PDF 17 MB Posted
- Solicitation number
- 36C77621B0004
About this file
This federal contract opportunity announcement is for the expansion and renovation of surgical services at the Oklahoma City VA Medical Center. The Department of Veterans Affairs Technology Acquisition Center Austin will solicit bids and award a firm-fixed-price contract for a two-phased construction project. Phase 1 involves building a new surgery locker room on the 8th floor and extending an elevator. Phase 2 will renovate the existing surgical processing and distribution area and expand it into the completed surgery locker room. The project description, agency details, and anticipated solicitation and award timeline are provided.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
A
D
I
E
T
D S T
N U
E T
M
AP
R
E NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R F
S
SPS EXPANSION
PROJECT NUMBER 635-3411
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch o ne fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
GI001
COVER SHEET
JULY 10, 2020 1
JULY 10, 2020
OKLAHOMA CITY
VETERANS AFFAIRS
HEALTH CARE SYSTEM
OKLAHOMA CITY, OKLAHOMA
jgraham Arch Seal - Nebraska - Rich jgraham Arch Seal - Nebraska - Rich
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch o ne fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
GI002
INDEX SHEET
JULY 10, 2020
STRUCTURAL SHEET INDEX
SHEET
NUMBER SHEET NAME
SS-101 6TH & 7TH FLOOR FRAMING PLAN
SS-102 8TH FLOOR FRAMING PLAN
SS-103 PENTHOUSE & MACHINE ROOM FRAMING PLANS
SS-104 ROOF FRAMING PLAN
SS-105 DETAILS
SS-106 DETAILS
SS-107 GENERAL NOTES AND DETAILS
PLUMBING SHEET INDEX
SHEET
NUMBER SHEET NAME
MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES
ELECTRICAL SHEET INDEX
SHEET
NUMBER SHEET NAME
EG101 GENERAL ELECTRICAL NOTES & SYMBOLS LEGEND
ED101 SIXTH FLOOR ELECTRICAL DEMOLITION PLAN
ED102 SEVENTH FLOOR ELECTRICAL DEMOLITION PLAN
EL101 SIXTH FLOOR LIGHTING PLAN
EL102 SEVENTH & EIGHT LIGHTING PLAN
EP100 BASEMENT POWER PLAN
EP101 SIXTH FLOOR POWER PLAN
EP102 SEVENTH & EIGHTH FLOOR POWER PLANS
EY101 SIXTH FLOOR SPECIAL SYSTEMS PLAN
EY102 SEVENTH & EIGHTH FLOOR SPECIAL SYSTEMS PLANS
E-501 ELECTRICAL DETAILS
E-601 POWER RISER DIAGRAMS AND SCHEDULES
E-602 ELECTRICAL SCHEDULES AND DETAILS
FIRE PROTECTION SHEET INDEX
SHEET
NUMBER SHEET NAME
FG101 FIRE SUPPRESSION SYMBOLS, LEGEND, SCHEDULE AND GENERAL
NOTES
FD101 SIXTH FLOOR FIRE PROTECTION DEMOLITION PLAN
FD102 SEVENTH FLOOR FIRE PROTECTION DEMOLITION PLAN
FD103 EIGHTH FLOOR FIRE PROTECTION DEMOLITION PLAN
FX101 SIXTH FLOOR FIRE PROTECTION PLAN
FX102 SEVENTH & EIGHTH FLOOR FIRE PROTECTION PLANS
GENERAL SHEET INDEX
SHEET
NUMBER SHEET NAME
GI001 COVER SHEET
GI002 INDEX SHEET
GI003 GENERAL NOTES
GI004 LIFE SAFETY PLAN-SIXTH FLOOR
GI005 LIFE SAFETY PLAN-SEVENTH & PENTHOUSE FLOOR
GI006 LIFE SAFETY PLAN - EIGHTH FLOOR
ARCHITECTURAL SHEET LIST
SHEET
NUMBER SHEET NAME
AD101 ARCHITECTURAL FLOOR PLAN SIXTH FLOOR DEMOLITION
AD102 ARCHITECTURAL FLOOR PLAN SEVENTH FLOOR DEMOLITION
AD103 ARCHITECTURAL FLOOR PLAN EIGHT FLOOR DEMOLITION
AD104 REFLECTED CEILING PLAN - SIXTH FLOOR DEMOLITION
PD101 SIXTH FLOOR PLUMBING DEMOLITION PLAN
PD102 SEVENTH FLOOR PLUMBING DEMOLITION PLAN
PD103 EIGHTH FLOOR PLUMBING DEMOLITION PLAN
PL101 SIXTH FLOOR PLUMBING PLAN
PL102 SEVENTH FLOOR PLUMBING PLAN
PL103 EIGHTH FLOOR PLUMBING PLAN
P-401 PARTIAL PLUMBING PLANS
P-501 PLUMBING DETAILS & SCHEDULES
P-601 PLUMBING RISER DIAGRAMS
MECHANICAL SHEET INDEX
SHEET
NUMBER SHEET NAME
MD101 SIXTH FLOOR HVAC DEMOLITION PLAN
MD102 SEVENTH FLOOR HVAC DEMOLITION PLAN
MD103 EIGHTH FLOOR HVAC DEMOLITION PLAN
MD104 SIXTH FLOOR PLAN HVAC PIPING DEMOLITION PLAN
MH101 SIXTH FLOOR HVAC PLAN
MH102 SEVENTH FLOOR HVAC PLAN
MH103 EIGHTH FLOOR HVAC PLAN
MH104 ROOF MECHANICAL PLAN
MP101 SIXTH FLOOR HVAC PIPING PLAN
MP102 EIGHTH FLOOR HVAC PIPING PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL CONTROL DIAGRAMS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
AS101 ARCHITECTURAL FLOOR PLAN - SIXTH FLOOR
AS102 ARCHITECTURAL FLOOR PLAN - SEVENTH FLOOR
AS103 ARCHITECTURAL FLOOR PLAN - EIGHTH FLOOR
AS104 PENTHOUSE AND MACHINE ROOM PLAN
AS105 ROOF PLAN
AS106 FINISHED FLOORING PLAN - SIXTH FLOOR
AS107 FINISHED FLOORING PLAN - EIGHTH FLOOR
AS108 SIXTH FLOOR SPS-AREA A
AS109 SIXTH FLOOR SPS - AREA B
AS110 EIGHTH FLOOR - AREA A & B
AS201 EXTERIOR ELEVATIONS
AS202 EXTERIOR ELEVATIONS
AS301 BUILDING SECTIONS
AS302 ELEVATOR SECTION
AS303 STAIR 7 SECTIONS
AS304 STAIR 14 SECTIONS
AS401 WALL SECTIONS
AS402 WALL SECTIONS
AS403 WALL SECTIONS
AS404 WALL SECTIONS
AS405 WALL SECTIONS
AS500 WALL TYPES
AS501 WALL AND PLAN DETAILS
AS502 WALL DETAILS
AS503 WALL DETAILS
AS601 ROOM FINISH SCHEDULE
AS701 DOOR SCHEDULE
AS702 DOOR AND WINDOW TYPES
AS703 DOOR DETAILS
AS704 WINDOW DETAILS
AS800 FIFTH FLOOR REFLECTED CEILING PLAN
AS801 SIXTH FLOOR - REFLECTED CEILING PLAN
AS802 SEVENTH FLOOR- REFLECTED CEILING PLAN
AS803 EIGHTH FLOOR-REFLECTED CEILING PLAN
AS901 INTERIOR ELEVATIONS
AS902 INTERIOR ELEVATIONS
AS903 INTERIOR ELEVATIONS
AS904 INTERIOR ELEVATIONS
AS905 INTERIOR ELEVATIONS
AS906 CASEWORK & MISC. DETAILS
INDEX OF SHEETS
PROJECT NO. : 635-3411
PROJECT NAME: SPS EXPANSION
OKLAHOMA VA MEDICAL CENTER
921 NE. 13TH STREET - OKLAHOMA CITY, OK
jgraham Arch Seal - Nebraska - Rich
| Sheets |
| GI001 - COVER SHEET |
| GI002 - INDEX SHEET |
| GI003 - GENERAL NOTES |
| GI004 - LIFE SAFETY PLAN-SIXTH FLOOR |
| GI005 - LIFE SAFETY PLAN-SEVENTH & PENTHOUSE FLOOR |
| GI006 - LIFE SAFETY PLAN - EIGHTH FLOOR |
| AD101 - ARCHITECTURAL FLOOR PLAN SIXTH FLOOR DEMOLITION |
| AD102 - ARCHITECTURAL FLOOR PLAN SEVENTH FLOOR DEMOLITION |
| AD103 - ARCHITECTURAL FLOOR PLAN EIGHT FLOOR DEMOLITION |
| AD104 - REFLECTED CEILING PLAN - SIXTH FLOOR DEMOLITION |
| AS101 - ARCHITECTURAL FLOOR PLAN - SIXTH FLOOR |
| AS102 - ARCHITECTURAL FLOOR PLAN - SEVENTH FLOOR |
| AS103 - ARCHITECTURAL FLOOR PLAN - EIGHTH FLOOR |
| AS104 - PENTHOUSE AND MACHINE ROOM PLAN |
| AS105 - ROOF PLAN |
| AS106 - FINISHED FLOORING PLAN - SIXTH FLOOR |
| AS107 - FINISHED FLOORING PLAN - EIGHTH FLOOR |
| AS108 - SIXTH FLOOR SPS-AREA A |
| AS109 - SIXTH FLOOR SPS - AREA B |
| AS110 - EIGHTH FLOOR - AREA A & B |
| AS201 - EXTERIOR ELEVATIONS |
| AS202 - EXTERIOR ELEVATIONS |
| AS301 - BUILDING SECTIONS |
| AS302 - ELEVATOR SECTION |
| AS303 - STAIR 7 SECTIONS |
| AS304 - STAIR 14 SECTIONS |
| AS401 - WALL SECTIONS |
| AS402 - WALL SECTIONS |
| AS403 - WALL SECTIONS |
| AS404 - WALL SECTIONS |
| AS405 - WALL SECTIONS |
| AS500 - WALL TYPES |
| AS501 - WALL AND PLAN DETAILS |
| AS502 - WALL DETAILS |
| AS503 - WALL DETAILS |
| AS601 - ROOM FINISH SCHEDULE |
| AS701 - DOOR SCHEDULE |
| AS702 - DOOR AND WINDOW TYPES |
| AS703 - DOOR DETAILS |
| AS704 - WINDOW DETAILS |
| AS800 - FIFTH FLOOR REFLECTED CEILING PLAN |
| AS801 - SIXTH FLOOR - REFLECTED CEILING PLAN |
| AS802 - SEVENTH FLOOR- REFLECTED CEILING PLAN |
| AS803 - EIGHTH FLOOR-REFLECTED CEILING PLAN |
| AS901 - INTERIOR ELEVATIONS |
| AS902 - INTERIOR ELEVATIONS |
| AS903 - INTERIOR ELEVATIONS |
| AS904 - INTERIOR ELEVATIONS |
| AS905 - INTERIOR ELEVATIONS |
| AS906 - CASEWORK & MISC. DETAILS |
| 13107-FINAL STAMPED |
| 132118_Final FPME CD - REISSUED |
| 132118_Final Fire CD |
| 132118_FD101 FD101 (1) |
| 132118_FD102 FD102 (1) |
| 132118_FD103 FD103 (1) |
| 132118_FX101 FX101 (1) |
| fx102 |
| 132118_Final HVAC CD |
| 132118_MD101 MD101 (1) |
| 132118_MD102 MD102 (1) |
| 132118_MD103 MD103 (1) |
| 132118_MD104 MD104 (1) |
| 132118_MH101 MH101 (1) |
| 132118_MH102 MH102 (1) |
| 132118_MH103 MH103 (1) |
| 132118_MH104 MH104 (1) |
| 132118_MP101 MP101 (1) |
| 132118_MP102 MP102 (1) |
| 132118_M-501 M-501 (1) |
| 132118_M-501 M-502 (1) |
| 132118_M-501 M-503 (1) |
| 132118_M-601 M-601 (1) |
| 132118_M-602 M-602 (1) |
| 132118_Final Plumbing CD |
| 132118_PD102 PD102 (1) |
| 132118_PD103 PD103 (1) |
| 132118_PL101 PL101 (1) |
| 132118_PL102 PL102 (1) |
| 132118_PL103 PL103 (1) |
| 132118_P-401 P-401 (1) |
| 132118_P-501 P-501 (1) |
| 132118_P-601 P-601 (1) |
| 132118_ED101 ED101 (1) |
| 132118_ED102 ED102 (1) |
| 132118_EL101 EL101 (1) |
| 132118_EL101 EL101 (1) |
| 132118_EL102 EL102 (1) |
| 132118_EP100 EP100 (1) |
| 132118_EP101 EP101 (1) |
| 132118_EP102 EP102 (1) |
| 132118_EY101 EY101 (1) |
| 132118_EY102 EY102 (1) |
| 132118_E-501 E-501 (1) |
| 132118_E-601 E-601 (1) |
| 132118_E-602 E-602 (1) |
File details come from the government source that posted it. Updated .