ATTACHMENT_6_-_E201_-_ELECTRICAL_DETAILS.pdf

PDF 277 KB Posted

Attached to
Pre-Qualified GC Pool, East Campus Black Box Theater Fire Sprinkler Install
Solicitation number
ITB-F 2025-13
Issued by
Orange County, Orlando City, Florida

About this file

The document is an electrical engineering schematic diagram from TLC Engineering Solutions, specifically detailing electrical fire pump and fire riser supervision details for Valencia College's East Campus Black Box Theater Fire Sprinkler Installation project. The diagram (E201) includes three key sections: a Flow and Tamper Switch Wiring Diagram, an Electric Fire Pump Supervision Diagram, and a Fire Riser Supervision Detail, which outline the technical specifications for monitoring and controlling fire suppression system components. The drawings specify technical connections for electric fire pump controllers, addressable input monitoring modules, flow switches, and tamper switches, with instructions to coordinate locations and quantities with Division 21 contractors.

The document appears to be a technical supporting document for the Valencia College project, which is seeking pre-qualified general contractors for a fire sprinkler installation with a project certification threshold of over $225,000. The schematic provides detailed electrical engineering specifications that will be critical for potential bidders to understand the technical requirements of the fire suppression system infrastructure. The drawings suggest a complex fire protection system design that requires precise electrical and monitoring configurations, indicating a sophisticated approach to fire safety systems for the Black Box Theater on Valencia College's East Campus in Orlando, Florida.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRIC FIRE PUMP

CONTROLLER

PUMP/MOTOR RUN

LOSS OF PHASE

PHASE

REVERSAL

ALTERNATE

SOURCE

RELAY, VOLTAGE AS

REQUIRED. (TYPICAL)

ADDRESSABLE INPUT MONITORING

MODULE. (TYPICAL)

TO PREVIOUS SLC

DEVICE

TO NEXT SLC

DEVICE

ADDRESSABLE INPUT

MONITORING MODULE

FLOW SWITCH. COORDINATE LOCATIONS AND

QUANTITIES WITH DIVISION 21 CONTRACTOR.

TAMPER SWITCH. COORDINATE LOCATIONS AND

QUANTITIES WITH DIVISION 21 CONTRACTOR.

TO NEXT SLC

DEVICE

TO PREVIOUS

SLC DEVICE ADDRESSABLE INPUT

MONITORING MODULE

TEST AND DRAIN

ASSEMBLY

FLOW SWITCH

TAMPER SWITCH

LIQUIDTIGHT FLEXIBLE

CONDUITS

TO NEXT SLC

DEVICE

ADDRESSABLE INPUT

MONITORING MODULES

SPRINKLER

DRAIN

MAIN FIRE RISER

GROUND LEVEL

FIRE RISER

TO PREVIOUS

SLC DEVICE

This item has been digitally signed and sealed by Jonathan Mark Hammond, PE, on the date adjacent to the seal.

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

255 S. Orange Avenue Suite 1600

Orlando, FL 32801 P 407.841.9050 www.tlc-engineers.com

© Copyright 2019 TLC Engineering Solutions, Inc.

TLC Project No. :

COA 15

Seal

Drawing No.:

Scale:

Revisions:

Drawing Title:

Approved By:

Issue Date:

Project No.:

Drawn By:

Consultants:

124060

12" = 1'-0"

/2 /2

:0

:5

P M

C U s e rs \s e a n .b ri tn e ll\

O n e

D ri v e

T

L C

E n g in e e ri n g S o lu ti o n s \D o c u m e n ts \1

E A

S T

M

E P

R

S e a n

.B ri tn e llB

S J .r v t

V A

L E

N C

IA

C

O L L E

G E

B

L A

C K

B O

X E

A S

T B

U

IL

D

IN

G

N o rt h E c o n lo c k h a tc h e e

T ra il, O rl a n d o

124060

10-25-2024

SPB

JMH

ELECTRICAL

DETAILS

E201

No. Date Description

1 10-28-2024 ASI #1

FLOW AND TAMPER SWITCH WIRING DIAGRAM

NO SCALE

1 2

ELECTRIC FIRE PUMP SUPERVISION DIAGRAM

NO SCALE

FIRE RISER SUPERVISION DETAIL

NO SCALE

Sheets
E201 - ELECTRICAL DETAILS
2024-10-28T17:45:02-0400
Jonathan Hammond
I attest to the accuracy and integrity of this document.

File details come from the government source that posted it. Updated .