ATTACHMENT 6_Task 1 Basic Inspections Form.pdf
PDF 173 KB Posted
- Attached to
- Southwest Regional Wastewater Services
- Solicitation number
- 127EAV23R0001
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA DEPARTMENT OF AGRICULTURE
US FOREST SERVICE SOUTHWESTERN REGION
Toilet Pumping and Wastewater Services BPA Contract
TASK 1 – PUMPING SERVICES
BASIC INSPECTIONS FORM
Use space below to document observed needs for repairs and maintenance Note any cracks, missing or broken components, graffiti, and other vandalism.
TOILET BUILDING EXTERIOR
Roof
Ventilation Stack
Walls, including vent cover
Foundation/Slab/Apron
Door and door handle
Signage (present or missing)
TOILET BUILDING INTERIOR
Floor
Walls, including vent cover
Foundation/Slab/Apron
Door and door handle
Toilet Seat and riser condition
Toilet Paper Dispenser (if present)
Signage (present or missing)
Or description of location
SUBSURFACE COMPONENT (Vault or septic system etc.)
Perform a basic inspection of the vault or subsurface structure. Enter N/A if not applicable.
1st Compartment
2nd Compartment
Inlet baffle condition OR access port to vault
Outlet Baffle condition
Effluent baffle screen condition
Total Tank Capacity
Total Gallons pumped
Depth of Scum
Depth of Sludge
Vault tank material type
Access to tank port
General Comments:
PHOTOS: Document inspection with photos
Inspection Certification
I verify that the information listed herein is true and accurate to the best of my knowledge, belief, and observation.
Attached is a copy of the disposal receipt.
Inspection Performed by:
Contractor Name:______________________________ Date:_____________________________
Address:______________________________________ Phone:____________________________
Email:____________________________________________________________________________
File details come from the government source that posted it. Updated .