Attachment 6 - GT_STABLE_REROOF_PLAN-GT A-5.pdf
PDF 198 KB Posted
- Attached to
- Grey Towers Roof Repairs
- Solicitation number
- 12445525Q0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a detailed architectural drawing sheet (A-5) for the Grey Towers Stables Reroof project, showing soffit and crown detail specifications for a roof restoration at a historic site. The technical drawing includes precise diagrams illustrating roofing components such as rafter rim board/sub-fascia, cedar fascia, crown moulding, starter course shingles, plywood sheathing, ice and watershield membrane, and existing cedar soffit. The drawings provide technical guidance for roof repair, emphasizing careful replacement and restoration of specific architectural elements, with notations to use a profile gauge for exact dimensions and to replace/repair any sections with holes or cracks. The document is part of a United States Department of Agriculture Forest Service project for the Grey Towers Historic Site, specifically focusing on the stables' roof renovation scheduled for 2024.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RAFTER RIM BOARD/SUB-FASCIA
CEDAR FASCIA
CROWN MOULDING -USE PROFILE GAUGE FOR EXACT
DIMENSIONS AND SHAPE
STARTER COURSE, DOUBLE SHINGLES, 1.5" OVERHANG
EXISTING 38" CEDAR SOFFIT- REPLACE/REPAIR ANY SECTIONS
WITH HOLES OR CRACKS
16" PLYWOOD SHEATHING
FELT OVER ICE AND WATERSHIELD
2 X NAILER
ICE AND WATERSHIELD
EXISTING TRANSVERSE LATHING
CROWN AND SOFFIT DETAIL2 NOT TO SCALE
CEDAR BREATHER DETAILS1
PASTE
ICE AND WATERSHIELD
ON SHEATHING
ICE AND WATERSHIELD
ON SHEATHING
NOT TO SCALE
* SHOWN TO ILLUSTRATE COMPONENTS
FOR ANY REQUIRED REPAIRS *
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
8/5 /24
0:
M
IC
HA
EL
W
EW
ER
KA
C
:\U
SE
RS
\M
IC
HA
EL
W
EW
ER
KA
\B
OX
\M
W W
OR
K
SP
AC
E\
GR
EY
T
OW
ER
S\
GT
_S
TA
BL
E_
RE
RO
OF
_P
LA
N.
DW
G;
R9
EASTERN REGION
GREY TOTWERS
STABLES
REROOF
GREY TOWERS HISTORIC
SITE
GREY TOWERS
SOFFIT AND CROWN
DETAIL
8/3/2024
MEW
MEW
SMHW
24-ENG-WGTH-85
A-5
5 5SOFFIT AND CROWN DETAIL
PASTE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| Sheets and Views |
| GT A-5 |
File details come from the government source that posted it. Updated .