ATTACHMENT 2_Schedule of Items_Amendment 02_20230111_PUMPING SERVICES.pdf
PDF 440 KB Posted
- Attached to
- Southwest Regional Wastewater Services Federal contract opportunity
- Solicitation number
- 127EAV23R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 0002.pdf | ||
| Attachment 9_List of USFS Region 3 Toilets.xlsx | XLSX spreadsheet | |
| SF30_AMENDMENT 0001.pdf | ||
| ATTACHMENT 1_SOW_Amendment_02.pdf | ||
| AMENDMENT 0001.pdf | ||
| ATTACHMENT 2_Schedule of Items_Amendment 02_20230111_CLEANING SERVICES.pdf | ||
| Responses to Questions 12.13.2022 127EAV23R0001 .pdf | ||
| ATTACHMENT 2_Schedule of Items_Modified 20221209_PUMPING SERVICES.docx | DOCX document | |
| ATTACHMENT 2_Schedule of Items_Modified 20221209_CLEANING SERVICES.docx | DOCX document | |
| ATTACHMENT 2_Schedule of Items.pdf | ||
| ATTACHMENT 8_QASP.pdf | ||
| ATTACHMENT 3_TABLES.pdf | ||
| ATTACHMENT 4_Toilet Summary.pdf | ||
| ATTACHMENT 5_ZONE MAPS.pdf | ||
| ATTACHMENT 7_All Services Call Order Form.pdf | ||
| ATTACHMENT 6_Task 1 Basic Inspections Form.pdf | ||
| 127EAV23R0001-SOLICITATION.pdf | ||
| ATTACHMENT 1_SOW.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Items
TASK 1: PUMPING SERVICES
ZONE 1: NORTHERN NEW MEXICO
FOREST: CARSON NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023 CARSON NATIONAL FOREST
PAY ITEM A B C
Description:
Vault capacities
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500 gallons) $ $ $
Extra Large (2,500 - 4,000 gallons) $ $ $
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024 CARSON NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025 CARSON NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026 CARSON NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027 CARSON NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
FOREST: SANTA FE NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- SANTA FE NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024 SANTA FE NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- SANTA FE NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- SANTA FE NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- SANTA FE NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
FOREST:
• CIBOLA NATIONAL FOREST
o MOUNTAINAIR RANGER DISTRICT o SANDIA RANGER DISTRICT o MOUNT TAYLOR RANGER DISTRICT
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- CIBOLA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024 CIBOLA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- CIBOLA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- CIBOLA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- CIBOLA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ZONE 2: SOUTHERN NEW MEXICO
FOREST: CIBOLA NATIONAL FOREST - MAGDALENA RANGER
DISTRICT
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023-
CIBOLA NATIONAL FOREST: MAGDALENA RANGER DISTRICT
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024-
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025-
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
FOREST: GILA NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- GILA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- GILA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025 GILA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- GILA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- GILA NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
FOREST: LINCOLN NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- LINCOLN NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024 LINCOLN NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- LINCOLN NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- ZONE 2: LINCOLN NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- LINCOLN NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ZONE 3: NORTHERN ARIZONA
FOREST: KAIBAB NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- KAIBAB NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- KAIBAB NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- KAIBAB NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- KAIBAB NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- KAIBAB NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
FOREST: COCONINO NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- COCONINO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- COCONINO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- COCONINO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- COCONINO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- COCONINO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
FOREST: PRESCOTT NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- PRESCOTT NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- PRESCOTT NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- PRESCOTT NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- PRESCOTT NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- PRESCOTT NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ZONE 4: SOUTHERN ARIZONA
FOREST: APACHE-SITGREAVES NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- APACHE-SITGREAVES NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- APACHE-SITGREAVES NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- APACHE-SITGREAVES NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- APACHE-SITGREAVES NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- APACHE-SITGREAVES NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
FOREST: TONTO NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- TONTO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- TONTO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- TONTO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- TONTO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- TONTO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
FOREST: CORONADO NATIONAL FOREST
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- CORONADO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- CORONADO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- CORONADO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- CORONADO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- CORONADO NATIONAL FOREST
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ZONE 5: GRASSLANDS
FOREST: CIBOLA GRASSLANDS - OKLAHOMA
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- CIBOLA GRASSLANDS - OKLAHOMA
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- CIBOLA GRASSLANDS - OKLAHOMA
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- CIBOLA GRASSLANDS - OKLAHOMA
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- CIBOLA GRASSLANDS - OKLAHOMA
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- CIBOLA GRASSLANDS - OKLAHOMA
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ZONE 5: GRASSLANDS
FOREST: CIBOLA GRASSLANDS - TEXAS
ORDERING PERIOD YEAR 1: 07/15/2022 - 07/14/2023- CIBOLA GRASSLANDS - TEXAS
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 2: 07/15/2023 - 07/14/2024- CIBOLA GRASSLANDS - TEXAS
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 3: 07/15/2024 - 07/14/2025- CIBOLA GRASSLANDS - TEXAS
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 4: 07/15/2025 - 07/14/2026- CIBOLA GRASSLANDS TEXAS
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
ORDERING PERIOD YEAR 5: 07/15/2026 - 07/14/2027- CIBOLA GRASSLANDS TEXAS
Cost for EACH facility pump
Cost for 3 to 5 toilet facility pumps within a designated recreation site.
Cost for 6 to 10 toilet facility pumps within a 20-mile proximity driving radius.
1 Small (less than 500 gallons) $ $ $
2 Medium (501- 1,000 gallons) $ $ $
3 Large (1,001 - 2,500
***QUOTE MUST INCLUDE ALL APPLICIABLE TAXES***
***PRE- AWARD QUESTIONS- If you have any questions regarding this Solicitation, please email them to the CO Ellena Silva. All questions must be received no later than 1200 MT on February 03, 2022. There will not be any questions accepted after this time. All questions shall be emailed to ellena.silva@usda.gov. All quotes shall be emailed to the Contracting Officer Ellena Silva at ellena.silva@usda.gov no later than February 10, 2022 at 1700
MT.
Signature Date
UEI #: DUNS #:
Note: All offerors must be currently registered in SAM in order to be considered for award. Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.sam.gov or by calling 1-334-206-7828.
mailto:ellena.silva@usda.gov http://www.sam.gov/
File details come from the government source that posted it. Updated .