Attachment_6_ONPVC_Sewer__As_Built_Drawings.pdf
PDF 3 MB Posted
- Attached to
- OLYM REPAIR ONPVC SEWER
- Solicitation number
- 140P8326Q0022
About this file
This document is a comprehensive set of as-constructed drawings for the Olympic National Park Comfort Station project located in Washington State. The drawings serve as record documentation for construction completed at the facility, with the project supervisor identified as Gypsy Holman and the contractor as Walker River Construction, located at 311 US Pasture Road, Schofield, WY 82427.
The drawing set includes 119 sheets total and covers all aspects of the comfort station construction, including structural, mechanical, electrical, plumbing, and site work. Key sheets address utility plans, sanitary sewer systems with profiles and details, floor plans for the enlarged comfort station, foundation and framing specifications, HVAC systems, fire protection systems, electrical schedules and layouts, plumbing details and schedules, and exterior/interior elevations and wall types. The drawings incorporate standard details for sanitary sewer connections, drainage systems, pipe bedding and backfill, concrete catch basins, and utility crossing specifications. The sheet index on page 2 provides a complete catalog of all drawing sheets organized by discipline, with references to general notes, demolition plans, site grading, building sections, and various architectural details required to document the full scope of the comfort station renovation and new construction work at Olympic National Park.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
kyle Text Box 175023 kyle Text Box 175023
File details come from the government source that posted it. Updated .