% inspection and customer feedback mechanisms.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

INTRODUCTION

This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled New Waste Pumping for the Willamette Valley Project consisting of Cottage Grove, Dorena, Fern Ridge, Dexter, Lookout Point, Fall Creek, Green Peter, Foster, Detroit, Big Cliff, Blue River, and Cougar. This plan sets forth the procedures and guidelines the Contracting Officer’s Representative’s (CORs) will use in ensuring the required performance standards or services levels are achieved by the contractor.

Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the Willamette Valley Project to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

Performance Management Strategy The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

ROLES AND RESPONSIBILITIES

The Contracting Officer The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Willamette Valley Project contracting officer (COR) and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

The Contracting Officer’s Representative The COR’s are designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in the “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. If the contractor exceeds the service or performance level, it is eligible to receive an incentive or award fee as stated in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount. That table from the PWS, has been included here as well.

PERFORMANCE REQUIREMENTS SUMMARY TABLE

Required Services (Tasks)

Performance Standards

Acceptable Quality Levels

Methods of Surveillance

Validated Complaints

Task 1: Administrative

Contractor provides work plan, project schedule, and quality control plan. Quality control plan is in accordance with USACE ER 1110-1-12, Quality Management.
Documents are 98% free of errors (typos, grammar). Content aligns with PWS.
100% Inspection
1 per Period of Performance
Task 2: Waste Pumping
As Defined in PWS. Removal of all materials from the vault, with all vaults being emptied of all liquid and sewage; All debris and spillage created by the pumping shall be removed by the contractor, and the site shall be returned to its natural state prior to the spill.
Zero Deviation from PWS.
100% Inspection
1 per Period of Performance
Mandatory Task 3: Rental and Servicing of portable units
The unit's interior and exterior is cleaned, stocked, and deodorized and delivered to location designated in accordance with PWS
Zero deviation from PWS
100% Inspection
1 per Period of Performance
Mandatory Task 4: Emergency Pumping
Emergency pumping services provided within the stated timeframe of PWS
Zero deviation from PWS
100% Inspection
1 per Period of Performance

Mandatory Task 5: Contractor has provided ACTIVITY REPORT FORM as required within the PWS

Contractor has provided ACTIVITY REPORT FORM as required within the PWS

All deliverables are formatted to the specifications in PWS. Reports are 98% free of errors (typos, grammar). Content aligns with PWS.
100% Inspection
1 per quarter

METHODOLOGIES TO MONITOR PERFORMANCE

Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are

· 100% Inspection – Zero room for any deviations to the contractual terms and conditions.

Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the CO/COR. The CO/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

Acceptable Quality Levels The acceptable quality levels (AQLs) included in the Performance Requirements Summary (PRS) Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls.

QUALITY ASSURANCE DOCUMENTATION

The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in the PRS.

Monitoring Forms The government’s QA surveillance, accomplished by the COR and QA will be reported monthly in PIEE to ensure that the required results of these services are being achieved.

The COR will retain a copy of all completed QA surveillance forms.

ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

Determining Performance Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

Reporting At the end of each month, the COR will prepare a written report for the COR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 1), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

Reviews and Resolution The COR may require the contractor’s project manager, or a designated alternate, to meet with the COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with COR as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· Issues arising from the performance monitoring processes

The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the

ATTACHMENT 1: QUALITY ASSURANCE MONITORING FORM

SERVICE or STANDARD: _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ _____________________________________________________________________________________________

SURVEY PERIOD:___________________
SURVEILLANCE METHOD (Check):_____Reports
_____100% Inspection
_____Periodic Inspection
_____Customer Input/Feedback

LEVEL OF SURVEILLANCE SELECTED (Check):

_____Monthly
_____Quarterly
_____As needed

ANALYSIS OF RESULTS:

OBSERVED SERVICE PROVIDER PERFORMANCE MEASUREMENT RATE = ______%

SERVICE PROVIDER’S PERFORMANCE (Check):____Meets Standards
____Does Not Meet Standards

NARRATIVE OF PERFORMANCE DURING SURVEY PERIOD: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ______________________________________________________________________________________________________________

PREPARED BY: ___________________________________ DATE: _____________________

ATTACHMENT 3: CONTRACTOR DISCREPANCY REPORT

Fillable Form can be found at the following link:

http://www.dtic.mil/whs/directives/forms/eforms/dd2772.pdf image1.png

File details come from the government source that posted it. Updated .