ATTACHMENT 6- Schedule-of-Values-Sample Template.xlsx

XLSX spreadsheet 78 KB Posted

Attached to
Z2DA--Project 603-22-601 - Post-surgical Patient Safety Improvements - 603-23-3-2311-0003
Solicitation number
36C24923R0031
Issued by

About this file

This document contains a solicitation notice and sample schedule of values template for a construction project. The Department of Veterans Affairs Network Contracting Office 9 Central Region is soliciting proposals for post-surgical patient safety improvements at the Robley Rex VA Medical Center in Louisville, Kentucky. The project budget is between $500,000 and $1,000,000 and is set aside exclusively for service-disabled veteran-owned small businesses. The solicitation is for all labor, materials, tools and equipment to complete demolition, general construction, HVAC, plumbing, building envelope, electrical and finish work. The anticipated completion time from notice to proceed is 180 calendar days. Apparent successful offerors must have a current VETS 4212 report on file with DOL, be registered in SAM, and obtain verification from the VA Center for Veterans Enterprise of their SDVOSB status by submitting documentation of veteran status and ownership. The sample schedule of values template provides a breakdown of anticipated costs by division and work item for payment tracking purposes over the course of the project.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Daily Construction Schedule-1

Schedule of Values
Project Name:Application Number:
Project Number:Application Date:
Contractor:Period to:
Item #Work Item DescriptionItem ValueAmount Previously BilledAmount Billed This PeriodAmount Of Stored Materials (Not In D or E)Percent CompletedTotal Completed And Stored To DateBalance RemainingRentention _%
Division 1General Requirements
01 00 00Bonds & Insurance
01 00 00Superintendent and General Labor
01 32 16.15Project Schedules
01 33 23Shop Drawings, Product Data, Samples
01 35 26Job Site Safety Officer & ICRA Requirments
01 45 00Quality Control Officer
01 74 19Construction Waste Management
Division 2Existing Conditions
02 41 00Demolition
Labor
Materials
Equipment
DIVISION 7THERMAL/MOISTURE PROTECTION
07 84 00Firestopping
Labor
Materials
07 92 00Joint Sealants
Labor
Materials
DIVISION 9FINISHES
09 22 16Non Struct Metal Framing
Labor
Materials
09 29 00Gypsum Board & Framing
Labor
Materials
09 51 00C/R Acoustical Ceilings
Labor
Materials
09 65 16Resilient Sheet Flooring
Labor
Materials
09 91 00High Build Glazed Coatings
Labor
Materials
DIVISION 11Equipment
11 26 10Custom Fabricated Electrical Panels
DIVISION 26ELECTRICAL
26 05 11Requirements (Electrical Installations)
Labor
Materials
26 05 19Low-Voltage Electrical Power Conductors/Cables
Labor
Materials
26 05 26Grounding/Bonding (Electrical Systems)
Labor
Materials
26 05 33Raceways/Boxes (Electrical Systems)
Labor
Materials
26 20 11Isolated Power Systems
Labor
Materials
26 27 26Wiring Devices
Labor
Materials

Totals

: Check if we should add the BigRentz logo -Jessica Santos 000000&P

File details come from the government source that posted it. Updated .