ATTACHMENT 2 - Drawings 603-22-101 Replace ORs 1-3 Supply Heads.pdf
PDF 11 MB Posted
- Solicitation number
- 36C24923R0032
About this file
This solicitation notice seeks proposals for construction services to replace operating room supply heads at the Robley Rex Veterans Affairs Medical Center in Louisville, Kentucky. The project is identified as number 603-22-101 and has a magnitude between $500,000 and $1 million. It is set aside exclusively for verified Service-Disabled Veteran-Owned Small Businesses. The selected contractor will demolish existing supply heads, perform general construction and installation of new HVAC, plumbing, electrical and finishes. The anticipated completion schedule is 270 calendar days from notice to proceed. Apparent successful offerors must have an active VETS 4212 report on file with the Department of Labor, be registered in the System for Award Management, and obtain verification from the Veterans Affairs Center for Veteran Enterprise of their SDVOSB status by the time proposals are submitted. Questions must be submitted in writing to the contracting officer with the project number and name in the email subject line.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
* C.O.R. = CONTRACTING OFFICER'S REPRESENTATIVE.
A. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.
B. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY
DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE C.O.R.
C. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
D. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
E. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE
ROUTES MUST BE RETURNED TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
F. MAINTAIN THE BUILDING IN A WEATHERTIGHT CONDITION AT ALL TIMES.
G. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF
THE VA'S OCCUPIED AREAS.
H. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING
MUST BE CONTINUOUS AND UNOBSTRUCTED.
I. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND
SYSTEMS AT ALL TIMES.
J. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK. THE WEIGHT AND COST OF DISPOSAL FOR ALL CONTROLLED SUBSTANCES SUCH AS LEAD AND ASBESTOS SHALL BE TRACKED AND REPORTED. THE GENERAL CONTRACTOR SHALL NOT USE THE VA TRASH COMPACTOR.
K. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND
PLUMBING.
L. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION LIGHTING.
M. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS
PROVIDED IN THE FINAL CONSTRUCTION.
N. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
O. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH. USE ONE FIRE STOPPING SYSTEM FOR ALL SUB-
CONTRACTORS.
P. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
Q. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
R. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE
RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
S. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO
THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.
G E N E R A L N O T E S F O R E X I S T I N G F A C I L I T I E S :
* C.O.R. = CONTRACTING OFFICER'S REPRESENTATIVE.
A. ALL WORK SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES, RULES, ORDINANCES AND REGULATIONS INCLUDING THE AMERICAN DISABILITIES ACT (ADA), ARCHITECTURAL BARRIERS ACT(ABA), THE VA BARRIER FREE DESIGN GUIDELINES AND THE AMERICAN
NATIONAL STANDARDS INSTITUTE (ANSI) GUIDELINES.
B. THE C.O.R. SHALL WORK WITH THE CONTRACTOR TO PROVIDE ACCESS TO TEMPORARY SERVICES REQUIRED TO PROVIDE THE WORK INDICATED. SEE SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS FOR ADDITIONAL REQUIREMENTS ON TEMPORARY ACCESS TO VA
UTILITIES.
C. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE SPECIFICATIONS, INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, AND MATERIAL AND CONSTRUCTION PROVISIONS, WHICH APPLY TO MATERIALS OR
CONSTRUCTION METHODS REQUIRED BY THIS PROJECT.
D. PRIOR TO BIDDING, THE GENERAL CONTRACTOR SHALL VISIT THE SITE, EXAMINE, AND ACCEPT ALL EXISTING CONDITIONS. DATES FOR SITE VISITS WILL BE POSTED IN THE CONTRACT DOCUMENTS AS POSTED ON THE FEDERAL BUSINESS OPPORTUNITIES WEBPAGE FOR THIS PROJECT.
UNSCHEDULED VISITS WILL NOT BE ALLOWED.
E. VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE FABRICATING ANY MATERIALS.
F. IT IS THE INTENT OF THE DOCUMENTS TO INDICATE COMPLETE AND OPERATIONAL SYSTEMS (I.E. STRUCTURAL, HVAC, PLUMBING, ELECTRICAL) THE CONTRACTOR SHALL PROVIDE THE SYSTEMS AS OPERATIONAL SYSTEMS WHICH COMPLY WITH APPLICABLE CODES AND REGULATIONS.
THIS NOTE SHALL BE LIMITED TO THE SYSTEMS AS INDICATED BY THE DOCUMENTS AND SHALL NOT INCLUDE CHANGES TO THE SYSTEMS WHICH
ALTER INDICATED CAPACITIES, OPERATIONAL CHARACTERISTICS.
G. THE GENERAL CONTRACTOR SHALL VERIFY THE SIZES OF ALL EQUIPMENT OR FIXTURES TO BE INSTALLED IN THE BUILDING THROUGH THE SUBMITTAL PROCESS, AND SHALL MAKE SPECIAL PROVISIONS FOR INSTALLATION OF ANY EQUIPMENT WHICH IS TOO LARGE TO FIT THROUGH A
FINISHED OPENING.
H. ALL CONTRACTORS SHALL BE RESPONSIBLE TO PATCH AND REPAIR ALL SURFACES WHERE EXISTING CONSTRUCTION IS REMOVED OR
DISTURBED BY WORK UNDER THEIR CONTRACT.
I. ALL SUSPENDED ITEMS SUCH AS CEILINGS, DUCTS, PIPES, CONDUITS, SHALL BE SUSPENDED (ATTACHED) DIRECTLY TO STRUCTURE AND SHALL
NOT BE ATTACHED OR ANCHORED TO EXISTING PLASTER, ACOUSTIC TILE.
J. NEW PENETRATIONS SUCH AS DUCTS, CONDUITS, PIPING, ELECTRICAL OUTLETS, LIGHT SWITCHES, RECESSED DEVICES OR ITEMS, HOLES, VOIDS, CRACKS IN MODIFIED AND NEW CORRIDOR WALLS, SMOKE PARTITIONS, FIRE RATED PARTITIONS, AND FLOOR SLABS SHALL BE SEALED TO PREVENT PASSAGE OF ANY SMOKE, FLAME, GASES. AS INDICATED IN THE CONTRACT DOCUMENTS.
K. WHERE NEW CONSTRUCTION REQUIRES CORE DRILLING THROUGH EXISTING STRUCTURAL CONCRETE FLOOR SLABS, AND WALLS THE CONTRACTOR SHALL COORDINATE HIS DRILLING WORK TO AVOID DRILLING INTO A STRUCTURAL ELEMENT, INCLUDING JOISTS, BEAMS, COLUMN.
L. WHERE NEW CONSTRUCTION MATERIAL AND EQUIPMENT IS INDICATED TO BE INSTALLED IN EXISTING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS FOR PROPER FIT AND FOR ACCESS INTO THE BUILDING PRIOR TO SHOP DRAWING SUBMITTAL, ORDERING AND
DELIVERING TO THE SITE.
M. FOR INFECTION CONTROL REASONS, WORK CONDUCTED IN THE CORRIDOR THAT DOES NOT GENERATE DUST MAY ONLY REMOVE UP TO 16 SQUARE FEET OF CEILING TILE AT ONCE. AS LONG AS THIS STANDARD IS FOLLOWED NEGATIVE AIR AND BARRIERS ARE NOT REQUIRED BY THE INFECTION CONTROL NURSES. IF DUST IS GENERATED AND GREATER THAN 16 SF OF CEILING TILES ARE DISTURBED AT ONCE THEN THE WORK AREA SHALL BE SEALED OFF WITH 6 MIL FIRE RETARDANT POLYETHYLENE AND NEGATIVE AIR PROVIDED. MAINTAIN 5' MINIMUM ACCESS IN CORRIDORS AT ALL TIMES. CLEAN THOROUGHLY PRIOR TO COMPLETION OF A GIVEN WORK AREA BY HEPA VACUUM AND WET MOP. REFER TO
SPECIFICATION 01 35 26 FOR ADDITIONAL INFORMATION.
G E N E R A L N O T E S F O R N E W W O R K :
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
A u to d e s k D o c s /L o u is v ill e V
A
R e p la c e
O R
A n e s th e s ia
S u p p ly H e a d s /F
F E
L o u is v ill e
R e p la c e
O R
A n e s th e s ia
B rv t
/1 /2
:4
:4
P M
GI001
COVER SHEET - SHEET INDEX
Owner
11/15/2022 PQ JF/JV
REPLACE OR 1-3 ANESTHESIA
SUPPLY HEADS
603-22-101
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
Replace OR 1-3 Anesthesia Supply Heads
DEPARTMENT OF VETERANS AFFAIRS
ROBLEY REX VA MEDICAL CENTER
SHEET INDEX
SHEET NUMBER SHEET NAME
GENERAL
GI001 COVER SHEET - SHEET INDEX
GI100 FOURTH FLOOR PHASING PLAN
GI200 FOURTH FLOOR INFECTION AND DUST CONTROL PLAN OR 3
GI201 FOURTH FLOOR INFECTION AND DUST CONTROL PLAN OR 1 AND 2
STRUCTURAL
S101 STRUCTURAL FRAMING PLAN
S501 STRUCTURAL DETAILS AND SECTIONS
ARCHITECTURAL
A001 ARCHITECTURAL LEGEND
AD101 FOURTH FLOOR DEMOLITION PLAN OR 3
AD102 FOURTH FLOOR DEMOLITION PLAN OR 1 AND 2
AD141 FOURTH FLOOR REFLECTED CEILING DEMOLITION PLAN - OR 3
AD142 FOURTH FLR REFLECTED CEILING DEMOLITION PLAN OR 1 AND 2
AE100 FOURTH FLOOR PLAN OR 3
AE101 FOURTH FLOOR PLAN OR 1 AND 2
AC101 FOURTH FLOOR REFLECTED CEILING PLAN OR 3
AC102 FOURTH FLOOR REFLECTED CEILING PLAN OR 1 AND 2
FIRE PROTECTION
FX101 FIRE SUPPRESSION FOURTH FLOOR PLAN
PLUMBING
PL101 PLUMBING FOURTH FLOOR PLANS
MECHANICAL
M001 MECHANICAL LEGEND
MD104 MECHANCIAL FOURTH FLOOR DEMOLITION
M104 MECHANICAL FOURTH FLOOR PLAN NEW WORK
ELECTRICAL
E001 LEGEND AND ABBREVIATIONS
ED104 ELECTRICAL FOURTH FLOOR DEMOLITION
EL104 ELECTRICAL LIGHTING FOURTH FLOOR PLAN NEW WORK
EP104 ELECTRICAL POWER FOURTH FLOOR PLAN NEW WORK
ET104 ELECTRICAL TECHNOLOGY FOURTH FLOOR PLAN NEW WORK
E601 ELECTRICAL DETAILS
# 603-22-101
800 ZORN AVE.
LOUISVILLE, KY 40206
No. Revisions: Date:
BID DOCUMENTS 11/15/2022
DP
D P
N. O
20.0
O.2 Q Q.3
18.1
N.1
PHASE 3
PHASE 2
PHASE 1
EQUIP STORAGE
C-409
OR-1
C-408
SUB-STERILE
C-406A
OR-2
C-406
CLEAN UTILITY
C-413
HAC
C-412
STORAGE
C-414
SCRUB
C-407
OR-3
C-404
ANEST WORK RM
C-405
MEN'S RESTROOM
C-411
WOMAN'S RESTROOM
C-410
CYSTOLOGY
C-415
22.7
21.3
R.3P.1N
18.7
PROJECT SCOPE
G E N E R A L P H A S I N G A N D H O U R S O F W O R K N O T E S
THESE PHASING PLANS/ORDER ARE MERELY A RECOMMENDATION AND ARE CONCEPTUAL IN NATURE. THIS DO NOT RELIEVE THE CONTRACTOR OF PREPARING SITE SPECIFIC PHASING ORDER/PLANS FOR IMPLEMENTATION OF THE FULL SCOPE OF WORK DEFINED BY THE CONTRACT DOCUMENTS. (REFER TO SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS FOR CONTRACTOR PHASING RESPONSIBILITY.) CONTRACTOR WILL SEND PHASING ORDER/PLANS TO C.O.R. FOR APPROVAL. CONTRACTOR MUST LEAVE TWO OF THE THREE OPERATING ROOMS OPERABLE AND FUNCTIONING WHILE THE THIRD OPERATING ROOM IS UNDER CONSTRUCTION DURING THE OVERALL PROJECT'S SCHEDULE.
A. CONTRACTOR SHALL TAKE ALL STEP NECESSARY TO PREVENT THE INTERRUPTION OF THE ROBLEY REX VA MEDICAL CENTER'S PROVISION OF CARE TO
PATIENTS.
B. REFER TO THE FOLLOWING SPECIFICATIONS FOR REQUIREMENTS RELATED TO PHASING:
1. SECTION 01 00 00 GENERAL REQUIREMENTS - PARAGRAPH 1.6 OPERATIONS AND STORAGE AREAS, ITEM 'G', PHASING.
2. SECTION 01 35 26 SAFETY REQUIREMENTS - PARAGRAPH 1.12, INFECTION CONTROL
C. CONTRACT WORK WITHIN SURGERY DEPARTMENT COMMON FACILITY CORRIDORS MAY ONLY BE PREFORMED OUTSIDE OF NORMAL VAMC BUSINESS
HOURS (6:30 A.M. TO 4:30 P.M. MONDAY THROUGH FRIDAY.
1. IF SURGICAL DEPARTMENT PROCEDURES EXTEND BEYOND 4:30 P.M., THEN CONTRACTORS WORK PERIOD (WITHIN SURGERY DEPARTMENT) CAN NOT BEGIN UNTIL THE DEPARTMENT PROCEDURES HAVE BEEN COMPLETED AND STAFF HAVE CLEANED THE O.R.(S)
2. WEEKENDS AND HOLIDAYS MAY BE AVAILABLE FOR CONTRACT WORK IF PERMITTED BY AND COORDINATED WITH THE VAMC CONTRACTING
OFFICER REPRESENTATIVE (COR).
D. ISOLATE EACH PHASE AS SHOWN WITH DUST PARTITIONS AND THE PROVISIONS OF NEGATIVE AIR PRESSURIZATION. FOLLOW INFECTION CONTROL PROVISIONS PER INFECTION AND DUST CONTROLL PLANS, NOTES, PERMITS, AND REFERENCED SPECIFICATION.
E. CONTRACTOR SHALL ASSUME THE CONTINUED VAMC OCCUPANCY - DURING NORMAL WORK HOURS - OF AREAS ON THE 1ST FLOOR ADJACENT TO THE
ISOLATED PHASES SHOWN..
F. CONTRACTOR SHALL FULLY COMPLETE THE WORK INDICATED AND REFERENCED FOR EACH PHASE OF CONSTRUCTION SHOWN.
G. CONTRACTOR SHALL COORDINATE MECHANICAL, ELECTRICAL, AND PLUMBING (MEP) WORK INDICATED TO PROVIDE THE FULL COMPLETE INFRASTRUCTURE IMPROVEMENTS, ASSEMBLIES, SYSTEMS AND FINISHES REQUIRED OR REFERENCED TO PERMIT FULL AND LEGAL OCCUPANCY OF
EACH COMPLETED PHASE OF WORK.
H. CONTRACTOR SHALL PROVIDE FOR THE INCREMENTAL OCCUPANCY OF EACH COMPLETED PHASE WITHIN THE SURGERY DEPARTMENT BY VAMC STAFF
PRIOR TO BEGINNING ON-SITE WORK - ON THE NEXT CONSECUTIVE PHASE.
1. SCHEDULE PUNCH LIST AND PERFORM CLOSEOUT REQUIREMENTS AT COMPLETION OF EACH PHASE SHOWN WITHIN THE SURGERY
DEPARTMENT.
2. ONCE A PHASE OF WORK WITHIN SURGERY DEPARTMENT HAS BEEN COMPLETED AND IS OCCUPIED BY VAMC, THE NEXT PHASE OF WORK MAY
BEGIN.
I. CERTAIN INFRASTRUCTURE IMPROVEMENTS OCCUR OUTSIDE OF THE SURGERY DEPARTMENT. THIS WORK MAY OCCUR DURING NORMAL VAMC WORK
HOURS IF THE FOLLOWING CONDITIONS ARE MET:
1. WORK DOES NOT OCCUR WITHIN THE SURGERY DEPARTMENT
2. WORK DOES NOT OCCUR IN CORRIDORS USED BY PATIENTS OR VISITORS.
3. WORK DOES NOT INTERFERE WITH NORMAL VAMC OPERATIONS.
4. WORK IS COORDINATED WITH THE PROJECT COR.
J. CONTRACTOR IS RESPONSIBLE FOR THE TIMELY COMPLETION OF EACH PHASE OF CONSTRUCTION IN A COMPLETE AND PROFESSIONAL MANNER.
K. REFER TO ALL CONSTRUCTION DOCUMENTS DEFINING WORK REQUIRED TO OCCUR WITHIN PHASED AREAS SHOWN AND NECCCESSARY FOR ITS
SUCCESSFUL OCCUPANCY.
L. BASE BID TO INCLUDE ALL WORK SHOWN BY CONSTRUCTION DOCUMENTS.
DASHED LINE INDICATES AREAS OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
A u to d e s k D o c s /L o u is v ill e V
A
R e p la c e
O R
A n e s th e s ia
S u p p ly H e a d s /F
F E
L o u is v ill e
R e p la c e
O R
A n e s th e s ia
B rv t
/1 /2
:4
:5
P M
GI100
FOURTH FLOOR PHASING PLAN
Owner
11/15/2022 PH JF/JV
REPLACE OR 1-3 ANESTHESIA
SUPPLY HEADS
603-22-101
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
1/4" = 1'-0"
PARTIAL FOURTH FLOOR PLAN - PHASING PLAN
KEY PLAN - FOURTH FLOOR
NTS
N
O
O.2N.1
OR-3
C-404
GI200
Sim
22.7
21.3
P.1N
INFECTION AND DUST CONTROL PLAN LEGEND
DUST MAT (2'-0" X 3'-0")
AREA NOT IN CONTRACT
AREA IN DIFFERENT PHASE
PROVIDE TEMPORARY INFECTION CONTROL / DUST CONTROL
BARRIERS AT THIS LOCATION. REMOVE AFTER CONSTRUCTION
IS COMPLETED PER PHASE INDICATED.
TEMPORARY PLASTIC SHEETING PER ICRA REQUIREMENTS.
POST ICRA, ILSM, FIRE
INSPECTION SHEETS VISIBLE
TO PUBLIC
SUSPENDED PLASTIC ZIPPER WALL
CURTAIN BARRIER
A P
P R
O X
A
.F .F
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY
DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,
ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-
FILTER.
INDICATOR (REFER TO PLAN
& ELEVATION)
CONTACT INFO
CONST. SUPERVISOR
NAME AND CELL
PHONE
CHILLER PLANT AFTER HOURS
CONTACT PHONE NUMBER FIRE
EMERGENCY DIAL 911
COMING SOON!!!
- DESCRIPTION OF NEWLY PROPOSED OCCUPANCY -
PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES
AND PROPER I.D.
THIS IS A
RESTRICTED AREA
AREA UNDER CONSTRUCTION
PAPER CADDY
ICRA, ILSM, FIRE WATCH,
MISC. FORMS
PROJECT SCOPE
DUE TO THE LOCATION OF RENOVATION WORK INDICATED (VAMC SURGERY
DEPARTMENT) CONSTRUCTION IS WITHIN THE HIGHEST INFECTION RISK CATEGORY.
THE INFECTION AND DUST CONTROL PLANS SHALL BE DISTRIBUTED AND APPLIED BY
ALL CONTRACTORS PERFORMING WORK ON THIS PROJECT.
A. REFER TO PHASING PLANS AND SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS FOR ADDITIONAL INFECTION CONTROL
INFORMATION.
B. COORDINATE ALL WORK ASSOCIATED WITH PROJECT FOLLOWING THE SITE-SPECIFIC INFECTION CONTROL RISK ASSESSMENT
PUBLISHED BY THE ROBLEY REX VAMC.
C. AREAS ADJACENT TO IMMEDIATE (PHASED) WORK AREAS WILL BE FULLY OCCUPIED AND FUNCTIONING NORMALLY THROUGHOUT THE
CONSTRUCTION PERIOD.
D. THERE WILL BE ZERO TOLERANCE FOR ANY DUST MIGRATION OUTSIDE OF THE IMMEDIATE WORK SITE AREAS IDENTIFIED BY PHASING
PLANS.
E. ALL WORK OCCURRING WITHIN THE SURGERY DEPARTMENT MUST BE PERFORMED OUTSIDE OF NORMAL VAMC WORKING HOURS.
F. CONTRACTOR SHALL PROVIDE FOR PROFESSIONAL TERMINAL CLEANING OF PHASED WORK AREAS PRIOR TO TURNING OVER TO THE
VAMC FOR OCCUPANCY.
G. EXTERIOR DEMOLITION ACTIVITIES (INCLUDES CUTTING AND PATCHING):
1. EVALUATE EXISTING SITE CONDITIONS TO DETERMINE THE PRESENCE OF ANY OUTSIDE AIR INTAKES WITHIN 20' OF THE
PROPOSED EXTERIOR WORK.
2. IF PRESENT - DETERMINE IF THE IMPACTED EXTERIOR AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED
AIR VS. OUTSIDE AIR.
a. IF FEASIBLE - SEAL OFF AIR INTAKES WITHIN 20' OF DUST GENERATING WORK.
b. IF NOT FEASIBLE - ROUTINELY CHECK THE LOW-EFFICIENCY FILTER BANKS LOCATED IN LINE WITH ADJACENT AIR INTAKE(S)
AND REPLACE AS NEEDED TO REDUCE PARTICULATE BUILD-UP.
3. SEAL WINDOWS AND REDUCE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN STAIRWELLS AND CORRIDORS)
THAT MAY BE IMPACTED BY CONSTRUCTION. PAY SPECIAL ATTENTION TO PROTECTIVE ENVIRONMENT (PE) AREAS.
H. INTERIOR DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL:
1. BARRIER SYSTEMS: PHASED AREAS OF WORK SHALL BE ISOLATED FROM ADJACENT AREAS WITH 1 -HR. RATED DUST
PARTITIONS.
2. DUST PARTITIONS TO BE METAL FRAMED WITH GYPSUM WALL BOARD ON EACH SIDE. PARTITION TO BE CONSTRUCTED EQUAL TO
UL DESIGN U465.
• IN LIEU OF SITE BUILT DUST PARTITIONS, CONTRACTOR MAY UTILIZE PRE-ENGINEERED (MODULAR) TEMPORARY
CONSTRUCTION PARTITIONS LIKE THOSE MANUFACTURED BY EDGE GUARD PRODUCTS, 216 N. PLATT ST., BEMENT, IL 61813, TELE 217-552-5418, WEBSITE: WWW.EDGE-GUARD.COM OR APPROVED EQUAL.
3. DUST PARTITIONS SHALL BE INSTALLED WITH A TIGHT SEAL AT FLOOR AND CEILING OR STRUCTURE ABOVE CEILING. WHERE OPERATING ROOM DEMISING WALLS ARE SHOWN TO BE EXTENDED UP TO STRUCTURE ABOVE - PROVIDE AIR TIGHT SEAL AT
BOTH TOP OF EXISTING DEMISING WALL (TO BE EXTENDED) AND AT STRUCTURE ABOVE.
• WHERE O.R. DEMISING WALL EXTENSIONS IMPACT EXISTING FIRE PROOFED STEEL STRUCTURE - CONTRACTOR SHALL
CAREFULLY REMOVE THE FIREPROOFING (ONLY) IN AREA WHERE TOP WALL PLATE MEETS EXISTING STEEL. PATCH ANY FIREPROOFING DISTURBED BY CONSTRUCTION ACTIVITIES WITH NEW FIRE PROOFING MATCHING EXISTING SYSTEM.
• AN INTERIM PLASTIC DUST BARRIER (MINIMUM 6-MIL THICKNESS) SHALL BE INSTALLED TO PROTECT ADJACENT AREAS WHILE
THE IMPERVIOUS (1-HR. RATED) DUST PARTITION IS BEING CONSTRUCTED.
4. ANY DUST GENERATED FROM DEMOLITION OR CONSTRUCTION ACTIVITIES SHALL BE IMMEDIATELY CLEANED IF TRACKED OR
FOUND OUTSIDE OF THE CONSTRUCTION PHASE PERIMETER.
5. CONTRACTOR PERSONNEL SHALL MONITOR DUST PARTITION CONDITION AND PERFORM MAINTENANCE - DURING PHASED
DEMOLITION AND CONSTRUCTION ACTIVITIES.
6. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, DUST PARTITIONS SHALL BE CAREFULLY REMOVED TO MINIMIZE THE SPREAD
OF DUST.
• CONTRACTOR SHALL INSTALL INTERIM PLASTIC DUST BARRIERS (MINIMUM 6-MIL THICKNESS) PRIOR TO THE REMOVAL OF
DUST PARTITIONS.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY PARTITION LAYOUT. LAYOUT SHALL NOT INTERFERE WITH HOSPITAL
OPERATION.
I. TRAFFIC CONTROL:
1. PHASED SITE ACCESS SHALL HAVE DEFINED ENTRY AND EXIT PROCEDURES. EGRESS PATHS AND BE FREE OF DEBRIS, TOOLS, EQUIPMENT, OR CONTAINERS.
2. DESIGNATED ELEVATORS SHALL ONLY BE USED DURING SCHEDULED TIME PERIODS AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. COORDINATE ELEVATOR ACCESS WITH THE VAMC THROUGH THE COR.
3. INSTALL SIGNAGE TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREAS.
J. DEMOLITION DEBRIS:
1. ALL DEBRIS GENERATED BY PROJECT SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTING COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE THE USE OF ELEVATORS SHARED BY PATIENTS OR STAFF. PERFORM TRANSPORT OF DEBRIS AT TIMES DIRECTED BY THE VAMC THROUGH THE COR. IF EXTERIOR TRASH CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED AND THE CHUTE OPENING SEALED WHEN NOT IN USE. USED FILTERS SHALL BE BAGGED AND SEALED BEFORE TRANSPORTING OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE VAMC.
K. VENTILATION AND ENVIRONMENTAL CONTROLS:
1. AIR SYSTEM FLOW: DETERMINE IF CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR. ADD FILTERS AND/OR
COVER RETURN GRILLS WITH FILTER MATERIAL OR PLASTIC. AIR MUST (ONLY) FLOW IN THE DIRECTION OF CLEAN AREAS TO
DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: AIR WITHIN THE CONSTRUCTION AREAS (PHASES) MUST BE MAINTAINED AT NEGATIVE PRESSURE WITH RESPECT TO SURROUNDING AREAS IN ACCORDANCE WITH ASHRAE STANDARD 170. NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS IS ALLOWED DURING PERIODS OF VAMC OCCUPANCY OF ADJACENT AREAS. THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSED PHASES WILL EXHAUST DIRECTLY OUTSIDE THROUGH EXISTING ROOF PENETRATION. ROOF-TOP EXHUAST FAN TO BE INSTALLED AT EXISTING ROOF PENETRATION TO ENSURE CONSTANT NEGATIVE PRESSURE EXIST.
• DUST PARTITIONS SHALL BE OUTFITTED WITH CONTINUOUS AIR PRESSURE MONITORING DEVICES WITH 24/7 READ OUT AND
LOGGING. BASIS OF DESIGN FOR AIR PRESSURE MONITORING DEVICE IS PHOENIX CONTROLS APM II, OR EQUAL.
L. WORKSITE CLOTHING AND CLEANING:
1. CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE ENTERING OR LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G. COVERALLS, FOOTGEAR, AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE PHASED CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE AS AN ANTEROOM FOR CHANGING CLOTHING
AND STORING EQUIPMENT.
2. ALL EQUIPMENT, TOOLS, CARS, MATERIALS, ETC. TRANSPORTED THROUGH NORMALLY OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET MOPPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR
WORK AREA.
3. THE CONSTRUCTION ZONE MUST BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS. SWEEP OR HEPA-VACUUM CONSTRUCTION AREA DAILY - OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS IMPACTED BY CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING OF DIRT AND DUST FROM CONSTRUCTION AREAS.
GENERAL INFECTION AND DUST CONTROL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
A u to d e s k D o c s /L o u is v ill e V
A
R e p la c e
O R
A n e s th e s ia
S u p p ly H e a d s /F
F E
L o u is v ill e
R e p la c e
O R
A n e s th e s ia
B rv t
/1 /2
:3
:4
P M
GI200
FOURTH FLOOR INFECTION AND
DUST CONTROL PLAN OR 3
Owner
11/15/2022 PH JF/JV
REPLACE OR 1-3 ANESTHESIA
SUPPLY HEADS
603-22-101
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
1/4" = 1'-0"
FOURTH FLOOR ICRA PLAN - OR 3
D R A W I N G N O T E S :
1 SEAL DOORS IN CLOSED POSITIONS DURING WORK ACTIVITIES
2 CONTRACTOR TO VERIFY O.R. DEMISING WALL EXTENDS ABOVE CEILING TO STRUCTURE ABOVE WITH METAL FRAMING AND GYPSUM BOARD. SEAL AS REQUIRED TO PREVENT AIR INFILTRATION. (TYPICAL AT EACH O.R.)
3 EXTEND WALL TO STRUCTURE AS NECESSARY TO MEET INFECTION AND DUST CONTROL REQUIREMENTS AS DEFINES IN
THE GENERAL ICRA NOTES.
4 EXTEND FLEXIBLE DUCT TO ROOF-MOUNTED EXHAUST FAN AT TEMPORARY EXHAUST LOCATION. VERIFY SEALANT AT
DUCT PENETRATION THROUGH ROOF CONSTRUCTION MEETS ICRA REQUIREMENTS.
5 PROVIDE TEMPORARY ICRA RATED VESTIBULE AS NECESSARY TO MAINTAIN NEGATIVE PRESSURE IN SCOPE OF WORK
6 PROVIDE TEMPORARY PLASTIC SHEETING AS NECESSARY FOR ICRA BARRIER INSTALLATION.
7 AIR PRESSURE MONITOR LOCATION. NEGATIVE AIR PRESSURE REQUIRED DURING ALL INTERIOR CONSTRUCTION
ACTIVITIES. REFER TO ELEVATION ON GI200 FOR REQUIREMENTS.
8 DUST MAT LOCATED HERE ONLY DURING CONSTRUCTION ACTIVITIES. MOVE TO INSIDE VESTIBULE DAILY AT END OF
CONSTRUCTION ACTIVITIES.
9 TEMPORARY EXHAUST LOCATION FOR ICRA NEGATIVE AIRFLOW REQUIREMENTS ALL PHASES.
1/2" = 1'-0"
TYPICAL ICRA ELEVATIONS
KEY PLAN - FOURTH FLOOR
NTS
N
20.0
Q Q.3
18.1
ANEST WORK RM
C-405
OR-2
C-406
SCRUB
C-407
SUB-STERILE
C-406A
OR-1
C-408
EQUIP STORAGE
C-409
CLEAN UTILITY
C-413
HAC
C-412
22.7
21.3
R.3
18.7
GI200
Sim
GI200 2
S im
INFECTION AND DUST CONTROL PLAN LEGEND
DUST MAT (2'-0" X 3'-0")
AREA NOT IN CONTRACT
AREA IN DIFFERENT PHASE
PROVIDE TEMPORARY INFECTION CONTROL / DUST CONTROL
BARRIERS AT THIS LOCATION. REMOVE AFTER CONSTRUCTION
IS COMPLETED PER PHASE INDICATED.
TEMPORARY PLASTIC SHEETING PER ICRA REQUIREMENTS.
PROJECT SCOPE
DUE TO THE LOCATION OF RENOVATION WORK INDICATED (VAMC SURGERY
DEPARTMENT) CONSTRUCTION IS WITHIN THE HIGHEST INFECTION RISK CATEGORY.
THE INFECTION AND DUST CONTROL PLANS SHALL BE DISTRIBUTED AND APPLIED BY
ALL CONTRACTORS PERFORMING WORK ON THIS PROJECT.
A. REFER TO PHASING PLANS AND SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS FOR ADDITIONAL INFECTION CONTROL
INFORMATION.
B. COORDINATE ALL WORK ASSOCIATED WITH PROJECT FOLLOWING THE SITE-SPECIFIC INFECTION CONTROL RISK ASSESSMENT
PUBLISHED BY THE ROBLEY REX VAMC.
C. AREAS ADJACENT TO IMMEDIATE (PHASED) WORK AREAS WILL BE FULLY OCCUPIED AND FUNCTIONING NORMALLY THROUGHOUT THE
CONSTRUCTION PERIOD.
D. THERE WILL BE ZERO TOLERANCE FOR ANY DUST MIGRATION OUTSIDE OF THE IMMEDIATE WORK SITE AREAS IDENTIFIED BY PHASING
PLANS.
E. ALL WORK OCCURRING WITHIN THE SURGERY DEPARTMENT MUST BE PERFORMED OUTSIDE OF NORMAL VAMC WORKING HOURS.
F. CONTRACTOR SHALL PROVIDE FOR PROFESSIONAL TERMINAL CLEANING OF PHASED WORK AREAS PRIOR TO TURNING OVER TO THE
VAMC FOR OCCUPANCY.
G. EXTERIOR DEMOLITION ACTIVITIES (INCLUDES CUTTING AND PATCHING):
1. EVALUATE EXISTING SITE CONDITIONS TO DETERMINE THE PRESENCE OF ANY OUTSIDE AIR INTAKES WITHIN 20' OF THE
PROPOSED EXTERIOR WORK.
2. IF PRESENT - DETERMINE IF THE IMPACTED EXTERIOR AREAS OF THE FACILITY CAN OPERATE TEMPORARILY ON RECIRCULATED
AIR VS. OUTSIDE AIR.
a. IF FEASIBLE - SEAL OFF AIR INTAKES WITHIN 20' OF DUST GENERATING WORK.
b. IF NOT FEASIBLE - ROUTINELY CHECK THE LOW-EFFICIENCY FILTER BANKS LOCATED IN LINE WITH ADJACENT AIR INTAKE(S)
AND REPLACE AS NEEDED TO REDUCE PARTICULATE BUILD-UP.
3. SEAL WINDOWS AND REDUCE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN STAIRWELLS AND CORRIDORS)
THAT MAY BE IMPACTED BY CONSTRUCTION. PAY SPECIAL ATTENTION TO PROTECTIVE ENVIRONMENT (PE) AREAS.
H. INTERIOR DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL:
1. BARRIER SYSTEMS: PHASED AREAS OF WORK SHALL BE ISOLATED FROM ADJACENT AREAS WITH 1 -HR. RATED DUST
PARTITIONS.
2. DUST PARTITIONS TO BE METAL FRAMED WITH GYPSUM WALL BOARD ON EACH SIDE. PARTITION TO BE CONSTRUCTED EQUAL TO
UL DESIGN U465.
• IN LIEU OF SITE BUILT DUST PARTITIONS, CONTRACTOR MAY UTILIZE PRE-ENGINEERED (MODULAR) TEMPORARY
CONSTRUCTION PARTITIONS LIKE THOSE MANUFACTURED BY EDGE GUARD PRODUCTS, 216 N. PLATT ST., BEMENT, IL 61813, TELE 217-552-5418, WEBSITE: WWW.EDGE-GUARD.COM OR APPROVED EQUAL.
3. DUST PARTITIONS SHALL BE INSTALLED WITH A TIGHT SEAL AT FLOOR AND CEILING OR STRUCTURE ABOVE CEILING. WHERE OPERATING ROOM DEMISING WALLS ARE SHOWN TO BE EXTENDED UP TO STRUCTURE ABOVE - PROVIDE AIR TIGHT SEAL AT
BOTH TOP OF EXISTING DEMISING WALL (TO BE EXTENDED) AND AT STRUCTURE ABOVE.
• WHERE O.R. DEMISING WALL EXTENSIONS IMPACT EXISTING FIRE PROOFED STEEL STRUCTURE - CONTRACTOR SHALL
CAREFULLY REMOVE THE FIREPROOFING (ONLY) IN AREA WHERE TOP WALL PLATE MEETS EXISTING STEEL. PATCH ANY FIREPROOFING DISTURBED BY CONSTRUCTION ACTIVITIES WITH NEW FIRE PROOFING MATCHING EXISTING SYSTEM.
• AN INTERIM PLASTIC DUST BARRIER (MINIMUM 6-MIL THICKNESS) SHALL BE INSTALLED TO PROTECT ADJACENT AREAS WHILE
THE IMPERVIOUS (1-HR. RATED) DUST PARTITION IS BEING CONSTRUCTED.
4. ANY DUST GENERATED FROM DEMOLITION OR CONSTRUCTION ACTIVITIES SHALL BE IMMEDIATELY CLEANED IF TRACKED OR
FOUND OUTSIDE OF THE CONSTRUCTION PHASE PERIMETER.
5. CONTRACTOR PERSONNEL SHALL MONITOR DUST PARTITION CONDITION AND PERFORM MAINTENANCE - DURING PHASED
DEMOLITION AND CONSTRUCTION ACTIVITIES.
6. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, DUST PARTITIONS SHALL BE CAREFULLY REMOVED TO MINIMIZE THE SPREAD
OF DUST.
• CONTRACTOR SHALL INSTALL INTERIM PLASTIC DUST BARRIERS (MINIMUM 6-MIL THICKNESS) PRIOR TO THE REMOVAL OF
DUST PARTITIONS.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY PARTITION LAYOUT. LAYOUT SHALL NOT INTERFERE WITH HOSPITAL
OPERATION.
I. TRAFFIC CONTROL:
1. PHASED SITE ACCESS SHALL HAVE DEFINED ENTRY AND EXIT PROCEDURES. EGRESS PATHS AND BE FREE OF DEBRIS, TOOLS, EQUIPMENT, OR CONTAINERS.
2. DESIGNATED ELEVATORS SHALL ONLY BE USED DURING SCHEDULED TIME PERIODS AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE. COORDINATE ELEVATOR ACCESS WITH THE VAMC THROUGH THE COR.
3. INSTALL SIGNAGE TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREAS.
J. DEMOLITION DEBRIS:
1. ALL DEBRIS GENERATED BY PROJECT SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTING COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE THE USE OF ELEVATORS SHARED BY PATIENTS OR STAFF. PERFORM TRANSPORT OF DEBRIS AT TIMES DIRECTED BY THE VAMC THROUGH THE COR. IF EXTERIOR TRASH CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED AND THE CHUTE OPENING SEALED WHEN NOT IN USE. USED FILTERS SHALL BE BAGGED AND SEALED BEFORE TRANSPORTING OUT OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE VAMC.
K. VENTILATION AND ENVIRONMENTAL CONTROLS:
1. AIR SYSTEM FLOW: DETERMINE IF CONSTRUCTION AREA USES FRESH/OUTSIDE OR RECIRCULATED AIR. ADD FILTERS AND/OR
COVER RETURN GRILLS WITH FILTER MATERIAL OR PLASTIC. AIR MUST (ONLY) FLOW IN THE DIRECTION OF CLEAN AREAS TO
DIRTY AREAS.
2. NEGATIVE AIR PRESSURE: AIR WITHIN THE CONSTRUCTION AREAS (PHASES) MUST BE MAINTAINED AT NEGATIVE PRESSURE WITH RESPECT TO SURROUNDING AREAS IN ACCORDANCE WITH ASHRAE STANDARD 170. NO DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS IS ALLOWED DURING PERIODS OF VAMC OCCUPANCY OF ADJACENT AREAS. THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSED PHASES WILL EXHAUST DIRECTLY OUTSIDE THROUGH EXISTING ROOF PENETRATION. ROOF-TOP EXHUAST FAN TO BE INSTALLED AT EXISTING ROOF PENETRATION TO ENSURE CONSTANT NEGATIVE PRESSURE EXIST.
• DUST PARTITIONS SHALL BE OUTFITTED WITH CONTINUOUS AIR PRESSURE MONITORING DEVICES WITH 24/7 READ OUT AND
LOGGING. BASIS OF DESIGN FOR AIR PRESSURE MONITORING DEVICE IS PHOENIX CONTROLS APM II, OR EQUAL.
L. WORKSITE CLOTHING AND CLEANING:
1. CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE ENTERING OR LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G. COVERALLS, FOOTGEAR, AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE DUST FROM CLOTHING BEFORE LEAVING THE PHASED CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE AS AN ANTEROOM FOR CHANGING CLOTHING
AND STORING EQUIPMENT.
2. ALL EQUIPMENT, TOOLS, CARS, MATERIALS, ETC. TRANSPORTED THROUGH NORMALLY OCCUPIED AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET MOPPING BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR
WORK AREA.
3. THE CONSTRUCTION ZONE MUST BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS. SWEEP OR HEPA-VACUUM CONSTRUCTION AREA DAILY - OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST. ADJACENT AREAS IMPACTED BY CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD BE UTILIZED TO MINIMIZE TRACKING OF DIRT AND DUST FROM CONSTRUCTION AREAS.
GENERAL INFECTION AND DUST CONTROL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
A u to d e s k D o c s /L o u is v ill e V
A
R e p la c e
O R
A n e s th e s ia
S u p p ly H e a d s /F
F E
L o u is v ill e
R e p la c e
O R
A n e s th e s ia
B rv t
/1 /2
:4
:5
P M
GI201
FOURTH FLOOR INFECTION AND
DUST CONTROL PLAN OR 1 AND 2
Owner
11/15/2022 PQ JF/JV
REPLACE OR 1-3 ANESTHESIA
SUPPLY HEADS
603-22-101
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
1/4" = 1'-0"
FOURTH FLOOR ICRA PLAN - OR 1 & 2
KEY PLAN - FOURTH FLOOR
D R A W I N G N O T E S :
1 SEAL DOORS IN CLOSED POSITIONS DURING WORK ACTIVITIES
2 CONTRACTOR TO VERIFY O.R. DEMISING WALL EXTENDS ABOVE CEILING TO STRUCTURE ABOVE WITH METAL FRAMING AND GYPSUM BOARD. SEAL AS REQUIRED TO PREVENT AIR INFILTRATION. (TYPICAL AT EACH O.R.)
3 EXTEND WALL TO STRUCTURE AS NECESSARY TO MEET INFECTION AND DUST CONTROL REQUIREMENTS AS DEFINES IN
THE GENERAL ICRA NOTES.
4 EXTEND FLEXIBLE DUCT TO ROOF-MOUNTED EXHAUST FAN AT TEMPORARY EXHAUST LOCATION. VERIFY SEALANT AT
DUCT PENETRATION THROUGH ROOF CONSTRUCTION MEETS ICRA REQUIREMENTS.
5 PROVIDE TEMPORARY ICRA RATED VESTIBULE AS NECESSARY TO MAINTAIN NEGATIVE PRESSURE IN SCOPE OF WORK
6 PROVIDE TEMPORARY PLASTIC SHEETING AS NECESSARY FOR ICRA BARRIER INSTALLATION.
7 AIR PRESSURE MONITOR LOCATION. NEGATIVE AIR PRESSURE REQUIRED DURING ALL INTERIOR CONSTRUCTION
ACTIVITIES. REFER TO ELEVATION ON GI200 FOR REQUIREMENTS.
8 DUST MAT LOCATED HERE ONLY DURING CONSTRUCTION ACTIVITIES. MOVE TO INSIDE VESTIBULE DAILY AT END OF
CONSTRUCTION ACTIVITIES.
NTSN
A. VERIFY ALL BOOM SUPPORT EXACT LOCATIONS AND DIMENSIONS WITH ARCHITECTURAL DRAWINGS. ALL INFORMATION
SHALL BE FIELD VERIFIED PRIOR TO START OF CONSTRUCTION.
B. STEEL ANGLES TO BE ASTM A50. STEEL CHANNELS TO BE A36.
C. STEEL PLATES FOR REINFORCEMENT TO BE ASTM A50.
D. EXISTING JOISTS ARE SLOPED.
E. REFER TO SHEET S501 FOR STRUCTURAL DETAILS AND SECTIONS.
F. WELDING ELECTRODES TO BE E70XX.
G. EXISTING FIREPROOFING MUST BE REMOVED AND STEEL MUST BE CLEANED BEFORE WELDING TO STRUCTURE.
H. AFTER CLEANING EXISTING JOISTS, CONTRACTOR TO VERIFY INTERIOR DIAGONAL ROD DIAMETERS FOR EACH JOIST AND
INFORM EOR TO DETERMINE IF ADDITIONAL WEB MEMBERS ARE TO BE REINFORCED.
I. PROVIDE SPRAY-ON FIREPROOFING ON ALL NEW STRUCTURAL STEEL AND AREAS THAT HAVE BEEN DAMAGED DURING
CONSTRUCTION. REFER TO SPECIFICATION 07 81 00.
G E N E R A L N O T E S
Q
(E
W X
(E
K
(E
K
(E
K
(E
K
(E
W X
(E
W X
(E
K
(E
K
(E
K
(E
K
(E
K
(E) W14X22
(E
K
(E
W X
(E) W18X40
(E) W21X44
(E) W21X44
(E) W14X22
(E
W X
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
(E
W X
(E
W X
(E
W X
(E
K
(E
K
(E
K
(E
K
(E
K
(E
K
C
S501
L3-1/2X3-1/2X3/8 DIAGONAL BRACING
SHOWN IN DASHED LINES
(TYP 8 PLACES)
L3-1/2X3-1/2X3/8 DIAGONAL BRACING
SHOWN IN DASHED LINES
(TYP 8 PLACES)
L3-1/2X3-1/2X3/8 DIAGONAL
BRACING SHOWN IN DASHED
LINES (TYP 8 PLACES)
L3-1/2X3-1/2X3/8 DIAGONAL BRACING
SHOWN IN DASHED LINES
(TYP 8 PLACES)
L3-1/2X3-1/2X3/8 DIAGONAL BRACING
SHOWN IN DASHED LINES
(TYP 8 PLACES)
L3-1/2X3-1/2X3/8 DIAGONAL BRACING
SHOWN IN DASHED LINES (TYP 6 PLACES)
L4X4X3/8 (TYP 4 PLACES)
C5X6.7 (TYP 2 PLACES)
L4X4X3/8 (TYP 4 PLACES)
P L
/4
1' - 0 3/4" 1' - 3 1/4"
2' - 4" PL
8 1/4"
2' - 1 1/2"
2' - 4" PL
4 1/2"
10 3/4" 1' - 5 1/4"
L3-1/2X3-1/2X3/8 HANGER
(TYP 4 PLACES)
L3-1/2X3-1/2X3/8 HANGER
(TYP 4 PLACES)
L3-1/2X3-1/2X3/8 HANGER
(TYP 4 PLACES)
L3-1/2X3-1/2X3/8 HANGER
(TYP 4 PLACES)
L3-1/2X3-1/2X3/8 HANGER
(TYP 4 PLACES)
L3-1/2X3-1/2X3/8 HANGER
(TYP 4 PLACES)
A
S501
L4X4X3/8 WELDED
BELOW JOIST
(TYP 3 PLACES)
L4X4X3/8 WELDED BELOW
JOIST (TYP 2 PLACES)
C5X6.7 WELDED BELOW JOIST
(TYP 2 PLACES)
C5X6.7 WELDED BELOW JOIST
(TYP 2 PLACES)
L4X4X3/8 WELDED
BELOW JOIST
(TYP 3 PLACES)
C5X6.7 WELDED BELOW JOIST
(TYP 2 PLACES)
B
S501
B
S501
A
S501
B
S501
4' - 1 1/8" 4' - 1 1/8" 4' - 10" 4' - 10" 4' - 10" 4' - 10"
P L
/2
P L
/8
JR
-2
JR
-2
JR
-4
JR
-3
JR
-4
JR
-3
JR
-1
1' - 5 1/4"
2' - 4" PL
1' - 0 3/4"
2' - 2 7/8" 1 1/8"
SEE JOIST REINFORCEMENT
SCHEDULE ON S501 FOR JR-#
DESIGNATION (TYP)
INSTALL AT PANEL POINT
(TYP. EACH END)
22.7
21.3
R.3
29' - 0"
P.1N
D
S501
BOTH
SIDES
D
S501SIM,
BOTH
SIDES
D
S501
BOTH
SIDES
D
S501
BOTH
SIDES
D
S501
BOTH
SIDES
CONNECT DIAGONAL
BRACING TO W14
(TYP 2 PLACES)
SIM
CONNECT DIAGONAL
BRACING TO W14
(TYP 2 PLACES)
B
S501
SIM
L4X4X3/8 (TYP 2 PLACES)
C5X6.7 (TYP 2 PLACES)
/4
P L
P L
/4
P L
/8
SIM
C5X6.7
JR
-5
JR
-5
18.7
20' - 6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
A u to d e s k D o c s /L o u is v ill e V
A
R e p la c e
O R
A n e s th e s ia
S u p p ly H e a d s /F
F E
L o u is v ill e
R e p la c e
O R
A n e s th e s ia
B rv t
/1 /2
:5
:4
P M
S101
STRUCTURAL FRAMING PLAN
Owner
11/15/2022 PM CL
REPLACE OR 1-3 ANESTHESIA
SUPPLY HEADS
603-22-101
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
N 1/4" = 1'-0"
FIFTH FLOOR/ROOF FRAMING PLAN
ABBREVIATIONS
JR JOIST REINFORCEMENT
PL PLATE
TYP TYPICAL
(E) EXISTING
REQ'D REQUIRED
L4L4
-3 /4
M
A X
-1 /4
M
IN
T
O
L3-1/2
HANGERS
(FIELD
MEASURE,
LENGTHS
VARY)
CEILING
EXISTING JOISTS
(SLOPED)
SEE PLAN SEE PLAN
L4 L4
L3-1/2 DIAGONAL
BRACING
L3-1/2 DIAGONAL
BRACING
2' - 4"1/2"
L4
MOUNTING PLATE
-3 /4
M
A X
-1
/4
M
IN
T
O
CEILING
EXISTING JOISTS
(SLOPED)
2' - 4" PL
L3-1/2 HANGERS
L3-1/2 DIAGONAL BRACING
L3-1/2 DIAGONAL BRACING
REQ'D ON ALL FOUR SIDES (TYP)
SEE PLAN
(L4 OR C5)
SEE PLAN SEE PLAN
MOUNTING PLATE
SEE PLAN
(L4 OR C5)
/8
/8
(TYP)
1/4"
3/16 2-8
3/16 2-8 12" CONT.
EACH END
TOP &BOTTOM
E L E
V A
T
IO
N S
S E
E J
O
IS
T R
E
IN
F
EX. WEB MEMBER
L1X1X1/8 WEB REINFORCEMENT
(TYP EACH SIDE)
L1X1X1/8 AT MIDPOINT
3/16
3/16
EX. WEB
MEMBER TO
L1
L3-1/2 REQUIRED WHEN
DIAGONAL BRACING IS NOT
ON PANEL POINT OF JOIST
(TYP BOTH SIDES)
DIAGONAL
BRACING (TYP)
C5 WELDED TO BOTTOM OF JOIST
- IF HANGER DOES NOT FALL ON
PANEL POINT, EXTEND C5 TO NEXT
PANEL POINT (TYP. EACH END)
C5
L4
MOUNTING PLATE
CEILING
3/16
L3-1/2
HANGER
1 2 3 4
1 2 3
PANEL 1 PANEL 2 PANEL 3 PANEL 4
PANEL 1 PANEL 2 PANEL 3
14K1
1 2 3 4 5
1 2 3
PANEL 1 PANEL 2 PANEL 3 PANEL 4
PANEL 1 PANEL 2 PANEL 3 PANEL 4
18K3
NO REINFORCING TOP CHORD THIS AREA
NO REINFORCING BOTTOM CHORD THIS AREA
PANEL 1PANEL 2PANEL 3
PANEL 1PANEL 2
NO REINFORCING TOP CHORD THIS AREA
CHORD THIS AREA
NO REINFORCING BOTTOM
NO REINFORCING BOTTOM CHORD THIS AREA
NO REINFORCING TOP CHORD THIS AREA
PANEL 5
22.7
PANEL 1PANEL 2PANEL 3
PANEL 1
1 2 3 4 5
1 2 3
PANEL 1 PANEL 2 PANEL 3 PANEL 4
PANEL 1 PANEL 2 PANEL 3
18K3 1234
PANEL 1PANEL 2PANEL 3
PANEL 1
NO REINFORCING TOP CHORD THIS AREA
NO REINFORCING BOTTOM CHORD THIS AREA
1 2 3
PANEL 1 PANEL 2 PANEL 3
PANEL 1
18K3 1234
PANEL 1PANEL 2PANEL 3
PANEL 1
NO REINFORCING TOP CHORD THIS AREA
NO REINFORCING BOTTOM CHORD THIS AREA
PANEL 4
PANEL 2
JR-1
JR-2
JR-3
JR-4
22.7
22.7
NO REINFORCING TOP CHORD THIS AREA
CHORD THIS AREA
NO REINFORCING TOP
NO REINFORCING TOP CHORD THIS AREA
CHORD THIS AREA
NO REINFORCING BOTTOM
PANEL 4
PANEL 2
NO REINFORCING TOP CHORD THIS AREA
CHORD THIS AREA
NO REINFORCING BOTTOM
JOIST REINFORCMENT SIZE = 1/2" X 1/4"
REINFORCE TOP CHORD - SEE CHORD REINFORCMENT DETAIL
JOIST REINFORCMENT SIZE = 1/2" X 1/4"
REINFORCE BOTTOM CHORD - SEE CHORD REINFORCMENT DETAIL
JOIST REINFORCMENT SIZE = 1/2" X 1/4"
REINFORCE TOP CHORD - SEE CHORD REINFORCMENT DETAIL
JOIST REINFORCMENT SIZE = 1/2" X 1/4"
REINFORCE BOTTOM CHORD - SEE CHORD REINFORCMENT DETAIL
JOIST REINFORCMENT SIZE = 3/4" X 1/4"
REINFORCE TOP CHORD - SEE CHORD REINFORCMENT DETAIL
JOIST REINFORCMENT SIZE = 3/4" X 1/4"
REINFORCE BOTTOM CHORD - SEE CHORD REINFORCMENT DETAIL
JOIST REINFORCMENT SIZE = 3/4" X 1/4"
REINFORCE TOP CHORD - SEE CHORD REINFORCMENT DETAIL
JOIST REINFORCMENT SIZE = 3/4" X 1/4"
REINFORCE BOTTOM CHORD - SEE CHORD REINFORCMENT DETAIL
PANEL 3
PANEL 5
PANEL 4 34
16K2
JR-5
1 PANEL 1
NO CHORD REINFORCEMENT
SEE DETAIL 3 FOR WEB REINFORCEMENT
(TYP)
WEB REINFORCEMENT REQUIRED - SEE WEB REINFORCEMENT DETAIL ON THIS SHEET
21.3 20
20 18.7
21.3
21.3
21.3
L3-1/2 REQUIRED WHEN DIAGONAL
BRACING IS NOT ON PANEL POINT
OF JOIST (TYP BOTH SIDES)
L4 WELDED TO BOTTOM OF JOIST
- IF HANGER DOES NOT FALL ON
PANEL POINT, EXTEND L4 TO NEXT
PANEL POINT (TYP. EACH END)
PANEL
POINT
DIAGONAL
BRACING (TYP)
L3-1/2 HANGER
MOUNTING PLATE
CEILING
EXISTING
JOIST
SEE PLAN
(L4 OR C5)L4
L3-1/2
SEE PLAN
(L4 OR C5)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
A u to d e s k D o c s /L o u is v ill e V
A
R e p la c e
O R
A n e s th e s ia
S u p p ly H e a d s /F
F E
L o u is v ill e
R e p la c e
O R
A n e s th e s ia
B rv t
/1 /2
:0
:2
P M
S501
STRUCTURAL DETAILS AND
SECTIONS
Owner
11/15/2022 PM CL
REPLACE OR 1-3 ANESTHESIA
SUPPLY HEADS
603-22-101
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
3/4" = 1'-0" A
SECTION
3/4" = 1'-0"
B
SECTION
6" = 1'-0"
CHORD REINFORCEMENT DETAIL
6" = 1'-0"
WEB REINFORCEMENT DETAIL
3/4" = 1'-0" C
SECTION
3/4" = 1'-0"
JOIST REINFORCEMENT ELEVATIONS
3/4" = 1'-0" D
SECTION
A B B R E V I A T I O N S
A.B. ANCHOR BOLT
A.C.M. ASBESTOS CONTAINING MATERIALS
A.C.P. ASPHALT CONCRETE PAVING
A/C AIR CONDITIONING
ACOUS. ACOUSTIC
A.C.T. ACOUSTICAL CEILING TILE
A.D. AREA DRAIN
ADJ. ADJUSTABLE
AFF ABOVE FINISH FLOOR
AGG. AGGREGATE
AL. ALUMINUM
ALT. ALTERNATE
APPROX. APPROXIMATE
ARCH. ARCHITECT
ASPH. ASPHALT
BD. BOARD
BITUM. BITUMINOUS
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
BM. BENCH MARK OR BEAM
BOT. BOTTOM
BRG. BEARING
BRK. BRICK
BRZ. BRONZE
BTWN. BETWEEN
B.U.R BUILT-UP ROOFING
CAB. CABINET
CARP. CARPET
C.B. CATCH BASIN
C.B.B. CEMENTITIOUS BACKER BOARD
CEM. CEMENT
CER. CERAMIC
CER.T. CERAMIC TILE
C.F.C.I. CONTRACTOR FURNISH/CONTRACTOR INSTALL
C.F.O.I. CONTRACTOR FURNISH/OWNER INSTALL
C.HK. COAT HOOK
C.I. CAST IRON
CIR. CIRCLE
C.J. CONSTRUCTION JOINT
CLG. CEILING
CLG.J. CEILING JOINT
CLKG. CAULKING
CLO. CLOSET
CLR. CLEAR
CLS. CLOSURE
CMU CONCRETE MASONRY UNIT
CNTR. COUNTER
C.O. CLEAN OUT
COL. COLUMN
COMB. COMBINATION
COMP. COMPOSITION
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONV.O. CONVECTION OVEN
C.O.R. CONTRACTING OFFICER'S REPRESENTATIVE
CTR. CENTER
C.W. COLD WATER
CW. CURTAINWALL
DET. DETAIL
DF. DOUGLAS FIR
D.F. DRINKING FOUNTAIN
DIA. DIAMETER
DIAG. DIAGONAL
DIM. DIMENSION
DISP. DISPOSAL
DIV. DIVISION
DN. DOWN
D.O. DOOR OPENING
DR. DOOR
D.S. DOWN SPOUT
D.T. DRAIN TILE
D.W. DISHWASHER
DWG(S). DRAWING(S)
DWR. DRAWER
(E) EXISTING
EA. EACH
E.C. ELECTRICAL CONTRACTOR
E.E. EACH END
E.F. EXHAUST FAN
E.J. EXPANSION JOINT
ELEC. ELECTRICAL
ELEV. ELEVATION
E.N. EDGE NAIL
ENCL. ENCLOSURE
EQUIV. EQUIVALENT
E.S. EACH SIDE
E.W. EACH WAY
E.W.C. ELECTRICAL WATER CLOSET
EXP. EXPANSION
EXP.B. EXPANSION BOLT
EXPO. EXPOSURE
EXT. EXTERIOR
F. FACE
F.A. FIRE ALARM
F.B. FACE BRICK
F.BD. FIRE BOARD
F.BELL FIRE BELL
F.B.O. FURNISHED BY OTHERS
F.D. FLOOR DRAIN
FDN. FOUNDATION
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
F.G. FINISH GRADE
FGL. FIBERGLASS
F.H. FIRE HYDRANT
FH.M.S. FLAT HEAD MACHINE SCREW
FIN. FINISH
FIXT. FIXTURE
F.J. FLOOR JOIST
F.L. FLOOR LINE
FLASH FLASHING
FLOUR FLUORESCENT
FLR. FLOOR
F.N. FACE NAIL
F.O.B. FACE OF BUILDING
F.O.C. FACE OF CONCRETE
F.O.F. FACE OF FINISH
F.O.M. FACE OF MASONRY
F.O.S. FACE OF STUD
F.R.T.W. FIRE RETARDANT TREATED WOOD
F.S.C. FIRE SUPPRESSION CONTRACTOR
F.S.E.C. FOOD SERVICE EQUIPMENT CONTRACTOR
FTG. FOOTING
FUT. FUTURE
F.V.C. FIRE VAULT CABINET
GA. GAUGE
GALV. GALVANIZED
G.C. GENERAL CONTRACTOR
G.B. GRAB BAR
G.D. GARBAGE DISPOSAL
G.E. GRATE ELEVATION
G.I. GALVANIZED IRON
GL. GLASS
GLB. GLUE LAMINATED BEAM
GND. GROUND
GR. GRADE
G.S.M. GALVANIZED SHEET METAL
GYP.BD. GYPSUM BOARD
H.B. HOSE BIB
HC. HANDICAPPED
HDR. HEADER
HDWD. HARDWOOD
HDWE. HARDWARE
HGT. HEIGHT
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
H.P. HIGH POINT
HR. HOUR
H.S.S. HOLLOW STRUCTURAL STEEL
HTG. HEATING
H.V.A.C. HEATING, VENTILATION & AIR CONDITIONING
H.W. HOT WATER
I.D. INSIDE DIAMETER
INSUL. INSULATION
INT. INTERIOR
INV. INVERT
JAN. JANITOR
J.H. JOIST HANGER
JST. JOIST HANGER
JT. JOINT
KIT. KINTCHEN
LAB LABORATORY
LAM. LAMINATE
LAV. LAVATORY
L.B. LAG BOLT
L.H. LEFT HAND
L.L. LIVE LOAD
L.P. LOW POINT
LT. LIGHT
MAT. MATERIAL
MAX. MAXIMUM
M.B. MACHINE BOLT
M.C. MEDICINE CABINET
MECH. MECHANICAL
MED. MEDIUM
MEMB. MEMBRANE
M.E.P. MECHANICAL, ELECTRICAL, PLUMBING
MFG. MANUFACTURER
MH. MANHOLE
MIN. MINIMUM
MIR. MIRROR
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MOD. MODULAR
MP.H. MOP HOLDER
MR. FRAMED MIRROR
M.R. MOISTURE RESISTANT
M.T. METAL THRESHOLD
MTD. MOUNTED
MTL. METAL
(N) NEW
N. NORTH
NAT. NATURAL
N.I.C. NOT IN CONTRACT
(NOT PART OF OSA APPROVAL)
NO. NUMBER
NOM. NOMINAL
NON/COM NON-COMBUSTIBLE
N.T.S. NOT TO SCALE
O/ OVER
O.A. OVERALL
OBS. OBSCURE
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OVERFLOW
OFF. OFFICE
O.F.S. OUTSIDE FACE OF STUD
O.H.W.S. OVAL HEAD WOOD SCREW
OPP. OPPOSITE
P. PAINT
P.C. PLUMBING CONTRACTOR
P.C.F. POUNDS PER CUBIC FOOT
P.E.N. PANEL EDGE NAILING
PERF. PERFORATED
PL. PLATE
P.LAM PLASTIC LAMINATE
PLAS. PLASTER
P.L.F. POUNDS PER LINEAR FOOT
PLYWD. PLYWOOD
P.M.F. PRESSED METAL FRAME
PR. PAIR
PROP. PROPERTY
P.S.F. POUNDS PER SQUARE FOOT
P.S.I. POUNDS PER SQUARE INCH
P.STA. PULL STATION
PTD. PAINTED
P.T.D. PAPER TOWEL DISPENSER
PT. POINT
P.T.D.F. PRESSURE TREATED DOUGLAS
FIR
PTN. PARTITION
P.T.R. PAPER TOWEL RECEPTACLE
P.V.C. POLYVINYL-CHLORIDE
Q.T. QUARRY TILE
RAD. RADIUS
R.B. RUBBER BASE
R.C.P. REFLECTED CEILING PLAN
R.D. ROOF DRAIN
RDWD. REDWOOD
REF. REFERENCE
REFR. REFRIGERATOR
REINF. REINFORCING
REQD. REQUIRED
RESIL. RESILIENT
R.H. ROOF HATCH
R.HK. ROBE HOOK
R.H.M.S. ROUND HEAD METAL SCREW
R.H.W.S. ROUND HEAD WOOD SCREW
RM. ROOM
R.O. ROUGH OPENING
R.W.L. RAIN WATER LEADER
S. SOUTH
S.A.B. SOUND ATTENUATION BATT
S.A.D. SEE ARCHITECTURAL DRAWINGS
S.A.F.F. SELF ADHERED FLEXIBLE FLASHING
S.A.S.M. SELF ADHERED FLEXIBLE MEMBRANE
S.BLKG. SOLID BLOCKING
SCWD. SOLID CORE WOOD DOOR
S.C.D. SEE CIVIL DRAWINGS
S.D. STORM DRAIN
S.DISP. SOAP DISPENSER
SEAL. SEALANT
SECT. SECTION
S.E.D. SEE ELECTRICAL DRAWINGS
SHR. SHOWER
SHT. SHEET
SHTG. SHEATHING
SIM. SIMILAR
SL. SLIDING
S.L.D. SEE LANDSCAPE DRAWINGS
S.M.D. SEE MECHANICAL DRAWINGS
S.N.D. SANITARY NAPKIN DISPOSAL
S.N.V. SANITARY NAPKIN DISPENSER
S.P. SOUNDPROOF
SPEC. SPECIFICATION
SQ. SQUARE
SQ.FT. SQUARE FOOT (FEET)
S.S. SANITARY SEWER
S.S.D. SEE STRUCTURAL DRAWINGS
STA. STATION
STD. STANDARD
STL. STEEL
S.STL. STAINLESS STEEL
STO. STORAGE
STRUC. STRUCTRUAL
SUSP. SUSPENDED
T.B. TACKBOARD
T&B. TOP AND BOTTOM
TEL. TELEPHONE
TEMP. TEMPERED
TER. TERRAZZO
T&G. TOUNGE AND GROOVE
THK. THICK
T.J. TOOL JOINT
T.N. TOE NAIL
T.O.C. TOP OF CURB
T.O.P TOP OF PAVEMENT
T.O.PL. TOP OF PLATE
T.O.S. TOP OF SEAT
T.O.W. TOP OF WALL
T.P.D. TOILET PAPER DISPENSER
T.S. TUBE STEEL
T.V. TELEVISION
TYP. TYPICAL
UNF. UNFINISHED
U.N.O. UNLESS NOTED OTHERWISE
UR. URINAL
U/S. UNDERSIDE
V.C.T. VINYL COMPOSITION TILE
VERT. VERTICAL
VEST. VESTIBULE
V.G. VERTICAL GRAIN
V.I.F. VERIFY IN FIELD
V.T. VINYL TILE
V.T.R. VENT TO ROOF
V.W.C. VINYL WALL COVERING
(VC) V.A. FURNISHED / CONTRACTOR INSTALLED
(VV) V.A. FURNISHED AND INSTALLED
W. WEST
W/ WITH
W/IN WITHIN
W.C. WATER CLOSET
WD. WOOD
WDW. WINDOW
W.F. WATER COOLER
W.H. WATER HEATER
W/O WITHOUT
W.P. WATER PROOF
W.R. WATER RESISTANT
WT. WEIGHT
W.W.F. WELDED WIRE FABRIC
YD. YARD
P1
A101
SIM
A101
SIM
A101
SIM
A101
SIM
LEVEL NAME W/ ELEVATION
NEW GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER, AREA
& OCCUPANCY
BUILDING SECTION NUMBER W/ SHEET
NUMBER
WALL SECTION NUMBER W/
SHEET NUMBER
DOOR NUMBER
WALL TAG
KEYNOTE
REVISION TAG
FINISH TAG
DETAIL SECTION NUMBER W/
SHEET NUMBER
NORTH ARROW
LEVEL
ELEVATION
150 SF
S Y M B O L S
N
WINDOW TAGA
0 EXISTING GRID HEAD
10'-0" CEILING HEIGHT TAG
ROOM NAME
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
T-691
A u to d e s k D o c s /L o u is v ill e V
A
R e p la c e
O R
A n e s th e s ia
S u p p ly H e a d s /F
F E
L o u is v ill e
R e p la c e
O R
A n e s th e s ia
B rv t
/1 /2
:4
:1
P M
A001
ARCHITECTURAL LEGEND
Owner
11/15/2022 PQ JF/JV
REPLACE OR 1-3 ANESTHESIA
SUPPLY HEADS
603-22-101
LOUISVILLE, KENTUCKY
BID DOCUMENTS
ROBLEY REX
VA MEDICAL
CENTER
N. O
20.0
O.2
18.1
N.1
CLEAN UTILITY
C-413
HAC
C-412
STORAGE
C-414
OR-3
C-404
ANEST WORK RM
C-405
MEN'S RESTROOM
C-411
WOMAN'S RESTROOM
C-410
CYSTOLOGY
C-415
22.7
21.3
P.1N
18.7
PROJECT SCOPE
A. CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH ALL TRADES, FOR ITEMS SHOWN TO BE REMOVED ON THIS PLAN. GENERAL CONTRACTOR SHALL ALSO COORDINATE WITH ALL TRADES, THE REMOVAL, REINTSALLATION, AND/OR REWORKING OF THE EXISTING FINISHES AS REQUIRED FOR THE ROUTING OF
EXISTING/NEW SERVICES INTO THE PROJECT AREA.
B. PRIOR TO THE START OF DEMOLITION, CONTRACTOR SHALL WALK THE SPACE WITH C.O.R. TO IDENTIFY ANY
ITEMS TO BE TURNED OVER TO THE GOVERNMENT.
C. ANY ITEMS DAMAGED BY THE CONTRACTOR OR BY PERSONS UNDER THE SUPERVISION OF THE CONTRACTOR THAT ARE NOT INDICATED TO BE REMOVED OR DEMOLISHED SHALL BE REPAIRED/REPLACED TO LIKE NEW
CONDITION AT THE CONTRACTORS EXPENSE.
D. SEE (ENLARGED) PARTIAL CEILING DEMOLITION PLANS AND MEP DRAWINGS FOR ADDITIONAL INFORMATION.
E. CONTRACTOR SHALL PROVIDE NEGATIVE AIR PRESSURE IN THE AREA BEING MODIFIED TO PREVENT THE SPREAD OF AIRBORNE DUST/PARTICLES TO OTHER OCCUPIED AREAS OF THE MEDICAL CENTER, REFER SPECIFICATION
SECTION 01 35 26, SAFETY REQUIREMENTS.
F. GENERAL CONTRACTOR SHALL PROVIDE CONSTRUCTION AND WARNING SIGNS AS PER THE SPECIFICATIONS.
G. CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATERTIGHT STATE THROUGHOUT CONSTRUCTION.
ANY DAMAGE CAUSED BY THE CONTRACTOR SHALL BE PREPARED TO LIKE NEW CONDITION AND SHALL MATCH
NEW CONSTRUCTION.
H. CONTRACTOR SHALL MAINTAIN A FULLY SEALED ENTRY POINTS TO THE ROOMS AND/OR AREAS BEING RENOVATED. ROOMS MUST BE SEALED TO PREVENT THE TRANSFER OF DUST AND DEBRIS TO ADJACENT
SPACES.
I. GENERAL CONTRACTOR SHALL MAINTAIN WALK-OFF (STICKY) MATS ON BOTH SIDES OF THE ENTRY OF THE ENTRY POINTS TO THE ROOMS AND/OR AREAS BEING RENOVATED. CHANGE MATS REGULARLY AND AS DIRECTED BY THE VA INFECTION CONTROL STAFF TO PREVENT THE TRANSFER OF FOOT TRAFFIC DUST AND
DEBRIS. (REFER TO INFECTION AND DUST CONTROL PLANS.)
J. PROTECT EXISTING FINISH FLOORING DURING CONSTRUCTION/DEMOLITION ACTIVITIES. CAREFULLY LAY 4'x8'x1/2" PLYWOOD OVER THE ENTIRE OPERATING ROOM WELDED RESILENT SHEET FLOORING AND PROTECT
FROM DAMAGE.
GENERAL DEMOLITION PLAN NOTES
Project Number
Building Number
Drawing Number
Proje…
This is the start of the file's text. The full file is on GovTribe.