ATTACHMENT 3 - Architectural.pdf
PDF 16 MB Posted
- Solicitation number
- 36C77621B0004
About this file
This document provides details for a federal contract solicitation to expand and renovate surgical space at the Oklahoma City VA Medical Center. The Department of Veterans Affairs Technology Acquisition Center Austin will solicit bids and award a firm-fixed-price contract for a two-phase construction project. Phase 1 involves building a surgery locker room on the 8th floor and extending an elevator. Phase 2 will renovate the surgical and procedural space and expand it into the completed surgery locker area. The solicitation number is 36C77621B0004 and it is titled "Y1DZ--Expand SPS (Minor) Construction Oklahoma City." The project description and agency are included.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
A
D
I
E
T
D S T
N U
E T
M
AP
R
E NT O
S
A
T SE FO
R E
M
A
CI
N
VE RA
TE
A
FA
I R F
S
SPS EXPANSION
PROJECT NUMBER 635-3411
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch o ne fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
GI001
COVER SHEET
JULY 10, 2020 1
JULY 10, 2020
OKLAHOMA CITY
VETERANS AFFAIRS
HEALTH CARE SYSTEM
OKLAHOMA CITY, OKLAHOMA
jgraham Arch Seal - Nebraska - Rich jgraham Arch Seal - Nebraska - Rich
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch o ne fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
GI002
INDEX SHEET
JULY 10, 2020
STRUCTURAL SHEET INDEX
SHEET
NUMBER SHEET NAME
SS-101 6TH & 7TH FLOOR FRAMING PLAN
SS-102 8TH FLOOR FRAMING PLAN
SS-103 PENTHOUSE & MACHINE ROOM FRAMING PLANS
SS-104 ROOF FRAMING PLAN
SS-105 DETAILS
SS-106 DETAILS
SS-107 GENERAL NOTES AND DETAILS
PLUMBING SHEET INDEX
SHEET
NUMBER SHEET NAME
MG101 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES
ELECTRICAL SHEET INDEX
SHEET
NUMBER SHEET NAME
EG101 GENERAL ELECTRICAL NOTES & SYMBOLS LEGEND
ED101 SIXTH FLOOR ELECTRICAL DEMOLITION PLAN
ED102 SEVENTH FLOOR ELECTRICAL DEMOLITION PLAN
EL101 SIXTH FLOOR LIGHTING PLAN
EL102 SEVENTH & EIGHT LIGHTING PLAN
EP100 BASEMENT POWER PLAN
EP101 SIXTH FLOOR POWER PLAN
EP102 SEVENTH & EIGHTH FLOOR POWER PLANS
EY101 SIXTH FLOOR SPECIAL SYSTEMS PLAN
EY102 SEVENTH & EIGHTH FLOOR SPECIAL SYSTEMS PLANS
E-501 ELECTRICAL DETAILS
E-601 POWER RISER DIAGRAMS AND SCHEDULES
E-602 ELECTRICAL SCHEDULES AND DETAILS
FIRE PROTECTION SHEET INDEX
SHEET
NUMBER SHEET NAME
FG101 FIRE SUPPRESSION SYMBOLS, LEGEND, SCHEDULE AND GENERAL
NOTES
FD101 SIXTH FLOOR FIRE PROTECTION DEMOLITION PLAN
FD102 SEVENTH FLOOR FIRE PROTECTION DEMOLITION PLAN
FD103 EIGHTH FLOOR FIRE PROTECTION DEMOLITION PLAN
FX101 SIXTH FLOOR FIRE PROTECTION PLAN
FX102 SEVENTH & EIGHTH FLOOR FIRE PROTECTION PLANS
GENERAL SHEET INDEX
SHEET
NUMBER SHEET NAME
GI001 COVER SHEET
GI002 INDEX SHEET
GI003 GENERAL NOTES
GI004 LIFE SAFETY PLAN-SIXTH FLOOR
GI005 LIFE SAFETY PLAN-SEVENTH & PENTHOUSE FLOOR
GI006 LIFE SAFETY PLAN - EIGHTH FLOOR
ARCHITECTURAL SHEET LIST
SHEET
NUMBER SHEET NAME
AD101 ARCHITECTURAL FLOOR PLAN SIXTH FLOOR DEMOLITION
AD102 ARCHITECTURAL FLOOR PLAN SEVENTH FLOOR DEMOLITION
AD103 ARCHITECTURAL FLOOR PLAN EIGHT FLOOR DEMOLITION
AD104 REFLECTED CEILING PLAN - SIXTH FLOOR DEMOLITION
PD101 SIXTH FLOOR PLUMBING DEMOLITION PLAN
PD102 SEVENTH FLOOR PLUMBING DEMOLITION PLAN
PD103 EIGHTH FLOOR PLUMBING DEMOLITION PLAN
PL101 SIXTH FLOOR PLUMBING PLAN
PL102 SEVENTH FLOOR PLUMBING PLAN
PL103 EIGHTH FLOOR PLUMBING PLAN
P-401 PARTIAL PLUMBING PLANS
P-501 PLUMBING DETAILS & SCHEDULES
P-601 PLUMBING RISER DIAGRAMS
MECHANICAL SHEET INDEX
SHEET
NUMBER SHEET NAME
MD101 SIXTH FLOOR HVAC DEMOLITION PLAN
MD102 SEVENTH FLOOR HVAC DEMOLITION PLAN
MD103 EIGHTH FLOOR HVAC DEMOLITION PLAN
MD104 SIXTH FLOOR PLAN HVAC PIPING DEMOLITION PLAN
MH101 SIXTH FLOOR HVAC PLAN
MH102 SEVENTH FLOOR HVAC PLAN
MH103 EIGHTH FLOOR HVAC PLAN
MH104 ROOF MECHANICAL PLAN
MP101 SIXTH FLOOR HVAC PIPING PLAN
MP102 EIGHTH FLOOR HVAC PIPING PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL CONTROL DIAGRAMS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
AS101 ARCHITECTURAL FLOOR PLAN - SIXTH FLOOR
AS102 ARCHITECTURAL FLOOR PLAN - SEVENTH FLOOR
AS103 ARCHITECTURAL FLOOR PLAN - EIGHTH FLOOR
AS104 PENTHOUSE AND MACHINE ROOM PLAN
AS105 ROOF PLAN
AS106 FINISHED FLOORING PLAN - SIXTH FLOOR
AS107 FINISHED FLOORING PLAN - EIGHTH FLOOR
AS108 SIXTH FLOOR SPS-AREA A
AS109 SIXTH FLOOR SPS - AREA B
AS110 EIGHTH FLOOR - AREA A & B
AS201 EXTERIOR ELEVATIONS
AS202 EXTERIOR ELEVATIONS
AS301 BUILDING SECTIONS
AS302 ELEVATOR SECTION
AS303 STAIR 7 SECTIONS
AS304 STAIR 14 SECTIONS
AS401 WALL SECTIONS
AS402 WALL SECTIONS
AS403 WALL SECTIONS
AS404 WALL SECTIONS
AS405 WALL SECTIONS
AS500 WALL TYPES
AS501 WALL AND PLAN DETAILS
AS502 WALL DETAILS
AS503 WALL DETAILS
AS601 ROOM FINISH SCHEDULE
AS701 DOOR SCHEDULE
AS702 DOOR AND WINDOW TYPES
AS703 DOOR DETAILS
AS704 WINDOW DETAILS
AS800 FIFTH FLOOR REFLECTED CEILING PLAN
AS801 SIXTH FLOOR - REFLECTED CEILING PLAN
AS802 SEVENTH FLOOR- REFLECTED CEILING PLAN
AS803 EIGHTH FLOOR-REFLECTED CEILING PLAN
AS901 INTERIOR ELEVATIONS
AS902 INTERIOR ELEVATIONS
AS903 INTERIOR ELEVATIONS
AS904 INTERIOR ELEVATIONS
AS905 INTERIOR ELEVATIONS
AS906 CASEWORK & MISC. DETAILS
INDEX OF SHEETS
PROJECT NO. : 635-3411
PROJECT NAME: SPS EXPANSION
OKLAHOMA VA MEDICAL CENTER
921 NE. 13TH STREET - OKLAHOMA CITY, OK
Calculations (20 female FTE and 30 male FTE per shift):
1 30 male lockers & 20 female lockers (minimum requested by VA)
2 1 shift = 50 FTEs (full time employees)
3 Per shift: 30 male FTEs & 20 female FTEs
Fixture Required Provided Reference
Water Closet- Female 1 for first 13, then 1 per 5 3 3 VASPC 286.5.G.3
Water Closet- Male 1 for first 13, then 1 per 5 4 (no urinals), 3 (1 urinals) 2
Urinal- Male 50% of WCs after 2 WCs up to 2 1 VASPC 410.5.C,t1/ IPC 419.2
Sink- Female 1 per 15 2 2 VASPC 410.5.C,table1
Sink- Male 1 per 20 2 2 VASPC 410.5.C,table1
Shower- Female 1 per 40 1 1 VASPC 410.5.C,table1
Shower- Male 1 per 40 1 1 VASPC 410.5.C,table1
Calculations (45 female FTE and 45 male FTE per shift):
1 90 male lockers & 98 female lockers
2 2 shifts = 180 FTEs (full time employees)
3 Per shift: 45 male FTEs & 45 female FTEs
Fixture Required Provided Reference
Water Closet- Female 1 for first 15, then 1 per 5 7 7 VASPC 286.5.G.3
Water Closet- Male 1 for first 15, then 1 per 5 7 (no urinals), 5 (2 urinals) 5 VASPC 286.5.G.3
Urinal- Male 50% of WCs after 2 WCs up to 2 2 VASPC 410.5.C,t1/ IPC 419.2
Sink- Female 1 per 15 3 4 VASPC 410.5.C,table1
Sink- Male 1 per 20 3 3 VASPC 410.5.C,table1
Shower- Female 1 per 40 2 2 VASPC 410.5.C,table1
Shower- Male 1 per 40 2 2 VASPC 410.5.C,table1
MATERIAL SYMBOLS
EARTH
CAST-IN-PLACE CONCRETE
CONCRETE MASONRY
STEEL
CONTINUOUS WOOD FRAMING
WOOD BLOCKING
FIBROUS INSULATION
GYPSUM BOARD
BRICK MASONRY
RIGID INSULATION
ROOF INSULATION
M D
C
F
B
A
E
BUILDING LOCATION MAP
INDICATES BUILDING F IN HOSPITAL
COMPLEX WHERE PROJECT OCCURS
6TH FLOOR - SPS LOCKER PLUMBING FIXTURE COUNTS
8TH FLOOR - LOCKER PLUMBING FIXTURE COUNTS
1. THE CONTRACTOR SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS.
CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE THE GOVT..
2. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.
3. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED
BY THE THE GOVT.. CONTRACTOR MUST CONTACT VA'S COR PRIOR TO ANY SHUTDOWNS.
4. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH MINIMUM INTERRUPTION. SCHEDULE ALL ELECTRICAL/MECHANICAL OUTAGES 14 DAYS IN ADVANCE WITH
THE THE GOVT..
5. PROTECT ALL WORK, MATERIALS AND EQUIPMENT DESIGNATED TO REMAIN. CAP OR PLUG TEMPORARY OPENINGS. DELIVER ALL
WORK TO THE THE GOVT. IN CLEAN AND IN GOOD CONDITION.
6. WHEN DEMOLITION IS COMPLETE, NOTIFY ARCHITECT AND THE GOVT. FOR A SCHEDULED MEETING TO REVIEW EXISTING CONDITIONS
AND ANY CONCERNS REGARDING NEW WORK.
7. CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED BY NEW WORK SHALL BE INCLUDED AS WORK
PROVIDED UNDER THIS CONTRACT.
8. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING EQUIPMENT, CONNECTIONS, CONTROLS, ETC.
9. DAMAGE CAUSED BY SUCH CUTTING SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY CONTRACTOR AT NO COST TO THE THE GOVT., UNLESS UNFORESEEN EXISTING CONDITIONS ARE DISCOVERED AND THE GOVT./ARCHITECT ARE NOTIFIED.
10. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS SHALL BE KEPT CLEAR OF DEBRIS.
11. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.
12. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED, UNLESS OTHERWISE NOTED.
13. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.
14. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND
SATISFACTORY INSTALLATION.
15. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND WALLS SHALL BE PATCHED WITH LIKE MATERIALS TO MATCH THE SURROUNDING AREAS, AND FILLED AS CLOSE AS POSSIBLE TO THE NEW PIPING OR DUCTWORK.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING AND REPLACING ANY DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK UNDER THIS CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION OR BETTER WITH NEW MATERIALS TO MATCH
17. INSTALL THE SPECIFIED FIRE STOPPING(SLEEVES,WRAP,CONDUIT,ETC.)AT RATED CONSTRUCTION(NEW OR EXISTING) OR SMOKE PARTITIONS:
A.
C.
E.
18. ALL METAL STUD AND GYPSUM WALLBOARD PARTITIONS ARE DIMENSIONED TO THE OUTSIDE FINISH FACE OF WALL AND TO THE COLUMN
GRID UNLESS OTHERWISE NOTED.
19. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD AND SHALL BE MOLD AND MOISTURE RESISTANT.
20. PROVIDE WOOD BLOCKING OR 16 GA. SHEET METAL BACKING PLATES IN ALL WALLS TO RECEIVE WALL HUNG ACCESSORIES, SUCH AS EQUIPMENT, GRAB BARS, MILLWORK, COAT HOOKS, AND DOOR STOPS, ETC. IF WOOD BLOCKING IS USED, PROVIDE
AS FIRE-RESISTANT.
21. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES, CONVENIENCE OUTLETS, DOOR STOPS, AND OTHER FINISH HARDWARE, ETC. SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF EXISTING WALLS INDICATED TO REMAIN.
22. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED, AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE THE GOVT..
COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:
A. THE THE GOVT.'S EQUIPMENT REQUIREMENTS.
B. THE CEILING SUPPORT SYSTEM.
C. THE MECHANICAL DUCTWORK SYSTEM.
D. THE LIGHTING FIXTURES.
E. ELECTRICAL WIRING AND CONDUIT SYSTEMS.
F. THE PLUMBING AND PIPING SYSTEMS.
G. FIRE PROTECTION SYSTEMS
23. ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF DOCUMENTS.
24. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.
25. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN QUESTION CONTRACTOR SHALL NOTIFY THE GOVT.
AND ARCHITECT IMMEDIATELY.
26. ALL NEW CONSTRUCTION IS INDICATED BOLD OR FULL TONE.
27. WHEN WALL PARTITIONS OF DIFFERENT FIRE RATING INTERSECT, THE HIGHEST RATED PARTITION TAKES PRECEDENT. MAINTAIN
RATING BEHIND RECESSED AREAS IN WALLS.
28. ALL CORRIDOR WALLS ARE REQUIRED TO BE SMOKE TIGHT, WHETHER THEY ARE FIRE RATED OR NOT. REPAIR AND EXTEND AT LEAST THE CORRIDOR SIDE OF NON-RATED CORRIDOR WALLS TO STRUCTURE, UNLESS NOTED OTHERWISE, SEE WALL TYPES.
29. COORDINATE CONSTRUCTION REQUIREMENTS WITH STRUCTURAL, MECHANICAL, FIRE PROTECTION, PLUMBING AND ELECTRICAL DRAWINGS.
CODES / REGULATIONS LATEST EDITION;
1. VETERANS AFFAIRS DESIGN AND CONSTRUCTION PROCEDURES
2. VETERANS AFFAIRS MASTER CONSTRUCTION SPECIFICATION
3. VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE
4. VETERANS AFFAIRS ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
5. OSHA STANDARDS
6. INTERNATIONAL BUILDING CODE 2018
7. VA SEISMIC REQUIREMENTS
8. NATIONAL ELECTRICAL CODE
9. NFPA CODES WITH THE EXCEPTION OF NFPA 5000
10. NATIONAL STANDARD PLUMBING CODE
11. UNIFORM FEDERAL ACCESSIBILITY STANDARDS
12. FEDERAL REGULATIONS PARTS 434 AND 435
13. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS AS STATED IN THE GENERAL
REQUIREMENTS SECTION 01 00 00 OF THE VA MASTER SPECIFICATIONS
BUILDING CLASSIFICATION:
THE FOLLOWING INFORMATION IS BASED ON INFORMATION OBTAINED FROM THE ORIGINAL
BUILDING DESIGN. THE SCOPE OF WORK BEING PERFORMED UNDER THIS CONTRACT HAS
BEEN NOTED ACCORDINGLY WITHIN THE DOCUMENTS.
1. OCCUPANCY: I-2 HOSPITAL NFPA 18-1.1.1.3 & IBC 308.4
2. OCCUPANCY: B BUSINESS-6TH SPS & 8TH FLOOR ADD-BUILDING F IBC 304.1
3. THE DESIGN IS BASED ON NON SEPARATED MIXED USE BUSINESS AND HEALTH CARE OCCUPANCY LSC 6.1.14.2.2
4. THE OTHER OCCUPANCY CLASSIFICATIONS NOTED ON THE LIFE SAFETY DRAWINGS ARE
FOR INFORMATION ONLY AS BASED ON THE ORIGINAL BUILDING DESIGN.
5. ORIGINAL SEVEN STORY CONSTRUCTION NFPA 18.1.6.1
6. TYPE OF CONSTRUCTION: 1A NON-COMBUSTIBLE IBC
7. ALLOWABLE HEIGHT: UNLIMITED STORY IBC TABLE 503
8. ALLOWABLE AREA: UNLIMITED IBC TABLE 503
FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
1. STRUCTURAL FRAME: STEEL / 3-HR / IBC TABLE 601(REDUCED TO 2-HR AT ROOF ONLY SUPPORT)
2. BEARING WALLS EXTERIOR: MASONRY / 3-HR / IBC TABLE 601
3. BEARING WALLS INTERIOR: MASONRY / 3-HR / IBC TABLE 601
4. NON-BEARING WALLS EXTERIOR: MASONRY / 0-HR GREATER THAN 30' SEPARATION,
1-HR LESS THAN 30' SEPARATION
5. NON-BEARING WALLS INTERIOR: 0 HR
6. FLOOR CONSTRUCTION: CONCRETE / 2-HR / IBC TABLE 601
7. ROOF CONSTRUCTION: STEEL / 1 1/2-HR / IBC TABLE 601
8. CORRIDORS: SMOKE PARTITIONS / NFPA 18.3.6.2 & IBC 407.3
9. SMOKE BARRIERS: 1-HR / NFPA 18.3.7.1 & IBC 407.4, 709
10. SHAFT ENCLOSURE: 2-HR / NFPA 18.3.1 & IBC 707.4, 1005.3.2
OCCUPANT LOAD FACTORS:
THE FOLLOWING INFORMATION IS BASED ON NFPA TABLE 7.3.1.2 & IBC 1003.2.2.2
1.
2.
3. STORAGE: 300 SF / OCC GROSS
MECHANICAL EQUIPMENT: 300 SF / OCC GROSS
BUSINESS AREAS: 100 SF / OCC GROSS
SMOKE COMPARTMENTS:EXISTING
BASED ON NFPA 18.3.7
GENERAL ARCHITECTURAL NOTES: APPLICABLE CODES & DESIGN STANDARDS:
11. EXIT ACCESS STAIRWAYS AND PASSAGEWAYS SHALL BE A TWO HOUR RATED
FIRE BARRIER.
D.
B.
REPLACE FIRE STOP AT ALL PENETRATIONS WHERE NEW DEVICES/LINES USE EXISTING PENETRATIONS OF RATED
BARRIERS.
FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE NEW DEVICES/LINES PENETRATE EXISTING
FLOORS, CEILINGS AND OTHER RATED BARRIERS.
USE ONLY APPROVED FIRE CAULKING AND FIRE STOPS (SEE SPECIFICATIONS).
FIRE STOP ALL NEW PENETRATIONS WHERE NEW DEVICES/LINES PENETRATE THROUGH NEWLY CONSTRUCTED
RATED BARRIERS OR SMOKE PARTITIONS.
REPLACE FIRE STOP AT ALL EXISTING PENETRATIONS OF RATED BARRIERS WHERE EXISTING LINES HAVE BEEN
MODIFIED OR RELOCATED.
14. GUIDELINES FOR DESIGN & CONSTRUCTION OF HEALTHCARE FACILITIES 2010
H. THE COMMUNICATIONS AND SPECIAL SYSTEMS.
30. AFTER DEMOLITION AND NEW CONSTRUCTION, REPAIR ALL FINISHED SURFACES ON EXISTING ITEMS TO REMAIN AFFECTED BY
WORK TO LIKE NEW CONDITION.
31. ALL FINISHED SURFACES ON NEW WALLS ETC. INFILLING OR EXTENDING EXISTING ITEMS SHALL BE INSTALLED SO NEW FINISHED
SURFACES ALIGN WITH EXISTING.
32. FURNITURE SHOWN IS N.I.C. UNLESS NOTED OTHERWISE. UNLESS NOTED OTHERWISE EQUIPMENT SHALL BE PROVIDED BY THE THE
GOVT. AND INSTALLED BY THE CONTRACTOR AS SCHEDULED. DISCONNECTION,RELOCATION, AND RECONNECTION OF EXISTING
EQUIPMENT IS THE RESPONSIBILITY OF THE CONTRACTOR.
DURING THE CONSTRUCTION OF THE OR EXPANSION IN 1991 THE CONTRACTOR ENCASED ELECTRICAL
CONDUITS IN THE CONCRETE OF THE EXISTING ROOF(TO BE EIGHTH FLOOR SLAB OF THIS PROJECT) . THE
VA HAS NO RECORD OF CONDUIT LOCATION. CONTRACTOR SHALL VERIFY LOCATION OF ANY EXISTING
CONDUITS IN EXISTING ROOF PRIOR TO START OF DRILLING OR CUTTING ANY HOLES IN THE CONCRETE.
POWER INTERRUPTION SHALL BE AVOIDED.
33.
ARCHITECTURAL SYMBOLS
C110A
6F-110
7'-2"
COLUMN GRID DESIGNATION
DETAIL NUMBER
WALL TYPE
DIMENSION LINE
CENTER LINE
WINDOW TYPE
(I-INTERIOR ; E-EXTERIOR)
ROOM NAME
SHEET DETAIL IS DRAWN ON
ARCHITECTURAL ELEVATION - EXTERIOR
ARCHITECTURAL ELEVATION - INTERIOR
EXISTING TO REMAIN
EXISTING TO BE REMOVED
EXISTING TO REMAIN
NEW CONSTRUCTION (POCHE
OR SOLID BLACK)
ROOM NUMBER SYMBOL
ROOM NUMBER
DOOR NUMBER SYMBOL
ARCHITECTURAL SECTION
OFFICE
AS303
A
EA
AS3031
AS303
AS303
STERILE PROCESSING EQUIPMENT TAG SP09
1. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR
SHALL STOP WORK AND NOTIFY THE THE GOVT. IMMEDIATELY FOR DIRECTION
1. MAINTAIN FIRE RATED CONSTRUCTION AT WALLPENETRATIONS, (CONSTRUCTION TO CONFORM TO
MANUFACTURER'S FIRE RATED / TEST ASSEMBLIES.
2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS / PARTITIONS AND FLOORS. CONFORM WITH THE TESTED / SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND LABEL WALL
WITH U.L. DESIGN NUMBER. FIRE RATED WALLS SHOWN ON PLAN.
3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND THATWHICH IS DISTURBED DURING CONSTRUCTION.
4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING ATEXISTING RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBEDDURING CONSTRUCTION. RE-LABEL EXISTING WALL IF NECESSARY.
HAZARDOUS MATERIAL
FIRE PROOFING GENERAL NOTES
ABBREVIATIONS
DET, DTL
DIAMETER
DIMENSION
DAMPER
DOWN
DISTRIBUTION PANEL
DOWNSPOUT, STORM DRAINAGE STRUCTURE
DOMESTIC WATER
DRAWING
EACH
EACH FACE, EXHAUST FAN
EXHAUST GRILLE
ELEVATION
ELECTRIC, ELECTRICAL CLOSET
EMER
EQ
EQUIP
EACH WAY
ELECTRIC WATER COOLER
EXH
EXIST
EXP
EXPANSION JOINT
EXPANSION JOINT
HEIGHT, HUMIDIFIER
HB
HANDICAPPED
HDW
HORIZ
HR
NA
NEC
NEUT
NIC
NOM
NTS
OA
OC
OD
OPNG
OPP
OH, OVHD
FRAME
FTG
T
T&B
TEL
TEMP
TERM
3/C
3/P
3 WAY
TO
TRANS
TS
TV
TW
TYP
WA
UH
V
VA
VAC
VCT
VENT
VERT
VEST
VS
VTR
VWC
W
W
W/
W/O
WC
WD
WP
WS
WT
WWF
SG
SAN
SCH
SD
SECT
SH
1 PH
SL
SP
SPDT
SPEC
SPST
SQ
SR
SS
ST
STA
STD
STL
SUP
SUSP
SV
SW
SWBD
SWGR
SIM
M
MAS
MATL
MAX
MECH
MET/MTL
MH
MIN
MISC
MM
MTD
MTG
MWP
MULL
KO
KVA
KW
L
LT
LAV
INT
INSUL
INV
JB
JC
JCT
JT
FXTR
GA
GALV
GFI
GL
GWB
GYP
C
C
CAPACITY
CENTER TO CENTER
CEILING DIFFUSER
CEM
CAST IRON, COURTYARD INLET
CHILLER
CAST IRON PIPE
CIRCULATING
CONTROL JOINT
CIRCUIT
CENTERLINE
CEILING
CLEAR
CORRUGATED METAL PIPE
CORRUGATED METAL PIPE ARCH
CONCRETE MASONRY UNITS
CONDENSATE
CLEANOUT
COLUMN
COMMUNICATION
CONCRETE
CONDUCTOR
CONNECTION
CONSTRUCTION
CONTINUOUS
CONVERTER
NONREINFORCED CONCRETE PIPE
CONDUIT
CERAMIC TILE, CURRENT TRANSFORMER,
COOLING TOWER
CENTER, COOLING TOWER RETURN
COOLING TOWER SUPPLY
COLD WATER
CARPET
CONCRETE SEALER/SURFACE
BOARD
BUILDING
BLK
BEAM
BOTTOM
BEARING
BASEMENT
ACOUSTIC
ADJUSTABLE
ABOVE FINISHED FLOOR
ALTERNATE
AIR HANDLING UNIT
ANCHOR BOLT, AUGER BORING
AL
APPROXIMATE
ARCH
AUTOMATIC TRANSFER SWITCH
FA
FLOOR DRAIN, FIRE DAMPER
FOUNDATION
FEEDER
FIRE EXTINGUISHER
FINISHED FLOOR ELEVATION
FIG
FIN
FLOOR, FLASHING, FLOW LINE
FLUOR
P
PB
PIV
PL
PLYWD
PNL
PNT
CHAIR OR CRASH RAIL
CORNER GUARD
FIRE EXTINGUISHER CABINET
OF
WG
ALC
CUBICAL CURTAIN TRACK
CLEAN
ACOUSTIC TILE
L
EPDM ROOF MEMBRANE
HSKP
NEG
STRUC
R
RA
RAD
RVB
RCP
RECP
REINF
REG
REQD
REV
RF
RHC
RM
RPM
RVT
PRELIM
PRIM
PT
PTN
PVMT
PVC
PVC
AB
ACT
ACST
ADJ
AFF
AHU
ALT
ALUMINUM
ALCOVE
APPROX
ARCHITECTURAL
ATS
BD
BLDG
BLOCK
BM
BOT
BRG
BSMT
CELSIUS
CAP
CC
CD
CCT
CEMENT
CG
CH
CI
CIP
CIR
CJ
CKT
CLN
CLG
CLR
CMP
CMPA
CMU
CND,C
CNDS
CO
COL
COMM
CONC
COND
CONN
CONST
CONT
CONV
CP
CR
CS
CT
CT
CTR
CTS
CW
CPT
DETAIL
DIA
DIM
DMPR
DN
DP
DS
DW
DWG
EA
EF
EG
EJ
ELEV
ELEC
EMERGENCY
EPDM
EQUAL
EQUIPMENT
EW
EWC
EXHAUST
EXISTING
EXPANSION, EXPOSED
EXP JT
FIRE ALARM
FD
FDN
FDR
FE
FEC
FFE
FIGURE
FINISH
FL
FLUORESCENT
FRAME
FOOTING
FIXTURE
GAGE
GALVANIZED
GROUND FAULT INTERRUPT
GLASS
GYPSUM WALL BOARD
GYPSUM
HGT, H
HOSE BIBB
HC
HARDWARE
HORIZONTAL
HOUR, HAND RAIL
HOUSEKEEPING
INTERIOR
INSULATION, INSULATED
INVERT
JUNCTION BOX
JANITOR CLOSET
JUNCTION
JOINT
KNOCK OUT
KILOVOLT-AMPERE
KILOWATT
LOUVER, LENGTH, LENGTH OF CURVE
LIGHT
LAVATORY VERTICAL
METER, MEGA
MASONRY
MATERIAL
MAXIMUM
MECHANICAL
METAL
MANHOLE
MINIMUM, MINUTE
MISCELLANEOUS
MILLIMETER
MOUNTED
MOUNTING
MEMBRANE WATERPROOFING
MULLION
NOT APPLICABLE
NATIONAL ELECTRIC CODE
NEGATIVE
NEUTRAL
NOT IN CONTRACT
NOMINAL
NOT TO SCALE
OUTSIDE AIR
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN
OPENING
OPPOSITE
PIPE, POLE
OVERHEAD
PULL BOX
POST INDICATOR VALVE
PLATE
PLYWOOD
PANEL
PAINT
PRELIMINARY
PRIMARY
POINT, POINT OF TANGENT
PARTITION
POINT OF VERTICAL CURVE
POLY VINYL CHLORIDE
PAVEMENT
RADIUS, RISER, RUBBER SHEATH
RETURN AIR
RADIUS
RESILIENT VINYL BASE
REINFORCED CONCRETE PIPE
RCP REFLECTED CEILING PLAN
RECEPTACLE
REINFORCEMENT
REGULATOR, REGISTER
REQUIRED
REVISION
ROOF, RETURN FAN
REHEAT COIL
ROOM
REVOLUTIONS PER MINUTE
RESILIENT VINYL TILE
SANITARY SEWER
SCHEDULE
SPLITTER DAMPER, STORM DRAIN
SECTION
SUPPLY GRILLE
SHEET
SIMILAR
SINGLE PHASE
SLOPE
STATIC PRESSURE, SINGLE POLE
SINGLE POLE, DOUBLE THROW
SPECIFICATION
SINGLE POLE, SINGLE THROW
SQUARE
SUPPLY REGISTER
SANITARY SEWER
STEAM, SINGLE THROW, STREET, STAFF
STATION
STANDARD
STEEL
STRUCTURAL
SUPPORT
SUSPENDED
SHEET VINYL
SWITCH, SIDEWALK
SWITCHBOARD
SWITCHGEAR
TILE,TOP,TANGENT
TOP AND BOTTOM
TELEPHONE
TEMPERATURE, TEMPORARY
TERMINAL
THREE CONDUCTOR
THREE POLE
THREE WAY
TOP OF
TRANSITION
TOP OF STEEL, TOP OF STONE, TOP OF SLAB
TELEVISION
TOP OF WALL
TYPICAL
UNIT HEATER
VENT,VOLT,VALVE
VOLT AMPRE
VACUUM
VINYL COMPOSITION TILE
VENTILATING
VERTICAL
VESTIBULE
VENT STACK
VENT THRU ROOF
VINYL WALL COVERING
WIDTH,WASTE,WATER,WATT,WEST, WIRE,
WATER LINE STRUCTURE
WATT
WITH
WITHOUT
WATER CLOSET, WHEEL CHAIR
WIDTH, WINDOW DIMENSION
WALL GUARD
WATERPROOF, WEATHERPROOF
WASTE STACK, WATER SURFACE, WATERSTOP
WEIGHT
WELDED WIRE FABRIC
RES RESINOUS
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch o ne fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
GI003
GENERAL NOTES
JULY 10, 2020 3
UP
UP
UP
1 2 3 4 5 6 7 8 9 10 11 1211A
B
C
D
E
F
G
H
I
A
J
K
9A8A
G2
G1
B1
C1
A1
9432 SF
6F-106
MECHANICAL
EQUIPMENT
ROOM
166 SF
6F-105
ELEV PIT
ACCESS
115 SF
6F-104
WOMEN
94 SF
6F-103
MEN
167 SF
6F-102C
EXISTING
OFFICE
112 SF
6F-102B
EXISTING
OFFICE
111 SF
6F-101
EXISTING
OFFICE
165 SF
6F-102
EXIST. HALL
93 SF
P-8
ELEVATOR
94 SF
P-7
ELEVATOR
93 SF
P-9
ELEVATOR
94 SF
P-10
ELEVATOR
344 SF
C6 1F
ELEVATOR
LOBBY
208 SF
STAIR
182 SF
STAIR
91 SF
6F-110J
HAC
130 SF
6F-110H
RME
183 SF
6F-110
ELECTRICAL
CLOSET
166 SF
STAIR
4497 SF
6F-110M
STERILE
STORAGE
280 SF
C6-7
LOBBY
108 SF
P-11
ELEVATOR
204 SF
STAIR
1135 SF
C6-6
CORRIDOR
62 SF
6F-118
SOILED LINEN
34 SF
6F-119
SOILED LINEN
103 SF
6F-112F
MANUAL EQUIP
WASH
109 SF
6F-110L
STERILE
1488 SF
6F-112
SOILED
RECEIVING AND
DECONTAMINATION
AREA
94 SF
6F-111A
ELEC. CLOSET
327 SF
6F-110P
PREP
ASSEMBLY AND
STERILIZATION
251 SF
6F-111B
CLEAN SCOPE
STORAGE
322 SF
6F-107
BREAK ROOM1793 SF
6F-110N
CLEAN
PROCESSING
153 SF
6F-117
HALL
819 SF
C6-4
CORRIDOR
ELEVATOR PIT
CONSTRUCTED UNDER
SEPARATE CONTRACT
113 SF
6F-112G
CART WASH
178 SF
6F-105A
ELEVATOR
MACHINE RM
129 SF
6F-120
STORAGE
121 SF
6F-110C
ASSIST. CHIEF
SPS OFFICE
48 SF
6F-110F
FILES/COPY
213 SF
6F-110D
CLERICAL/WAITING
209 SF
6F-110A
Q.I. &
SUPERVISOR
PPE
PPE
436 SF
6F-113B
WOMEN
LOCKER
189 SF
6F-114A
MEN LOCKER
36 SF
6F-114
MEN ENTRY
105 SF
6F-113A
WOMEN ENTRY
135 SF
6F-110K
SERVICE RM.
34 SF
6F-112A
HAC
425 SF
6F-111C
AER ROOM
211 SF
6F-112E
HALL
PPE
280 SF
6F-115
HALL
WORK
STATION
W O R K
S T A T
IO
N
W O
A T
IO
N
W O
A T
IO
N
V E N D O
C A R T S
COAT HOOKS
937 SF
C6-3
CORRIDOR
136 SF
C6-10
LOBBY
INFILL FLOOR OPENING
WITH CONCRETE-
MAINTAIN 2 HR. RATING
INFILL FLOOR OPENING
WITH CONCRETE-
MAINTAIN 2 HR. RATING
INFILL FLOOR OPENING
WITH CONCRETE-
MAINTAIN 2 HR. RATING
C O A T
H O O K S
86 SF
6F-112B
HAC
103 SF
6F-110G
STORAGE
120 SF
6F-110I
SUPPORT
218 SF
6F-110B
CHIEF SPS
OFFICE/
CONF. RM.
VENDOR
CARTS
FEC
FEC
F E C
FEC
FEC
F E C
F E C
F E C
FEC
F E C
F E C
FEC
FEC
5'-0 1/8"
REINSTALL
FEC CAB
OCCUPANT LOAD:
ONE PERSON/ 300 SF=31 OCCUPANTS
1 OCCUPANT
OCCUPANT LOAD:
ONE PERSON/15 SF=
14 OCCUPANTS
OCCUPANT LOAD:
ONE PERSON/100 SF=3 OCCUPANTS
1 OCC.
1 OCC.
1 OCCUPANT
EXIT DISTANCE = 141'
E X
IT
D
IS
T A N C E
E X
IT
D
IS
T A N C E
EXIT DISTANCE 110 '
WITH 90' COMMON TRAVEL
DISTANCE
EXISTING 3 HR RATED
ENCLOSURE OF
STRUCTURAL STEEL
COLUMNS AND
FRAME-MAINTAIN-
TYPICAL
EXIT ONLY
HARDWARE
6A
EXISTING ONE HOUR FIRE BARRIER TO REMAIN.
SEAL PERIMETER AND ALL PENETRATIONS TO
MAKE SMOKE TIGHT.
FE
FE
261 SF
6F-111
SOIL SCOPE
DECONTAMINATE
ROOM
OCCUPANT LOAD:
ONE PERSON/100 SF=4 OCCUPANTS
6F-116
HALL
6F-113C
WOMEN
SHOWER
6F-114B
SHOWER
6F-112H
WATER EQUIP
M D
C
F
B
A
E
KEY PLAN
169 TOTAL OCCUPANTS X .3 OCCUPANCY FACTOR FOR STAIRS = 50.7" OF EXIT WIDTH REQUIRED
3 EXISTING STAIR EXITS PROVIDE TOTAL EXIT WIDTH OF 132"
GENERAL NOTES
1.
THE FLOOR FIRE RATING IS 2 HOURS. ALL PENETRATIONS SHALL BE FIRE STOPPED AND
SEALED AS REQUIRED TO MAINTAIN RATING USING UL LISTED METHODS
2.
THE ROOF FIRE RATING IS 1 1/2 HOURS. ALL PENETRATIONS SHALL BE FIRE STOPPED
AND SEALED AS REQUIRED TO MAINTAIN RATING USING UL LISTED METHODS
3.
ALL RATED WALLS SHALL BE LABELED ABOVE CEILINGS WITH STENCILED LETTERS IN
ACCORDANCE WITH IBC 703.7 AND HOSPITAL GUIDELINES.
4.
TRAVEL DISTANCES-BUSINESS OCCUPANCY WITH AUTOMATIC SPRINKLER 5.
COMMON PATH
MAX. TRAVEL DISTANCE TO EXIT
MAX. DEADEND
100 FEET
300 FEET
50 FEET
IBC TABLE 1014.3
IBC TABLE 1016.2
IBC 1018.4 EXCEPTION 2
FIRE EXTINGUISHER CABINETS ARE EXISTING. REINSTALL ONE FEC CABINET AS SHOWN. PROVDE
FIRE EXTINGUISHER ON BRACKETS IN HAC.
6.
REPAIR EXISTING WALLS AS NEEDED TO MAINTAIN FIRE RATING. 7.
STRUCTURAL FRAME SHALL BE PROTECTED WITH 3 HOUR FIRE RATING. RESTORE FIRE RATING AT
ANY RATING THAT HAVE BEEN DISTURBED BY CONSTRUCTION. SEE DETAIL 1/SHEET AS501
8.
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
1 HOUR FIRE/SMOKE BARRIER
FEC FIRE EXTINGUISHER CABINETS
LEGEND - LIFE SAFETY PLAN
EXIT PATH
SMOKE PARTITION
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch o ne fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
GI004
LIFE SAFETY PLAN-SIXTH FLOOR
JULY 10, 2020
1/8" = 1'-0"GI004
1 6TH FLOOR PLAN -LIFE SAFETY PLAN
OCCUPANCY SCHEDULE- SIXTH FLOOR
ROOM
NUMBER ROOM NAME AREA
OCCUPANT
LOAD
FACTOR OCCUPANTS
6F-101 EXISTING OFFICE 111 SF 100 SF 1.112809
6F-102 EXIST. HALL 165 SF
6F-102B EXISTING OFFICE 112 SF 100 SF 1.122955
6F-102C EXISTING OFFICE 167 SF 100 SF 1.672847
6F-103 MEN 94 SF
6F-104 WOMEN 115 SF
6F-105 ELEV PIT ACCESS 166 SF
6F-105A ELEVATOR MACHINE RM 178 SF
6F-106 MECHANICAL EQUIPMENT ROOM 9432 SF 300 SF 31.439419
6F-107 BREAK ROOM 322 SF 15 SF 21.488715
6F-110 ELECTRICAL CLOSET 183 SF
6F-110A Q.I. & SUPERVISOR 209 SF 100 SF 2.089974
6F-110B CHIEF SPS OFFICE/ CONF. RM. 218 SF 100 SF 2.176339
6F-110C ASSIST. CHIEF SPS OFFICE 121 SF 100 SF 1.208637
6F-110D CLERICAL/WAITING 213 SF 15 SF 14.186111
6F-110F FILES/COPY 48 SF 100 SF 0.484028
6F-110G STORAGE 103 SF 300 SF 0.342746
6F-110H RME 130 SF 100 SF 1.298325
6F-110I SUPPORT 120 SF 100 SF 1.202839
6F-110J HAC 91 SF 300 SF 0.301806
6F-110K SERVICE RM. 135 SF 100 SF 1.350988
6F-110L STERILE 109 SF 100 SF 1.085049
6F-110M STERILE STORAGE 4497 SF 300 SF 14.991392
6F-110N CLEAN PROCESSING 1793 SF 100 SF 17.925783
6F-110P PREP ASSEMBLY AND STERILIZATION 327 SF 100 SF 3.268997
6F-111 SOIL SCOPE DECONTAMINATE ROOM 261 SF 100 SF 2.607172
6F-111A ELEC. CLOSET 94 SF 300 SF 0.313009
6F-111B CLEAN SCOPE STORAGE 251 SF 300 SF 0.835737
6F-111C AER ROOM 425 SF 100 SF 4.254929
6F-111D PPE 34 SF
6F-112 SOILED RECEIVING AND DECONTAMINATION AREA 1488 SF 100 SF 14.878463
6F-112A HAC 34 SF 300 SF 0.112278
6F-112B HAC 86 SF 300 SF 0.286771
6F-112C ANTEROOM, SOILED DROP-OFF 186 SF
6F-112D PPE 140 SF 100 SF 1.400521
6F-112E HALL 211 SF
6F-112F MANUAL EQUIP WASH 103 SF
6F-112G CART WASH 113 SF
6F-112H WATER EQUIP 35 SF
6F-113 VESTIBULE 65 SF
6F-113A WOMEN ENTRY 105 SF 50 SF 2.099472
6F-113B WOMEN LOCKER 436 SF 50 SF 8.718095
6F-113C WOMEN SHOWER 38 SF 50 SF 0.751042
6F-114 MEN ENTRY 36 SF 50 SF 0.711576
6F-114A MEN LOCKER 189 SF 50 SF 3.786908
6F-114B SHOWER 41 SF 50 SF 0.820036
6F-114C MEN LOCKER 225 SF 50 SF 4.506042
6F-115 HALL 280 SF
6F-116 HALL 358 SF
6F-117 HALL 153 SF
6F-118 SOILED LINEN 62 SF
6F-119 SOILED LINEN 34 SF
6F-120 STORAGE 129 SF 300 SF 0.430972
6F-122 ACCESS 89 SF
165.26278
DN
DN
UP DN
UP
UP
UP DN
DN
1 2 3 4 5 6 7 8 9 10 11 1211A
B
C
D
E
F
G
H
I
A
J
K
9A8A
G2
G1
B1
C1
A1
182 SF
STAIR
158 SF
C7 4F
CORRIDOR
76 SF
7F107H
GAS STOR
28 SF
7F-107B
HAC
132 SF
7F110A
CONTROL RM
93 SF
7F108X
ANGIO EQUIP
72 SF
7F125
ANTHES GAS
STOR
758 SF
7F124
NEUROSURGERY
O.R.9
976 SF
7F113
CLEAR CORE
EXPANSION
106 SF
7F127
HSKP'G
145 SF
7F129
STORAGE
132 SF
7F130
X-RAY
STORAGE
57 SF
7F131
HAC
61 SF
7F133
ELECTRICAL
185 SF
STAIR
173 SF
7F-137
HEAD NURSE
120 SF
7F-138
STORAGE
148 SF
7F-139
CONTROL
PLASTER &
SPLINT
579 SF
7F-134
ORTHOPEDIC
OR 5
85 SF
7F-137
SCRUB
100 SF
7F-114C
SUB STERILE
111 SF
7F-126
BLOOD GAS
547 SF
7F-128
CARDIAC OR
115 SF
7F-113F
SUB-STER
1074 SF
7F-110
HYBRID O.R.
71 SF
7F-107A
SCRUB
178 SF
7F-113D
SUB-STER.
38 SF
7F-100
TELEPHONE
344 SF
C7-2F
ELEVATOR
LOBBY
93 SF
P-8
ELEVATOR
94 SF
P-7
ELEVATOR
93 SF
P-9
ELEVATOR
94 SF
P-10
ELEVATOR
142 SF
7F150A
OFFICE
122 SF
7F150
SECT'Y/WAITING
133 SF
7F148
MASS
SPECROMETER
442 SF
7F150B
ANESTH.
CLEAN-UP
AND STORAGE
599 SF
7F140
GENERAL OR
112 SF
7F113B
SUBSTERILE
69 SF
7F123
STORAGE
479 SF
7F122
GENERAL OR
58 SF
7F121
STORAGE
115 SF
7F120
SCRUB
57 SF
7F119
STORAGE
121 SF
7F116
ELEC.CLOSET
502 SF
7F118
GENERAL OR
95 SF
7F113A
SUB STERILE
70 SF
7F114
HAC
115 SF
7F116A
ELEC. CLOS
100 SF
7F141
SCRUB
63 SF
7F142A
CONTROL
128 SF
7F113E
SUB STERILE
67 SF
7F143
X-RAY DIGITAL
ROOM
492 SF
7F142
GENERAL OR 7
195 SF
7F144
STORAGE
132 SF
7F113G
SUB-STERILE
88 SF
7F145
SCRUB
451 SF
7F151
AMBULATORY
OR 8
170 SF
7F152
ALCOVE
108 SF
P-11
ELEVATOR
160 SF
STAIR
8'-9"
29'-3"
102 SF
7F107I
STORAGE
183 SF
7F113H
EQUIP STOR.
131 SF
7F109A
PUMP RM
117 SF
7F112
IT CLO
905 SF
7F109
CARDIAC OR 3
147 SF
P-12
ELEVATOR
8'-0"
130 SF
7F155
OR CTR
49 SF
7F108D
SOIL
8'-0"
103 SF
7F108A
CLEAN
8'-0"
80 SF
7F103
CONSULT
22'-5"
92 SF
7F108E
ISOLATION
42 SF
7F154D
SOIL
31 SF
7F154C
CLEAN
34 SF
7F154B
TLT
35 SF
7F154A
TLT
30 SF
7F154F
STO.CLO.
25 SF
7F154E
TLT
30 SF
7F154H
STO. CLO.
27 SF
7F154G
TLT
1913 SF
7F154
PRE-OP
487 SF
C7 8F
CORRIDOR
557 SF
C7 6F
CORRIDOR
98 SF
7F107
ALCOVE
744 SF
C73F
CORRIDOR
2089 SF
7F108
RECOVERY
35 SF
7F108C
TLT
35 SF
7F108B
TLT
273 SF
C7-19F
CORRIDOR
94 SF
C7-17F
CORRIDOR
453 SF
7F102
SURGICAL
WAITING
450 SF
C7 2F
CORRIDOR
1211 SF
C7 16F
CORRIDOR
38 SF
7F101A
TLT
38 SF
7F101B
TLT
1130 SF
C7 10F
CORRIDOR
601 SF
C7 6F
CORRIDOR
896 SF
C7 5F
CORRIDOR
39 SF
7F107C
SCRUB
36 SF
7F106
TLT
38 SF
7F105
TLT
160 SF
7F153
SOILED UTILITY
1182 SF
7F113
EXISTING
CLEAN CORE
757 SF
C7 11F
CORRIDOR
361 SF
C7 12F
CORRIDOR
53 SF
7F149
STORAGE
26 SF
7F147
TLT
26 SF
7F146
TLT
FEC
F E C
FEC
F E C
FEC
2 HOUR FIRE RATED WALL TO
MAINTAIN FLOOR RATING BETWEEN
SEVENTH AND EIGHTH
INSTALL CONCRETE
SLAB FLOOR INFILL
AT PREVIOUS
OPENING IN 7TH
FLOOR FOR
REMOVED STAIR.
PROVIDE 2 HOUR
RATING
6A
EXIT DISTANCE = 216'
STAIR 9 10 11 11A
B
C
9A8A
B1
C1
A1
STAIR 7
9F-111
PENTHOUSE
9F-110
MACHINE
ROOM
EXISTING
LINEN CHUTE
SHIP LADDER TO
ROOF
LADDER TO
PENTHOUSE
ROOF
EXTEND TWO
HOUR FIRE
BARRIER FOR
STAIR
FLOOR INFILL
SHALL MAINTAIN
TWO HOUR
RATING
SHAFT
ENCLOSURE -
COOR. W/MECH
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
1 HOUR FIRE/SMOKE BARRIER
FEC FIRE EXTINGUISHER CABINETS
LEGEND - LIFE SAFETY PLAN
EXIT PATH
SMOKE PARTITION
M D
C
F
B
A
E
KEY PLAN
GENERAL 7TH FLOOR LIFE SAFETY NOTES:
1. THE ARCHITECTURAL WORK ON THIS FLOOR IS LIMITED TO REPLACING CONVENIENCE
STAIR FROM 6TH TO 7TH WITH STAIR FROM 7TH TO 8TH FLOOR
2. MAINTAIN AND REPLACE AS NEEDED FIRE RATING AND FIRE PROOFING WHERE
DAMAGED TO INSTALL NEW OR RELOCATE EXISTING ROOF DRAIN, ELECTRICAL, FIRE
PROTECTION AND PLUMBING LINES
LAYOUT SHOWN REFLECTS PROPOSED OPERATING ROOM
EXPANSION TO BE PERFORMED UNDER SEPARATE CONTRACT
3.
OTHER THAN WALLS AT PERIMETER OF STAIR 14- SMOKE AND
FIRE BARRIERS ARE EXISTING.
4.
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch o ne fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
GI005
LIFE SAFETY PLAN-SEVENTH &
PENTHOUSE FLOOR
JULY 10, 2020
1/8" = 1'-0"GI005
1 LIFE SAFETY PLAN - 7TH FLOOR
1/8" = 1'-0"GI005
2 LIFE SAFETY PLAN- PENTHOUSE FLOOR
DN
UP
DN
UP
1 2 3 4 5 6 7 8 9 10 11 1211A
B
C
D
E
F
G
H
I
A
J
K
9A8A
G2
G1
B1
C1
A1
3613 SF
8F100A
MECHANICAL
EQUIPMENT
PENTHOUSE
592 SF
8F-161
MEN'S LOCKER
333 SF
8F-162
LOUNGE
419 SF
C8-15
CORRIDOR
313 SF
C8-14
CORRIDOR
250 SF
8F-155
UNIFORM
DISTRIBUTION
413 SF
8F-167
BREAKROOM
259 SF
C8-17
CORRIDOR
581 SF
8F-157
WOMEN'S
LOCKER
228 SF
8F-158
WOMEN'S
170 SF
8F-160
MEN'S
30 SF
8F-159
JANITOR
400 SF
C8-16
LOBBY
201 SF
STAIR
51 SF
8F-168
LINEN
25'-6"
IN THIS AREA-UNDER SEPARATE CONTRACT
EXISTING ROOF TOP EQUIPMENT MOVED
NEW ROOFING AND NEW ROOF DRAINS INSTALLED
IN THIS AREA-UNDER SEPARATE CONTRACT
NEW ADDITION CONSTRUCTED
4'-10"
7'-5"
279 SF
8F-111
ISOLATION ICU
PAT RM
66 SF
8F-110
ANTE ROOM
270 SF
8F-109
ICU PAT RM
259 SF
8F-108
ICU PAT RM
279 SF
8F-107
ICU PAT RM
277 SF
8F-106
ICU PAT RM
204 SF
8F-112
ICU PAT RM
199 SF
8F-113
ICU PAT RM
201 SF
8F-114
ICU PAT RM
188 SF
8F-115
TEAM ROOM
157 SF
8F-116
STAFF LOUNGE
272 SF
8F-117
ICU PAT RM
278 SF
8F-118
ICU PAT RM
276 SF
8F-119
ICU PAT RM
272 SF
8F-120
ICU PAT RM
307 SF
8F-148
NURSE
STATION 80 SF
8F-146
NOURISHMENT
88 SF
8F-147
MEDS
58 SF
8F-142
CLEAN LINENS
70 SF
8F-143
SIGNAL CLOSET
47 SF
8F-144
HAC
353 SF
8F-145
CLEAN
SUPPLIES
127 SF
8F-139
SOILED UTILITY
125 SF
8F-140
CLEAN UTILITY
116 SF
C8-9
CORRIDOR
824 SF
C8-7
CORRIDOR
740 SF
C8-8
CORRIDOR
676 SF
C8-13
CORRIDOR
187 SF
C8-10
CORRIDOR
82 SF
8F-123
ANTE ROOM 100 SF
C8-11
ELEVATOR
LOBBY
273 SF
8F-121
ISOLATION ICU
PAT RM
279 SF
8F-122
ICU PAT RM 87 SF
8F-125
ON CALL
61 SF
8F-124 T/S
23 SF
8F-126W
COMM.RM
96 SF
P-8
ELEVATOR
94 SF
P-7
ELEVATOR
94 SF
P-9
ELEVATOR
94 SF
P-10
ELEVATOR
43 SF
8F-126
COMM.CLO
213 SF
STAIR
350 SF
C8-2
ELEVATOR
LOBBY
286 SF
8F-130
NURSE
STATION
89 SF
8F-133
ELECTRIC
CLOSET
217 SF
8F-134
EQUIP.
STORAGE
106 SF
8F-135
OFFICE
65 SF
8F-136
TRASH
110 SF
C8-5
CORRIDOR
159 SF
8F-100
MEN'S
158 SF
8F-101
WOMENS
249 SF
8F-102
ICU PAT RM
242 SF
8F-103
ICU PAT RM
273 SF
8F-104
ICU PAT RM
274 SF
8F-105
ICU PAT RM
650 SF
C8-3
CORRIDOR
662 SF
C8-6
CORRIDOR
341 SF
8F-129
WAITING ROOM
469 SF
C8-1
CORRIDOR
106 SF
P-11
ELEVATOR6'-0"
1'-5 1/8"
27 SF
8F-160D
MEN'S SHOWER
152 SF
P-12
PATIENT
ELEVATOR
68' FEET EXIT ACCESS TRAVEL DISTANCE
58' EXIT ACCESS TRAVEL DISTANCE
FEC
FEC
F E C
F E C
EXIT ACCESS TRAVEL
DISTANCE WITHIN
SUITE IS 54'
8F100B
MECHANICAL
EQUIPMENT
PENTHOUSE
6A
NEW EXTERIOR WALL AS PART
OF DEDUCT ALTERNATE #10
SEE DETAIL 15/AS502
TEMP WALL TO BE BUILT
HERE TO AVOID DEAD END,
INCLUDED AS PART OF
DEDUCT ALTERNATE #10
UNNOCCUPIED AND
INNACCESSIBLE SPACE AS
APART OF DEDUCT
ALTERNATE #10
STAIR 14
93' FEET EXIT ACCESS TRAVEL DISTANCE
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
1 HOUR FIRE/SMOKE BARRIER
FEC FIRE EXTINGUISHER CABINETS
LEGEND - LIFE SAFETY PLAN
EXIT PATH
SMOKE PARTITION
126 TOTAL OCCUPANTS X .3 OCCUPANCY FACTOR FOR STAIRS = 41.4" OF EXIT WIDTH REQUIRED
2 EXISTING STAIR EXITS PROVIDE TOTAL EXIT WIDTH OF 88"
GENERAL NOTES
1.
THE FLOOR FIRE RATING IS 2 HOURS. ALL PENETRATIONS SHALL BE FIRE STOPPED AND
SEALED AS REQUIRED TO MAINTAIN RATING USING UL LISTED METHODS
2.
THE ROOF FIRE RATING IS 1 1/2 HOURS. ALL PENETRATIONS SHALL BE FIRE STOPPED
AND SEALED AS REQUIRED TO MAINTAIN RATING USING UL LISTED METHODS
3.
ALL RATED WALLS SHALL BE LABELED ABOVE CEILINGS WITH STENCILED LETTERS IN
ACCORDANCE WITH IBC 703.7 AND HOSPITAL GUIDELINES.
4.
TRAVEL DISTANCES-BUSINESS OCCUPANCY WITH AUTOMATIC SPRINKLER 5.
COMMON PATH
MAX. TRAVEL DISTANCE TO EXIT
MAX. DEADEND
100 FEET
300 FEET
50 FEET
IBC TABLE 1014.3
IBC TABLE 1016.2
IBC 1018.4 EXCEPTION 2
6. STRUCTURAL FRAME SHALL BE PROTECTED WITH 2 HOUR FIRE RATING FOR THIS EIGHTH FLOOR
LEVEL ONLY WHERE STRUCTURE ONLY SUPPORTS ROOF LEVEL. (IBC TABLE 601)
7. STAIR 14 IS AN UNPROTECTED VERTICAL OPENING BETWEEN 7TH AND 8TH FLOOR COMPLYING
WITH LSC 18.3.1.2 AND 8.6.8.2-CONVENIENCE OPENINGS.
M D
C
F
B
A
E
KEY PLAN
NON SLEEPING SUITE - 2440 SF
PREVIOUS CONSTRUCTION UNDER SEPARATE CONTRACT
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
CLH
VAMC Oklahoma City, OK
SPS EXPANSION
Office of
Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e q ua rt er in ch o ne fo ot th re e ei g ht hs in ch o ne fo ot on e h al f in ch o ne fo ot th re e q ua rt er s in ch o ne fo ot on e in ch on e fo ot on e a nd on e h al f in ch es on e fo ot th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th in ch on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
JJG
Department of Veterans Affairs
GI006
LIFE SAFETY PLAN - EIGHTH
FLOOR
JULY 10, 2020
1/8" = 1'-0"GI006
1 LIFE SAFETY PLAN - EIGHTH FLOOR
OCCUPANCY SCHEDULE- EIGHTH FLOOR
ROOM
NUMBE ROOM NAME AREA
OCCUPANT
LOAD
FACTOR OCCUPANTS
8F-155 UNIFORM DISTRIBUTION 250 SF 100 SF 2.504461
8F-156 WOMEN'S ENTRY 86 SF 50 SF 1.72987
8F-157 WOMEN'S LOCKER 581 SF 50 SF 11.620698
8F-158 WOMEN'S 228 SF 50 SF 4.566781
8F-158B WOMEN'S SHOWER 38 SF 50 SF 0.767246
8F-158C WOMEN'S SHOWER 34 SF 50 SF 0.681795
8F-159 JANITOR 30 SF
8F-159A MEN'S TOILET 36 SF 50 SF 0.72
8F-160 MEN'S 170 SF 50 SF 3.40848
8F-160A M. VEST 45 SF 50 SF 0.892084
8F-160A MEN'S TOILET 19 SF 50 SF 0.38875
8F-160C MEN'S SHOWER 35 SF 50 SF 0.700787
8F-160D MEN'S SHOWER 27 SF 50 SF 0.532518
8F-161 MEN'S LOCKER 592 SF 50 SF 11.833704
8F-161A MEN'S TOILET 19 SF 50 SF 0.389097
8F-162 LOUNGE 333 SF 15 SF 22.183137
8F-163 VESTIBULE 115 SF
8F-167 BREAKROOM 413 SF 15 SF 27.536614
8F-168 LINEN 51 SF
90.45602
4 5 6
D
E
F
G
H
G2
G1
(E)W14X43
(E )W
X5
(E)W10X22
(E)W10X22
(E )W
X5
(E)W14X43
(E )C
8X
.5
(E )C
8X
.5
(E)W14X43
(E)W10X22
(E)W10X22
(E )W
X5
(E )W
X5
(E )C
8X
.5
(E )C
8X
.5
(E)W14X43
L4x4x1/4, TYP. 4-SIDES
5 1/4" CONC. SLAB OVER 2"-20 GA.
MTL. DECK, (MATCH EXIST. SLAB,
FIELD VERIFY)
L4x4x1/4, TYP. 4-SIDES
5 1/4" CONC. SLAB OVER 2"-20 GA.
MTL. DECK, (MATCH EXIST. SLAB,
FIELD VERIFY)
(E) C8x11.5
NOTES:
1. TOP OF (E) STEEL = 1308'-11 3/8"
SS101(E)C8X11.5
(E)C8X11.5
20' - 9" 20' - 9"
7 8 9
B
C
A
8A
B1
A1
(E)W14X43
(E )W
X5
(E)W10X22
(E )W
X4
(E)W10X15
(E)W14X43
NOTES
1. 1 INDICATES 5 1/4" CONC. SLAB
(MATCH EXIST., FIELD VERIFY) W/
2"-20 GA. COMPOSITE METAL DECK
W/ 6x6-W2.1xW2.1 WWF
2. TOP OF (E) STEEL = 1320'-0 7/8"
SS105
SS105
L4x4x1/4
C12X20.7
HSS3X3X1/4
HSS3X3X1/4
(E)W10X22 (E)W10X22
(E)W10X22(E)W10X22
(E)W18X35 (E)W18X35
(E )W
X3
(E )W
X5
(E )W
X5
(E)W14X43
L4x4x1/4 TOILET PARTITION FRAMING
COORD. WITH ARCH.
L4x4x1/4 TOILET PARTITION FRAMING
COORD. WITH ARCH.
STAIR LANDING
SUPPORT
STAIR LANDING
SUPPORT
SIM.
SS106
SS106
WELD SHEAR TAB TO EXIST.
BEAM, SIM. TO DET. 3/SS105, TYP.
SS106
SS106
SS106
L2 1/2x2 1/2
BRACE
BEAR C12 ON CONC. SLAB
W/ L3x3x1/4x3" W/ 5/8" Ø
EXPANSION ANCHOR
REMOVE (E) W10
REMOVE (E) C10 REMOVE (E) W10
W 8X
W 8X
2'
1/
2" 3'
W12X26
W12X26
REMOVE (E) SLAB
SS105
L4x4x1/4
WELD SHEAR TAB TO EXIST.
BEAM, SIM. TO DET. 3/SS105, TYP.
20' - 9" 20' - 9"
3' - 4"
W 8X
3' - 6"
EXISTING 6TH FLOOR
1309'-4 5/8"
CONC. SLAB OVER 2"-20 GA. MTL.
DECK W/ 6x6-W2.1xW2.1 WWF
(E) C8 (E) C8
(E) BENT PL
(E) BENT PL
L4x4x1/4, 4 SIDES (E) CONC. SLAB
W/ MTL DECK
(E) CONC. SLAB
W/ MTL. DECK
1/4 3@12
8 9
C
8A
B1
SS106
SS106
SIM.
SIM.
C12X20.7
C12X20.7
C12X20.7
C9X13.4
C9X13.4
C
X2 0.
C 9X
.4
NOTES
1. 1 INDICATES 5" CONC. SLAB W/
2"-20 GA. COMPOSITE METAL DECK
TOP OF SLAB EL. = 1328'-5 5/8"
C12X20.7
SS106
SS106
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
DRS
VAMC Oklahoma City, OK
SPS EXPANSION Office of Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e qu ar te r in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e ha lf i nc h o ne fo ot th re e qu ar te rs i nc h o ne fo ot
6" 6" on e in ch on e fo ot on e an d on e ha lf in ch es fo ot
6"
6" th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th i nc h on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
MGJ
Department of Veterans Affairs
9910 North 48th St, Omaha, NE 68152 402.455.7698
SS101
6th & 7th FLOOR FRAMING
JULY 10, 2020
1/4" = 1'-0"SS101
1 PARTIAL 6th FLOOR FRAMING (PHASE 2)
1/4" = 1'-0"SS101
2 PARTIAL 7th FLOOR FRAMING (PHASE 1)
1" = 1'-0"SS101
3 INFILL FRAMING DETAIL
1/4" = 1'-0"SS101
4 STAIR 14 @ LANDING (PHASE 1)
UP
5 6 7 8 9 10 11 1211A
B
C
D
E
F
G
H
A
9A8A
G2 G1
B1
C1
A1
6A
(E)W18X35 (E)W18X35 (E)W18X35 (E)W18X35
(E )W
X3
(E
)W
X4
(E )W
X3
(E
)W
X3
(E )W
X3
(E
)W
X3
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E
)W
X5
(E )W
X5
(E
)W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E )W
X5
(E)W14X43 (E)W14X43
(E )W
X5
(E )W
X5
(E )W
X5
(E)W14X43 (E)W14X43 (E)W14X43
(E)W14X43 (E)W14X43 (E)W14X43
(E)W14X43 (E)W14X43
(E )W
X5
(E )W
X5
(E)W14X43 (E)W14X43 (E)W14X43 (E)W14X43 (E)W14X43
(E)W14X43 (E)W14X43
(E)W14X43 (E)W14X43
(E)W14X43 (E)W14X43 (E)W14X43 (E)W14X43
(E)W10X22 (E)W10X22
(E)W10X22 (E)W10X22
(E)W10X22 (E)W10X22
(E)W10X22 (E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22 (E)W10X22
(E)W10X22 (E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X22
(E)W10X33
(E)W10X39
(E)W14X43
(E)W10X26 (E)W14X26
(E)W14X26
(E)W10X26
(E)W10X22
(E)W14X26
(E)W10X33
W10X33
(E)W10X15 (E)W10X15 (E)W10X15
(E)W10X15(E)W10X15(E)W10X15(E )W
X5
(E )W
X6
(E )W
X6
(E )W
X5
(E)W14X43(E)W14X43 (E)W14X53
(E)W10X22
SS105
SS105
SS105
NOTES
1. TOP OF EXISTING (E) STEEL = 1333'-6 3/4"
W14X90W14X90W14X90W14X90
W14X90 W14X90
W14X90
W14X90 W14X90
W14X90 W14X90 W14X90 W14X90
W14X90
W14X90
SS103
PROVIDE DBL-STUDS
AT EA. CAGED
LADDER CONN.
SS102
PREFABRICATED BRICK PANEL
PREFABRICATED BRICK PANEL
PREFABRICATED BRICK PANEL
PREFABRICATED BRICK PANEL
PREFABRICATED BRICK PANEL
PREFABRICATED BRICK PANEL
C
X2 0.
REMOVE EXIST. SLAB
SS105
SS105
SS105
SIM.
2' - 5"
3'
8"
64' - 11"
20' - 9" 20' - 9" 20' - 9" 20' - 9" 20' - 9"
2' - 6"
20' - 9"
1"
HSS4X4X1/4HSS4X4X1/4
HSS4X4X1/4
HSS4X4X1/4
SS105
PHASE 3/DEDUCT
ALTERNATE #10
WORK HATCHED
REMOVE IN PHASE 3/DEDUCT
ALTERNATE #3
8 9
C
8A
B1
(E )W
X4
(E )W
X5
(E)W14X43
(E)W10X22
W10X33
C
X2 0.
(E)W10X22
W14X90
C12X20.7
C12X20.7
SS106 SIM.
SS106
HSS 4X4
COL., BELOW
WELD SHEAR TAB TO EXIST.
BEAM SIM. TO DET. 3/SS105
SS106
SS105
SIM.
CONNECT (E) W10
TO C12 W/ TYP SHEAR
TAB CONN. DET. 3/SS105
6' - 10"
3' - 2 1/2"
12' - 3" 8' - 6 1/4"
OMAHA | LINCOLN | DES MOINES | COLORADO SPRINGS
FARRIS ENGINEERING
farris-usa.com
IMPORTANT CONTRACTOR'S NOTE
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK.
CONTRACTOR SHALL NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE
TO REVIEW ENTIRE SET OF DOCUMENTS.
ANY USE OF THESE ELECTRONIC DRAWINGS OR SCALING OF THE
PRINTED DOCUMENTS ARE DONE SO AT THE CONTRACTORS RISK.
Fax: 402.291.9193
Calvin
Phone:402.291.6941 rchitects, P.C.
Elkhorn, L 3705 orthN
A
68022 treet
Nebraska
H 200th S
. INZ
L. Hinz Architects is
These plans are specifically designed for construction and are intended for no by Calvin L. Hinz Architects written consent of Calvin in part or whole without for use of this document other purposes. Permission prohibited.
Calvin L. Hinz Architects P.C.C 2020
DRS
VAMC Oklahoma City, OK
SPS EXPANSION Office of Construction and Facilities Management
1 2 3 4 5 6 87 9
A
B
C
D
E
F
97 8654321
VA FORM 08-6231
on e qu ar te r in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e ha lf i nc h o ne fo ot th re e qu ar te rs i nc h o ne fo ot
6" 6" on e in fo ot on e an d on e ha lf in ch fo ot
6"
6" th re e in ch es o ne fo ot
F
E
D
C
A
B on e ei gh th i nc h on e fo ot ARCHITECT/ENGINEERS:
Dwg. of
Drawn
Drawing Number
Project Number
Building Number
Checked
Location
Date
Project Title
Approved: Project Director
Drawing Title
1.
2.
635-3411
F
Shaffer & Stevens
MGJ
Department of Veterans Affairs
9910 North 48th St, Omaha, NE 68152 402.455.7698
SS102
8th Floor Framing Plan
JULY 10, 2020
1/8" = 1'-0"SS102
1 8th FLOOR FRAMING (PHASE 1, UNLESS NOTED OTHERWISE)
1/4" = 1'-0"SS102
2 STAIR 14 @ 8TH FLOOR ENLARGED PLAN (PHASE 1)
UP
DN UP
DNUP
DN
DN
DN
DN
9 10 11 11A
B
C
9A
B1
A1 W18x35
W10x17
W10x17
W10x17
W10x17
W10x17
W18x35
W12x26
W18x35
W12x26
W12x26
W18x35
W x3
W x3
W x3
W x3
W x4
NOTES:
1. TOP OF STEEL ELEVATION = 1366'-4"
1/
2"
G
A.
M
ET
AL
D
EC
K
W
X1
W
X1
ROOF HATCH OPENING
SS105
8" CMU W/
#5 @ 48" O.C.
SS106
ROOF OPENING,
SEE ARCH.
W
X1
SS106
L4x4x1/4, TYP. @ EDGE
PREFABRICATED BRICK PANEL,
SEE ARCH.
SS106
L4x4x1/4, TYP. 4 SIDES
W10X17L4x4x1/4, TYP. 4 SIDES
8" CMU, TYP.
SS105
TYP.
8' - 6" 12' - 3" 2' - 6" 10' - 9"
8"
4' - 0" 3' - 8"
5'
4" 5'
0"
5'
1/
2" 5'
1/ 2"
5'
2"
1'
4"
9 10 11 11A
B
C
9A
B1
A1
(E )W
X3
(E
)W
X4
(E)W18X35
(E)W10X33
(E)W10X39
(E)W18X35
(E)W18X35
(E)W10X12
(E)W10X12
(E)W10X12
(E)W18X35
(E)W10X12
(E)W10X12
(E)W10X12
(E )W
X4
(E )W
X4
(E)W21X…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .