ATTACHMENT 6- Schedule-of-Values-Sample Template.xlsx
XLSX spreadsheet 78 KB Posted
- Solicitation number
- 36C24923R0032
About this file
This document contains a federal solicitation notice and a sample schedule of values template. The solicitation notice is for construction services for project number 603-22-101 to replace operating rooms 1 through 3 supply heads at the Robley Rex VA Medical Center in Louisville, Kentucky. The project magnitude is estimated between $500,000 and $1,000,000, set aside exclusively for service-disabled veteran-owned small businesses. Interested contractors must be verified as SDVOSBs by the Department of Veterans Affairs Center for Veterans Enterprise by the time proposals are submitted. The anticipated completion time from notice to proceed is 270 calendar days. The sample schedule of values template appears to be an attachment for tracking payment amounts for line items and work phases over the course of a construction project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Daily Construction Schedule-1
| Schedule of Values | |||||||||
| Project Name: | Application Number: | ||||||||
| Project Number: | Application Date: | ||||||||
| Contractor: | Period to: | ||||||||
| Item # | Work Item Description | Item Value | Amount Previously Billed | Amount Billed This Period | Amount Of Stored Materials (Not In D or E) | Percent Completed | Total Completed And Stored To Date | Balance Remaining | Rentention _% |
| Division 1 | General Requirements | ||||||||
| 01 00 00 | Bonds & Insurance | ||||||||
| 01 00 00 | Superintendent and General Labor | ||||||||
| 01 32 16.15 | Project Schedules | ||||||||
| 01 33 23 | Shop Drawings, Product Data, Samples | ||||||||
| 01 35 26 | Job Site Safety Officer & ICRA Requirments | ||||||||
| 01 45 00 | Quality Control Officer | ||||||||
| 01 74 19 | Construction Waste Management | ||||||||
| Division 2 | Existing Conditions | ||||||||
| 02 41 00 | Demolition | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| Equipment | |||||||||
| DIVISION 7 | THERMAL/MOISTURE PROTECTION | ||||||||
| 07 84 00 | Firestopping | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 07 92 00 | Joint Sealants | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| DIVISION 9 | FINISHES | ||||||||
| 09 22 16 | Non Struct Metal Framing | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 09 29 00 | Gypsum Board & Framing | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 09 51 00 | C/R Acoustical Ceilings | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 09 65 16 | Resilient Sheet Flooring | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 09 91 00 | High Build Glazed Coatings | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| DIVISION 11 | Equipment | ||||||||
| 11 26 10 | Custom Fabricated Electrical Panels | ||||||||
| DIVISION 26 | ELECTRICAL | ||||||||
| 26 05 11 | Requirements (Electrical Installations) | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 05 19 | Low-Voltage Electrical Power Conductors/Cables | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 05 26 | Grounding/Bonding (Electrical Systems) | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 05 33 | Raceways/Boxes (Electrical Systems) | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 20 11 | Isolated Power Systems | ||||||||
| Labor | |||||||||
| Materials | |||||||||
| 26 27 26 | Wiring Devices | ||||||||
| Labor | |||||||||
| Materials |
Totals
: Check if we should add the BigRentz logo -Jessica Santos 000000&P
File details come from the government source that posted it. Updated .