2013-28 VA Oklahoma City SPS - Addendum 1 Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- 36C77621B0004
About this file
This document describes a federal government solicitation for the Design-Bid-Build Expand SPD (Minor) Construction project at the Oklahoma City VA Medical Center.
The project involves a two-phase construction process. Phase 1 will construct a Surgery Locker on the eighth floor and extend elevator 11 to the eighth floor. After Phase 1 is complete and the VA takes beneficial occupancy, Phase 2 will renovate the SPS and expand into the existing Surgery Locker Room. The solicitation seeks bids for the design and construction services required to complete both phases. The Department of Veterans Affairs Technology Acquisition Center Austin will solicit bids and award a single firm-fixed-price contract for the work. The solicitation number is 36C77621B0004 and the opportunity type is listed as a solicitation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Calculations (20 female FTE and 30 male FTE per shift):
1 30 male lockers & 20 female lockers (minimum requested by VA)
2 1 shift = 50 FTEs (full time employees)
3 Per shift: 30 male FTEs & 20 female FTEs
Fixture Required Provided Reference
Water Closet- Female 1 for first 13, then 1 per 5 3 3 VASPC 286.5.G.3
Water Closet- Male 1 for first 13, then 1 per 5 4 (no urinals), 3 (1 urinals) 2
Urinal- Male 50% of WCs after 2 WCs up to 2 1 VASPC 410.5.C,t1/ IPC 419.2
Sink- Female 1 per 15 2 2 VASPC 410.5.C,table1
Sink- Male 1 per 20 2 2 VASPC 410.5.C,table1
Shower- Female 1 per 40 1 1 VASPC 410.5.C,table1
Shower- Male 1 per 40 1 1 VASPC 410.5.C,table1
Calculations (45 female FTE and 45 male FTE per shift):
1 90 male lockers & 98 female lockers
2 2 shifts = 180 FTEs (full time employees)
3 Per shift: 45 male FTEs & 45 female FTEs
Fixture Required Provided Reference
Water Closet- Female 1 for first 15, then 1 per 5 7 7 VASPC 286.5.G.3
Water Closet- Male 1 for first 15, then 1 per 5 7 (no urinals), 5 (2 urinals) 5 VASPC 286.5.G.3
Urinal- Male 50% of WCs after 2 WCs up to 2 2 VASPC 410.5.C,t1/ IPC 419.2
Sink- Female 1 per 15 3 4 VASPC 410.5.C,table1
Sink- Male 1 per 20 3 3 VASPC 410.5.C,table1
Shower- Female 1 per 40 2 2 VASPC 410.5.C,table1
Shower- Male 1 per 40 2 2 VASPC 410.5.C,table1
MATERIAL SYMBOLS
EARTH
CAST-IN-PLACE CONCRETE
CONCRETE MASONRY
STEEL
CONTINUOUS WOOD FRAMING
WOOD BLOCKING
FIBROUS INSULATION
GYPSUM BOARD
BRICK MASONRY
RIGID INSULATION
ROOF INSULATION
M D
C
F
B
A
E
BUILDING LOCATION MAP
INDICATES BUILDING F IN HOSPITAL
COMPLEX WHERE PROJECT OCCURS
6TH FLOOR - SPS LOCKER PLUMBING FIXTURE COUNTS
8TH FLOOR - LOCKER PLUMBING FIXTURE COUNTS
1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS.
CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE THE GOVT..
2. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.
3. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED
BY THE THE GOVT.. CONTRACTOR MUST CONTACT VA'S COR PRIOR TO ANY SHUTDOWNS.
4. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH MINIMUM INTERRUPTION. SCHEDULE ALL ELECTRICAL/MECHANICAL OUTAGES 14 DAYS IN ADVANCE WITH
THE THE GOVT..
5. PROTECT ALL WORK, MATERIALS AND EQUIPMENT DESIGNATED TO REMAIN. CAP OR PLUG TEMPORARY OPENINGS. DELIVER ALL
WORK TO THE THE GOVT. IN CLEAN AND IN GOOD CONDITION.
6. WHEN DEMOLITION IS COMPLETE, NOTIFY ARCHITECT AND THE GOVT. FOR A SCHEDULED MEETING TO REVIEW EXISTING CONDITIONS
AND ANY CONCERNS REGARDING NEW WORK.
7. CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED BY NEW WORK SHALL BE INCLUDED AS WORK
PROVIDED UNDER THIS CONTRACT.
8. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING EQUIPMENT, CONNECTIONS, CONTROLS, ETC.
9. DAMAGE CAUSED BY SUCH CUTTING SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY CONTRACTOR AT NO COST TO THE THE GOVT., UNLESS UNFORESEEN EXISTING CONDITIONS ARE DISCOVERED AND THE GOVT./ARCHITECT ARE NOTIFIED.
10. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS SHALL BE KEPT CLEAR OF DEBRIS.
11. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.
12. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED, UNLESS OTHERWISE NOTED.
13. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.
14. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND
SATISFACTORY INSTALLATION.
15. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND WALLS SHALL BE PATCHED WITH LIKE MATERIALS TO MATCH THE SURROUNDING AREAS, AND FILLED AS CLOSE AS POSSIBLE TO THE NEW PIPING OR DUCTWORK.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AND REPLACING ANY DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK UNDER THIS CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION OR BETTER WITH NEW MATERIALS TO MATCH
17. INSTALL THE SPECIFIED FIRE STOPPING(SLEEVES,WRAP,CONDUIT,ETC.)AT RATED CONSTRUCTION(NEW OR EXISTING) OR SMOKE PARTITIONS:
A.
C.
E.
18. ALL METAL STUD AND GYPSUM WALLBOARD PARTITIONS ARE DIMENSIONED TO THE OUTSIDE FINISH FACE OF WALL AND TO THE COLUMN
GRID UNLESS OTHERWISE NOTED.
19. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD AND SHALL BE MOLD AND MOISTURE RESISTANT.
20. PROVIDE WOOD BLOCKING OR 16 GA. SHEET METAL BACKING PLATES IN ALL WALLS TO RECEIVE WALL HUNG ACCESSORIES, SUCH AS EQUIPMENT, GRAB BARS, MILLWORK, COAT HOOKS, AND DOOR STOPS, ETC. IF WOOD BLOCKING IS USED, PROVIDE
AS FIRE-RESISTANT.
21. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES, CONVENIENCE OUTLETS, DOOR STOPS, AND OTHER FINISH HARDWARE, ETC. SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF EXISTING WALLS INDICATED TO REMAIN.
22. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED, AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE THE GOVT..
COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:
A. THE THE GOVT.'S EQUIPMENT REQUIREMENTS.
B. THE CEILING SUPPORT SYSTEM.
C. THE MECHANICAL DUCTWORK SYSTEM.
D. THE LIGHTING FIXTURES.
E. ELECTRICAL WIRING AND CONDUIT SYSTEMS.
F. THE PLUMBING AND PIPING SYSTEMS.
G. FIRE PROTECTION SYSTEMS
23. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.
24. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.
25. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN QUESTION CONTRACTOR SHALL NOTIFY THE GOVT.
AND ARCHITECT IMMEDIATELY.
26. ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.
27. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING INTERSECT, THE HIGHEST RATED PARTITION TAKES PRECEDENT. MAINTAIN
RATING BEHIND RECESSED AREAS IN WALLS.
28. ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT, WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND AT LEAST THE CORRIDOR SIDE OF NON-RATED CORRIDOR WALLS TO STRUCTURE, UNLESS NOTED OTHERWISE, SEE WALL TYPES.
29. COORDINATE CONSTRUCTION REQUIREMENTS WITH STRUCTURAL, MECHANICAL, FIRE PROTECTION, PLUMBING AND ELECTRICAL DRAWINGS.
CODES / REGULATIONS LATEST EDITION;
1. VETERANS AFFAIRS DESIGN AND CONSTRUCTION PROCEDURES
2. VETERANS AFFAIRS MASTER CONSTRUCTION SPECIFICATION
3. VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE
4. VETERANS AFFAIRS ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
5. OSHA STANDARDS
6. INTERNATIONAL BUILDING CODE 2018
7. VA SEISMIC REQUIREMENTS
8. NATIONAL ELECTRICAL CODE
9. NFPA CODES WITH THE EXCEPTION OF NFPA 5000
10. NATIONAL STANDARD PLUMBING CODE
11. UNIFORM FEDERAL ACCESSIBILITY STANDARDS
12. FEDERAL REGULATIONS PARTS 434 AND 435
13. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS AS STATED IN THE GENERAL
REQUIREMENTS SECTION 01 00 00 OF THE VA MASTER SPECIFICATIONS
BUILDING CLASSIFICATION:
THE FOLLOWING INFORMATION IS BASED ON INFORMATION OBTAINED FROM THE ORIGINAL
BUILDING DESIGN. THE SCOPE OF WORK BEING PERFORMED UNDER THIS CONTRACT HAS
BEEN NOTED ACCORDINGLY WITHIN THE DOCUMENTS.
1. OCCUPANCY: I-2 HOSPITAL NFPA 18-1.1.1.3 & IBC 308.4
2. OCCUPANCY: B BUSINESS-6TH SPS & 8TH FLOOR ADD-BUILDING F IBC 304.1
3. THE DESIGN IS BASED ON NON SEPARATED MIXED USE BUSINESS AND HEALTH CARE OCCUPANCY LSC 6.1.14.2.2
4. THE OTHER OCCUPANCY CLASSIFICATIONS NOTED ON THE LIFE SAFETY DRAWINGS ARE
FOR INFORMATION ONLY AS BASED ON THE ORIGINAL BUILDING DESIGN.
5. ORIGINAL SEVEN STORY CONSTRUCTION NFPA 18.1.6.1
6. TYPE OF CONSTRUCTION: 1A NON-COMBUSTIBLE IBC
7. ALLOWABLE HEIGHT: UNLIMITED STORY IBC TABLE 503
8. ALLOWABLE AREA: UNLIMITED IBC TABLE 503
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
1. STRUCTURAL FRAME: STEEL / 3-HR / IBC TABLE 601(REDUCED TO 2-HR AT ROOF ONLY SUPPORT)
2. BEARING WALLS EXTERIOR: MASONRY / 3-HR / IBC TABLE 601
3. BEARING WALLS INTERIOR: MASONRY / 3-HR / IBC TABLE 601
4. NON-BEARING WALLS EXTERIOR: MASONRY / 0-HR GREATER THAN 30' SEPARATION,
1-HR LESS THAN 30' SEPARATION
5. NON-BEARING WALLS INTERIOR: 0 HR
6. FLOOR CONSTRUCTION: CONCRETE / 2-HR / IBC TABLE 601
7. ROOF CONSTRUCTION: STEEL / 1 1/2-HR / IBC TABLE 601
8. CORRIDORS: SMOKE PARTITIONS / NFPA 18.3.6.2 & IBC 407.3
9. SMOKE BARRIERS: 1-HR / NFPA 18.3.7.1 & IBC 407.4, 709
10. SHAFT ENCLOSURE: 2-HR / NFPA 18.3.1 & IBC 707.4, 1005.3.2
OCCUPANT LOAD FACTORS:
THE FOLLOWING INFORMATION IS BASED ON NFPA TABLE 7.3.1.2 & IBC 1003.2.2.2
1.
2.
3. STORAGE: 300 SF / OCC GROSS
MECHANICAL EQUIPMENT: 300 SF / OCC GROSS
BUSINESS AREAS: 100 SF / OCC GROSS
SMOKE COMPARTMENTS:EXISTING
BASED ON NFPA 18.3.7
GENERAL ARCHITECTURAL NOTES: APPLICABLE CODES & DESIGN STANDARDS:
11. EXIT ACCESS STAIRWAYS OF 3-STORIES & GREATER AND PASSAGEWAYS
SHALL BE A TWO HOUR RATED FIRE BARRIER. EXIT ACCESS STAIRWAYS OF
LESS THAN 3-STORIES SHALL BE A ONE HOUR RATED FIRE BARRIER.D.
B.
REPLACE FIRE STOP AT ALL PENETRATIONS WHERE NEW DEVICES/LINES USE EXISTING PENETRATIONS OF RATED
BARRIERS.
FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE NEW DEVICES/LINES PENETRATE EXISTING
FLOORS, CEILINGS AND OTHER RATED BARRIERS.
USE ONLY APPROVED FIRE CAULKING AND FIRE STOPS (SEE SPECIFICATIONS).
FIRE STOP ALL NEW PENETRATIONS WHERE NEW DEVICES/LINES PENETRATE THROUGH NEWLY CONSTRUCTED
RATED BARRIERS OR SMOKE PARTITIONS.
REPLACE FIRE STOP AT ALL EXISTING PENETRATIONS OF RATED BARRIERS WHERE EXISTING LINES HAVE BEEN
MODIFIED OR RELOCATED.
14. GUIDELINES FOR DESIGN & CONSTRUCTION OF HEALTHCARE FACILITIES 2010
H. THE COMMUNICATIONS AND SPECIAL SYSTEMS.
30. AFTER DEMOLITION AND NEW CONSTRUCTION, REPAIR ALL FINISHED SURFACES ON EXISTING ITEMS TO REMAIN AFFECTED BY
WORK TO LIKE NEW CONDITION.
31. ALL FINISHED SURFACES ON NEW WALLS ETC. INFILLING OR EXTENDING EXISTING ITEMS SHALL BE INSTALLED SO NEW FINISHED
SURFACES ALIGN WITH EXISTING.
32. FURNITURE SHOWN IS N.I.C. UNLESS NOTED OTHERWISE. UNLESS NOTED OTHERWISE EQUIPMENT SHALL BE PROVIDED BY THE THE
GOVT. AND INSTALLED BY THE CONTRACTOR AS SCHEDULED. DISCONNECTION,RELOCATION, AND RECONNECTION OF EXISTING
EQUIPMENT IS THE RESPONSIBILITY OF THE CONTRACTOR.
DURING THE CONSTRUCTION OF THE OR EXPANSION IN 1991 THE CONTRACTOR ENCASED ELECTRICAL
CONDUITS IN THE CONCRETE OF THE EXISTING ROOF(TO BE EIGHTH FLOOR SLAB OF THIS PROJECT) . THE
VA HAS NO RECORD OF CONDUIT LOCATION. CONTRACTOR SHALL VERIFY LOCATION OF ANY EXISTING
CONDUITS IN EXISTING ROOF PRIOR TO START OF DRILLING OR CUTTING ANY HOLES IN THE CONCRETE.
POWER INTERRUPTION SHALL BE AVOIDED.
33.
ARCHITECTURAL SYMBOLS
C110A
6F-110
7'-2"
COLUMN GRID DESIGNATION
DETAIL NUMBER
WALL TYPE
DIMENSION LINE
CENTER LINE
WINDOW TYPE
(I-INTERIOR ; E-EXTERIOR)
ROOM NAME
SHEET DETAIL IS DRAWN ON
ARCHITECTURAL ELEVATION - EXTERIOR
ARCHITECTURAL ELEVATION - INTERIOR
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING TO REMAIN
NEW CONSTRUCTION (POCHE
OR SOLID BLACK)
ROOM NUMBER SYMBOL
ROOM NUMBER
DOOR NUMBER SYMBOL
ARCHITECTURAL SECTION
OFFICE
AS303
A
EA
AS3031
AS303
AS303
STERILE PROCESSING EQUIPMENT TAG SP09
1. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR
SHALL STOP WORK AND NOTIFY THE THE GOVT. IMMEDIATELY FOR DIRECTION
1. MAINTAIN FIRE RATED CONSTRUCTION AT WALLPENETRATIONS, (CONSTRUCTION TO CONFORM TO
MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.
2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS / PARTITIONS AND FLOORS. CONFORM WITH THE TESTED / SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND LABEL WALL
WITH U.L. DESIGN NUMBER. FIRE RATED WALLS SHOWN ON PLAN.
3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND THATWHICH IS DISTURBED DURING CONSTRUCTION.
4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING ATEXISTING RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBEDDURING CONSTRUCTION. RE-LABEL EXISTING WALL IF NECESSARY.
HAZARDOUS MATERIAL
FIRE PROOFING GENERAL NOTES
ABBREVIATIONS
DET, DTL
DIAMETER
DIMENSION
DAMPER
DOWN
DISTRIBUTION PANEL
DOWNSPOUT, STORM DRAINAGE STRUCTURE
DOMESTIC WATER
DRAWING
EACH
EACH FACE, EXHAUST FAN
EXHAUST GRILLE
ELEVATION
ELECTRIC, ELECTRICAL CLOSET
EMER
EQ
EQUIP
EACH WAY
ELECTRIC WATER COOLER
EXH
EXIST
EXP
EXPANSION JOINT
EXPANSION JOINT
HEIGHT, HUMIDIFIER
HB
HANDICAPPED
HDW
HORIZ
HR
NA
NEC
NEUT
NIC
NOM
NTS
OA
OC
OD
OPNG
OPP
OH, OVHD
FRAME
FTG
T
T&B
TEL
TEMP
TERM
3/C
3/P
3 WAY
TO
TRANS
TS
TV
TW
TYP
WA
UH
V
VA
VAC
VCT
VENT
VERT
VEST
VS
VTR
VWC
W
W
W/
W/O
WC
WD
WP
WS
WT
WWF
SG
SAN
SCH
SD
SECT
SH
1 PH
SL
SP
SPDT
SPEC
SPST
SQ
SR
SS
ST
STA
STD
STL
SUP
SUSP
SV
SW
SWBD
SWGR
SIM
M
MAS
MATL
MAX
MECH
MET/MTL
MH
MIN
MISC
MM
MTD
MTG
MWP
MULL
KO
KVA
KW
L
LT
LAV
INT
INSUL
INV
JB
JC
JCT
JT
FXTR
GA
GALV
GFI
GL
GWB
GYP
C
C
CAPACITY
CENTER TO CENTER
CEILING DIFFUSER
CEM
CAST IRON, COURTYARD INLET
CHILLER
CAST IRON PIPE
CIRCULATING
CONTROL JOINT
CIRCUIT
CENTERLINE
CEILING
CLEAR
CORRUGATED METAL PIPE
CORRUGATED METAL PIPE ARCH
CONCRETE MASONRY UNITS
CONDENSATE
CLEANOUT
COLUMN
COMMUNICATION
CONCRETE
CONDUCTOR
CONNECTION
CONSTRUCTION
CONTINUOUS
CONVERTER
NONREINFORCED CONCRETE PIPE
CONDUIT
CERAMIC TILE, CURRENT TRANSFORMER,
COOLING TOWER
CENTER, COOLING TOWER RETURN
COOLING TOWER SUPPLY
COLD WATER
CARPET
CONCRETE SEALER/SURFACE
BOARD
BUILDING
BLK
BEAM
BOTTOM
BEARING
BASEMENT
ACOUSTIC
ADJUSTABLE
ABOVE FINISHED FLOOR
ALTERNATE
AIR HANDLING UNIT
ANCHOR BOLT, AUGER BORING
AL
APPROXIMATE
ARCH
AUTOMATIC TRANSFER SWITCH
FA
FLOOR DRAIN, FIRE DAMPER
FOUNDATION
FEEDER
FIRE EXTINGUISHER
FINISHED FLOOR ELEVATION
FIG
FIN
FLOOR, FLASHING, FLOW LINE
FLUOR
P
PB
PIV
PL
PLYWD
PNL
PNT
CHAIR OR CRASH RAIL
CORNER GUARD
FIRE EXTINGUISHER CABINET
OF
WG
ALC
CUBICAL CURTAIN TRACK
CLEAN
ACOUSTIC TILE
L
EPDM ROOF MEMBRANE
HSKP
NEG
STRUC
R
RA
RAD
RVB
RCP
RECP
REINF
REG
REQD
REV
RF
RHC
RM
RPM
RVT
PRELIM
PRIM
PT
PTN
PVMT
PVC
PVC
AB
ACT
ACST
ADJ
AFF
AHU
ALT
ALUMINUM
ALCOVE
APPROX
ARCHITECTURAL
ATS
BD
BLDG
BLOCK
BM
BOT
BRG
BSMT
CELSIUS
CAP
CC
CD
CCT
CEMENT
CG
CH
CI
CIP
CIR
CJ
CKT
CLN
CLG
CLR
CMP
CMPA
CMU
CND,C
CNDS
CO
COL
COMM
CONC
COND
CONN
CONST
CONT
CONV
CP
CR
CS
CT
CT
CTR
CTS
CW
CPT
DETAIL
DIA
DIM
DMPR
DN
DP
DS
DW
DWG
EA
EF
EG
EJ
ELEV
ELEC
EMERGENCY
EPDM
EQUAL
EQUIPMENT
EW
EWC
EXHAUST
EXISTING
EXPANSION, EXPOSED
EXP JT
FIRE ALARM
FD
FDN
FDR
FE
FEC
FFE
FIGURE
FINISH
FL
FLUORESCENT
FRAME
FOOTING
FIXTURE
GAGE
GALVANIZED
GROUND FAULT INTERRUPT
GLASS
GYPSUM WALL BOARD
GYPSUM
HGT, H
HOSE BIBB
HC
HARDWARE
HORIZONTAL
HOUR, HAND RAIL
HOUSEKEEPING
INTERIOR
INSULATION, INSULATED
INVERT
JUNCTION BOX
JANITOR CLOSET
JUNCTION
JOINT
KNOCK OUT
KILOVOLT-AMPERE
KILOWATT
LOUVER, LENGTH, LENGTH OF CURVE
LIGHT
LAVATORY VERTICAL
METER, MEGA
MASONRY
MATERIAL
MAXIMUM
MECHANICAL
METAL
MANHOLE
MINIMUM, MINUTE
MISCELLANEOUS
MILLIMETER
MOUNTED
MOUNTING
MEMBRANE WATERPROOFING
MULLION
NOT APPLICABLE
NATIONAL ELECTRIC CODE
NEGATIVE
NEUTRAL
NOT IN CONTRACT
NOMINAL
NOT TO SCALE
OUTSIDE AIR
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN
OPENING
OPPOSITE
PIPE, POLE
OVERHEAD
PULL BOX
POST INDICATOR VALVE
PLATE
PLYWOOD
PANEL
PAINT
PRELIMINARY
PRIMARY
POINT, POINT OF TANGENT
PARTITION
POINT OF VERTICAL CURVE
POLY VINYL CHLORIDE
PAVEMENT
RADIUS, RISER, RUBBER SHEATH
RETURN AIR
RADIUS
RESILIENT VINYL BASE
REINFORCED CONCRETE PIPE
RCP REFLECTED CEILING PLAN
RECEPTACLE
REINFORCEMENT
REGULATOR, REGISTER
REQUIRED
REVISION
ROOF, RETURN FAN
REHEAT COIL
ROOM
REVOLUTIONS PER MINUTE
RESILIENT VINYL TILE
SANITARY SEWER
SCHEDULE
SPLITTER DAMPER, STORM DRAIN
SECTION
SUPPLY GRILLE
SHEET
SIMILAR
SINGLE PHASE
SLOPE
STATIC PRESSURE, SINGLE POLE
SINGLE POLE, DOUBLE THROW
SPECIFICATION
SINGLE POLE, SINGLE THROW
SQUARE
SUPPLY REGISTER
SANITARY SEWER
STEAM, SINGLE THROW, STREET, STAFF
STATION
STANDARD
STEEL
STRUCTURAL
SUPPORT
SUSPENDED
SHEET VINYL
SWITCH, SIDEWALK
SWITCHBOARD
SWITCHGEAR
TILE,TOP,TANGENT
TOP AND BOTTOM
TELEPHONE
TEMPERATURE, TEMPORARY
TERMINAL
THREE CONDUCTOR
THREE POLE
THREE WAY
TOP OF
TRANSITION
TOP OF STEEL, TOP OF STONE, TOP OF SLAB
TELEVISION
TOP OF WALL
TYPICAL
UNIT HEATER
VENT,VOLT,VALVE
VOLT AMPRE
VACUUM
VINYL COMPOSITION TILE
VENTILATING
VERTICAL
VESTIBULE
VENT STACK
VENT THRU ROOF
VINYL WALL COVERING
WIDTH,WASTE,WATER,WATT,WEST, WIRE,
WATER LINE STRUCTURE
WATT
WITH
WITHOUT
WATER CLOSET, WHEEL CHAIR
WIDTH, WINDOW DIMENSION
WALL GUARD
WATERPROOF, WEATHERPROOF
WASTE STACK, WATER SURFACE, WATERSTOP
WEIGHT
WELDED WIRE FABRIC
RES RESINOUS
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch on e fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
5/4/2021ADDENDUM NO. 1
GI003
GENERAL NOTES
JULY 10, 2020 3
DN
DN
UP DN
UP
UP
UP DN
DN
1 2 3 4 5 6 7 8 9 10 11 1211A
B
C
D
E
F
G
H
I
A
J
K
9A8A
G2
G1
B1
C1
A1
182 SF
STAIR
158 SF
C7 4F
CORRIDOR
76 SF
7F107H
GAS STOR
28 SF
7F-107B
HAC
132 SF
7F110A
CONTROL RM
93 SF
7F108X
ANGIO EQUIP
72 SF
7F125
ANTHES GAS
STOR
758 SF
7F124
NEUROSURGERY
O.R.9
976 SF
7F113
CLEAR CORE
EXPANSION
106 SF
7F127
HSKP'G
145 SF
7F129
STORAGE
132 SF
7F130
X-RAY
STORAGE
57 SF
7F131
HAC
61 SF
7F133
ELECTRICAL
185 SF
STAIR
173 SF
7F-137
HEAD NURSE
120 SF
7F-138
STORAGE
148 SF
7F-139
CONTROL
PLASTER &
SPLINT
579 SF
7F-134
ORTHOPEDIC
OR 5
85 SF
7F-137
SCRUB
100 SF
7F-114C
SUB STERILE
111 SF
7F-126
BLOOD GAS
547 SF
7F-128
CARDIAC OR
115 SF
7F-113F
SUB-STER
1074 SF
7F-110
HYBRID O.R.
71 SF
7F-107A
SCRUB
178 SF
7F-113D
SUB-STER.
38 SF
7F-100
TELEPHONE
344 SF
C7-2F
ELEVATOR
LOBBY
93 SF
P-8
ELEVATOR
94 SF
P-7
ELEVATOR
93 SF
P-9
ELEVATOR
94 SF
P-10
ELEVATOR
142 SF
7F150A
OFFICE
122 SF
7F150
SECT'Y/WAITING
133 SF
7F148
MASS
SPECROMETER
445 SF
7F150B
ANESTH.
CLEAN-UP
AND STORAGE
599 SF
7F140
GENERAL OR
112 SF
7F113B
SUBSTERILE
69 SF
7F123
STORAGE
479 SF
7F122
GENERAL OR
58 SF
7F121
STORAGE
115 SF
7F120
SCRUB
57 SF
7F119
STORAGE
121 SF
7F116
ELEC.CLOSET
502 SF
7F118
GENERAL OR
95 SF
7F113A
SUB STERILE
70 SF
7F114
HAC
115 SF
7F116A
ELEC. CLOS
100 SF
7F141
SCRUB
63 SF
7F142A
CONTROL
128 SF
7F113E
SUB STERILE
67 SF
7F143
X-RAY DIGITAL
ROOM
492 SF
7F142
GENERAL OR 7
195 SF
7F144
STORAGE
132 SF
7F113G
SUB-STERILE
88 SF
7F145
SCRUB
451 SF
7F151
AMBULATORY
OR 8
170 SF
7F152
ALCOVE
108 SF
P-11
ELEVATOR
158 SF
STAIR
8'-9"
29'-3"
102 SF
7F107I
STORAGE
183 SF
7F113H
EQUIP STOR.
131 SF
7F109A
PUMP RM
117 SF
7F112
IT CLO
905 SF
7F109
CARDIAC OR 3
147 SF
P-12
ELEVATOR
8'-0"
130 SF
7F155
OR CTR
49 SF
7F108D
SOIL
8'-0"
103 SF
7F108A
CLEAN
8'-0"
80 SF
7F103
CONSULT
22'-5"
92 SF
7F108E
ISOLATION
42 SF
7F154D
SOIL
31 SF
7F154C
CLEAN
34 SF
7F154B
TLT
35 SF
7F154A
TLT
30 SF
7F154F
STO.CLO.
25 SF
7F154E
TLT
30 SF
7F154H
STO. CLO.
27 SF
7F154G
TLT
1913 SF
7F154
PRE-OP
487 SF
C7 8F
CORRIDOR
557 SF
C7 6F
CORRIDOR
98 SF
7F107
ALCOVE
744 SF
C73F
CORRIDOR
2089 SF
7F108
RECOVERY
35 SF
7F108C
TLT
35 SF
7F108B
TLT
273 SF
C7-19F
CORRIDOR
94 SF
C7-17F
CORRIDOR
453 SF
7F102
SURGICAL
WAITING
450 SF
C7 2F
CORRIDOR
1211 SF
C7 16F
CORRIDOR
38 SF
7F101A
TLT
38 SF
7F101B
TLT
1130 SF
C7 10F
CORRIDOR
601 SF
C7 6F
CORRIDOR
896 SF
C7 5F
CORRIDOR
39 SF
7F107C
SCRUB
36 SF
7F106
TLT
38 SF
7F105
TLT
160 SF
7F153
SOILED UTILITY
1182 SF
7F113
EXISTING
CLEAN CORE
757 SF
C7 11F
CORRIDOR
361 SF
C7 12F
CORRIDOR
53 SF
7F149
STORAGE
26 SF
7F147
TLT
26 SF
7F146
TLT
FEC
F E C
FEC
F E C
FEC
1 HOUR FIRE RATED WALL
INSTALL CONCRETE
SLAB FLOOR INFILL
AT PREVIOUS
OPENING IN 7TH
FLOOR FOR
REMOVED STAIR.
PROVIDE 2 HOUR
RATING
6A
EXIT DISTANCE = 216'
STAIR
9 10 11 11A
B
C
9A8A
B1
C1
A1
STAIR 7
9F-111
PENTHOUSE
9F-110
MACHINE
ROOM
EXISTING
LINEN CHUTE
SHIP LADDER TO
ROOF
LADDER TO
PENTHOUSE
ROOF
EXTEND TWO
HOUR FIRE
BARRIER FOR
STAIR
FLOOR INFILL
SHALL MAINTAIN
TWO HOUR
RATING
SHAFT
ENCLOSURE -
COOR. W/MECH
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
1 HOUR FIRE/SMOKE BARRIER
FEC FIRE EXTINGUISHER CABINETS
LEGEND - LIFE SAFETY PLAN
EXIT PATH
SMOKE PARTITION
M D
C
F
B
A
E
KEY PLAN
GENERAL 7TH FLOOR LIFE SAFETY NOTES:
1. THE ARCHITECTURAL WORK ON THIS FLOOR IS LIMITED TO REPLACING CONVENIENCE
STAIR FROM 6TH TO 7TH WITH STAIR FROM 7TH TO 8TH FLOOR
2. MAINTAIN AND REPLACE AS NEEDED FIRE RATING AND FIRE PROOFING WHERE
DAMAGED TO INSTALL NEW OR RELOCATE EXISTING ROOF DRAIN, ELECTRICAL, FIRE
PROTECTION AND PLUMBING LINES
LAYOUT SHOWN REFLECTS PROPOSED OPERATING ROOM
EXPANSION TO BE PERFORMED UNDER SEPARATE CONTRACT
3.
OTHER THAN WALLS AT PERIMETER OF STAIR 14- SMOKE AND
FIRE BARRIERS ARE EXISTING.
4.
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch on e fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
5/4/2021ADDENDUM NO. 1
GI005
LIFE SAFETY PLAN-SEVENTH &
PENTHOUSE FLOOR
JULY 10, 2020
1/8" = 1'-0"GI005
1 LIFE SAFETY PLAN - 7TH FLOOR
1/8" = 1'-0"GI005
2 LIFE SAFETY PLAN- PENTHOUSE FLOOR
DN
UP
DN
UP
1 2 3 4 5 6 7 8 9 10 11 1211A
B
C
D
E
F
G
H
I
A
J
K
9A8A
G2
G1
B1
C1
A1
3613 SF
8F100A
MECHANICAL
EQUIPMENT
PENTHOUSE
592 SF
8F-161
MEN'S LOCKER
334 SF
8F-162
LOUNGE
419 SF
C8-15
CORRIDOR
313 SF
C8-14
CORRIDOR
250 SF
8F-155
UNIFORM
DISTRIBUTION
413 SF
8F-167
BREAKROOM
260 SF
C8-17
CORRIDOR
581 SF
8F-157
WOMEN'S
LOCKER
228 SF
8F-158
WOMEN'S
170 SF
8F-160
MEN'S
30 SF
8F-159
JANITOR
400 SF
C8-16
LOBBY
201 SF
STAIR
51 SF
8F-168
LINEN
25'-6"
IN THIS AREA-UNDER SEPARATE CONTRACT
EXISTING ROOF TOP EQUIPMENT MOVED
NEW ROOFING AND NEW ROOF DRAINS INSTALLED
IN THIS AREA-UNDER SEPARATE CONTRACT
NEW ADDITION CONSTRUCTED
4'-10"
7'-5"
279 SF
8F-111
ISOLATION ICU
PAT RM
66 SF
8F-110
ANTE ROOM
270 SF
8F-109
ICU PAT RM
259 SF
8F-108
ICU PAT RM
279 SF
8F-107
ICU PAT RM
277 SF
8F-106
ICU PAT RM
204 SF
8F-112
ICU PAT RM
199 SF
8F-113
ICU PAT RM
201 SF
8F-114
ICU PAT RM
188 SF
8F-115
TEAM ROOM
157 SF
8F-116
STAFF LOUNGE
272 SF
8F-117
ICU PAT RM
278 SF
8F-118
ICU PAT RM
276 SF
8F-119
ICU PAT RM
272 SF
8F-120
ICU PAT RM
307 SF
8F-148
NURSE
STATION 80 SF
8F-146
NOURISHMENT
88 SF
8F-147
MEDS
58 SF
8F-142
CLEAN LINENS
70 SF
8F-143
SIGNAL CLOSET
47 SF
8F-144
HAC
353 SF
8F-145
CLEAN
SUPPLIES
127 SF
8F-139
SOILED UTILITY
125 SF
8F-140
CLEAN UTILITY
116 SF
C8-9
CORRIDOR
824 SF
C8-7
CORRIDOR
740 SF
C8-8
CORRIDOR
676 SF
C8-13
CORRIDOR
187 SF
C8-10
CORRIDOR
82 SF
8F-123
ANTE ROOM 100 SF
C8-11
ELEVATOR
LOBBY
273 SF
8F-121
ISOLATION ICU
PAT RM
279 SF
8F-122
ICU PAT RM 87 SF
8F-125
ON CALL
61 SF
8F-124 T/S
23 SF
8F-126W
COMM.RM
96 SF
P-8
ELEVATOR
94 SF
P-7
ELEVATOR
94 SF
P-9
ELEVATOR
94 SF
P-10
ELEVATOR
43 SF
8F-126
COMM.CLO
213 SF
STAIR
350 SF
C8-2
ELEVATOR
LOBBY
286 SF
8F-130
NURSE
STATION
89 SF
8F-133
ELECTRIC
CLOSET
217 SF
8F-134
EQUIP.
STORAGE
106 SF
8F-135
OFFICE
65 SF
8F-136
TRASH
110 SF
C8-5
CORRIDOR
159 SF
8F-100
MEN'S
158 SF
8F-101
WOMENS
249 SF
8F-102
ICU PAT RM
242 SF
8F-103
ICU PAT RM
273 SF
8F-104
ICU PAT RM
274 SF
8F-105
ICU PAT RM
650 SF
C8-3
CORRIDOR
662 SF
C8-6
CORRIDOR
341 SF
8F-129
WAITING ROOM
469 SF
C8-1
CORRIDOR
106 SF
P-11
ELEVATOR6'-0"
1'-5 1/8"
27 SF
8F-160D
MEN'S SHOWER
152 SF
P-12
PATIENT
ELEVATOR
68' FEET EXIT ACCESS TRAVEL DISTANCE
58' EXIT ACCESS TRAVEL DISTANCE
FEC
FEC
F E C
F E C
EXIT ACCESS TRAVEL
DISTANCE WITHIN
SUITE IS 54'
8F100B
MECHANICAL
EQUIPMENT
PENTHOUSE
6A
NEW EXTERIOR WALL AS PART
OF DEDUCT ALTERNATE #10
SEE DETAIL 15/AS502
TEMP WALL TO BE BUILT
HERE TO AVOID DEAD END,
INCLUDED AS PART OF
DEDUCT ALTERNATE #10
UNNOCCUPIED AND
INNACCESSIBLE SPACE AS
APART OF DEDUCT
ALTERNATE #10
STAIR 14
93' FEET EXIT ACCESS TRAVEL DISTANCE
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
1 HOUR FIRE/SMOKE BARRIER
FEC FIRE EXTINGUISHER CABINETS
LEGEND - LIFE SAFETY PLAN
EXIT PATH
SMOKE PARTITION
M D
C
F
B
A
E
KEY PLAN
NON SLEEPING SUITE - 2440 SF
PREVIOUS CONSTRUCTION UNDER SEPARATE CONTRACT
126 TOTAL OCCUPANTS X .3 OCCUPANCY FACTOR FOR STAIRS = 41.4" OF EXIT WIDTH REQUIRED
2 EXISTING STAIR EXITS PROVIDE TOTAL EXIT WIDTH OF 88"
GENERAL NOTES
1.
THE FLOOR FIRE RATING IS 2 HOURS. ALL PENETRATIONS SHALL BE FIRE STOPPED AND
SEALED AS REQUIRED TO MAINTAIN RATING USING UL LISTED METHODS
2.
THE ROOF FIRE RATING IS 1 1/2 HOURS. ALL PENETRATIONS SHALL BE FIRE STOPPED
AND SEALED AS REQUIRED TO MAINTAIN RATING USING UL LISTED METHODS
3.
ALL RATED WALLS SHALL BE LABELED ABOVE CEILINGS WITH STENCILED LETTERS IN
ACCORDANCE WITH IBC 703.7 AND HOSPITAL GUIDELINES.
4.
TRAVEL DISTANCES-BUSINESS OCCUPANCY WITH AUTOMATIC SPRINKLER 5.
COMMON PATH
MAX. TRAVEL DISTANCE TO EXIT
MAX. DEADEND
100 FEET
300 FEET
50 FEET
IBC TABLE 1014.3
IBC TABLE 1016.2
IBC 1018.4 EXCEPTION 2
6. STRUCTURAL FRAME SHALL BE PROTECTED WITH 2 HOUR FIRE RATING FOR THIS EIGHTH FLOOR
LEVEL ONLY WHERE STRUCTURE ONLY SUPPORTS ROOF LEVEL. (IBC TABLE 601)
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch on e fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
5/4/2021ADDENDUM NO. 1
GI006
LIFE SAFETY PLAN - EIGHTH
FLOOR
JULY 10, 2020
1/8" = 1'-0"GI006
1 LIFE SAFETY PLAN - EIGHTH FLOOR
OCCUPANCY SCHEDULE- EIGHTH FLOOR
ROOM
NUMBE ROOM NAME AREA
OCCUPANT
LOAD
FACTOR OCCUPANTS
8F-155 UNIFORM DISTRIBUTION 250 SF 100 SF 2.504461
8F-156 WOMEN'S ENTRY 86 SF 50 SF 1.72987
8F-157 WOMEN'S LOCKER 581 SF 50 SF 11.620698
8F-158 WOMEN'S 228 SF 50 SF 4.566781
8F-158B WOMEN'S SHOWER 38 SF 50 SF 0.767246
8F-158C WOMEN'S SHOWER 34 SF 50 SF 0.681795
8F-159 JANITOR 30 SF
8F-159A MEN'S TOILET 36 SF 50 SF 0.72
8F-160 MEN'S 170 SF 50 SF 3.40848
8F-160A M. VEST 45 SF 50 SF 0.892084
8F-160A MEN'S TOILET 19 SF 50 SF 0.38875
8F-160C MEN'S SHOWER 35 SF 50 SF 0.700787
8F-160D MEN'S SHOWER 27 SF 50 SF 0.532518
8F-161 MEN'S LOCKER 592 SF 50 SF 11.833704
8F-161A MEN'S TOILET 19 SF 50 SF 0.389097
8F-162 LOUNGE 334 SF 15 SF 22.28138
8F-163 VESTIBULE 115 SF
8F-167 BREAKROOM 413 SF 15 SF 27.536614
8F-168 LINEN 51 SF
90.554263
DN
UP DN
UP
UP
UP
1 2 3 4 5 6 7 8 9 10 11 1211A
B
C
D
E
F
G
H
I
A
J
K
STAIR
C7 4F
CORRIDOR
7F107H
GAS STOR
7F-107B
HAC
7F110A
CONTROL RM
7F108X
ANGIO EQUIP
7F125
ANTHES GAS
STOR
7F124
NEUROSURGERY
O.R.9
7F113
CLEAR CORE
EXPANSION
7F127
HSKP'G
7F129
STORAGE
7F130
X-RAY
STORAGE
7F131
HAC
7F133
ELECTRICAL
STAIR
7F-137
HEAD NURSE
7F-138
STORAGE
7F-139
CONTROL
PLASTER &
SPLINT
7F-134
ORTHOPEDIC
OR 5
7F-137
SCRUB
7F-114C
SUB STERILE
7F-126
BLOOD GAS
7F-128
CARDIAC OR
7F-113F
SUB-STER
7F-110
HYBRID O.R.
7F-107A
SCRUB
7F-113D
SUB-STER.
7F-100
TELEPHONE
C7-2F
ELEVATOR
LOBBY
P-8
ELEVATOR
P-7
ELEVATOR
P-9
ELEVATOR
P-10
ELEVATOR
7F150A
OFFICE
7F150
SECT'Y/WAITING
7F148
MASS
SPECROMETER
7F150B
ANESTH.
CLEAN-UP
AND STORAGE7F140
GENERAL OR
7F113B
SUBSTERILE
7F123
STORAGE
7F122
GENERAL OR
7F121
STORAGE
7F120
SCRUB
7F119
STORAGE
7F116
ELEC.CLOSET
7F118
GENERAL OR
7F113A
SUB STERILE
7F114
HAC
7F116A
ELEC. CLOS
7F141
SCRUB
7F142A
CONTROL
7F113E
SUB STERILE
7F143
X-RAY DIGITAL
ROOM
7F142
GENERAL OR 7
7F144
STORAGE
7F113G
SUB-STERILE
7F145
SCRUB
7F151
AMBULATORY
OR 8
7F152
ALCOVE
P-11
ELEVATOR
STAIR
NEW STAIR 14 UP
TO 8TH FLOOR
9A8A
G2
G1
S14A
NEW DOOR AND
FRAME
B1
C1
A1
8'-9"
7F107I
STORAGE
7F113H
EQUIP STOR. 7F109A
PUMP RM
7F112
IT CLO
7F109
CARDIAC OR 3
P-12
ELEVATOR
7F155
OR CTR
7F108D
SOIL 7F108A
CLEAN
7F103
CONSULT
7F108E
ISOLATION
7F154D
SOIL
7F154C
CLEAN
7F154B
TLT
7F154A
TLT
7F154F
STO.CLO.
7F154E
TLT
7F154H
STO. CLO.
7F154G
TLT
7F154
PRE-OP
C7 8F
CORRIDOR
C7 6F
CORRIDOR
7F107
ALCOVE
C73F
CORRIDOR
7F108
RECOVERY
7F108C
TLT
7F108B
TLT
C7-19F
CORRIDOR
C7-17F
CORRIDOR7F102
SURGICAL
WAITING
C7 2F
CORRIDOR C7 16F
CORRIDOR
7F101A
TLT
7F101B
TLT
C7 10F
CORRIDOR
C7 6F
CORRIDOR
C7 5F
CORRIDOR
7F107C
SCRUB
7F106
TLT
7F105
TLT
7F153
SOILED UTILITY
7F113
EXISTING
CLEAN CORE
C7 11F
CORRIDOR
C7 12F
CORRIDOR
7F149
STORAGE
7F147
TLT
7F146
TLT
MODIFY EXISTING
PERIMETER WALL AT
STAIR 14 AS
REQUIRED TO
CREATE 1 HOUR
WALL BETWEEN 7TH
& 8TH FLOOR
MODIFY EXISTING CHASES
AS REQUIRED TO
RECONNECT ROOF DRAINS
COORDINATE W/
PLUMBING - REFINISH TO
MATCH EXISTING
WORK SHOWN ON ARCHITECTURAL SEVENTH FLOOR PLAN IS AT STAIR 14 ONLY - SEE ALSO STRUCTURAL, ELECTRICAL, MECHANICAL AND FIRE PROTECTION FOR ADDITIONAL REQUIREMENTS. CONTRACTOR SHALL REPAIR TO MATCH EXISTING OR BETTER ANY ITEMS AND FINISHES TO REMAIN THAT ARE DISTURBED BY WORK SHOWN ON STRUCTURAL, MECHANICAL, ELECTRICAL AND FIRE PROTECTION.
LAYOUT SHOWN REFLECTS PROPOSED OPERATING ROOM EXPANSION TO BE PERFORMED UNDER SEPARATE CONTRACT
NOTES
1.
2.
SEE SHEET GI002 - SHEET INDEX FOR LOCATION OF ROOM FINISH SCHEDULE, DOOR SCHEDULE, DOOR TYPES, WINDOW TYPES, AND WALL TYPES.
3.
SEE SHEET GI003 FOR MATERIAL AND ARCHITECTURAL SYMBOLS.4.
SEE SHEET GI003 FOR GENERAL INFORMATION INCLUDING GENERAL ARCHITECTURAL NOTES.5.
22'-3"
AS304
A1
6A
9'-4"
11'-4"
M D
C
F
B
A
E
KEY PLAN
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch on e fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
5/4/2021ADDENDUM NO. 1
AS102
ARCHITECTURAL FLOOR PLAN -
SEVENTH FLOOR
JULY 10, 2020
1/8" = 1'-0"AS102
1 7TH FLOOR - NEW CONSTRUCTION
DN
UP
DN
UP
1 2 3 4 5 6 7 8 9 10 11 1211A
B
C
D
E
F
G
H
I
A
J
K
8F100A
MECHANICAL
EQUIPMENT
PENTHOUSE
9A8A
G2
G1
8F-161
MEN'S LOCKER
8F-162
LOUNGE
C8-15
CORRIDOR
C8-14
CORRIDOR
8F-155
UNIFORM
DISTRIBUTION
8F-167
BREAKROOM
C8-17
CORRIDOR
8F-157
WOMEN'S
LOCKER
8F-158
WOMEN'S
8F-160
MEN'S
8F-159
JANITOR
C8-16
LOBBY
AS301
AS201
EA
EB
EC
EE
EG
EG
EG
B1
C1
A1
AS303
AS3027
STAIR
AS301
AS302
AS401
8F-168
LINEN
25'-6"
AS104
AS104
AS401
IN THIS AREA-UNDER SEPARATE CONTRACT
EXISTING ROOF TOP EQUIPMENT MOVED
IN THIS AREA-UNDER SEPARATE CONTRACT
NEW ADDITION CONSTRUCTED
C8-14
SOUND RATED
WALL
90 LOCKERS
ADA BENCH
C8-16
C8-17 8F160A
8F159
8F156
8F158A 8F158B
8F158C
8F160D
8F160C
8F168A
NEW
ELEVATOR
DOOR
S14B
24" DEEP X
12" WIDE X
72" TALL
4'-10"
7'-5"
8F-111
ISOLATION ICU
PAT RM
8F-110
ANTE ROOM
8F-109
ICU PAT RM
8F-108
ICU PAT RM
8F-107
ICU PAT RM
8F-106
ICU PAT RM
8F-112
ICU PAT RM
8F-113
ICU PAT RM
8F-114
ICU PAT RM
8F-115
TEAM ROOM
8F-116
STAFF LOUNGE
8F-117
ICU PAT RM
8F-118
ICU PAT RM
8F-119
ICU PAT RM
8F-120
ICU PAT RM
8F-148
NURSE
STATION
8F-146
NOURISHMENT
8F-147
MEDS
8F-142
CLEAN LINENS
8F-143
SIGNAL CLOSET
8F-144
HAC
8F-145
CLEAN
SUPPLIES
8F-139
SOILED UTILITY
8F-140
CLEAN UTILITY
C8-9
CORRIDOR
C8-7
CORRIDOR
C8-8
CORRIDOR
C8-13
CORRIDOR
C8-10
CORRIDOR
8F-123
ANTE ROOM
C8-11
ELEVATOR
LOBBY
8F-121
ISOLATION ICU
PAT RM
8F-122
ICU PAT RM
8F-125
ON CALL
8F-124 T/S
8F-126W
COMM.RM
P-8
ELEVATOR
P-7
ELEVATOR
P-9
ELEVATOR
P-10
ELEVATOR
8F-126
COMM.CLO
STAIR
C8-2
ELEVATOR
LOBBY
8F-130
NURSE
STATION
8F-133
ELECTRIC
CLOSET
8F-134
EQUIP.
STORAGE
8F-135
OFFICE8F-136
TRASH
C8-5
CORRIDOR
8F-100
MEN'S
8F-101
WOMENS8F-102
ICU PAT RM
8F-103
ICU PAT RM
8F-104
ICU PAT RM
8F-105
ICU PAT RM
C8-3
CORRIDOR
C8-6
CORRIDOR
C8-1
CORRIDOR
P-11
ELEVATOR
8F161 8F162
AS903 58
AS903 4
AS904
AS904
AS904
AS904
AS905
AS904
AS904
AS904
AS905 3
AS905
1'-4"
AS402
6'-0"
1'-5 1/8"
AS402
AS402
AS403
AS403
8F-160D
MEN'S SHOWER
RELOCATE EXISTING
EXHAUST FAN-SEE MECH.
RELOCATE EXIST RELIEF
HOOD SEE MECH.
P-12
PATIENT
ELEVATOR
LAYOUT SHOWN REFLECTS PROPOSED OPERATING ROOM EXPANSION AND EIGHTH FLOOR SICU ADDITION TO BE PERFORMED UNDER SEPARATE CONTRACT
NOTES
1.
SEE SHEET GI002 - SHEET INDEX FOR LOCATION OF ROOM FINISH SCHEDULE, DOOR SCHEDULE, DOOR TYPES, WINDOW TYPES, AND WALL TYPES.
2.
SEE SHEET GI003 FOR MATERIAL AND ARCHITECTURAL SYMBOLS.3.
SEE SHEET GI003 FOR GENERAL INFORMATION INCLUDING GENERAL ARCHITECTURAL NOTES.4.
AREA A - SEE SHEET AS110
AREA B - SEE SHEET AS110
MATCHLINE
20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 20'-9" 2'-6" 10'-9" 10'-0"
EXISTING ROOF DRAINS TO
REMAIN - PROTECT
E X P
JT
2'-8" 18'-1" 2'-8" 18'-1" 2'-8" 18'-1" 2'-8"
EB EB
AS2012
8F-129
WAITING ROOM
8F100B
MECHANICAL
EQUIPMENT
PENTHOUSE
INSTALL SELF LEVELING UNDERLAYMENT OVER FINISHED FLOOR SURFACE. MAXIMUM DEPTH OF 3/4". VERIFY
AND COORDINATE FINAL FLOOR ELEVATION WITH ALL ELEMENTS.
5.
8'-0"
6A
14'-0"
24" DEEP X
12" WIDE X
72" TALL
90 LOCKERS
AS404
CAGED LADDER TO ROOF
AS404
AS404
AS405
AS405
AS402
1'-5 1/8"
C R
8F155
1'-4"
EXP. JT.
AS502
EA
INSTALL 4" HIGH LIGHTWEIGHT CONCRETE BASE UNDER LOCKERS. COORDINATE WITH LOCKER LAYOUT AND
BASE.
6.
8F163
DURING THE CONSTRUCTION OF THE OR EXPANSION IN 1991 THE CONTRACTOR
ENCASED ELECTRICAL CONDUITS IN THE CONCRETE OF THE EXISTING ROOF(TO
BE EIGHTH FLOOR SLAB OF THIS PROJECT) . THE VA HAS NO RECORD OF
CONDUIT LOCATION. CONTRACTOR SHALL VERIFY LOCATION OF ANY EXISTING
CONDUITS IN EXISTING ROOF PRIOR TO START OF DRILLING OR CUTTING ANY
HOLES IN THE CONCRETE. POWER INTERRUPTION SHALL BE AVOIDED.
ROOFING SYSTEM
IN THIS AREA- SEE
DETAIL 3/AS105
ROOFING SYSTEM
IN THIS AREA- SEE
DETAIL 3/AS105
ROOFING SYSTEM
UNDER RAISED DECK
& EQUIPMENT- SEE
DETAIL 3/AS105
SIM
8F162A
AS903
10'-0"
10'-0"
9'-8 1/2"
TEMP WALL TO BE BUILT
HERE TO AVOID DEAD END,
INCLUDED AS PART OF
DEDUCT ALTERNATE #10
NEW EXTERIOR WALL AS PART
OF DEDUCT ALTERNATE #10
SEE DETAIL 15/AS502
UNNOCCUPIED AND
INNACCESSIBLE SPACE AS
APART OF DEDUCT
ALTERNATE #10
THIS AREA TO BE
INCLUDED AS PHASE
3 IN BASE BID, AND
IS ALSO DEDUCT
ALTERNATE #10.
STAIR 14
M D
C
F
B
A
E
KEY PLAN
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch on e fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
5/4/2021ADDENDUM NO. 1
AS103
ARCHITECTURAL FLOOR PLAN -
EIGHTH FLOOR
JULY 10, 2020
1/8" = 1'-0"AS103
1 EIGHTH FLOOR-NEW CONSTRUCTION
UP
DNDN
DN
DN
DN
DN
UP
UP
9 10 11 11A
B
C
9A
B1
C1
A1
AS303
AS302
AS301
AS302
STAIR 7
9F-111
PENTHOUSE
9F-110
MACHINE
ROOM
EXISTING
EXTERIOR
MASONRY WALL
EXISTING
LINEN CHUTE
1348'-11 3/8"
INSTALL RELOCATED
ELEVATOR MACHINE
EQUIPMENT-PROVIDE
NEW CONTROLLER
AND BELT-
COORDINATE WITH
ELEVATOR EQUIPMENT
MFR.
NEW STAIR FROM
EIGHTH FLOOR TO
PENTHOUSE
T.O.CONCRETE-ROOF
1'-4" 23'-3"
S7A
AS104
9F111
60 DEGREE STAIR
TO ROOF DECK
1356'-2 1/8"
F E C
10 LB ABC
0" 10'-7"
MAIN LINES
AND LIGHT SW
9F110
CONCRETE SLAB INFILL
MAINTAIN 2 HR RATING
TR
E A D S
'2
TR
E
AD
S
4"
LADDDER TO ROOF
AS404
AS404
FLOOR ELEVATION : 1356'-2 1/8"
(EXISTING PENTHOUSE ROOF SLAB)
1356'-2 1/8"
1350'-2"
AS501
5'-1 1/2"
E Q
E Q
P2
L2
L2
ELEVATOR EQUIPMENT
CHASE FOR SHAFT EXHAUST TO ROOF
AS501
8 9
C
8A
AS301
B1
AS301
S14B
AS905
9 TREADS @ 11" = 8'-3" 3'-9 3/4"
C
LE
AR
G
1334'-1 3/4"
2'-9 5/8" 9'-5 3/8" 6'-9 3/4" 1'-8 1/4"
NOTE: 3'-8"
CLEAR DIMENSION
DOES NOT
INCLUDE
HANDRAILING
2'-2 3/4"
14'-9 1/2"
4 1/4"
K
D1
9 10 11 11A
B
C
9A
B1
C1
A1
AS303
AS302
AS301
AS302
STAIR
C8-16
LOBBY
8F-168
LINEN
C8-15
CORRIDOR
P-11
ELEVATOR
8F168A
C8-16
NEW
ELEVATOR
DOOR
ADD STOP AND
EXTEND
ELEVATOR TO
EIGHTH FLOOR
C8-17
NEW CONCRETE FLOOR SLAB
MATCH FINISH ELEVATION OF EXISTING
ROOF SLAB
1'-10"
CONCRETE STEPS
TO NEW FLOOR ELEVATION
AS905 3
10'-4"
1'-4"
INFILL EXISTING OPENING
WITH MASONRY TO MATCH
NEW RATED
ACCESS
DOORS-B
LABEL - SELF
CLOSING AND
SELF LATCHING
AS404
AS404
8F-155
UNIFORM
DISTRIBUTION
G L2
1334'-1 3/4"
1332'-5 1/8"
1326'-1 5/8"
FLOOR ELEVATION : 1334'- 1 3/4"
(EXISTING ROOF ELEVATION + 3/4" SELF LEVELING UNDERLAYMENT)
CREATE INTAKE
THROAT & FINISH
PENETRATIONS IN
LINEN CHUTES TO
MATCH OPENINGS @
OTHER FLOORS
K A1
G
S7B
9 10 11 11A
B
C
9A
B1
A1
AS303
AS302
AS301
AS302
EXPOSED STEEL STRUCTURE- SPRAY WITH FIREPROOFING
A.F.F.
2' x 2' ACT 8'-0"
AS2012
AS404
ROOF HATCH
COORDINATE LIGHT
LOCATION WITH ELEVATOR
EQUIPMENT
9 10 11 11A
B
C
9A
B1
C1
A1
STAIR
REMOVE CMU WALL FROM EIGHTH
FLOOR TO MACHINE ROOM FLOOR
REMOVE EXISTING
FLOOR SLAB AT
EL. 1338'-11
5/8"
REMOVE EXISTING
MACHINE ROOM FLOOR
SLAB AT EL. 1345'-10
3/8"
REMOVE LADDER
AND ACCESS DOOR
REMOVE EXISTING
LOUVER- INFILL W/
MASONRY TO
MATCH
RENOVE EXISTING
PENTHOUSE ROOF SLAB
REMOVE
EXISTING TRAP
DOOR
REMOVE ROOF SCUTTLE
AND ACCESS LADDER
REMOVE EXISTING
ROOF EXHAUST
ABOVE
EXISTING
PENTHOUSE ROOF
BEAM REMAINS-
SEE STRUCTURE
REMOVE ROOF
DRAIN @ROOF
REMOVE EXISTING
ELEVATOR MACHINE
9 10 11 11A
T.O.S.- PENTHOUSE ROOF
1366'-4"
9A
8A
AS301
8TH FLOOR ROOF TOS
1348'-3"
T.O. PENTHOUSE WALL
1369'-7"
AS303
AS302
PENTHOUSE FLOOR
1356'-2 1/8"
9F111
AS404
EXISTING LINEN CHUTE
EXISTING MASONRY
PARAPET WALL
PREFABRICATED BRICK PANEL
EXISTING MASONRY WALL
STAIR 14 ENCLOSURE
60 DEGREE STAIR TO ROOF DECK
COUNTERFLASHING
METAL COPING
HOLLOW METAL DOOR AND
FRAME FLASH NEW ROOFING
MEMBRANE INTO EXISTING
CURB AT LINEN CHUTE
REMOVE EXISTING BRICK
MASONRY COPING AND INSTALL
NEW METAL COPING - SEE
DETAILS
COUNTERFLASHING
NEW ROOF MEMBRANE
AND INSULATION SYSTEM.
TAPERED INSULATION
SLOPE TO SCUPPER
MEMBRANE ROOF
SYSTEM W/
INSULATION
METAL ROOF DECK
SEE STRUCTURE
STEEL BEAM-TYP.
SEE STRUCTURE
MEMBRANE FLASHING
EH
SLOPED ROOF
W/MECH
FASTEN TPO
GUTTER
DOWNSPOUT
SPLASH PAN
ALUMINUM WINDOW
MEMBRANE FLASHING AND
COUNTERFLASHING
AS703
AS703
AS703
8 9
C
8A
AS301
B1
AS301
EH
2'-0 1/2" 14'-0" 1'-8"
EH
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch on e fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
5/4/2021ADDENDUM NO. 1
AS104
PENTHOUSE AND MACHINE
ROOM PLAN
JULY 10, 2020
1/4" = 1'-0"AS104
1 PENTHOUSE FLOOR PLAN
1/4" = 1'-0"AS104
4 STAIR 14 ENLARGED PLAN @ 8TH FLOOR
1/4" = 1'-0"AS104
2 STAIR 7 ENLARGED PLAN
1/4" = 1'-0"AS104
3 PENTHOUSE FLOOR-REFLECTED CEILING PLAN
ROOF FOR STAIR 14
1/4" = 1'-0"AS104
DEMOLITION PLAN @ EXIST. MACHINE ROOM & EXIST.
PENTHOUSE ROOF LEVEL1/4" = 1'-0"AS104
6 SOUTH PENTHOUSE ELEVATION
1/4" = 1'-0"AS104
7 STAIR 14 ENLARGED CLERESTORY PLAN
NOTE: REMOVE EXISTING ROOFING,
INSULATION AND BALLAST TO CONCRETE
ROOF DECK OF PENTHOUSE
DN
UP
6 7 8 9 10 11 11A
B
C
D
E
A
9A8A
AS301
AS201
B1
C1
A1
AS303
AS302
AS301
AS302
AS401
AS401
8F-161
MEN'S LOCKER
8F-162
LOUNGE
C8-15
CORRIDOR
8F-155
UNIFORM
DISTRIBUTION
8F-167
BREAKROOM
C8-17
CORRIDOR
8F-157
WOMEN'S
LOCKER
8F-158
WOMEN'S
8F-160
MEN'S
8F-159
JANITOR
C8-16
LOBBY
EA
EB
EC
EE
EG
STAIR
8F-168
LINEN
C8-16
C8-17
8F160A
8F159
8F156
8F158A
8F158B8F158C
8F160D
8F160C
8F168A
NEW
ELEVATOR
DOOR
S14B
24" DEEP X
12" WIDE X
72" TALL
P-11
ELEVATOR
8F161
8F162
AS903 5
AS903 4
AS904
AS904
AS904
AS904
AS905
AS904
AS904
AS904
AS905 3
1'-6" 1'-6" 1'-6" 1'-6" 1'-4"1'-4" 1'-4"
1'-4 5/8"
5'-10 7/8" 6'-3 7/8"3'-3 7/8" 3'-4"
1'-6 1/8"
CLEAR
6'-0"
6'-3 3/4" 3'-1" 3'-1" 3'-1" 3'-1"
3'-1"
4'-3 7/8"
8F-156
WOMEN'S
ENTRY
8F157A
8F157
AS905
AS402
AS402
AS402
AS402
8F-163
VESTIBULE
8F163
8F-160A
M. VEST
8F160E
8F160B
2'-8" 18'-1" 1'-4"1'-4" 18'-1" 1'-4"1'-4" 18'-1" 2'-8"
EB
EB
A
A
KM SIM
L2
A A
E
A
E
A
A
K
A1
E A1
E A
A
A
B
K
A
Q
FS
AREA A
AREA B
AS2012
RELOCATED CAGE LADDER
AS501
AS501
AS501
6A
AS501
AS501
9 AS501
EA
AS501
AS404
AS404
AS405
AS405
5'-11 1/4" 1'-4 3/4" 14'-0"
1'-2 1/2" 7'-4"
4'-1 3/4" 20'-9"
FS
5'-7"
6'-0" 5'-3 1/4" 11'-0" 22'-10 1/4" 12'-1 7/8"
5'-9" 17'-2 1/4"
1'-4" 5'-3 3/8" 5'-6" 15'-3 1/8" 10'-4 5/8" 10'-6" 3'-5 3/8" 6'-2" 3'-6 1/4" 3'-1"
4'-3" 3'-2 3/4"
Q
G
8F168B8F168C
1'-4" 2'-8" 2'-0" 2'-8"
11'-1" 9'-2" 3'-1" 9'-9 3/4"
2T @11"
1'-10"
C
AS704
SIM
8F155
E
E
C
A1
A1
A
A
AS704
K
C R
FE
FEC
F E
C
FEC
AS903
10'-2 7/8"
8F162A
D1
STAIR 14
9 10 11
E
F
G
H
9A8A
G2
G1
AS301
C8-15
CORRIDOR
C8-14
CORRIDOR
EG
EG
EG
C8-14
8F-126
COMM.CLO
C8-5
CORRIDOR
8F-100
MEN'S
C8-1
CORRIDOR
AS903 58
AS403
AS403
AREA A
AREA B
8F-129
WAITING ROOM
AS501
AS704
AS404
FEC
AS403
THIS AREA TO BE
INCLUDED AS PHASE
3 IN BASE BID, AND
IS ALSO DEDUCT
ALTERNATE #10.
NEW EXTERIOR WALL
AS PART OF DEDUCT
ALTERNATE #10
SEE DETAIL
15/AS502
TEMP WALL TO BE
BUILT HERE TO AVOID
DEAD END, INCLUDED
AS PART OF DEDUCT
ALTERNATE #10
UNNOCCUPIED AND
INNACCESSIBLE SPACE
AS APART OF DEDUCT
ALTERNATE #10
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch on e fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
5/4/2021ADDENDUM NO. 1
AS110
EIGHTH FLOOR - AREA A & B
JULY 10, 2020
1/4" = 1'-0"AS110
1 EIGHTH FLOOR-AREA A
1/4" = 1'-0"AS110
2 EIGHTH FLOOR-AREA B
LINEAR SHOWER DRAIN
SEE PLUMBING-TYP.
CR
CRCR
EXISTING 6TH FLOOR
1309'-4 5/8"
EXISTING 7TH FLOOR
1320'-6 1/8"
8TH FLOOR
1334'-1"
B C D E
A
AS201
T.O.W.
1352'-9"
8TH FLOOR ROOF TOS
1348'-3"
B1 C1A1
AS302
AS301
AS304
AS401
6F-114
MEN ENTRY 6F-112
SOILED
RECEIVING AND
DECONTAMINATION
AREA
6F-110P
PREP
ASSEMBLY AND
STERILIZATION
8F-157
WOMEN'S
LOCKER
C8-17
CORRIDOR
STAIR 14
8F-162
LOUNGE
8F-167
BREAKROOM
24" X 12" X 72" H
LOCKERS WITH BENCH
GYPSUM BOARD SOFFIT W/
DOWNLIGHTING
ALUMINUM WINDOW
FOR DAYLIGHTING
SUSPENDED 2X2 ACT WITH
RECESSED LED LIGHTING
METAL DECK WITH GYPSUM BOARD
AND FIREPROOFING
CONTINUOUS RIGID INSULATION
MEMBRANE ROOFING
METAL COPING
PREFARICATED
BRICK PANELS
WITH STEEL STUD
BACK UP
CLEARSTORY
ALUMINUM
WINDOW
SMOKE TIGHT
PARTITION
CONCRETE INFILL
OF PREVIOUS
STAIR OPENING
ONE HOUR
RATED WALL
METAL PAN
WITH
CONCRETE FILL
STAIRS
AND PIPE
HANDRAILS
SOFFIT WITH
LED DOWNLIGHTING
SICU EIGHT FLOOR ADDITION UNDER SEPARATE CONTRACT
PERIMETER COVE
LIGHTING
STEPPED GYPSUM BOARD SOFFIT
GWB CEILING WITH
RECESSED LIGHTING
6F111
6F111B
AN
D
E X P
AN
S
IO
N
O F S P S
S
IX
TH
FL
O O R
R E N O V
AT
IO
N
R E N O
VA
TI
O N
M E N
AN
D
W O M E N
LO
C K E R
R O O M
E
IG
H
TH
FL
O O R
AD
D
IT
IO
N
SMOKE TIGHT
PARTITION
AS104
MECH. PENTHOUSE ROOF
1345'-7"
EXIST. 8TH FLR. & STAIR LANDING
1332'-5 1/8"
T.O.BEAM
1354'-5 3/4"
6F110NA
6F-122
ACCESS
6F-114C
MEN LOCKER
7F154
PRE-OP
EXHAUST FAN
SEE MECH
DIAGONAL BRACING FOR
BULKHEADS- TYPICAL
FURNISHINGS BY OWNER-TYP.
SELF LEVELING
UNDERLAYMENT
AS402
C6-7C
EXISTING 6TH FLOOR
1309'-4 5/8"
EXISTING 7TH FLOOR
1320'-6 1/8"
8TH FLOOR
1334'-1"
1 2 3 4 5 6 7 8 9 10 11 1211A
T.O.S.- PENTHOUSE ROOF
1366'-4"
9A8A
AS301
T.O.W.
1352'-9"
8TH FLOOR ROOF TOS
1348'-3"
T.O. PENTHOUSE WALL
1369'-7"
AS303
PENTHOUSE FLOOR (PREVIOUS ROOF SLAB)
1356'-2 1/8"
AS302
AS304
18F100A
MECHANICAL
EQUIPMENT
PENTHOUSE
6F-106
MECHANICAL
EQUIPMENT
ROOM
6F-110M
STERILE
STORAGE
6F-112
SOILED
RECEIVING AND
DECONTAMINATION
AREA C6-7
LOBBY
C6-10
LOBBY
C8-16
LOBBY
STAIR 14
8F-161
MEN'S LOCKER
8F-160C
MEN'S SHOWER
9F-111
PENTHOUSE
EXISTING EXPANSION JOINT
FR
O M
TH
TO
TH
S
TA
IR
INFILL FLOOR OPENING WITH
2 HOUR RATED FLOOR CONSTRUCTION
NEW LOBBY FLOOR AT EXISTING
SLAB ELEVATION-SEE STRUCTURE
STAIR TO EIGHTH FLOOR ELEVATION
STAINLESS STEEL PIPE RAIL
SUSPENDED 2X2 ACT CEILING
PREFABRICATED
BRICK WALL PANEL
WITH STEEL STUD
BACK-UP
METAL COPING
ROOF MEMBRANE
CONTINUOUS RIGID INSUL.
STEEL ROOF DECK
8F162 S14B
24" X 12" X 72"
LOCKER
W/BENCH
PREFABRICATED
BRICK WALL PANEL
WITH STEEL STUD
BACK-UP
METAL COPING ROOF MEMBRANE
R30 CONTINUOUS INSUL.
STEEL ROOF DECK
HVAC UNIT
MECH. PENTHOUSE ROOF
1345'-7"
EXIST. 8TH FLR. & STAIR LANDING
1332'-5 1/8"
T.O.BEAM
1354'-5 3/4"
6A
AS404
9F110
ROOF HATCH
ELEVATOR SHAFT RELIEF HOOD
SEE MECHANICAL
S7A
EH
C6-7A6F112D
AS402
PENTHOUSE ADDITION FOR ELEVATOR EXTENSION
EXISTING MECHANICAL PENTHOUSE TO REMAIN
SIXTH FLOOR MECHNICAL ROOM - SEE MECHANICAL
SELF LEVELING
UNDERLAYMENT
GYPSUM WALLBOARD BULKHEAD
AS501
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch on e fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .