This document is a Geotechnical Engineering Services Report for the proposed VA Topeka Outpatient Mental Health facility. The report presents the results of a subsurface investigation, laboratory testing, and geotechnical engineering recommendations for the proposed single-story, slab-on-grade building. Key details include:

The site currently contains existing utilities and fill soils up to 8.5 feet deep that will need to be removed and replaced with engineered fill. Shallow spread footings are recommended, designed for an allowable bearing pressure of 2,000 psf and estimated total/differential settlement less than 1 inch. Specific requirements are provided for floor slabs, shallow foundations, site preparation, earthwork, and material specifications. The report concludes with general notes and limitations of the geotechnical analysis. No federal contract opportunity details are contained in this document.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION | SURVEY | GEOTECHNICAL DIVISIONS LOCATED AT: 350 SOUTH WASHINGTON WICHITA, KS 67202 316-262-6457 WWW.PEC1.COM

April 29, 2021

Mr. Bob Sinclair Atriax Group PO Box 1629 Hickory, North Carolina 28603

Subject: Report for Geotechnical Engineering Services Proposed VA Topeka Outpatient Mental Health PEC Project No.: 200410-000

Dear Mr. Sinclair:

Professional Engineering Consultants, PA (PEC) has completed the geotechnical engineering services for the above referenced project. The purpose of the geotechnical engineering services was to explore the subsurface conditions at the project site and develop geotechnical related design and construction recommendations.

The attached report presents the results of our field exploration, laboratory testing programs, and our engineering interpretations with respect to the project characteristics as presented in the report. Based on these results, recommendations related to the site development, structural design, and construction are provided. We recommend that all individuals read the entire report along with all the appendices.

This report completes our current scope of services for this project. We appreciated the opportunity to provide geotechnical engineering services for this project and look forward to providing the recommended construction services as well.

Respectfully, FIELD SERVICES: GEOTECHNICAL ENGINEERING DIVISION

A Department of Professional Engineering Consultants, P.A.

Prepared By:

Britt Clubb, PE Division Manager

04/29/2021

04/04/04/04/04/29/29/29/29/29/20220220220220211111

CONSTRUCTION | SURVEY | GEOTECHNICAL DIVISIONS LOCATED AT: 350 SOUTH WASHINGTON WICHITA, KS 67202 316-262-6457 WWW.PEC1.COM

Geotechnical Engineering Services Report

VA Topeka Outpatient Mental Health 2200 SW Gage Boulevard

Topeka, Kansas

PREPARED FOR

Atriax Group Hickory, North Carolina

PEC PROJECT NO.

200410-000

PREPARED BY

Britt Clubb, PE License No. 24123

DATE

April 29, 2021

��������������������������������������������������������������������������ttææ����

1. INTRODUCTION

ssääss

��������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��tt ssäätt ����������������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��tt ssääuu ������������������������������������������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��tt ssäävv ������������������������������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��uu

2. SITE CONDITIONS

ttääss ����������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��vv ttäätt ��������������������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��vv ttääuu

��������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��ww

3. GEOTECHNICAL RECOMMENDATIONS

uuääss

��������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��xx

3.1.1 Existing Utilities and Existing Fill Soils

uuäätt ���������������� ����������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��xx

3.2.1 General

3.2.2 Allowable Bearing Pressure and Settlement

4. SITE DEVELOPMENT

vvääss ����������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��yy vväätt ��������������������������

��������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��yy vvääuu ��������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��yy vväävv ��������ææ������������������������������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��yy

4.4.1 Floor Slabs

4.4.2 Shallow Spread Footings

vvääww ������������������������������������������������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��zz vvääxx ��������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��zz vvääyy ������������������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��{{

4.7.1 LVC Materials

4.7.2 Engineered Fill

4.7.3 Existing Onsite Soils

4.7.4 Compaction Criteria

vvääzz ����������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��{{ vvää{{ ����������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��ssrr vväässrr ������������������������������������������������ääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääääää��ssrr

5. GENERAL NOTES AND LIMITATIONS

FIGURES: Site and Boring Locations

APPENDIX A: Field Exploration Program

APPENDIX B: Laboratory Testing Program

��������������������������������������������������������������������������tt��

1. INTRODUCTION

1.1 GENERAL

PEC has completed the subsurface investigation, laboratory testing and geotechnical engineering evaluations for the above referenced project. All services were performed either directly by or under the direction of professional engineers licensed in the State of Kansas. This report presents the results of our field explorations, laboratory tests, and our conclusions and recommendations related to the geotechnical aspects of the project design and construction.

The conclusions and recommendations were based on the project information available at the time of this report and the subsurface conditions encountered in the borings at the locations and time indicated. It is possible that subsurface conditions could vary between or beyond the explored locations. If subsurface condition changes during construction, construction activity shall be ceased and PEC should be notified immediately to review and make any supplementary recommendations, if necessary.

1.2 PROJECT DESCRIPTION

It is our understanding the proposed construction will consist of a new building addition to the existing outpatient and mental health facility at the Topeka Veterans Affairs Hospital. The new addition is anticipated to be a single-story structure, slab-on-grade building, founded on a shallow foundation system consisting of isolated column pads and continuous wall trench footings. Loading information was not provided prior to this report, however, we have assumed column and wall loading of 75 kips and 5 kips per lineal foot, respectively. Below-grade structures such as basements and/or crawl spaces are not anticipated for this project. Total settlement and differential settlement is anticipated to be less than 1 inch and ½ inch, respectively.

Our scope of work and engineering evaluations were based on our understanding of the project as described above. If pertinent details of the project have changed or otherwise differ from our understandings described above, PEC shall be notified immediately to review and make modifications of our recommendations, if needed.

1.3 DRILLING AND SAMPLING PROCEDURES

PEC performed the five soil test borings on January 14, 2021. The borings were located in the field by PEC survey crews. Coordinates of the boring locations are as shown in Table A-1, Boring Information of Appendix A. The approximate boring locations are shown on Figure 2, Boring Location Plan.

The borings were advanced to depths ranging from 1.5 to 14.5 feet below existing grade as shown in Table A-1 with a track-mounted Mobile B-57 rotary drill rig, using a combination of hollow-stem augers and mud rotary techniques. Subsurface conditions in the borings were visually logged in the field by PEC personnel referencing ASTM D-2488 visual-manual procedures. Groundwater seepage was monitored during and at completion of drilling operations.

Samples of the subsurface soils were obtained using a 2-inch O.D. split-spoon sampler. The sampler was driven into the strata using a 140-pound automatic hammer falling 30 inches. The number of blows required to advance the sampler three successive 6-inch increments is recorded. The total number of blows used to advance the sampler the second and third 6-inch increment is the penetration resistance “N” value. Standard Penetration Test (SPT) borings were performed in general accordance with ASTM D1586.

��������������������������������������������������������������������������uu��

Relatively undisturbed soil samples were also obtained with Shelby tubes. The Shelby tube sampling procedure was conducted in general accordance with ASTM D1587, utilizing a thin-walled, steel tube with a sharp cutting edge that is pushed hydraulically into the bottom of the boring. The samples were then sealed, labeled and returned to lab for further classification.

1.4 LABORATORY TESTING PROGRAM

Laboratory tests were performed on selected representative samples to evaluate pertinent engineering properties of the subsurface materials obtained from our borings. The results of these laboratory tests are presented on the respective boring logs in Appendix A, and are summarized in the Summary of Laboratory Results in Appendix B. The laboratory tests were performed in general accordance with the following ASTM standards:

· Visual Classification, ASTM D2487, Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System).

· Moisture Content, ASTM D2216, Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass.

· Atterberg Limits, ASTM D4318, Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.

· Percent finer the #200 sieve, ASTM D1140, Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing.

· Unconfined Compressive Strength, ASTM D2166, Standard Test Method for Unconfined Compressive Strength of Cohesive Soil.

��������������������������������������������������������������������������vv��

2. SITE CONDITIONS

2.1 SITE DESCRIPTION

The general vicinity of the project site is shown on Figure 1, Site Location Map. In general, the project site is located east of SW Gage Boulevard and on the southwest portion of the existing Topeka Veterans Affairs Medical Center in Topeka, Kansas. The site is currently occupied with existing buildings, landscape, and parking areas. Using appropriate Kansas One-Call tickets and utility locators, as well as Bloodhound private utility locators, the site was marked for underground utilities. In the areas of borings SB1, SB-2, SB-3, P-1 and P-2, existing utilities were marked and encountered during drilling operations.

2.2 SUBSURFACE CONDITIONS

The approximate boring locations are shown on Figure 2, Boring Location Map. A summary of the subsurface conditions is shown in Table 2-1:

Table 2-1: Subsurface Conditions Boring No. Depth (feet) Material Consistency

SB-1

0.0 – 0.40 Topsoil N/A

0.40 – 3.0 Fill, Fat Clay Stiff

3.0 – 6.0 Fill, Lean Clay with Sand Very Stiff

6.0 – 8.5 Sand Lean Clay Stiff

8.5 – 10.0 Limestone Moderately Hard

SB-2

0.0 – 0.50 Topsoil N/A

0.50 – 3.5 Fill, Lean Clay Stiff

3.5 – 6.0 Fill, Sandy Lean Clay Very Stiff

6.0 – 8.5 Fill, Fat Clay Hard

8.5 – 12.0 Shale Moderately Hard

12.0 – 13.5 Limestone Moderately Hard

SB-3

0.0 – 0.30 Topsoil N/A

0.30 – 6.0 Fill, Lean Clay Stiff

6.0 – 8.5 Fill, Lean Clay with Sand Stiff

8.5 – 13.0 Shale Moderately Hard

13.0 – 14.5 Limestone Moderately Hard

P-1

0.0 – 0.40 Topsoil N/A

0.40 – 1.5 Fil, Lean Clay Medium Stiff

P-2

0.0 – 0.40 Topsoil N/A

0.40 – 6.0 Fill, Lean Clay Stiff

6.0 – 8.5 Fill, Lean Clay with Sand Stiff

8.5 – 12.0 Shale Moderately Hard

12.0 – 13.5 Limestone Moderately Hard

Boring logs, attached in Appendix A, present soil descriptions, consistencies, relative densities, depths, sampling intervals, and observed groundwater conditions, if any. The stratification boundaries and soil conditions on the boring logs were results of the engineer’s interpretation of the field logs combined with laboratory and field-testing results. Locations of these boundaries shown on the boring logs are

��������������������������������������������������������������������������ww�� approximate, and the transitions between material types may be gradual rather than clearly defined.

Additional subsurface explorations are required if more detailed stratifications are needed.

2.3 GROUNDWATER

Groundwater seepage observation was made after completion of drilling operations. The observation results are summarized in Table 2-2.

Table 2-2: Groundwater Summary

Boring Groundwater Depth During Drilling

(ft) Groundwater Depth After Drilling

(ft)

SB-1 -- --

SB-2 -- --

SB-3 -- --

P-1 -- -- P-2 -- --

If a more accurate groundwater level is required, a piezometer may be installed on site and additional monitoring will be required. Fluctuations of groundwater levels can occur due to seasonal variations in the amounts of rainfall, run off, nearby creek/river water level (if present), and other factors not evident at the time the borings were performed. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.

��������������������������������������������������������������������������xx��

3. GEOTECHNICAL RECOMMENDATIONS

3.1 GENERAL

Based on our evaluations, the site is suitable for the proposed construction. The project structures may be supported on a shallow spread foundation system. The following sections contain recommendations for shallow foundation systems. The recommendations regarding geotechnical aspects of the project design and construction are presented in the following sections and they are appropriate for the purpose of this project.

3.1.1 Existing Utilities and Existing Fill Soils

Existing utilities are present within the proposed footprint of the new building addition. Obstructions were encountered in borings SB-1 and P-1 consisted of concrete debris and an electrical line. Additionally, existing fill materials are present to depths of up to 8.5 feet below existing grade. Due to the rampant and random nature of the encountered and marked underground utilities and the presence of existing fill materials, discerning an appropriate allowable bearing pressure is difficult. The recommendations in the sections below assume that all underground utilities are relocated and/or abandoned and all existing fill material is removed and replaced with new existing fill soils.

3.2 SHALLOW FOUNDATIONS

3.2.1 General

It is anticipated that some structures will be supported on shallow foundations with the recommended minimum width as shown in Table 3-1.

Table 3-1: Shallow Foundation Minimum Width Foundation Minimum Width (inches)

Earth-formed Trench Footings 12 Formed Continuous Wall Footings 18

Isolated Spread Footings 48

3.2.2 Allowable Bearing Pressure and Settlement

Table 3-2: Shallow Foundation Design Parameters

Bearing Material Net Allowable Bearing

Pressure (psf) Estimated Settlement

(in) Estimated Differential

Settlement (in) Engineered Fill 2,000 < 1.0 < ½

When considering short term wind and seismic loading, the allowable bearing pressure stated above may be increased by a factor of one-third.

A coefficient of sliding friction of 0.25 can be used to calculate the sliding resistance underneath foundations. A factor of safety of 1.5 has been applied.

The base of all foundation excavations should be free of water and loose soil prior to placing concrete.

Concrete should be placed as soon as possible after bearing elevations are achieved so that excessive drying of bearing materials does not occur. A licensed geotechnical engineer should be onsite during construction of foundations to ensure bearing materials are satisfied. If the Owner elects to keep the existing fill materials and utilities in place, the allowable bearing capacity should be reduced to minimum allowable bearing capacity allowed by code.

��������������������������������������������������������������������������yy��

4. SITE DEVELOPMENT

4.1 DEMOLITION

Initial site preparation should commence with demolition of all structures and existing concrete slabs within the footprint of the construction limit. All broken concrete and other debris from the demolition process should be removed from the site. The demolition areas should be thoroughly evaluated by a geotechnical engineer prior to placement of engineered fill. All disturbed soils should be undercut prior to placement of engineered fill.

4.2 CLEARING AND GRUBBING

Site preparation should commence with clearing and grubbing of all vegetation and debris within the construction limits. Any required tree removal should also be accomplished at this time. Care should be taken to thoroughly remove root systems. Undisturbed stumps and roots no more than 6 inches above the existing ground surface or below water level may remain, provided those stumps and roots are a minimum of 3 feet below the finished subgrade elevation.

Backfill stump holes using granular materials or loose friable soil from the project to the level of the surrounding ground. Use material that is free of standing water, frozen lumps, roots, sod, rocks greater than 4 inches in diameter or other deleterious materials. If the backfill area is within the limit of the new construction, compact the backfill to the degree of compaction and within the moisture range as specified in Section 4.7.4.

A zone of desiccated soils may exist in the vicinity of the trees. The desiccated soils have a higher swell potential and should also be undercut and replaced with structural fill. Do not clear and grub areas unless work will actively be performed in the exposed area within 7 calendar days.

4.3 STRIPPING

Site preparation should commence with stripping and stockpiling the existing topsoil within the construction limits. The stripped topsoil can be used to cap non-structural and landscape areas. A minimum stripping depth of 6 inches should be anticipated. Actual striping depths will likely vary and should be adjusted to remove all vegetation and root systems during construction. Care should be exercised to separate these materials to avoid incorporation of any organic matter into engineered fill sections.

Existing fill materials are present within the proposed building footprint location to depths ranging from 6 to 8.5 feet below existing ground elevation. These materials are considered undocumented and should be removed completely from within the building footprint and extending laterally a minimum 5 feet beyond the building footprint. The existing fill materials are not suitable for reuse within the upper 18 inches of the building pad but could be used as structural fill on this project.

4.4 OVER-EXCAVATION AND REPLACEMENT

4.4.1 Floor Slabs

The upper 18 inches of subgrade should consist of low volume change (LVC) material, as described in Section 4.7.1. A minimum of 4 inches of leveling course is recommended directly underneath the floor slabs. The leveling course should consist of clean, medium to coarse grained sand, or clean gravel/rock with less than 5 percent fines. Floor slab subgrade construction should extend a minimum of 5 feet beyond the footprint on all sides.

��������������������������������������������������������������������������zz��

4.4.2 Shallow Spread Footings

Shallow spread footings are suitable to be founded on the new engineered fill soils at a minimum depth of 3 feet below finish grade for frost protection. No over-excavation for the footing construction is anticipated except the required embedment depth. The bottom of the excavations shall be inspected carefully for unsuitable materials and/or soft bearing soils.

If unsuitable materials and/or soft bearing soils exist, additional over-excavation and replacement with engineered fill shall be performed to the extent that all the unsuitable materials are replaced. The width of the trench over-excavation should extend laterally on either side of the trench 8 inches for every 12 inches in over-excavation depth. Engineered fill shall be compacted to the degree as specified in Section

4.7.4 of the report with suitable equipment. Using lean concrete or controlled low strength material (CLSM) to backfill areas where unsuitable soils are identified is acceptable. If lean concrete or CLSM is chosen, extending the excavation of the trench laterally is not required.

4.5 MOISTURE CONDITIONING AND COMPACTION

The moisture content of the exposed subgrade should be evaluated prior to proofrolling and/or fill placement. Depending upon the in-situ moisture content of the subgrade exposed, moisture conditioning of the exposed subgrade may be required. Moisture conditioning and compaction of the exposed subgrade should be performed in general accordance with Section 4.7.4.

Extremely wet or unstable areas that hamper compaction of the subgrade may require undercutting and replacement with engineered fill or other stabilization techniques. If the subgrade soils are desiccated and have a high swell potential (PI of 25 or more), undercutting may also be required. If deemed necessary, it may also be prudent to perform laboratory swell tests at the time of construction. Engineered fill should be placed to design grade as soon as practical after reworking the subgrade to avoid moisture changes in the underlying, more highly plastic soils.

4.6 PROOFROLLING

Following any undercutting and/or moisture conditioning and compaction, it is recommended that the exposed subgrade be thoroughly proofrolled, if practical. Proofrolling of the subgrade provides a more stable base prior to placement of fill materials or leveling course and aids in identifying soft or disturbed areas. Proofrolling can be accomplished through use of a fully loaded tandem-axle dump truck or similar heavy construction equipment weighing at least 15 tons under the direction of PEC personnel.

Localized soft or unstable areas identified by the proofrolling operation should be undercut and replaced with engineered fill. As an alternative, stabilization of the soft and unstable soil may also be performed in lieu of undercut and replacement. Clean crushed rock having a particle diameter of 3 to 6 inches could be used to stabilize the subgrade prior to placement of engineered fill. After initial undercutting, the large rock would be spread over the unstable subgrade and worked into the soft soils by close tracking with a bulldozer or other suitable construction equipment. Additional rock would be added until the subgrade becomes firm enough to support construction equipment. The use of a geotextile fabric, in conjunction with crushed rock, could also be considered as a means of stabilizing the exposed grade.

4.7 MATERIAL REQUIREMENT

4.7.1 LVC Materials

LVC materials should be free of organic matter and deleterious debris and have a maximum particle size of 1.5 inches. Cohesive LVC materials are classified as materials having a plasticity index between 5 and 15, as defined by ASTM D-2487. KDOT AB-3 graded crushed limestone or crushed concrete, as well as limestone screenings are also defined as LVC material. Non-cohesive soils, such as sand, may also be used as LVC material provided the material is confined on all sides.

4.7.2 Engineered Fill

Engineered fill should be free of organic matter and deleterious debris and have a maximum particle size of 3 inches with a liquid limit and plasticity index not exceeding 45 and 25, respectively. Engineered fill can be used as deeper fill below the LVC zone provided they are placed in accordance with Section 4.7.4.

4.7.3 Existing Onsite Soils

The top 6 to 8.5 feet of the existing onsite materials are not suitable to be reused as LVC material.

However, these materials are suitable to be used as Engineered Fill placed underneath any required LVC zone. Additional testing should be performed on the excavated onsite materials to verify the suitability.

4.7.4 Compaction Criteria

Soil compaction during construction should be performed with the minimum percentage of density and within the moisture content specified as shown in Table 4-1. Moisture content should be maintained within the above specified range until casting of concrete or placing the fill.

Table 4-1. Compaction Criteria

Soil Type Maximum loose

Lift Thickness (in.)

Moisture Content

Minimum Compaction

Existing Onsite Clay Soils 8 within 2% point of optimum 95%* LVC Materials 8 within 2% point of optimum 95%*

Engineered Fill – PI >20 8 within 4% point above optimum 95%* Engineered Fill – PI <=20 8 within 2% point of optimum 95%*

Lime/Cement/CKD Stabilized Subgrade 8 within 2% point of optimum 95%** Pavement Subgrade/AB-3 Aggregate 8 workable 98%***

*Based on maximum dry density (ASTM D698) **Based on laboratory mix design (ASTM D698) ***Based on maximum dry density (ASTM D1557)

4.8 EXCAVATIONS

Any required excavation is anticipated to be in the fat clay layers and can generally be excavated with conventional construction equipment such as backhoes, loaders, etc. Typical dewatering techniques should be sufficient to remove any water seepage that may be encountered in the excavations.

Excavations extending to depths greater than 5 feet should be cut to a stable slope or be temporarily braced. Temporary slopes should be no steeper than 1(H) to 1(V) and may need to be flatter depending upon on the excavation depth and soil conditions. Construction slopes should be closely observed for signs of mass movement: tension cracks near the crest, bulging at the toe, etc. If potential stability problems are observed, PEC should be contacted immediately.

Stockpiles should be placed well away from the edge of the excavation and their height should be controlled so they do not surcharge the sides of the excavation. Surface drainage should be carefully

��������������������������������������������������������������������������ssrr�� controlled to prevent flow of water into the excavation. Temporary construction slopes should be designed in strict compliance with the most recent governing regulations and the responsibility for excavation safety and stability of temporary construction slopes should lie solely with the contractor.

4.9 UTILITY TRENCHES

Utility trenches created by installing/removing utilities lines should be backfilled and compacted using small compaction equipment, such as mechanical rammers or vibratory-plate compactors, or intermediate size equipment such as walk-behind, dual-drum vibratory rollers. In addition, the base of the excavations should be thoroughly evaluated by a geotechnical engineer or engineering technician prior to placement of fill. All fill should be placed in accordance with the recommendations presented in the Section 4.7.4 of this report. As an alternative, the excavations can be backfilled with Controlled Low Strength Material (CLSM).

4.10 QUALITY CONTROL TESTING

We recommend that PEC be retained to perform the construction materials testing and observations required for this project, to verify that our recommendations have been satisfied. Due to our familiarity with the project and the intent of our engineering design, we are the most qualified to efficiently address any problems that may arise during construction.

A representative number of field density tests should be made in each lift of newly placed engineered fill.

At a minimum, (1) nuclear density test should be conducted for every 2,500 square feet of area but no less than (3) per lift. The density tests are considered necessary to verify that satisfactory compaction operations have been performed. It is recommended that bearing materials be evaluated at a minimum of 2 locations within 50 linear feet from within the foundation footprint.

��������������������������������������������������������������������������ssss��

5. GENERAL NOTES AND LIMITATIONS

This report has been prepared in general accordance with widely accepted geotechnical engineering practices for the purpose of this project. The conclusions and recommendations presented in this report were based upon applicable standards of care in the project geographic area at the time this report was prepared. No warrantees or guarantees are intended.

We depended on project information provided to us to develop our conclusions and recommendations.

If project information described in this report is not accurate, or if it changes during course of project development, we should be notified of the changes so that we can modify our recommendations based on the additional information, if necessary.

Our recommendations were based on limited subsurface information obtained from our field explorations which consisted of periodic sampling in widely spaced, small diameter borings. Subsurface conditions may vary from those encountered in the borings and the variations may not become evident until construction.

Our scope of services was intended to evaluate the soil conditions within the zone of soil influenced by the foundation system. If conditions are encountered which appear different than those described in our report, we should be notified, and our recommendations may need to be re-evaluated and adjusted.

Our Scope of Services does not address geologic conditions, such as sinkholes or soil conditions existing below the depth of the soil borings. In addition, this report should not be construed to represent subsurface conditions for the entire site.

��������������������������������������������������������������������������sstt��

FIGURES: Site and Boring Locations

Figure 1. Site Location Map Figure 2. Boring Location Plan

��������������������������������������������������������������������������ssuu��

APPENDIX A: Field Exploration Program

Coordinates are as shown in Table A-1, Boring Information. The approximate boring locations are shown on Figure 2, Boring Location Plan.

Table A-1. Boring Information Boring ID Latitude Longitude Depth (ft.)

SB-1 39.0249738 -95.7630257 10.0

SB-2 39.0249350 -95.7233546 13.5

SB-3 39.0247608 -95.97231873 14.5

P-1 39.0244865 -95.7230762 1.5 P-2 39.0250138 -95.7223152 13.5

"0

&1

1(

(1

"1

$0

#234256783392:5;8<=6>7-/7<?5@A

)BC+7DEFFG7DH#7BFHIG7J92KLG7465M?<6>7;254<G74<5NN

)BF+7DEFFG7FOHP7BFHI7K.7!HPQG7J92KL.9=RR54?7J92KLG7465M?<6>7;254<G

S=9>74<5NN

)BF+7!HPQI7FOHP7BFHIG79=R.9=RR54?7J92KLG7465M?<6>7;254<G74<5NN

FETO!#UPOG7<8L

V2<<2;72N7J29=?26=78<7"*W*7N==<W

1, !"#$% %1W*$&1,%0G7'1-W,(%*$-, +"&&$)*/0 XW7V92KL

)'.++.!&*1$#2") Y2K=97HZM=9

)'.++.!&*3"!#'-3#"' YOB &'"(!)*4-#$'*+$,$+%5

32$36$)*/0 VW7B6ZJJ

)-#$*%#-'#$) "."&.$" 3"17+$#$) "."&.$"

-#*#.1$*"8*)'.++.!& '''

-#*$!)*"8*)'.++.!& '''

-8#$'*)'.++.!& '''

2"+$*%.9$ &75L@?=4

H T Y

FO

7# I Y O

P T V O X

X O B U O X I 7]

)X Q

V

FU

B U P

)P 7\ H F[ O

T U E!

X O

B U P O P #7

FE

EQ

FE

T E#

Y

FH

#E B

FE

T E#

D

EP

O 7B U P O P

H##OXVOX`

FETE#!

X H Y C

EB

FU

Q O Y C

)N

Y U B a O 7Y O P W

4N

Y

FH

#E B E# I

EP

Q O bTH#OXEHF7QO!BXEY#EUP

X O B U O X I 7]

)X Q

P E# 7_ #W

)3 @N

YH`O77"77UD77"

/"'.!&*!(1/$'*%/:;

3+.$!# H<958:7`92Z3

7'"<$3#*!(1/$' $**&"*'***

7'"<$3#*!-1$ \H7#23=A87UZ<38<5=L<7T=L<867C=86<?

7'"<$3#*+"3-#."! #23=A8G7a8L484

O U #O B C 7V C 7B U F[ T P 7' 7`

EP

#7 #Q 7[ 7F H V W` Q #7 '7" 1.

7" $c 7' 7[ cdF H X O P B O d$ *d d* dY O B d` O U #O B C d`

EP

#d 7`

EP

#W Y e

"0

#1

"1

'1

,0

1*

$234256783392:5;8<=6>7,/7<?5@A

)BC+7DECCF7CGHI7BCHJF7K92LM.N9=>.9=OF7465N?<6>7;254<F74<5PP

)BC+7DECCF7!HIQJ7CGHI7BCHJF79=OF7465N?<6>7;254<F7R=9>74<5PP

)BS+7DECCF7DH$7BCHJF7K92LMF7465N?<6>7;254<F7?89O

!SHCGF7L5<?7@86@89=2T4F765N?<7K92LM.<8MF7465N?<6>7;254<

CEUG!$VIGF7<8M

W2<<2;72P7K29=?26=78<7"%X'7P==<X

!"#$% %1X-#&1%'-F7(1'X0#%%'&, +"&&$)*/0 YX7W92LM

)'.++.!&*1$#2") Z2L=97HTN=9

)'.++.!&*3"!#'-3#"' ZGB &'"(!)*4-#$'*+$,$+%5

32$36$)*/0 WX7B6TKK

)-#$*%#-'#$) "."&.#" 3"17+$#$) "."&.#"

-#*#.1$*"8*)'.++.!& (((

-#*$!)*"8*)'.++.!& (((

-8#$'*)'.++.!& (((

2"+$*%.9$ &75M@?=4

H U Z

CG

7$ J Z G

I U W G Y

Y G B V G Y J 7]

)Y Q

W

CV

B V I

)I 7\ H C[ G

U V E!

Y G

B V I G I $7

CE

EQ

CE

U E$

Z

CH

$E B

CE

U E$

D

EI

G 7B V I G I

H$$GYWGY`

CEUE$!

Y H Z S

EB

CV

Q G Z S

)P

Z V B a G 7Z G I X

4P

Z

CH

$E B E$ J

EI

Q G bUH$GYEHC7QG!BYEZ$EVI

Y G B V G Y J 7]

)Y Q

I E$ 7_ $X

)3 @P

ZH`G77"77VD77"

/"'.!&*!(1/$'*%/:;

3+.$!# H<958:7`92T3

7'"<$3#*!(1/$' #--&"-(---

7'"<$3#*!-1$ \H7$23=A87VT<38<5=M<7U=M<867S=86<?

7'"<$3#*+"3-#."! $23=A8F7a8M484

G V $G B S 7W S 7B V C[ U I 7( 7`

EI

$7 $Q 7[ 7C H W X` Q $7 (7" 1.

7" #c 7( 7[ cdC H Y G I B G d# -d d-dZ G B d` G V $G B S d`

EI

$d 7`

EI

$X Z

)1+

$0

#234256783392:5;8<=6>7&/7<?5@A

)BF+7DEFFG7FOHP7BFHIG7J92KLG7465M?<6>7;254<G74<5NN

)BF+7DEFFG7FOHP7BFHI7K.7!HPQG79=RG7465M?<6>7;254<G74<5NN

!CHFOG765M?<7J92KL.<8LG7R9>

FETO!#UPOG7<8L

V2<<2;72N7J29=?26=78<7"&W-7N==<W

!"#$% %1W*$&,(*0G7'1-W,$%"0,%

+"&&$)*/0 XW7V92KL

)'.++.!&*1$#2") Y2K=97HZM=9

)'.++.!&*3"!#'-3#"' YOB &'"(!)*4-#$'*+$,$+%5

32$36$)*/0 VW7B6ZJJ

)-#$*%#-'#$) "."&.$" 3"17+$#$) "."&.$"

-#*#.1$*"8*)'.++.!& '''

-#*$!)*"8*)'.++.!& '''

-8#$'*)'.++.!& '''

2"+$*%.9$ &75L@?=4

H T Y

FO

7# I Y O

P T V O X

X O B U O X I 7]

)X Q

V

FU

B U P

)P 7\ H F[ O

T U E!

X O

B U P O P #7

FE

EQ

FE

T E#

Y

FH

#E B

FE

T E#

D

EP

O 7B U P O P

H##OXVOX`

FETE#!

X H Y C

EB

FU

Q O Y C

)N

Y U B a O 7Y O P W

4N

Y

FH

#E B E# I

EP

Q O bTH#OXEHF7QO!BXEY#EUP

X O B U O X I 7]

)X Q

P E# 7_ #W

)3 @N

YH`O77"77UD77"

/"'.!&*!(1/$'*%/:=

3+.$!# H<958:7`92Z3

7'"<$3#*!(1/$' $**&"*'***

7'"<$3#*!-1$ \H7#23=A87UZ<38<5=L<7T=L<867C=86<?

7'"<$3#*+"3-#."! #23=A8G7a8L484

O U #O B C 7V C 7B U F[ T P 7' 7`

EP

#7 #Q 7[ 7F H V W` Q #7 '7" 1.

7" $c 7' 7[ cdF H X O P B O d$ *d d* dY O B d` O U #O B C d`

EP

#d 7`

EP

#W Y

)*+,*-./0++1*2-3045.6/'7/48-9:

&;<(/=><<?/<@AB/;<AC?/D1*EF?/,.-G84.6/3*-,4?/35H-I3/,4-JJ

K*44*3/*J/D*158*.5/04/"L'/J554L

!"#$% %MLN#OOPQ'?/$M'LR#%NRQ#

+"&&$)*/0 SL/K1*EF

)'.++.!&*1$#2") T*E51/AIG51

)'.++.!&*3"!#'-3#"' T@; &'"(!)*4-#$'*+$,$+%5

32$36$)*/0 KL/;.IDD

)-#$*%#-'#$) "U"OU#" 3"17+$#$) "U"OU#"

-#*#.1$*"8*)'.++.!& $$$

-#*$!)*"8*)'.++.!& $$$

-8#$'*)'.++.!& $$$

2"+$*%.9$ O/-F985, A V T C T

B W V K S

S X Y S C /Z

&S

K <X

X W B

&B /Y A <W

V X W S

X B B &Z

W

V

T <A

V

>B X B B

&Z

A))@SK@S^

<>V>)!

S A T

<X

T

&J 4(

N

T X /T B L

&4 ,J

T <A C

>B aVA)@S>A</\@!;S>T)>XB

S X Y S C /Z

&S

W B )L

9J

TA^@//"//X=//"

/"'.!&*!(1/$'*7:;

3+.$!# A41-02/^1*I+

7'"<$3#*!(1/$' #NNO"N$NNN

7'"<$3#*!-1$ YA/)*+5:0/XI4+04-5F4/V5F40./_50.48

7'"<$3#*+"3-#."! )*+5:0?/`0F,0, X /K X <W V B >B /W A K L^ U"

MU

#b %N /W bc< A S B c# N# Nc #N

NO

"N cN

NN

cT c^ X c^ >B )c #N

NO

"N $N

NN

>B )L T d

O

#$#$Q &P(

&"Q(

%$O$"N &"O(

%#$'NU%7

'NUN7

#M

%Q "O MR##

)*+,*-./0++1*2-3045.6/'7/48-9:

&;<(/=><<?/<@AB/;<AC?/D1*EF?/,.-G84.6/3*-,4?/,4-JJ

$/9*.*1/980FG5/4*/15HH-,8UD1*EF

&;<(/=><<?/<@AB/;<AC/EU/!AB\?/15H?/,.-G84.6/3*-,4?/,4-JJ

!_A<@?/.-G84/D1*EFU40F?/,.-G84.6/3*-,4

<>V@!)XB@?/40F

K*44*3/*J/D*158*.5/04/"%L'/J554L

!"#$% %MLN#'N"%P?/$MRLR##%"'#

+"&&$)*/0 SL/K1*EF

)'.++.!&*1$#2") T*E51/AIG51

)'.++.!&*3"!#'-3#"' T@; &'"(!)*4-#$'*+$,$+%5

32$36$)*/0 KL/;.IDD

)-#$*%#-'#$) "U"OU#" 3"17+$#$) "U"OU#"

-#*#.1$*"8*)'.++.!& $$$

-#*$!)*"8*)'.++.!& $$$

-8#$'*)'.++.!& $$$

2"+$*%.9$ O/-F985, A V T C T

B W V K S

S X Y S C /Z

&S

K <X

X W B

&B /Y A <W

V X W S

X B B &Z

W

V

T <A

V

>B X B B

&Z

A))@SK@S^

<>V>)!

S A T

<X

T

&J 4(

N

"N

T X /T B L

&4 ,J

T <A C

>B aVA)@S>A</\@!;S>T)>XB

S X Y S C /Z

&S

W B )L

9J

TA^@//"//X=//"

/"'.!&*!(1/$'*7:=

3+.$!# A41-02/^1*I+

7'"<$3#*!(1/$' #NNO"N$NNN

7'"<$3#*!-1$ YA/)*+5:0/XI4+04-5F4/V5F40./_50.48

7'"<$3#*+"3-#."! )*+5:0?/`0F,0, X /K X <W V B >B /W A K L^ U"

MU

#b %N /W bc< A S B c# N# Nc #N

NO

"N cN

NN

cT c^ X c^ >B )c #N

NO

"N $N

NN

>B )L T

'()*$!&+%,-.$( ,--./-0---

'()*$!&+%/-$ 1!'2)+34%'5*"+%"$36"'736"%8'93%8":

'()*$!&+")!/&#)% 2)+34%;'<%6=%=

AB

++C

25D1!EF

>9525?5E?G!2?5E'@F2FB25D

AEB5EH?EF@'B57>DFII?5E

>!D2I'>FD'7?JJ?5E

J?KA?@'J?7?2'LMN

>J!I2?B'?E@FO'LMN

75?I2ADF'B5E2FE2'LMN

@DP'@FEI?2P'L>BHN

E5E'>J!I2?B

>FDBFE2'>!II?E('E5Q',--'I?F1F

>5B<F2'>FEF2D57F2FD'L2IHN

JJ

R E> 0,--

I+8$"'I+))6

I:38ST'2*S3

*!+,-$#.*/+"(-*-&'0(-(1&2.*/+"(-*

34567689.*:6;.2;<==676><?6:5.*@=?8AB

BJU''AIBI'J)V'>8%="$W$"T'B8%T

H?JJU''H$88'LC%X3'Y#)*6XN

J?7FI25EFU''J$C3=")63

I9!JFU''I:%83

25>I5?JU''2)+=)$8

C$--.2()*'#42'&().*/+"(-*

D$/.'(.*/+"(-*

R%"3#'J3Z38'%"'2$C3 @#$88$6Y;')#'%='I:)V6

R%"3#'J3Z38'!["3#',.

9)*#=;')#'%='I:)V6

R%"3#'J3Z38'%"'F6X')[ @#$88$6Y;')#'%='I:)V6

F P '2 'I P

JI

'0' ?E 2' I 2@ 'A I 'J Q( 2' 0'/ ,U '0 'A U`J R D F E B F F B F 2F B ?E 2` 0- ?E 2Q a

��8� ����%�7#9) :�+4 /��,�",�3� /��*+44�3�2+���,��14� 6;

������������
���������
�������
�����������������
���������� �������
�����!���
���������
������"
!���������#���
���������� ������"
�������������0����������
�������������0���������

.$�������1�����232��� �

.�������+���%��
�������/����4���
����/������%��

�����5/�/�

6�%� � ��+5/�/�/.

6�%� � �����5/�/�/7

.$&8�� ��������� �����1����232��� ��9

.$'��� ��������� ����1�����232��� ��9

����3�;������ ������������������� %�����(<� ��=8

�11�������1�������/����1��������2����� �11�������1�������� ����������1���2����%����� ���

����� ���� �����������������+�1���?

����"�!���������
����� ���������������������+�1���?
��������!:<!���:����%��������������������
��������!:<!����:����%���������������
��������!.<!����.����+�%��������������������
��������!.<!�����.����+�%���������������

����)�����@�"-�A"��B�� �A�="���C�"-�>�

���� �/�����2������� �2����%����� ����

������+������<��/�����������+�1�����<��/����!�<!��

����,��$�������������%��
/�����2�������%��
�����2����%���������

��%�����/�����2�����%�����2����%����� ����

����9���$��3����1��%�������������� ����

����5��$�������

�������
���� D����������� ��/�����2��������2����2�����%�����2����%���������
������
�(������������ ��/������������+����/�����2���+2����%���������
������
�(�������������/������������+�%�����/�����2%�����+2����%���������

���� ��������� �����1����232��� ��

����6��.$�'������������1�����232��� ��

����.��.$�������� �����1����232��� ��

����7��.$�������1�����232��� ��

��+5/�/�

!���5/�/�

6�%� � ��+5/�/�/�

6�%� � �����5/�/�

��+5/�/�

6�%� �

�����������������������������0����������
�����������������������������0���������
�����������������������������0����������
�����������������������������0���������

6�%� �

���������
����������

E���8

E���8

C

� �� � (� �� 8� F� D�-�

�������
�����<%�����������?�)�����������

232��� �?�,���G� �������.$�@���������@

��� ��.�$��@���8(�=��< �>

)������ ����2H2��� �?��I����

���@��-����.$�@�8/���� �

.$�@���D�=���<�F>

F�

���!�G��� ������������

� �� -� ��(AF�(

�<�A (A�

F�

��J

"��@���8

< �1���3� ��3� � /��6����33 ���33 < �1����33

��*������*+1

��00* 4

���*/ �4

.���� %����� ���!�����=���8

���� ������������!�����=���8 ������8

��!�����=��8 ����8

��!�����=8

6����� ��

� 44���+,�&== �===����7=== 7===����#=== #===����9=== �. ��9===

=����7 7����# #����9 9�����(

%��**�,��+,/�4+6-*�,��-��2 /�� 4�+� ��1-�2+**1�- �3��6 /��,�+22��/+,2 �>���� ����4�+,/+�/4��,* 44���� �>�4 �,�� /���1-�2+*�4+6-*�,�� +,/�/��**�,��+00� .�+���,4�3�**�>48 �����������������������������+,/+�/�� , ��+���,�4+6-* ��������������������������������������+>������0���0+�� *�4+6-* � �������������������������:��!?9��,���%�4-*���4-��,;����������������������������������������������#���#��,��/�+6 � ��2�,��,���4�3*�����+�� � ���������������������������!��,��/�+6 � �����,�>+** /��� *01���0 ��������������������(���(��,��/�+6 � ��2�,��,���4�3*�����+�� � �����������������������%���% ,�4�,��+�� *��+6-* ������������������������������������������'����)��?#��,��/�+6 � ����**�>�4� 6�+�� � �����������������������������*@?��+0�4+6-* ���������������������������������������������������� ����%�+6�,/�0���2���,�

��������
��������������

9&�����==

< �1����4

���4

� /��6�% ,4

< �1�'+�/

� 44���+,�7=

7=����!=

&=����9=

�. ��9=

A +�� � /�:��3�;

���6

� /��6�'+�/

��������������������
�

�"�0� ��

% ,4

< �1�% ,4

* 44���+,��&

(&����9&

������� �����������
�

���*�2*+44�3�2+���,��4�0+4 /��,� ����%�7#9)�B���*��*+44�3�2+���,�3����,��, ��,�����-�4 4B�>��2���4�0+4 /����,��� �",�3� /����*� �*+44�3�2+���,��14� 6�����, ���+�, /�4��*4��+. �* 44���+,�&=�- �2 ,���3��� ���-+���2* 4�� �+�, /��,��� � ���7==�4� . ����� 4 �4��*4�+� � 2*+44�3� /�+4�4�*�4��3��� 1�+� �,�,�-*+4��2����4*����*1�-*+4��2�+,/�+4�2*+14��3��� 1�2*+44�31�+4�-*+4��2�����+�4 ���+�, /�4��*4��+. �6�� ���+,�&=�

- �2 ,���3��� ���-+���2* 4�� �+�, /��,��� � ���7==�4� . �+,/�+� �2*+44�3� /�+4�4+,/4C���+. *4C�2�00* 4�+,/�0��*/ �4�/ - ,/�,���,��� � ��+�,�4�D �����,���+,/�6+E���2�,4���� ,�4�6+1�0 �+// /�+4�6�/�3� �4�/ - ,/�,���,��� �-��-�����,4��3��� �4��*��1- 4��� //����,+**1C�3�, � ��+�, /�4��*4�+� �/ 42��0 /�0+4 /��,��� ���2�,4�4� ,21�+,/�2�+�4 ���+�, /�4��*4�+� �/ *�, +� /�01��� ���� *+��. �/ ,4��1����5+6-* 48���+�� 2*+1�>����4+,/�:�';�+,/���*�1�4+,/�:��;�

A+� ��* . *�6 +4�� 6 ,�4�-� 4 ,� /��,��� �� 4��0���,��*��4�+� �3����� ���6 4��,/�2+� /����� 4 �6 +4�� 6 ,�4�6+1�,���, 2 44+��*1� � -� 4 ,���� �+2��+*�����,/>+� ��* . *4�+���� �4�� �����, ���+�, /�4��*4��3�*�>�- �6 +0�*��1�6+1�� F��� �6 +4�� 6 ,�4�3��� 5� ,/ /�

- ���/4����+22��+� *1�� 3* 2��3� �>+� ��* . *4�����+�4 ���+�, /�4��*4�>�**�� , �+**1�� 3* 2����� �����,/>+� ��* . *4�+3� ��4�����- ���/4��� ����,/>+� ��* . *4�+,/�4 -+� �>+� ��2+,�.+�1�/ - ,/�,���,���6 ��3�1 +�C�2*�6+��2�2�,/����,4�+,/���� ��3+2���4�0 1�,/��� �42�- ��3� ,��6+*�� �� 2�,�2+*� 5-*��+���,4����1-�2+*�>+� ��* . *�+00� .�+���,4�3�**�>48 �����������������������������A%���A+� ��* . *�/���,��/��**�,����������������������������A ���A+� ��* . *�+3� ��/��**�,� �����������������������������A7#���A+� ��* . *�7#�����4�+3� ��/��**�,���������������A#9���A+� ��* . *�#9�����4�+3� ��/��**�,� ������������������������������A���% -������> ��2+. ��3�0���,��������������������������%���% -������/�1�2+. ��3�0���,��

�������� 0���*!� ���%

��� �1�2�'3�(�!��

��/�3� � ��� ���+,��7

��+2 � 44���+,�&

A��� &�����7

��������������������������������������������������������������������������ssvv��

APPENDIX B: Laboratory Testing Program

Laboratory tests were performed on selected representative samples to evaluate pertinent engineering properties of the subsurface materials obtained from our borings. The results of these laboratory tests are presented on the respective boring logs in Appendix A, and are summarized in the Summary of Laboratory Results in Appendix B. The laboratory tests were performed in general accordance with the following ASTM standards:

· Visual Classification, ASTM D2487, Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System).

· Moisture Content, ASTM D2216, Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass.

· Atterberg Limits, ASTM D4318, Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.

· Percent finer the #200 sieve, ASTM D1140, Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing.

· Unconfined Compressive Strength, ASTM D2166, Standard Test Method for Unconfined

· Unconfined Compressive Strength, ASTM D2166, Standard Test Method for Unconfined

Compressive Strength of Cohesive Soil.

01"# $%$ '& #, )' $%$,' (* -2 &+%( 01"# )%$ )+ #' #( $%$,' ,) -. #)%+ (,%' 01"# *%$ +( &# &/ $%$,' *( -. #,%* 01"& $%$ #$%* 01"& )%' )' #' &$ $%$,' *, -. #*%( 01"& *%$ '( &* )) $%$,' (/ -2 &/%( /*%+ 01"& /%' #(%$ 01") $%$ &,%' 01") )%' #*%' 01") *%$ )' #' &$ $%$,' ,) -. #+%( 01") /%' /%, .34536 .3738

0985:"

983;<

@;36 A983;

-B9CC"

3D3E983;<

F98G:

-;<8G<8

HGI8J1;:GJ;BG

!KLMNN#NNOPNN#

!B9C83E .3738

!B9C83E38Q

R<6GS

T9S3757

03UG

=77?

>VW&$$

03GXG

Y<38

FG3ZJ8

=IED?

.*/-0, K8:39SNL:;5I

1%(2-.,'0"#+-% &$$+#$"$$$

1%(2-.,'0$#- @KN[;IG\9NO58I983G<8NTG<89BN2G9B8J

1%(2-.,'*(.$,/(0 [;IG\9]N^9<C9C

.K N0 Y T T K A N"

NL

R` [N [H

NY

N.

K %L H [N "N# a# (a N# &b N"

NY

bc.

K F A M M c& $c c$ c!

M cL M O [M cL R` [c

NL

R` L

*28925:*2)21

;<=>? +@A??<B<CAD<E=

/012,3/1453/6

718,3/145396

/012,3/14,:;<=,$12>53/6

$12>4,/012,3/1453/6

$12>4,/012,3/1453/6

718,3/145396

/012,3/14,:;<=,$12>53/6

** .* .2

1880@%0@A,/BCB8$D,@0$E/8$

'F-

?F?

'F?

*F?

'F-

*F?

*F?

FGH6,G*6 56.1,

3/B028 /DI<AJ:KIELM

!@GH038,2EC%0@ #!!%"!-!!!

!@GH038,21C0 N/:1EM>OA:GLDMAD<>=D:)>=DA@:,>A@DP

!@GH038,/G318BG2 1EM>OAQ:RA=?A?

H F H K 2) :K 1:

:9 F

SK

1:

T"

UT

#V $W :9

VX*

Y H X# !X X!

X.

XK

G

XK

1X :K 1S K Z

+,-./012-3.-3405

6789.:02;0<./3/= >?.:@A.= B.C,@-= B,-,878= B@D,878= E3@-C@:C0F.?=

-3

G7

HI

'."$#) >3:,@D0J:27K

/*(0$')&#,12$* $!!&#!L!!!

/*(0$')&#31$ M>0<2K.N@0O73K@3,.-30B.-3@P0Q.@P3R

/*(0$')&.('3)"(# <2K.N@40S@-/@/

+T U E O <U <0 L0J T6 <0 E <F 0V E 0W X

YJ

F <0 L0# Z# *Z 0# 0L 0V =[W U U U [J U O <U Q [J T6 L!

0J T6 <Y J

.011 ,1

+,-./01.2304.15,.675.8/

.233145 678941

('9' ($9( #%9' '(9!

'#9*

*9*#$ *9*#$ *9*#$ *9*#$ *9*#$

58:;

678-:<5-=4<-:<>-11->4?475

/@ABCD EFGD

:3-/0;:-<=;:> ?-50;:-<=;@>

:3-/0;:-<0ABCD01-/4=;:>

1-/4<0:3-/0;:-<=;:> 1-/4<0:3-/0;:-<=;:>

.HACCFEF/AIF@G

;#!! ;'! ;%! ;#! J6BAKDH

EF%

16F!

16F!

16F!

16F%

/@ABCD

5-1?<27<.18L

EFGDMDNF0M

&9$ *9* &9* '9* &9$

J5AGN J5FHI J.HAO

3274P214 ;4,?P

3274P214 ;4,?P

EF%

16F!

16F!

16F!

16F%

# $!!' #! "!#Q$

PL;72>4?47R+5+<5-494<2,4:-:6<-:<-:.P45 R+5+<5-494<:R>3475

#&!% & $! &!' '!#+" ) #&%Q& %Q)

&9$ *9* &9* '9* &9$

<S <3 L <T -6 P

;:.3/5 8IBFAU<6B@0V

E,8G3;50/7H63, $!!&#!W!!!

E,8G3;50/-H3 98<?@VDXA<20IVAIFDGI<>DGIAH<PDAHIY

E,8G3;50:8;-5.8/ ?@VDXAZ<[AGCAC

<5 <W< <R <1 +6 W<# Q# *Q <W <R \]1 T ]6 ?4 P ]6 W!

<6

.011 ,1

+,-./01.2304.15,.675.8/

.233145 678941

(#9# #&9&

*9*#$ *9*#$

58:;

678-:<5-=4<-:<>-11->4?475

/@ABCD EFGD

?-50;:-<=;@>

:3-/0;:-<0ABCD01-/4=;:>

.HACCFEF/AIF@G

;#!! ;'! ;%! ;#! J6BAKDH

16F% 16F&

/@ABCD

5-1?<27<.18L

EFGDMDNF0M

'9* '9*

J5AGN J5FHI J.HAO

3274P214 ;4,?P

3274P214 ;4,?P

16F% 16F&

# $!!' #! "!#Q$

PL;72>4?47R+5+<5-494<2,4:-:6<-:<-:.P45 R+5+<5-494<:R>3475

#&!% & $! &!' '!#+" ) #&%Q& %Q)

'9* '9*

<S <3 L <T -6 P

;:.3/5 8IBFAU<6B@0V

E,8G3;50/7H63, $!!&#!W!!!

E,8G3;50/-H3 98<?@VDXA<20IVAIFDGI<>DGIAH<PDAHIY

E,8G3;50:8;-5.8/ ?@VDXAZ<[AGCAC

<5 <W< <R <1 +6 W<# Q# *Q <W <R \]1 T ]6 ?4 P ]6 W!

<6

1234506783483

9:2;3<=0+<><3

+<?@<A0+<><3

B<84;

C D E0F

/)(!"0&&&'12

957G453H0I2:@4E0J

34!$"* K35<2L0-57@G

'()5$3*&"-6/$( #!!%"!M!!!

'()5$3*&"76$ IK0C7G4N20O@3G23<4830P4832:0D42:3Q

'()5$3*&4)37*!)" C7G4N2E0R28;2;

S.

T U O…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .