ATTACHMENT 6 - Drawings 5 of 7.pdf

PDF 11 MB Posted

Attached to
Y1DA--Expand Primary Care (Minor) Construction Iron Mountain
Solicitation number
36C77621B0005
Issued by

About this file

This document provides details regarding a federal contract solicitation for construction services. The Department of Veterans Affairs, through its Veterans Health Administration and Program Contracting Activity Central, will issue an Invitation for Bid for an expansion and renovation construction project at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The project scope involves adding 10,000 square feet to the southeast corner of the existing main hospital and renovating approximately 1,100 square feet of existing space on the first floor for primary care. Work will include architectural, site, structural, fire protection, HVAC, plumbing, electrical and other construction services. The solicitation will be set aside as a total Service-Disabled Veteran-Owned Small Business set-aside. The North American Industry Classification System code is 236220 with a size standard of $39.5 million. The solicitation is expected to issue in March 2021 with a performance period of approximately 546 calendar days from notice to proceed. The magnitude of construction is estimated between $5 million to $10 million.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOM

PROCEDURE

ALCOVE

UTILITY

SOILED

1267A

TOILET

PATIENT

1267B

GARAGE

AMBULANCE

LOCKERS

BREAK RM/

RM

EXAM

WORK RM

NURSE

ROOM

EXAM

RM

EXAM

RM

EXAM

RM

DECON

MEDICATION

UTILITY

SOILED

TOILET

PATIENT

RM

TREATMENT

RM

TREATMENT

ROOM

TREATMENT

MEDICATION

/SECURITY RM.

FIRE ALARM

TOILET

PATIENT

LOBBY

ELEVATOR

TOILET

1224A

ROOM

COAT

OFFICE

PHARMACY

PHARMACY

MAIN

VAULT

MED PREP

SECURE

TOILET

PATIENT

CLERKS

RM

EXAM

WORKRM

NURSE

RM

EXAM

ROOM

EXAM

RM

EXAM

SUPPLY

STERILE

ROOM

EXAM

ROOM

ANTE

1312A

STATION

NURSE

DICTATION

WORKRM

NURSE

RM

EXAM

RM

EXAM

LINEN

CLEAN

HOUSEKEEPING

TOILET

STAFF

ISOLATION

TREATMENT/

TREATMENT

SECURE

TOILET

WOMENS

LAB/EKG

BLOOD DRAW

LAB/EKG

BLOOD DRAW

PT. TOILET

1312B

EQUIPMENT

PHARMACIST

CLINICAL

DISPENSING

OUTPATIENT

CLOSET

HSKPG

HSKPG

ELIGIBILITY

ENROLLMENT &

AREA

WAITING

AREA

CLERK

ELECTRICAL

CONSULTING

PHARMACY

DATA

DATA & PHONE

1218A

EQUIPMENT

ELEVATOR

VESTIBULE

AREA

WAITING

CONSULTING

1218B

CONSULTING

1218C

TRIAGE

STORAGE

WHLCHR

VESTIBULE

MRI

1304A

TOILET

STAFF

1340A

RM

CHANGING

1304C

RM

CHANGING

1304B

VESTIBULE

MRI

ROOM

EXAM

TOILET

PATIENT

ALCOVE

SCALE

TOILET

MENS

STAIR4

STAIR3

ALCOVE

PYXIS

BASEMENT ROOF

BASEMENT ROOF

LDRY

CHUT

RM

EXAM

DNUP

UP

DN

VOLUNTEER

AREA

MECH.

CHASE

CARPET

CARPET TILE

TILE

MECH

SHAFT

FD

FE FE

MD

MDMD

MD

F

MD

MD

MD

MD

S

S

SS

T

S

S

S

S

S

S

S

S

S

S

S

S

S

T

H

AHU

RF

EF

CRE

EXISTING

HUMIDIFIER

EXISTING

FANCOIL

AC

AC

AC

28x16 x1

18x14

28x16

44x14

56x10

8"

8"8"

8"

24x24 x1

X

'-0

6x6

12x12 95

24x24 x1

X

9'

-6

12x10

18x18

18x10 EXH x

16x16-UP

4" EXHAUST

4" COMBUSTION INTAKE

8x8

6"

6∅

8"

8"

6"

6"6" 6"

24x24

24x24

24x24

8x8

24x24

8x824x24

24x24

24x24

24x24

48x8

48x8

24x24

8"

CAP

CAP

24" DEEP

PLENUM

GAS CONNECTION TO

RADIANT HEATER

1" GAS (75 CFH

@ 11" w.c.)

CAP

CAP

CAP

D E

F

CC

A

B A

A

B

AA

G

CAP

A

I

I I

K

J

L

I

N

P

O

O

Q

C A

P

R

Q

180180

Q

8" O

O

O A

A

R

Q

Q

CAP

CAP S

S

SS

S

S S

S

S

C A

P

Q

M

T

RADIANT HEATER H

I

2" HPS-UP

1" HPCR-UP

STEAM TRAP

HUMIDIFIER

LPCR-UP/DN

60 60

180 180

180 EA

70 125

105 EA

105 EA

30 30

140 EA

100100

100145

145170

24x12 125

RG-E

24x12 125

RG-E

24x24 2280

RG-E (2)

CD-1

12ø 500

CD-1

12ø 500

CD-1

150 - 8∅

180180

22/10

14x8

22∅

16"

12x12 EA-UP

TO 2ND FL

10/8 EA

UP TO

10x10

24x24

24x24

8x8

8x8

24x12

8"

12x12

8"

22x18-UP 14x8-DN

2ND FL.

x1

UP TO

EF-66

UP TO

EF-65

UP TO

EE-23

18x10 EXH-DN

12x1212x12

12x12

24x24

12x12

10x16

16x10

6x

10x10 DN

IN CHASE

8x16

7"AFF

12x12

14x8 x1

12x12

14x10 x1

12x12 6x6 12 x1

12x6

8x8

16x16 UP TO

EF-64 ON ROOF

x1

12x8

8x

24x24

24x24

24x24

12x12

24x24

24x24

6"

EG-1

150 - 24x12

8∅

14x12 UP

12x12

12"

(2)R3

14x12

(1)@12"AFF

(1)@60"AFF

20x16 SA 20x18

RA STACKED

20x16

INSULATED

44x64 UP TO

ROOF

20x14

12" 12" x1

12"

26x20 30x14

24x24 24x2424x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x2424x24

8" 8" 8"

8"

8"

8" 8" 8" 8"

8"

8" 8"

8"

8"

8"

8"

8"

8"

24x24

8∅

24x12

24x12

12∅

24x24

8"

24x24

24x24

24x24

8x8

12x12

12x12

12x12

24x24

24x24

24x24

24x24

24x24

24x24

24x24 24x24

8"

26x10

24x24

18x10 EXH-DN

F

14x12 14x12

12x14

48x14

/1

9"

12x12 16x12 x1

8"

8"

12x8 x1 x1

7"

6"

8"

10" x1

8" x1 x1

34x14 x1

12x10

12x10 12x10 x1 x1 x1 x1 x1

14x12 x1 x1 x1

18x14 x1

44x14 x1

10x12

10x10

10x12

10x12

12x10

10"

10"

10"

24x24

24x24

24x2424x24

24x24

24x24 24x24

24x2424x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

10"

10"

8"8"

8"

8"

8" 8"

8" 8"

6"

6"

6"

24x24

10"

12x12

12x12 6" 6"

24x24

6"

24x24

8"

12x12 12x12

6"6"

24x24

8"

8"

8"

24x24

24x24

12x12

6"

6" 24x24

48x8

24x24

10"

24x24

24x24

6" 24x24

24x24

24x24

24x24

8"

24x24

8" 8"

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

8x

48x8

48x8

48x8

48x8

24x24

24x24

48x8

48x8

48x8

24x24

24x24

24x24 24x24

24x24

24x24

24x24

/1

(A

B V x1 4(

A B

V

/1

(A

B V x1

S

A

A B

V

24x24

24x24

48x8

8"

8"

8"

6"

6"

8"

6"

12"

8" 8"

8"

6"

6"

6"

8"

6"

12"

12"

8"

12"

8"

8" x6

20x12

10"

10" x8 x8

10"

12"

12x8

24x24 24x24

24x24

48x848x848x8

24x24

24x24

24x24

24x24

6"

24x24

24x24

48x8

24x24

24x24

48x8

48x8 48x848x8

24x24

24x24

24x24

24x24

8"

8" x1 x1 x1 x1

8"

14x14

12" x1

8"

12"

8∅

24x24 24x24

14x12

(1)@12"AFF

(1)@60"AFF

COND. DOWN

TO MOP SINK

3/4" COND

REFRIGERATION

LINES UP TO

ROOF

R

1" GAS (2 PSI)

1 1/2" G (2 PSI)

1" GAS (2 PSI)

2" G-UP

GAS PRESSURE REGULATOR TO

REDUCE GAS PRESSURE FROM 2

PSI TO 11" W.C.

R-16

S-17

S-16 S-17 R-17

R-18

R-172"

2"

3/4"

S-18

R-19

S-19

R-20

S-20

S-22

2"

S-22

R-22

R-22

S-23A

R-23A

R-11 S-11

R-23

S-23

R-24

S-24

S-25

S-26

R-25

R-27 R-28

R-26

S-27

S-18 R-18

R-12 S-12

S-28

R-29

S-29

S-30

S-31 R-30

11/2"

R-31

S-32

S-32

R-32

3/4"

2"

S-32 R-41R-42

S-42R-43

4" LPS UP & DN

3" LPC UP & DN

1" LPS UP & DN

1" LPC UP & DN

1"

2" HPS

1 1/2" HPC

TO AHU-24

2" HPS

1 1/2" HPC

2" HPS

1 1/2" HPC

3/4"LPS

3/4" LPC

3/4" LPS

3/4" LPC

LPS/LPCR-DN

T

T

T

TT

T

2" HWR/S DN

1 1/4"

1 1/4"

2"

1 1/4"

1"

3/4"

1 1/2"

12.8 GPM

1"

3/4" HWS/R

3/4"

2"

1 1/4"

2"

1 1/4"

2"

1 1/2"

2 1/2" HWS & HWR

DN TO BASEMENT

2 1/2"

2 1/2" 2 1/2"

3/4"

3/4" 2 1/2"1" 1"

1 1/4"

2"

2" 1 1/4"

1 1/4" 2"

1 1/2" 1 1/2"

1 1/2"

2"

2"

1 1/2"

1 1/4"

2"

2"

1 1/4"

2 1/2"

2 1/2"

1" HWS/R

1" HWS/R UP TO

SECOND FLOOR

3/4" HWS

& HWR

T

T TT

T

T

T

T

T

T

T

T

T

T

T

T

T

TTTT

T

T

T

T

T

T

T

T

T

T

T T

T

T x1

52x16 x1

54x10 x1 x1 x1

54x10 x1

54x10

32x64-UP

THRU ROOF

12x12

12x12

12x12

12x12 12x12

12x12 x1

0( B

LW

x1

R

A

24x24

/1

R

A

B

LW

24x24

16x10

8x8

8x8

8x x1 x1 x8 x1

A

B

C

D

E

F

123478282625242321

T

S

R

P

O

N

M

L

K

J

H

G

F'

22 27 29

29.5

(THIS SHEET ONLY) - DEMOLITION

PLAN KEYED NOTES

REMOVE DUCT UP THROUGH FLOOR ABOVE. CAP AS INDICATED.

REMOVE EXHAUST LOUVER, PLENUM, CONTROL DAMPER AND

EXHAUST DUCT BACK TO EXHAUST FAN. CONTROLS TO BE

EXTENDED TO NEW DAMPER. SEE NEW WORK PLANS.

REMOVE EXHAUST BACK TO RADIANT HEATER. EXHAUST TO BE

RELOCATED. SALVAGE TERMINATION COMPONENTS FOR REUSE

AT NEW EXHAUST LOCATION. SEE NEW WORK PLANS.

REMOVE REGULATOR VENT BACK TO REGULATOR. VENT TO

BE RELOCATED. SEE NEW WORK PLANS.

REMOVE RADIANT HEAT, PIPING AND CONTROLS. CAP PIPING WHERE

INDICATED. PROVIDE MATCHING STYLE ACT TO PATCH CEILING.

REMOVE CONTROL DAMPER AND CONTROLS.

REMOVE DUCTWORK. CAP AS INDICATED.

- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR

SHOWN DASHED.

- GENERAL TRADE SHALL PATCH WALL OPENINGS REMAINING AFTER

DEMOLITION TO MATCH ADJACENT SURFACES.

G

F

E

D

C

B

A

SALVAGE INFRARED HEATER. RELOCATE TO OPPOSITE WALL.

SEE NEW WORK PLAN. SALVAGE, RELOCATE AND REUSE

PIPING, VALVES AND COMBUSTION DUCT COMPONENTS.

H

SALVAGE GRILLE FOR REUSE IN SAME ROOM. I

SALVAGE EXHAUST FAN FOR REUSE IN SAME ROOM. REMOVE

DUCTWORK AND CONTROS.

REMOVE DUCTWORK/DAMPER ATTACHED TO INTAKE LOUVER.

GAS DETECTOR SYSTEM TO REMAIN. REMOVE AND REINSTALL

ALL COMPONENTS THAT WILL BE IN INACCESSIBLE LOCATONS

DUE TO NEW WORK. THIS INCLUDES WIRING/COINDUIT TO

PANELS THAT WILL INTERFERE WITH NEW INTAKE LOUVER

LOCATION. REINSTALL ALL REMOVED COMPONENTS IN

OFFSET/RELOCATED POSITION TO AVOID NEW WORK. EXTEND

WIRING AND CONDUIT AS REQUIRED. RESTORE FUNCTION TO

GAS DETECTOR SYSTEM.

DUCTWORK TO BE DEMOED FOR OFFSET. SEE NEW WORK PLANS.

J

K

L

N

DISCONNECT PIPING FROM EXISTING AIR CURTAIN. SALVAGE

EXISTING AIR CURTAIN FOR REUSE. SEE NEW WORK PLANS.

M

REMOVE AND REINSTALL GRILLE FOR ARCHITECTURAL WORK. O

SALVAGE VAV TERMINAL FOR REUSEIN SAME ROOM IN OFFSET

POSITION.

P

REMOVE VAV BOX, DUCTWORK, PIPING, GRILLES AND CONTROL.Q

REMOVE THERMOSTAT FOR ARCHITECTURAL WORK. SEE NEW

WORK PLANS FOR RELOCATION.

R

CEILING TO BE REMOVED DURING CONSTRUCTION. SUPPORT

GRILLES DURING CONSTRUCTION. REPLACE IN CEILING ONCE

T-BARS ARE REINSTALLED.

S

- HVAC CONTRACTOR SHALL REMOVE/REINSTALL CEILING, WHEN NOT

DEFINED ON ARCHITECTURAL PLANS, AS NECESSARY TO

REMOVE/INSTALL HVAC SYSTEMS.

SALVAGE TERMINATION COMPONENTS FOR REUSE AT NEW

INTAKE LOCATION. SEE NEW WORK PLAN.

T

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

KEY PLAN

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

ZONE 1

ZONE 2

ZONE 3

ZONE 4

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:1

P

M

D.A.S. K.K.S.

MD101

FIRST FLOOR DEMOLITION PLAN

DWG. 101 OF 147

N

1/8" = 1'-0"MD101

FIRST FLOOR PLAN - DEMOLITIONF1

4'0 8' 12'2'

TOILET

PATIENT

ULTRASOUND

ROOM

TECH. WORK

SUPPLY

CLEAN

VIEWING

PACS

TOILET

PT.

ROOM

CHANGING

TOILET

STAFF

HSKG

CONTROL

CT SCAN

CT SCAN

TOILET

PT.

HOT LAB

2254A

MEDICINE

NUCLEAR

DENSITY

BONE

CHUTE

LAUNDRY

UTILITY

ROOM

CONTROL

2263A

RADIOLOGY

SCANNER

GE CT

STORAGE

2263B

CLEAN

STERILE

CYSTOSCOPY

CLOSET

HSKG

MECHANICAL

MECHANICAL

2307A

LOBBY

ELEVATOR

PHONE

DATA &

2218 ALCOVE

EQUIP.

2230A

CORRIDOR

2230P

ROOM

TECH WORK

C2-2

CORRIDOR

SOCIAL

WORKER

ACCUPUNCTURE

EXAM ROOM

DATA

CLOSET

ACCUPUNCTURE

EXAM ROOM

EYE PRE-

TREATMENT

EYE PRE-

TREATMENT

OFFICE

STAFF

LOUNGE

STERILE

SUPPLY

CLEAN

SUPPLY

SOCIAL

WORKER

2335A

PATIENT

TOILET

CHEMOTHERAPY

MENTAL HEALTH

EXAM

HSKG CLST

ELECTRICAL

ROOM

LANE

ROOM

LANE

ROOM

LANE

ROOM

EYE

INSTRUMENTS

TELE-HEALTH

EXAM RM

TELE-HEALTH

EXAM RM

TELE-HEALTH

OFFICE

TELE-HEALTH

EXAM RM

TELE-HEALTH

EXAM RM

MENS

TOILET

WAITING

AREA

ROOM

WOMENS

TOILET

CLERKS

AREA

2374A

STAFF

WORK AREA

CORRIDOR

STAFF

TOILET

SUB-WAIT

AREA

WOMENS

HEALTH EXAM 2352

TOILET

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

FAMILY

LOUNGE

2338A

FAMILY

RESTROOM

ONOCOLOGY

EXAM/OFFICE

ONOCOLOGY

EXAM/PROC.

SOILED

LINEN

2261A

CONTROL

ROOM

CLERK

CHECK-IN

WAITING

AREA

FEMALE

TOILET

MALE

TOILET

C2-1

CORRIDOR

AREA

DUMBWAITER

/CART ALCOVE

2110B

SCRUB

ALCOVE

2252P

CORRIDOR

CORRIDOR

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

STAIR 3

UP

DN

STAIR 4

UP

DN

MECH

CHASE

MECH.

SHAFT

CHASE

MECH.

SHAFT

CHASE

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

CO

CO

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

H

S

T

S T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

TT

T

T

T

6" CHWR

1" HWR

1" HWS

1" HWR

1" HWS 1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWS

1 1/4" HWR

3/4" HWS

3/4" HWR

2" HWR2" HWS

3/4" HWR1" HWR

1" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

3/4" HWR

3/4" HWS

1 1/4" HWR

1 1/4" HWS

2 1/2" HWS

2 1/2"

HWR

3/4" HWR

3/4" HWS

2 1/2" HWR

2 1/2" HWS

3/4" HWR

3/4" HWS

2" HWR

2" HWS

3/4" HWS

3/4" HWR2" HWR

2" HWS

3/4" HWS

3/4" HWR

2" HWR

2" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

3/4" HWR

2 1/2" HWS

3/4" HWS

3/4" HWS

3/4" HWR 3/4" HWR

3/4" HWR

3/4" HWS3/4" HWS

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

1" HWS

1" HWR

3/4" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

2" HWR

2" HWS

3/4" HWS

3/4"

HWR

3/4" HWR

3/4" HWS

3/4" HWS

1 1/2" HWS

1 1/2" HWR

3/4" HWS

3/4" HWS

1 1/2" HWS

1 1/2" HWR

3/4" HWR

3/4" HWS

1 1/2" HWR

1 1/2" HWS

1" HWS

1" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

1" HWS

1" HWR

3/4" HWR

1" HWR

1" HWS

3/4" HWS 3/4" HWS 3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR 3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR3" HWR

3" HWS

4" HWS

4" HWR

3" HWR

3" HWS

3" HWS

3" HWR

3" HWS

3" HWR 3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

EXIST STEAM

CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM

CONVECTOR

75 75

155 120

170170

160 90

110 110

190 8Ø

CD-1

70 12x12

EG-1

875 14Ø CD-1 x (4)

270 24x12

RG-1

EG-1

180 8Ø

CD-1

180 8Ø

CD-1

200 48x24

SD-3

200 48x24

SD-3

205 48x24

SD-3

200 48x24

SD-3

200 48x24

SD-3

225 10Ø

CD-1

320 24x12

RG-1

50 12x12

EG-3

140 24x12

EG-1

50 24x12

RG-1

50 6Ø

CD-1

280 10Ø

CD-1

405 24x12

EG-1

260 10Ø

CD-1

140 8Ø

CD-1

90 24x12

395 24x12

RG-1

220 10Ø

CD-1

220 10Ø

CD-1

425 14x16

200 48x24

SD-3

200 48x24

SD-3

RG-1

155 24x12

RG-1

65 24x12

EG-1

125 24X12

RG-1

160 8Ø

CD-1

125 8Ø

CD-1

290 24x12

RG-1

125 8Ø

CD-1

90 6Ø

CD-1

360 12x12

RG-2

195 8Ø

CD-1

310 10Ø

SD-2

415 24x12

560 24x12

EG-1

240 10Ø

CD-1

240 10Ø

CD-1

390 24x12

RG-1

170 8Ø

CD-1

170 8Ø

CD-1

205 10Ø

CD-1

205 10Ø

CD-1

115 24x12

EG-1

80 20x12

EG-3

370 24x12

RG-1

570 24x24

RG-1

70 24x12

EG-1

40 12x12

EG-3

145 24x12

RG-1

250 10Ø

CD-1125 8Ø

CD-1

425 14x16

RG-3

95 24x12

EG-1

200 18x12

RG-3250 10Ø

CD-1

1000 24x24

RG-1

1000 24x24

RG-1

550 10Ø

SD-1

660 24x24

RG-1

550 10Ø

SD-1

550 10Ø

SD-1

220 10Ø

CD-1

220 10Ø

CD-1

220 10Ø

CD-1

60 24x12

160 8x6

SG-2

160 8x6

SG-2

160 8x6

SG-2

220 10x6

SG-3

220 10x6

SG-3

220 10x6

SG-3

50 24X12

RG-1

375 24x12

RG-1

145 8Ø

CD-1

50 6Ø

CD-1

145 8Ø

CD-1

90 6Ø

CD-1

90 6Ø

CD-1

375 22x12

RG-1

70 24x12

EG-1

50 6Ø

CD-1

1100/1800

225 CFM

90 (CV)

125 CFM

2" G-UP/DN

S32 R32

R31 S31

R30 S30

S32

R41

R42

R29

R43 S42

S28

R26 S27

R23A

R22S22

S20

S23

R24

S25

S26

R25

S24

R20

S19

R19

S18

R18S18

S17

R17

S17 R17

S16

S29

R18

S23A

R23

R27 R28

R13

S13

S13

R12 S12

1" LPR FROM

1 1/2" LPCR-UP

2" HPS UP

2"HPS FROM 1st FLOOR

3/4"HPR FROM 1st FLOOR

3/4"

1" LPS UP & DN

1" LPC UP & DN

3/4" HPR

FROM PENTHOUSE

1/

H

W S

HWS/R

HWS

3/4"3/4"

3/4"

1" 3/4"

3/4"1"

1" HWS&HWR 1" HWS/R 2 1/2 HWS

2" H

W S

2" H

W S

2" H

W S

2" HWS 2" HWS

1/

2" H

W S

1/

2" H

W S

1/

4" H

W S

1" H

W S

2 1/2" HWR

1/

2" H

W R

2" H

W R

2" H

W R

2" H

W R

2" HWR

1/

2" H

W R

1/

2" H

W R

1" HWR

LINES DN TO

1ST FLOOR

2 1/2"

HWR/S UP TO

PENTHOUSE

1" HWR

1" HWS

1" HWS/R DOWN TO

FIRST FLOOR

1" HWS/R

1" HWS/R

6"

6" C

H S

/R S

T A

C K

E D

6" CHS/R

UP TO PENTHOUSE.

STACKED

6" CWS/R

6" CWS/R

LPCR-DN

HUMIDIFIER

T

TM

T

HUM-2

H-24

EF-2

4 FT - 4 SLOT

GRILLE

435 CFM

/1

8∅

/1

2∅

/1 8∅

56/24

56/24∅

/1

A

B V

24x24

48x8

24x24

24x24

24x24

24x24

24x24 24x24 48x8

24x24

24x24

24x24

48x8

48x8

48x8

48x8

24x24

24x24

24x24

24x24 24x24

24x2424x24

24x24

24x24

24x24

24x24

24x24

24x24 24x24

48x8

48x8

48x8 24x24

24x24

24x24

48x8

24x24

24x24

24x24

24x24

24x24

24x24 24x24

24x24

24x24

24x24

24x24

24x24

48x8 48x8

24x24

24x24

24x24

48x8

48x8

48x8

/1

2∅

/1

/1

4∅

/1

2∅

/1

4∅

/1 2∅

14∅

10∅

/1

2∅

10∅

10∅

10∅

6∅

10∅

10∅

10∅ 6∅

14∅

8∅

27/14∅ 12∅

8∅

21/12∅ 10∅

8∅

10∅

12∅

12∅

8∅

14∅

48x8

10∅

10∅

6∅

6∅

10∅

10∅

10∅

10∅ 8∅

8∅

12∅

10∅ 8∅

8∅

10∅

8∅

10∅

8∅

12/10

48x8

10∅

6/

44/18∅

UP

48x8

48x8

14∅14∅

14∅

30x30 UP

24x24

8ø

8x8 10x8

8x6

12x10

8ø

8ø

8ø

6ø

10x8

12x10 ø

18x10 12x10

/3 20

/3

10ø ø

18x10 x1

6x10 ø

10ø8ø

8ø

10x8

14x8 ø

10x8

8ø

12x10 ø

8ø

8x6 8ø

6ø x1 x1

/3

/3

/3

16x14 ø

8x6

12x8 8ø

8ø 6ø x1

8ø10ø10ø

8ø 10x6

12x8 8ø

14x12 x1 ø

14x8 ø ø x1

10ø

8ø

8ø

8ø

10x10

8ø 8ø

68x20

8ø x1

8ø x1 x8 x1

16x12 24x8

38x12 42x12

42x12

78x12

78x12 x1

10ø6ø

10x66ø

14x10 18x4

10x6

8x128x128ø 12x6

8ø

44x1052x1052x10 x1

/3

6ø 6ø

12x10

10ø

12x10

18x12

26x8

26x8

26x8

26x8

40x6 30x12 14ø

14ø

18x4

10ø

10ø ø

10ø x1 x1

44x10 x8

6ø

10x610x6 10x6

8x6

8x6 x1

8ø x1

6ø x8

8ø

8ø

12x8 10ø

8ø

14x8

6ø

14x10

6ø ø x1

UP TO

ROOFTOP

AHU

22/16

/1

14/14

24x24 12x12

12x12

12x12

24x24

8/

6/

12/12

8/8

6/

6/6 12∅

6/ 6 8/6

12x12

TO EF-21

18/12 TO

12/12 TO EF-23

24x24

EF-24

12/18 14/12

EF-66

16/10

DOWN

16/10 TO

14/8 FRM

FIRST FLR.

14/8

18/12

/1

EF-65

12/12 TO

14x14

TO EF-20

EF-22

12∅ TO

10x10

FROM 1ST FLR.

UP THROUGH 2ND

FLOOR ROOF AND UP TO

6TH FLOOR ROOF AND

EF-15

30x20

10x610x6

14x12

12x8

14x12

8x6

8x

8x6

8x6

8x x1

28x12 x1

42x1246x8 x8

6ø

8x6

18x8

8x6 x1

12x8 12x8

18x8 x1

8x

10x8

8x

8x

8x

6x6 x1

12x8 x8 x8

14x12 14x12

30x16

8x6

10x6 10x8

8x6

10x6 10x8

8x

8x

14/14

24x24

24x24

16/16 TO

16/16 FROM 1ST FLOOR.

EF-67

A

B

B

C

C C

MD

FDFD

F/S

MD

MD

FD

MD

14x12 10"

10" 10"

8"

16x16-UP/DN

TO EF-64

24x12

24x12

24x12

24x12

24x12

40/18

/1

R

E T

U R

N

56/24

/1

/1

/1

/1

/1

/1

80/18

12x12

12x12

24x24

24x24

24x24

24x24

24x24 24x24

24x24

12x12

24x24

24x24

24x24

24x24 24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x24

24x2424x24

24x24

12x12 24x24

24x24

24x24

24x24

24x24

24x24

24x24 24x24

24x24

24x24

24x24

24x24

24x24

/1

8/8

6/6

6/6

8/6 8/6

10/8 8/6

10/10

10/8

8/

8/

6/6

12/10

14/12

8/ 6 8/ 8 6/

6/

20/12

8/

6/

10/10

12/108/

6/

8/6

6/6

8/8

10/10

10/10

24x24

24x24

8/6

6/6

6/

6/

8/88/8

6/6

6/

6/6

14x8 ø

8ø 8x x8

20x10

14x8 x8

14x6 x1

14x8

8x14

30x10

30x10

10x6

44x12

10x8 x1 x8

14x8

8x

14x6 x8 x8

14x10 x1 x1

50x1252x10 x1 x1 x1

8x6

8x630 x1 x1

12x10 x1

36x12

18x8

10x10 x1

12x8

14x10

14x10

8x x6 x1

UP TO

ROOFTOP

AHU

36/56 UP

TO

PENTHOUSE

A

B

C

D

E

F

123478282625242321

T

S

R

P

O

N

M

L

K

J

H

G

F'

22 27 29

29.5

(THIS SHEET ONLY) - DEMOLITION

PLAN KEYED NOTES

REMOVE DUCTWORK FROM FLOOR BELOW UP THROUGH FAN ON

ROOF ABOVE.

- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR

SHOWN DASHED.

- GENERAL TRADE SHALL PATCH WALL OPENINGS REMAINING AFTER

DEMOLITION TO MATCH ADJACENT SURFACES.

A

REMOVE AND REINSTALL GRILLE FOR ARCHITECTURAL WORK. B

CEILING TO BE REMOVED DURING CONSTRUCTION. BRACE

GRILLES DURING CONSTRUCTION. REPLACE IN CEILING ONCE T-

BARS ARE REINSTALLED.

C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

KEY PLAN

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

ZONE 1

ZONE 2

ZONE 3

ZONE 4

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:1

P

M

D.A.S. K.K.S.

MD102

SECOND FLOOR DEMOLITION PLAN

DWG. 102 OF 147

N

1/8" = 1'-0"MD102

SECOND FLOOR PLAN - DEMOLITIONF1

STORAGE

HEALTH

TELE-

ROOM

EXAM

HEALTH

TELE-

MECH

3244A

LOBBY

ELEVATOR

ROOM

EXAM

CLOSET

BIO-MED

ROOM

EXAM

AREA

WAITING

ROOM

EXAM

PHONE

DATA &

3216 CORRIDOR

3299B-1

ROOM

EXAM

ROOM

MECHANICAL

CHIEF, DENTAL

X-RAY

CONTROL

3228A

ROOM

WAITING

PASSAGE

3237A

PASSAGE

WORK

CLERK/

TRAINING ROOM

NURSE EDUCATION

OFFICE

NURSE EDUCATI

PASSAGEWAY

TRAINING ROOM

NURSE EDUCATION

STORAGE

NESS/KITCHEN

TOILET

3246A

TOILET

3250A

OPERATORYOPERATORY

SUPPLY

STERILE

SUPPLY

CLEAN

UTILITY

SOILED

ROOM

EXAM

& LOCKERS

STAFF LOUNGE

EXAM RM.

TELE-HEALTH

MANAGER

NURSE

STAFF OFFICE

TELE-HEALTH

OFFICE

MSA

CORRIDOR

3299C-1

CORRIDOR

CORRIDOR

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRE

EQUIP

LDRY

CHUT

DN

UP

STAIR 3

STAIR 4

UP DN

PASSENGER

ELEVATOR

MECH

SHAFT

2ND FLOOR ROOF

2ND FLOOR ROOF

2ND FLOOR ROOF

MECH

SHAFT

MECH

CHASE

M D

M D

T

M D

S

M D

M D

3/4" HPCR-DN

MD

EF

EF

x

SUPPLY BYPASSEF

6" CWS/CWR

FROM BELOW.

P

P

ET

P

ET

AS

AS

P

P

HX

HX

(STACKED)

(STACKED)

1/3 & 2/3 VALVES

HX

HX

GLYCOL4" FINAL FILTER

TCP

1 1/2" LPR TO END OF

MAIN STEAM TRAP BELOW

EXISTING

HUMIDIFIER

1/3 & 2/3

VALVESA B

D

E

E

H

C

G

F

I

J

K

L

G

VFD'S

V F

D 'S

F

M

O P

N

PROVIDE (7) SETS OF MERV (30%) PREFILTERS FOR

EXISTING AIR UNIT(36,000)(RM SYSTEM, APPROXIMATELY

70 SQ. FT. (VERIFY ACTUAL SIZES)). CHANGE FILTERS AT

DIRECION OF OWNER AS FILTERS LOAD DUE TO DUST

PRODUCING ACTIVITIES OF ADDITION'S CONSTRUCTION.

S

Q

Q

Q

R

RQ

Q

EXISTING

PRV

EXISTING

UNIT HEATER

CRC

EXISTING LIEBERT

AC UNIT

/1

8"

66x18

8"8"

66/18

UP

60x48

PLENUM

56x24 OVAL SUPPLY DOWN

40x18∅

10"

10"

6"

10" 6"

6" x1 x1

10"

6" x1

10x10

8"

12"

8"

8"

24x12

10"

34x10

8"

12" 34x10

"8"

8"8"

8"

10"

8∅ 8∅

8"

5" 6"

4"

8"

8"

18x8 8" x6

18x10

8"

8∅

6∅

8" 10"

8"

6"

8"

6"

8"6"

8"

6"

8"

6"

8" x1 x1 x1

8" 6"

8"

8"

14x12 14x12

6∅

8"

6∅

8x

8"

6"

8∅

8"

8∅

8"

8"

8" 8"

6"

8"

8∅

6∅

84x66 X = 18"

R 60x24Ø X=8'-5"

60x36Ø X=7'-4"

24x12 OVAL SUPPLY DOWN

14x12-UP

15x14-UP x1

10x10

18x8

34x10

34x10

30x28 UP & 28x18

DN (ERU-2)

12x10

40x16 x2

28x14

6x

8x

14x8

16x8

8x6

8x

14x8

48x10

EXISTING 16x20 EXHAUST

20" EXHAUST DUCT UP

FROM NUCLEAR MED.

26x10

TRANSITION TO

20" IN VERTICAL

8x

8x

8x

8x

8"

24x24

(TYP. 2)

24x24

(1434)

SD-2

SD-2

SD-2

RG-2

RG-3

RG-2

SD-1

RG-3

EG-1

EG-4

SD-1

SD-3

EG-2

EG-6

50 CFM

EG-6

50 CFM

SD

80 CFM

75 CFM

SD-1

CFM

RG-1

CFM

SD-1

CFM

SD-1

CFM

SD-1

CFM

RG-1

CFM

RG-1

CFM

SD-1

CFM

EG-1

CFM

EG-1

CFM

C

F M

C

F M

SD - 1

6∅ 75

SD-1

8∅ 175

SD-1

8∅ 130

TYP 2

SD-1

6∅ 100

TYP 2

SD-1

6∅100

TYP 2

SD-1

8∅ 125

SD-1

8∅ 125SD-2

8∅ 130

SD-2

8∅ 160

RG-3

SD-2

8∅ 170

SD-1

6∅ 100

SD-2

8∅ 170

SD-1

6∅100

TYP 2

SD-1

6∅ 100

TYP 2

SD-1

6∅ 100

TYP 2

RG-3

12x12 260 RG-2

12x12 160

RG-2

12x12 125

RG-2

12x12 200

RG-2

12x12 200

RG-2

12x12 200

RG-3

12x12 260

EG-2

12x12 200

RG-2

12x12 125

RG-2

12x12 75

RG-2

12x12 200

RG-2

12x12 200

R G

-2 x1

SD-2

8∅ 145

SD-1

6∅ 100

SD-2

8∅ 130

SD - 1

6∅ 75

SD-2

8∅ 150

SD-2

8∅ 150

R G

-3 x1

RG-2

12x12 75

RG-2

12x12 100

SD-6

6∅ 100

SD-6

6∅ 100

RG-4

10x10 100

EG-1

12x12 130RG-4

10x10 100

EG-1

12x12 75

SD - 1

6∅ 70

SD-2

8∅ 130

60x20-UP

SMOKE

DETECTOR

SMOKE

DETECTORS

/1

24/10

/1

60x60

56x36

62x48

18x10

8" 8"

8"

8x8 x1 x1

14x10

10x10

14x1016x10

8x

8x

20x10

8x

14x10

10x10 x1

12x12

8" x1

8"

8"

8∅

8"

10∅ x1 x1 x1

24x14 x1

24x14

12x6 x6

8∅

14x10 8∅ 10

8"

8"

8"

6"

8"

40x18 DOWN

X=5'-2"

X=7'-0"

X=5'-11"

56x36-DN

F

F

F DP

SD

AFMD

16x16-DN

MD

MD

SD

DX PIPING-DN

R

11/2"G

11/2" G UP TO ROOF

1 1/2"

2 PSI GAS

3/4" GAS

3/4" GAS

2" G-UP/DN

2" LPS RISER

3/4" LPC

RISER 2" LPS RISER

2 1/2" LPS RISER

3/4" LPC

RISER

3/4" LPC RISER

1 1/4" LPS

RISER

2" LPS RISER3/4" LPC

RISER

2" LPS RISER

3/4" LPC

RISER

1 1/2" LPS

RISER

3/4" LPR

RISER

S-32

R-34

S-13

S-13

S-25

S-24

R-24

S-23

R-23

R-22S-22

S-18

R-19

S-19

R-20

S-20

S-26

R-25

S-31 R-30 S-30R-31

S-28R-27 R-28

R-26

R-41R-43 S-42 R-42

S-32 R-32

S-29

R-29

S-16

R-16 R-17 S-17

S-18

R-18

S-27

R-12

S-12

R-18

STEAM PRS2" HPS FROM BELOW

4" LPS

1 1/2" LCPR-DN

3/4" CONDENSATE TO

OPENSITE DRAIN IN

MECHANICAL SHAFT

1" LPS/LPC

UP & DN

3/4" LPS

3/4" LPCR-DN

4" LPS UP & DN

3" LPC UP & DN

X=6'-8"

1" LPCR-DN

2" HPS-DN

EXISTING

PRV

1"

1 1/4"

1"

2"

1 1/4"

2"

1 1/4"

1"

3/4"

3/4"

1 1/4"

2 1/2"HWS/HWR

3" HWS/R

3/4"

3/4"

3/4"

3/4"

4" HWS/R-UP

4" HWS/R-DN

2"

1 1/2" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

1 1/4"

1 1/2"

3/4"

3/4"

3/4"

1 1/2"

3/4"

1"3/4"

3/4"

3/4"

3/4"

1 1/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

1"

3/4"

1 1/4"

1"

3/4"

1"

1 1/2"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4" 3/4"

3/4"

3/4"

3/4"

1/2" PURGE PORTS

1/2"PURGE PORTS

4"

HWS

HWR

T

H

H

H

T

T

T

T

T

T

T

T

TT

T

T

T

T

T

T

T

T T

T

T

T

TT

T

T

T

T

T

T

TT

CRC

EF

EF

EF

EF

EF

EF

MUA

RAF VFD

AHU VFD

RAF

SAD

AHU

EF

SAD

TCP

(THIS SHEET ONLY) - DEMOLITION

PLAN KEYED NOTES

RELOCATE TCP AND TRANSFORMER. ELECTRICAL TRADE TO

EXTEND ELECTRICAL WIRING. SEE NEW WORK PLANS.

REMOVE GLYCOL FILL TANK. OWNER DOES NOT USE AND HAS

REQUESTED REMOVAL.

REMOVE PUMPS, CONTROLS AND VFDS. PUMPS TO BE REPLACED

WITH NEW INTEGRAL VFD PUMPS. SEE NEW WORK PLANS.

DEMO EXPANSION TANK AND AIR SEPARATOR.

SALAVGE HEAT EXCHANGERS. HEAT EXCHANGERS TO BE

RELOCATED. SEE NEW WORK PLANS.

REMOVE INTAKE PLENUM, CONTROL DAMPER AND CONTROLS.

REMOVE CONTROL DAMPER. PATCH DUCTWORK. CONTROLS

TO BE EXTENDED TO NEW DAMPER. SEE NEW WORK PLAN.

REMOVE SUPPLY BYPASS AND DAMPER. CAP AT MAINS.

REMOVE 4" FILTER RACK. FILTER RACK TO BE REPALCED WITH 2"

FILTER RACK. SEE NEW WORK PLAN.

- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR

SHOWN DASHED.

- GENERAL TRADE SHALL PATCH WALL OPENINGS REMAINING AFTER

DEMOLITION TO MATCH ADJACENT SURFACES.

I

H

G

F

E

D

C

B

A

REMOVE EXHAUST FAN, CURB, CONTROLS AND DUCTWORK DOWN

THROUGH FLOOR BELOW. GENERAL TRADE TO PATCH ROOF TO

MATCH EXISTING.

J

REMOVE HUMIDIFIER AND PIPING FOR REPLACEMENT. SEE NEW

WORK PLANS.

K

REMOVE DUCTWORK CONNECTING TO LOUVER FOR LOUVER

WORK. REMOVE DAMPER/CONTROLS.

L

REMOVE EXHAUST FAN AND CURB. NEW FAN AND CURB TO

REPLACE EXISTING. SEE NEW WORK PLANS.

M

REMOVE EXHAUST FAN, DUCTWORK AND CONTROLS. GENERAL TO

REMOVE LOUVER AND INFIL WALL TO MATCH EXISTING.

N

OFFSET AND EXTEND CONDUIT AND CONTROL WIRING TO MAKE

ROOM FOR NEW LOUVER IN WALL.

O

OFFSET SMALL DIAMETER COPPER VENT / DRAIN PIPING FOR NEW

LOUVER.

P

-SALVAGE 35% PROPYLENE GLYCOL SOLUTION FROM CHILLED WATER

SYSTEM AND 35% PROPYLENE GLYCOL SOLUTION FROM HOT WATER

SYSTEMS. CONTRACTOR SHALL DRAIN SYSTEM AND REFILL AND VENT

THE SYSTEM AFTER RENOVATION WORK IS COMPLETE. CONTRACTOR

SHALL TEST THE FLUIDS. PIPING REVISIONS AND EXTENSIONS

(ADDITION) WILL REQUIRE ADDITIONL FLUID. HVAC CONTRACTOR IS

RESPONSIBLE FOR ALL FLUID AND SHALL MATCH EXISTING SOLUTION

TYPE. WHEN ADDING FLUID, AFTER TESTING, NOTIFY THE OWNER AND

A/E OF SOLUTION TYPE AND % GLYCOL. IF BELOW THE DEFINED

PERCENTAGES, OWNER MAY OPT TO ADD PURE GLYCOL TO INCREASE

OVERALL CONCENTRATION VIA CB.

-AHU HEAT EXCHANGER SYSTEMS SHALL BE

RELOCATED/MODIFIED/TAKEN OUT OF SERVICE WHEN THE OUTDOOR

TEMPERATURE IS EXPECTED TO STAY ABOVE 50 DEGREES.

COORDINATE OUTAGE WITH OWNER. BELOW 50 DEGREES RELOCATE

AS DEFINED BELOW FOR REHEAT UNITS.

-REHEAT HEAT EXCHANGER SYSTEMS SHALL HAVE A PHASED

RELOCATION AND SHORT PERIOD OUTAGE. SEE NEW WORK PLANS FOR

NEW EQUIPMENT LOCATIONS. RELOCATED (1) PUMP AND (1) HEAT

EXCHANGER SYSTEM. INSTALL ALL PIPING, ISOLATION VALVES

(PROVIDE ALL NEW VALVES IN THE NEW ADDITION. COORDINATE

CROSSOVER SYSTEM OUTAGE WITH OWNER. WORK SHALL PROCEED

AROUND HE CLOCK 24/7 (MINIMUM OF 4 PERSON CREW) UNTIL CROSS

TIE IS MADE AND SYSTEMS ARE MADE OPERATIONAL. FINALLY,

RELOCATE REMAINING EQUIPMENT TO NEW POSITIONS AND COMPLETE

DEMOLITION.

BENCHMARK READING AT ALL DAMPERS WILL BE REQUIRED TO

ASSIST IN REBALANCING AND QUANTIFYING DUCT LEAKAGE.

Q

TAKE BENCHMARK READINGS OF FLOW, WITH CONTROL VALVES

FULLY OPEN, FOR THE HEATING COIL AND COOLING COIL OF

AHU-024. RESTORE BALANCE AFTER CONSTRUCTION IS COMPLETE.

R

TAKE BENCHMARK READINGS OF FLOW, WITH ALL CONTROL

VALVES FULLY OPEN, TO ASSIST WITH REBALANCING AFTER

CONSTRUCTION IS COMPLETE.

S

-THE REMOVAL OF DAMPER, INDICATED BY KEYED NOTE C, SHALL

OCCUR SIMULTANEOUSLY WITH THE CONNECTION OF THE INTAKE

HOOD.

-THE REMOVAL OF THE DAMEPR IN THE 60X48 OUTSIDE AIR DUCT,

CONNECTING THE LOUVER TO AHU-024 RETURN DUCT, SHALL OCCUR

SIMULTANEOUSLY WITH THE INSTALLATION OF THE REPLACEMENT

ECONOMIZER DAMPER. CONTRACTOR IS TO COORDINATE WITH OWNER

FOR WHICH SHUTDOWN THIS WORK SHALL BE PERFORMED UNDER,

BASED ON MAXIMUM OWNER ALLOTED SHUTDOWN TIME.

A

B

C

D

E

F

123478282625242321

T

S

R

P

O

N

M

L

K

J

H

G

F'

22 27 29

29.5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

KEY PLAN

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

ZONE 1

ZONE 2

ZONE 3

ZONE 4

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:2

P

M

D.A.S. K.K.S.

MD103

THIRD FLOOR DEMOLITION PLAN

DWG. 103 OF 147

N

1/8" = 1'-0"MD103

THIRD FLOOR PLAN - DEMOLITIONF1

G A

S G

A S

G A

S G

A S

GAS GAS GAS GAS GAS

GAS GAS GAS GAS GAS GAS

G A

S

G a s G a s

G a s

D e e p

D e e p

G a s G a s

G a s

G A

S

GASGASGASGASGASGAS

G A

S

GASGASGASGASGAS

G A

S G

A S

G A

S

G a s

TUNNEL

SMOKER

BLDG

BLDG

MAIN BUILDING

FUEL

STATION

FUEL

STATION

BLDG

F U E L

S T A T

IO

N

HAZ.

STORAGE

MAIN BUILDING

BLDG

BLDG

#20

A

CAP

(THIS SHEET ONLY) - DEMOLITION

PLAN KEYED NOTES

GAS METER IS AT SOUTH SIDE OF BUILDING. GAS ENTERS

THROUGH BUILDING IN BASEMENT AND CONNECTS TO EXISTING

BOILER AND WATER HEATER. DISCONNECT GAS FROM BOILER

AND WATER HEATER. REMOVE GAS METER AND GAS LINE BACK

TO UNDERGROUNDMAIN. CAP AT MAIN. WORK BY UTILITY

CONTRACTOR TO BE COORDINATED BY HVAC CONTRACTOR WITH

CHARGES INCLUDED IN HVAC CONTRACTOR BIDS.

A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:2

P

M

D.A.S. K.K.S.

MD104

BUILDING 3 - DEMOLITION

DWG. 104 OF 147

N

1" = 30'-0"MD104

BUILDING 3 - SITE PLAN - DEMOLITIONF2

T

UH-001

CH-001

3/4"3/4"PITCH PITCH

1"D-UP

D

1" X=4'-6"

PITCH

1" HWS-UP1" HWR-UP

HWSHWS

H W

S

D

HWRHWR

H W

R

1" 3/4"

3/4"

X=8'-6"

PLAN KEYED NOTES

(THIS SHEET ONLY) - NEW WORK

- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR

EXISTING CONDITION AND COORDINATED INSTALLATIONS.

- WHERE PIPING AND/OR DUCTWORK IS INSTALLED WITHIN 7" OF

FINISHED CEILING, CLOSELY COORDINATE SYSTEMS FOR

INSTALLATION BETWEEN AND AROUND LIGHT FIXTURES AND

OTHER CEILING MOUNTED ITEMS (I.E. SPRINKLERS, SPEAKERS, ETC.)

COORDINATE FINAL LOCATION OF DRAIN WITH PLUMBING TRADE.

3/4" VALVES WITH HOSE BIBS AND DRAIN FOR SYSTEM FLUSHING

PRIOR TO START-UP.

PROVIDE 3/4" DRAIN AT BOTTOM OF PLENUM ATTACHED TO

LOUVER. RUN TO FLOOR DRAIN. COORDINATE FINAL LOCATION

WITH PLUMBING TRADE.

- CUT EXISTING WALLS FOR NEW WORK. PATCHING OF WALL BY

GENERAL TRADE.

- X=X'-X" IS THE DISTANCE FROM FINISHED FLOOR TO THE CENTERLINE

OF THE PIPE.

- ALL PIPE PENETRATIONS GOING THROUGH THE FLOOR TO HAVE PIPE

SLEEVES INSTALLED PRIOR TO THE FLOOR BEING POURED. CORE

DRILLING IS NOT TO BE USED WITHOUT PERMISSION FROM THE

STRUCTURAL ENGINEER.

2.7 0.0

D.0

C.0

A.3

B.0

1.5 0.5

A

123 1.3 0.7

B.4

A.9

B001

ST-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

KEY PLAN

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

ZONE 1

ZONE 2

ZONE 3

ZONE 4

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:5

P

M

D.A.S. K.K.S.

MP101

PIPE BASEMENT FLOOR PIPING PLAN

DWG. 105 OF 147

N

1/8" = 1'-0"MP101

PIPE BASEMENT PIPING PLAN - NEW WORKF5

ALCOVE

UTILITY

SOILED

1267A

TOILET

PATIENT

1267B

GARAGE

AMBULANCE

LOCKERS

BREAK RM/

RM

EXAM

WORK RM

NURSE

ROOM

EXAM

RM

EXAM

RM

EXAM

RM

DECON

MEDICATION

UTILITY

SOILED

TOILET

PATIENT

RM

TREATMENT

RM

TREATMENT

ROOM

TREATMENT

MEDICATION

/SECURITY RM.

FIRE ALARM

TOILET

PATIENT

LOBBY

ELEVATOR

TOILET

1224A

ROOM

COAT

OFFICE

PHARMACY

PHARMACY

MAIN

VAULT

MED PREP

SECURE

TOILET

PATIENT

CLERKS

RM

EXAM

WORKRM

NURSE

RM

EXAM

ROOM

EXAM

RM

EXAM

SUPPLY

STERILE

ROOM

EXAM

ROOM

ANTE

1312A

STATION

NURSE

DICTATION

WORKRM

NURSE

RM

EXAM

RM

EXAM

LINEN

CLEAN

HOUSEKEEPING

TOILET

STAFF

ISOLATION

TREATMENT/

TREATMENT

SECURE

TOILET

WOMENS

LAB/EKG

BLOOD DRAW

LAB/EKG

BLOOD DRAW

PT. TOILET

1312B

EQUIPMENT

DISPENSING

OUTPATIENT

CLOSET

HSKPG

ELIGIBILITY

ENROLLMENT &

AREA

WAITING

AREA

CLERK

ELECTRICAL

CONSULTING

PHARMACY

DATA

DATA & PHONE

1218A

EQUIPMENT

ELEVATOR

VESTIBULE

AREA

WAITING

CONSULTING

1218B

CONSULTING

1218C

TRIAGE

STORAGE

WHLCHR

VESTIBULE

MRI

1304A

TOILET

STAFF

1340A

RM

CHANGING

1304C

RM

CHANGING

1304B

VESTIBULE

MRI

ROOM

EXAM

TOILET

PATIENT

ALCOVE

SCALE

TOILET

MENS

STAIR4

STAIR3

ALCOVE

PYXIS

FIRE

EQUIP

LO

CK

ER

S

BASEMENT ROOF

LDRY

CHUT

RM

EXAM

DNUP

UP

DN

VOLUNTEER

AREA

MECH.

CHASE

CARPET

CARPET TILE

TILE

MECH

SHAFT

FD

FE FE

S

S

SS

T

S

S

CO2

S

S

S

S

S

S

S

S

S

S

S

S

H

T

T

T

T

T

T

T

T

T

T

T

TT T

T

T

T

T

T

T

T

T

T

T

H

RELOCATED

THERMOSTAT

SHUT OFF AND

CONTROL VALVES

INSIDE CABINET

AHU

RF

EF

CRE

V A

V -1

N

VAV-1413S

V A

V -1

V A

V -1

VAV-1405

VAV-1402

VAV-1408

V A

V -1

VAV-1411

VAV-1409

VAV-1401

VAV-1499

RCP-1497

R C

P -1

RCP-1499(1)

RCP-1499(2)

RWP-1408

VAV-1404

VAV-1403

VAV-1360

VAV-1271

VAV-1365

VAV-1363

VAV-1359

VAV-1374

VAV-R1340

V A

V -1

EXISTING

HUMIDIFIER

EXISTING

HUMIDIFIER

EXISTING

FANCOIL

AC

AC

AC

3/4"D-UP

1"D-DN

(IN WALL)

V

G

3/4"HWS/R-DN

TO RWP-1408

(IN WALL)

FC-001

3/4"CWS/R-UP

2" HPS-UP

1" HPCR-UP

STEAM TRAP

HUMIDIFIER

LPCR-UP/DN

3/4" COND

REFRIGERATION

LINES UP TO

ROOF

R

1" GAS (2 PSI)

1 1/2" G (2 PSI)

1" GAS (2 PSI)

2" G-UP

GAS PRESSURE REGULATOR TO

REDUCE GAS PRESSURE FROM 2

PSI TO 11" W.C.

1-1/2"HWS/R-UP

18.0 GPM

1"HWS-DN

HWS

HWS

HWS

HWS

1-1/2"

1-1/4"

1-1/4"

1-1/4"

1"

1"

3/4"

3/4" 5.1 GPM5.1 GPM

D

D

D

D

D

D

D

D

D

DD

D

D

D

PROVIDE NON

DDC ELECTRIC

THERMOSTAT

ON INSULATED

BASE ADJACENT

DOOR. SERVES

CABINET

HEATER ON

FLOOR BELOW.

D

D

D

D

D

D

D

D

18.0 GPM1"HWR-DN

HWR

HWR

HWR

HWR

3/4" 3/4" 1"

1-1/4"

1"

1-1/4"

1-1/2"

D

3/4"

R-16

S-17

S-17 R-17

R-18

R-17

2"

3/4"

S-18

R-19

S-19

R-20

S-20

S-22

2"

S-22

R-22

R-22

S-23A

R-23A

R-11 S-11

R-23

S-23

R-24

S-24

S-25

S-26

R-25

R-27 R-28

R-26

S-27

S-18 R-18

R-12 S-12

S-28

R-29

S-29

S-30

S-31 R-30

11/2"

R-31

S-32

S-32

R-32

3/4"

2"

S-32

R-35

S-34

R-34

S-41

S-40

R-41R-42 S-42

1" LPS/C DN

4" LPS UP & DN

3" LPC UP & DN

1" LPS UP & DN

1" LPC UP & DN

1"

2" HPS

1 1/2" HPC

TO AHU-24

2" HPS

1 1/2" HPC

2" HPS

1 1/2" HPC

3/4"LPS

3/4" LPC

3/4" LPS

3/4" LPC

LPS/LPCR-DN

INFRARED HEATER

24x24

24x24

19 2

2" HWR/S DN

1 1/4"

2"

1 1/4"

1 1/4"

1"

1 1/2"

12.8 GPM

1"

3/4" HWS/R

3/4"

2"

1 1/4"

2"

1 1/4"

2"

1 1/2"

2 1/2" HWS & HWR

DN TO BASEMENT

2 1/2"

2 1/2" 2 1/2"

3/4"

3/4" 2 1/2"1" 1"

1 1/4"

2"

2" 1 1/4"

1 1/4" 2"

1 1/2" 1 1/2"

1 1/2"

2"

2"

1 1/2"

1 1/4"

2"

2"

1 1/4"

2 1/2"

2 1/2"

3/4"HS & HR

DOWN TO

FT-1 & FT-2.

1" HWS/R

1" HWS/R UP TO

SECOND FLOOR

3/4" HWS

& HWR

T

T TT

T

T

T

T

T

T

T

T

T

T

T

T

T

TTTT

T

T

T

T

T

T

T

T

T

T

T T

T

T

PLAN KEYED NOTES

(THIS SHEET ONLY) - NEW WORK

- CUT EXISTING WALLS FOR NEW WORK. PATCHING OF WALL BY

GENERAL TRADE.

- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR

EXISTING CONDITION AND COORDINATED INSTALLATIONS.

- REVIEW PHASING PLAN FOR WORK ON THIS FLOOR.

- WHERE PIPING AND/OR DUCTWORK IS INSTALLED WITHIN 7" OF

FINISHED CEILING, CLOSELY COORDINATE SYSTEMS FOR

INSTALLATION BETWEEN AND AROUND LIGHT FIXTURES AND

OTHER CEILING MOUNTED ITEMS (I.E. SPRINKLERS, SPEAKERS, ETC.)

NEW CONNECTION TO EXISTING PIPING AND/OR DUCTWORK.

CONTROL POWER TRANSFORMER LOCATION. ELECTRICAL

TRADE WILL TERMINATE 120 VOLT CIRCUIT AT THIS LOCATION

FOR DDC TRANSFORMER. COORDINATE PREFERRED LOCATION

WITH ELECTRICAL CONTRACTOR. ADDITIONAL POWER CIRCUITS

BEYOND THAT SHOWN ON THE ELECTRICAL DRAWINGS WILL BE

THE CONTROL CONTRACTOR RESPONSIBILITY.

3/4" VALVES WITH HOSE BIBS AND DRAIN FOR SYSTEM FLUSHING

PRIOR TO START-UP.

RELOCATE INFRARED HEATER. HEATER TO BE 1'-0" BELOW ANY

OBSTRUCTION, APROXIMATELY 16" ABOVE INFILLED WINDOWS.

COORDINATE WITH EXISTING SPRINKLER BELOW GARAGE DOOR

TRACK. ANGLE FOR MAXIMUM COVERAGE, APROXIMATELY 30-45°.

REINSTALL SALVAGED PIPING, VALVES AND ACCESSORIES.

FULL SIZE REGULATOR VENT TO BE FED INTO PLENUM

CONNECTED TO EXHAUST LOUVER.

RELOCATE EXISTING AIR CURTAIN 2'-0" INTO THE AMBULANCE

GARAGE. EXTEND PIPING AND RESTORE FUNCTION.

RELOCATED VAV BOX, RESTORE FUNCTION TO EXISTING

CONDITIONS.

PROVIDE SWITCH WITH PILOT LIGHT INDICATOR AND CLEAR

SAFETY COVER TO PROTECT ACCIDENTAL ENGAGEMENT.

SWITCH TO ENGAGE EMERGENCY MODE ON AHU-031. SEE SPEC.

VERIFY PANEL LOCATION WITH OWNER.

- X=X'-X" IS THE DISTANCE FROM FINISHED FLOOR TO THE CENTERLINE

OF THE PIPE.

- ALL PIPE PENETRATIONS GOING THROUGH THE FLOOR TO HAVE PIPE

SLEEVES INSTALLED PRIOR TO THE FLOOR BEING POURED. CORE

DRILLING IS NOT TO BE USED WITHOUT PERMISSION FROM THE

STRUCTURAL ENGINEER.

ST-1

F7

MK301

2.7 0.0

D.0

C.0

A.3

B.0

1.5 0.5

A

B

C

D

E

F

123478282625242321

T

S

R

P

O

N

M

L

K

J

H

G

F'

22 27 29

29.5

1.3 0.7

B.4

A.9

NOTE: ALL PIPING TO

EQUIPMENT TO BE 3/4"

UNLESS NOTED OTHERWISE.

1358 1352

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

KEY PLAN

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

ZONE 1

ZONE 2

ZONE 3

ZONE 4

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:0

P

M

D.A.S. K.K.S.

MP102

FIRST FLOOR PIPING PLAN

DWG. 106 OF 147

N

1/8" = 1'-0"MP102

FIRST FLOOR PIPING PLAN - NEW WORKF1

ULTRASOUND

ROOM

TECH. WORK

SUPPLY

CLEAN

VIEWING

PACS

TOILET

PT.

ROOM

CHANGING

HSKG

CONTROL

CT SCAN

CT SCAN

TOILET

PT.

HOT LAB

2254A

MEDICINE

NUCLEAR

DENSITY

BONE

CHUTE

LAUNDRY

UTILITY

ROOM

CONTROL

2263A

RADIOLOGY

SCANNER

GE CT

STORAGE

2263B

CLEAN

STERILE

CYSTOSCOPY

CLOSET

HSKG

MECHANICAL

MECHANICAL

2307A

LOBBY

ELEVATOR

PHONE

DATA &

2218 ALCOVE

EQUIP.

2230A

CORRIDOR

2230P

ROOM

TECH WORK

C2-2

CORRIDOR

SOCIAL

WORKER

ACCUPUNCTURE

EXAM ROOM

DATA

CLOSET

ACCUPUNCTURE

EXAM ROOM

EYE PRE-

TREATMENT

EYE PRE-

TREATMENT

OFFICE

STAFF

LOUNGE

STERILE

SUPPLY

CLEAN

SUPPLY

SOCIAL

WORKER

2335A

PATIENT

TOILET

CHEMOTHERAPY

MENTAL HEALTH

EXAM

HSKG CLST

ELECTRICAL

ROOM

LANE

ROOM

LANE

ROOM

LANE

ROOM

EYE

INSTRUMENTS

TELE-HEALTH

EXAM RM

TELE-HEALTH

EXAM RM

TELE-HEALTH

OFFICE

TELE-HEALTH

EXAM RM

TELE-HEALTH

EXAM RM

MENS

TOILET

WAITING

AREA

ROOM ROOM

WOMENS

TOILET

CLERKS

AREA

2374A

STAFF

WORK AREA

CORRIDOR

STAFF

TOILET

SUB-WAIT

AREA

WOMENS

HEALTH EXAM 2352

TOILET

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

WOMENS

HEALTH EXAM

FAMILY

LOUNGE

2338A

FAMILY

RESTROOM

ONOCOLOGY

EXAM/OFFICE

ONOCOLOGY

EXAM/PROC.

SOILED

LINEN

2261A

CONTROL

ROOM

CLERK

CHECK-IN

WAITING

AREA

FEMALE

TOILET

MALE

TOILET

C2-1

CORRIDOR

AREA

DUMBWAITER

/CART ALCOVE

2110B

SCRUB

ALCOVE

2252P

CORRIDOR

CORRIDOR

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

STAIR 3

UP

DN

STAIR 4

UP

DN

MECH

CHASE

MECH.

SHAFT

CHASE

MECH.

SHAFT

CHASE

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

H

CO

CO

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

H

S

T

S

T T

T

T

T

T

T

T

T

T

T

T

T T

T

T

T

H

T

T

T

T

T

T

T

T

T

T T

T

T

T

T

T

T

T

T

TT

T

T

6" CHWR

1" HWR

1" HWS

1" HWR

1" HWS 1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWS

1 1/4" HWR

3/4" HWS

3/4" HWR

2" HWR2" HWS

3/4" HWR1" HWR

1" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

3/4" HWR

3/4" HWS

1 1/4" HWR

1 1/4" HWS

2 1/2" HWS

2 1/2"

HWR

3/4" HWR

3/4" HWS

2 1/2" HWR

2 1/2" HWS

3/4" HWR

3/4" HWS

2" HWR

2" HWS

3/4" HWS

3/4" HWR2" HWR

2" HWS

3/4" HWS

3/4" HWR

2" HWR

2" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

3/4" HWR

2 1/2" HWS

3/4" HWS

3/4" HWS

3/4" HWR 3/4" HWR

3/4" HWR

3/4" HWS3/4" HWS

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

1" HWS

1" HWR

3/4" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

2" HWR

2" HWS

3/4" HWS

3/4"

HWR

3/4" HWR

3/4" HWS

3/4" HWS

1 1/2" HWS

1 1/2" HWR

3/4" HWS

3/4" HWS

1 1/2" HWS

1 1/2" HWR

3/4" HWR

3/4" HWS

1 1/2" HWR

1 1/2" HWS

1" HWS

1" HWR

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

1" HWS

1" HWR

3/4" HWR

1" HWR

1" HWS

3/4" HWS 3/4" HWS 3/4" HWR

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3" HWR

3" HWS

4" HWS

4" HWR

3" HWR

3" HWS

3" HWS

3" HWR

3" HWS

3" HWR 3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1" HWS

1" HWR

3/4" HWS

3/4" HWR

SHUT OFF AND

CONTROL VALVES

V A

V -2

VAV-2498

VAV-2404

VAV-2414

V A

V -2

VAV-2416

VAV-2412

V A

V -2

RCP-2415

RCP-2414

R C

P -2

RCP-2498

R C

P -2

R

C P

-2

RCP-2405

RWP-2412

R W

P -2

VAV-2401

VAV-2405

VAV-2409

VAV-2408

V A

V -2

VAV-2413

V A

V -2

7VAV-2403

VAV-2418

V A

V -2

3/4"D-DN

15.3 GPM

2"HWS/R-UP

1-1/2"HWS/R-DN

PIPE ANCHORPIPE ANCHOR

3/4"

HWS

HWS HWS

H W

S

HWS

H W

S

1" 1-1/4"

1-1/2"

1"

EXPANSION LOOP,

INSIDE CLEAR

DIMENSIONS 2'-6"x5'-0"

1-1/4"

3/4" 1-1/4"

1-1/2"

1-1/2"

1-1/2"

1-1/4"

HWR

3/4"

15.3 GPM

HWR

HWR HWR

H W

R

H W

R

1-1/4" 1"

1"

3/4"

D

D

D

D

D

D

D

D

D

D

D

D

D D

D

D

D

1-1/4"

3/4"

1-1/4"

3/4"HWR-DN3/4"HWS-DN

3/4"HWS/R-DN

(IN WALL)(IN WALL)

(IN WALL)

FC-002

1-1/4"CWS/R-UP

CWR

CWS

CWR

CWS

1"

3/4"CWS/R-DN

1"

EXIST STEAM

CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM

CONVECTOR

EXIST STEAM

CONVECTOR

2" G-UP/DN

S32 R32

R31 S31

R30 S30

S32

R41

R42

R29

S42

S28

R26 S27

R23A

R22S22

S20

S23

R24

S25

S26

R25

S24

R20

S19

R19

S18

R18S18

S17

R17

S17 R17

S29

R18

S23A

R23

R27 R28

R13

S13

S13

R12 S12

1" LPR FROM

1 1/2" LPCR-UP

2" HPS UP

2"HPS FROM 1st FLOOR

3/4"HPR FROM 1st FLOOR

3/4"

1" LPS UP & DN

1" LPC UP & DN

3/4" HPR

FROM PENTHOUSE

REFRIGERATION

LINES UP TO

ROOF

1/

H

W S

HWS/R

HWS

3/4"3/4"

3/4"

1" 3/4"

3/4"1"

1" HWS&HWR 1" HWS/R 2 1/2 HWS

2" H

W S

2" H

W S

2" H

W S

2" HWS 2" HWS

1/

2" H

W S

1/

2" H

W S

1/

4" H

W S

1" H

W S

2 1/2" HWR

1/

2" H

W R

2" H

W R

2" H

W R

2" H

W R

2" HWR

1/

2" H

W R

1/

2" H

W R

1" HWR

LINES DN TO

1ST FLOOR

2 1/2"

HWR/S UP TO

PENTHOUSE

1" HWR

1" HWS

1" HWS/R DOWN TO

FIRST FLOOR

1" HWS/R

1" HWS/R

6"

6" C

H S

/R S

T A

C K

E D

6" CHS/R

UP TO PENTHOUSE.

STACKED

6" CWS/R

6" CWS/R

LPCR-DN

T

TM

HUM-2

H-24

EF-2

4 FT - 4 SLOT

GRILLE

435 CFM

PLAN KEYED NOTES

(THIS SHEET ONLY) - NEW WORK

- CUT EXISTING WALLS FOR NEW WORK. PATCHING OF WALL BY

GENERAL TRADE.

- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR

EXISTING CONDITION AND COORDINATED INSTALLATIONS.

- REVIEW PHASING PLAN FOR WORK ON THIS FLOOR.

- WHERE PIPING AND/OR DUCTWORK IS INSTALLED WITHIN 7" OF

FINISHED CEILING, CLOSELY COORDINATE SYSTEMS FOR

INSTALLATION BETWEEN AND AROUND LIGHT FIXTURES AND

OTHER CEILING MOUNTED ITEMS (I.E. SPRINKLERS, SPEAKERS, ETC.)

NEW CONNECTION TO EXISTING PIPING AND/OR DUCTWORK.

CONTROL POWER TRANSFORMER LOCATION. ELECTRICAL

TRADE WILL TERMINATE 120 VOLT CIRCUIT AT THIS LOCATION

FOR DDC TRANSFORMER. COORDINATE PREFERRED LOCATION

WITH ELECTRICAL CONTRACTOR. ADDITIONAL POWER CIRCUITS

BEYOND THAT SHOWN ON THE ELECTRICAL DRAWINGS WILL BE

THE CONTROL CONTRACTOR RESPONSIBILITY.

3/4" VALVES WITH HOSE BIBS AND DRAIN FOR SYSTEM FLUSHING

PRIOR TO START-UP.

- X=X'-X" IS THE DISTANCE FROM FINISHED FLOOR TO THE CENTERLINE

OF THE PIPE.

- ALL PIPE PENETRATIONS GOING THROUGH THE FLOOR TO HAVE PIPE

SLEEVES INSTALLED PRIOR TO THE FLOOR BEING POURED. CORE

DRILLING IS NOT TO BE USED WITHOUT PERMISSION FROM THE

STRUCTURAL ENGINEER.

ST-1

2419 2418

24202421

F7

MK301

23642362

F6

MK301

2.7 0.0

D.0

C.0

A.3

B.0

1.5 0.5

A

B

C

D

E

F

123478282625242321

T

S

R

P

O

N

M

L

K

J

H

G

F'

22 27 29

29.5

1.3 0.7

B.4

NOTE: ALL PIPING TO

EQUIPMENT TO BE 3/4"

UNLESS NOTED OTHERWISE.

A.9

D7

MK301

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

KEY PLAN

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

ZONE 1

ZONE 2

ZONE 3

ZONE 4

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:0

P

M

D.A.S. K.K.S.

MP103

SECOND FLOOR PIPING PLAN

DWG. 107 OF 147

N

1/8" = 1'-0"MP103

SECOND PIPING FLOOR PLAN - NEW WORKF1

HEALTH

TELE-

ROOM

EXAM

HEALTH

TELE-

MECH

3244A

LOBBY

ELEVATOR

ROOM

EXAM

CLOSET

BIO-MED

ROOM

EXAM

AREA

WAITING

ROOM

EXAM

PHONE

DATA &

3216 CORRIDOR

3299B-1

ROOM

EXAM

ROOM

MECHANICAL

CHIEF, DENTAL

X-RAY

CONTROL

3228A

ROOM

WAITING

PASSAGE

3237A

PASSAGE

WORK

CLERK/

TRAINING ROOM

NURSE EDUCATION

OFFICE

NURSE EDUCATI

PASSAGEWAY

TRAINING ROOM

NURSE EDUCATION

STORAGE

NESS/KITCHEN

TOILET

3246A

TOILET

3250A

SUPPLY

STERILE

SUPPLY

CLEAN

UTILITY

SOILED

ROOM

EXAM

& LOCKERS

STAFF LOUNGE

EXAM RM.

TELE-HEALTH

MANAGER

NURSE

STAFF OFFICE

TELE-HEALTH

OFFICE

MSA

CORRIDOR

3299C-1

CORRIDOR

CORRIDOR

DUCT

FIRST FLOOR ROOF

FIRST FLOOR ROOF

BASEMENT ROOF

BASEMENT ROOF

FIRST FLOOR ROOF

FIRST FLOOR ROOF

FIRE

EQUIP

LDRY

CHUT

DN

UP

STAIR 3

STAIR 4

UP DN

PASSENGER

ELEVATOR

MECH

SHAFT

2ND FLOOR ROOF

2ND FLOOR ROOF

2ND FLOOR ROOF

MECH

SHAFT

MECH

CHASE

S

T

T

9 10

NOTE: PROVIDE ALUMINUM JACKET

ON NEW LPCR BELOW X=2'-0" IN

PENTHOUSE UNTIL NEW

CONNECTION TO EXISTING IS MADE.

3/4" HPCR-DN

SH-001

UH-002

ET-001

ET-002

P-020&P-021

STACKED ON

UNISTRUT W/

VIBRATION

ISOLATION

RELIEF VALVE

(TYP.)

RELOCATED HX003 & HX-004 ON

UNISTRUT. TUBE PULL CLEARANCE

TO BE INTO WALKWAY ENTERING

NEW PENTHOUSE.

RELOCATED

HX-001 &

HX-002 ON

UNISTRUT

D

UNION

STEAM TRAP

1/3 2/3 VALVE

(TYP. EACH HX)

X=1'-4"

P

IT

C H

1-1/2"

2"HWS/R-DN

P-018&P-019

ON UNISTRUT

W/ VIBRATION

ISOLATION

2-1/2"

3"

3/4"3/4"

H W

S

H W

S

AS-001

HWS

1-1/2"

1-1/4"

1-1/4"

3/4"

3"

33.0 GPM

1-1/4"

D

D

HWR

2"

AS-002

H W

R

H W

R

HWR

AHU-031

1-1/4"CWS/R-DN

CWS

6"CWS/R-DN

X=8'-9" 4"

X=7'-3"

(18" CHANGE IN

FLOOR HEIGHT)

3"

C W

S

CWR

C W

R

6 GPM

VFD'S ON

UNISTRUT

VFD'S ON

UNISTRUT

TCP ON

UNISTRUT

RELOCATED

TCP ON

UNISTRUT

LPS

L P

C R

4"

L P

S

1-1/2"

2-1/2"

2-1/2"

EXISTING

PRV

EXISTING

UNIT HEATER

CRC

EXISTING LIEBERT

AC UNIT

DX PIPING-DN

R

11/2"G

11/2" G UP TO ROOF

1 1/2"

2 PSI GAS

3/4" GAS

3/4" GAS

2" G-UP/DN

2" LPS RISER

3/4" LPC

RISER 2" LPS RISER

2 1/2" LPS RISER

3/4" LPC

RISER

3/4" LPC RISER

1 1/4" LPS

RISER

2" LPS RISER3/4" LPC

RISER

2" LPS RISER

3/4" LPC

RISER

1 1/2" LPS

RISER

3/4" LPR

RISER

S-32

S-13

S-13

S-25

S-24

R-24

S-23

R-23

R-22S-22

S-18

R-19

S-19

R-20

S-20

S-26

R-25

S-31 R-30 S-30R-31

S-28R-27 R-28

R-26

R-41R-43 S-42 R-42

S-32 R-32

S-29

R-29

R-16 R-17 S-17

S-18

R-18

S-27

R-12

S-12

R-18

STEAM PRS

2" HPS FROM BELOW

4" LPS

1 1/2" LCPR-DN

3/4" CONDENSATE TO

OPENSITE DRAIN IN

MECHANICAL SHAFT

1" LPS/LPC

UP & DN

3/4" LPS

3/4" LPCR-DN

4" LPS UP & DN

3" LPC UP & DN

X=6'-8"

1" LPCR-DN

2" HPS-DN

EXISTING

PRV

1"

1 1/4"

1"

2"

1 1/4"

2"

1 1/4"

1"

3/4"

3/4"

1 1/4"

2 1/2"HWS/HWR

3" HWS/R

3/4"

3/4"

3/4"

3/4"

4" HWS/R-UP

4" HWS/R-DN

2"

1 1/2" 3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

1 1/4"

1 1/2"

3/4"

3/4"

3/4"

1 1/2"

3/4"

1"3/4"

3/4"

3/4"

3/4"

1 1/4"

3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

1"

3/4"

1 1/4"

1"

3/4"

1"

1 1/2"

3/4"

3/4"

3/4"

3/4"

3/4" 3/4" 3/4"

3/4"

3/4"

3/4"

1/2" PURGE PORTS

1/2"PURGE PORTS

4"

HWS

HWR

T

H

H

H

T

T

T

T

T

T

T

T

TT

T

T

T

T

T

T

T

T T

T

T

T

TT

T

T

T

T

T

T

TT

CRC

EF

EF

EF

EF

EF

EF

MUA

RAF VFD

AHU VFD

RAF

SAD

AHU

EF

SAD

TCP

PLAN KEYED NOTES

(THIS SHEET ONLY) - NEW WORK

NEW THERMOSTAT.

PROVIDE FIRE RATED SLEEVE FOR EXISTING PIPE THRU NEW WALL.

REUSE EXISTING STAT TO CONTROL NEW COIL OR VAV BOX.

PROVIDE VOLUME DAMPER AND BALANCE DUCT MAIN TO CFM

INDICATED.

RELOCATE/OFFSET EXISTING DUCT OR PIPE TO ALLOW SPACE FOR

INSTALLATION OF NEW SYSTEMS.

- CUT EXISTING WALLS FOR NEW WORK. PATCHING OF WALL BY

GENERAL TRADE.

- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR

EXISTING CONDITION AND COORDINATED INSTALLATIONS.

- REVIEW PHASING PLAN FOR WORK ON THIS FLOOR.

- WHERE PIPING AND/OR DUCTWORK IS INSTALLED WITHIN 7" OF

FINISHED CEILING, CLOSELY COORDINATE SYSTEMS FOR

INSTALLATION BETWEEN AND AROUND LIGHT FIXTURES AND

OTHER CEILING MOUNTED ITEMS (I.E. SPRINKLERS, SPEAKERS, ETC.)

BALANCE GRILLE TO CFM INDICATED.

NEW CONNECTION TO EXISTING PIPING AND/OR DUCTWORK.

CONTROL POWER TRANSFORMER LOCATION. ELECTRICAL

TRADE WILL TERMINATE 120 VOLT CIRCUIT AT THIS LOCATION

FOR DDC TRANSFORMER. COORDINATE PREFERRED LOCATION

WITH ELECTRICAL CONTRACTOR. ADDITIONAL POWER CIRCUITS

BEYOND THAT SHOWN ON THE ELECTRICAL DRAWINGS WILL BE

THE CONTROL CONTRACTOR RESPONSIBILITY.

SALVAGE AND REUSE EXISTING VALVE.9

PROVIDE SIGN INDICATING TRIP HAZARD AT LPCR CROSSING

MAIN WALK WAY. PROVIDE MOVABLE METAL STEP WITH HAND

RAILS AT LPCR.

PROVIDE NEW AHU MOUNTED HUMIDIFIER SH-001. CONCECT NEW

LPCR PIPING TO EXISTING LPCR.

THERMOSTAT TO CONTROL NEW UNIT HEATER (UH-002),

PENTHOUSE VENTILATION DAMPERS AND EXHAUST FAN (F-003).

1-1/2" CONDENSATE DRAIN PIPE WITH DOWN TURNED ELBOW

INTO FLOOR DRAIN. COORDINATE FINAL LOCATION OF FLOOR

DRAIN WITH PLUMBING TRADE.

- IN ADDITION TO THOSE CALLED FOR IN DETAILS, PROVIDE FOR 1

STEAM MAIN DRIP PRIOR TO LPS ENTERING NEW PENTHOUSE FROM

EXISTING PENTHOUSE AND 1 STEAM MAIN DRIP AT THE END OF THE

RUN IN THE NEW PENTHOUSE.

- X=X'-X" IS THE DISTANCE FROM FINISHED FLOOR TO THE CENTERLINE

OF THE PIPE.

- ALL PIPE PENETRATIONS GOING THROUGH THE FLOOR TO HAVE PIPE

SLEEVES INSTALLED PRIOR TO THE FLOOR BEING POURED. CORE

DRILLING IS NOT TO BE USED WITHOUT PERMISSION FROM THE

STRUCTURAL ENGINEER.

2.7 0.0

D.0

C.0

A.3

B.0

1.5 0.5

A

B

C

D

E

F

123478282625242321

T

S

R

P

O

N

M

L

K

J

H

G

F'

22 27 29

29.5

F1

MK301

1.3 0.7

B.4

A.9

C6

MK301

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

KEY PLAN

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

ZONE 1

ZONE 2

ZONE 3

ZONE 4

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:0

P

M

D.A.S. K.K.S.

MP104

THIRD FLOOR PIPING PLAN

DWG. 108 OF 147

N

1/8" = 1'-0"MP104

THIRD FLOOR PIPING PLAN - NEW WORKF1

MD

MD

AF-004

72x48, 3'-0" LONG

EXTERNALLY INSULATED

PLENUM, CONNECTED TO

LOUVER, WITH DAMPER

AND FILTER. 4,700 CFM.

DAMPER TO BE LOW

LEAKAGE DAMPER.

COVER OPENING

W/ 1x1 METAL MESH

COVER OPENING WITH

1x1 METAL MESH

64x48, 2'-0" LONG PLENUM CONNECTED TO

38x38 EXTERNALLY INSULATED PLENUM

WITH CONTROL DAMPER AND F-002. 4,700

CFM. VERIFY FAN PLENUM SIZE WITH FAN

MANUFACTURER. DAMPER TO BE LOW

LEAKAGE DAMPER.

2.7 0.0

D.0

C.0

A.3

B.0

1.5 0.5

A

123 1.3 0.7

B.4

A.9

ST-1

B001

PLAN KEYED NOTES

(THIS SHEET ONLY) - NEW WORK

- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR

EXISTING CONDITION AND COORDINATED INSTALLATIONS.

- WHERE PIPING AND/OR DUCTWORK IS INSTALLED WITHIN 7" OF

FINISHED CEILING, CLOSELY COORDINATE SYSTEMS FOR

INSTALLATION BETWEEN AND AROUND LIGHT FIXTURES AND

OTHER CEILING MOUNTED ITEMS (I.E. SPRINKLERS, SPEAKERS, ETC.)

- AT 90 DEGREE RETURN DUCT OR EXHAUST DUCT SQUARE ELBOWS,

PROVIDE TURNING VANES AND ACCESS DOORS ( FOR DUCT

CLEANING). PROVIDE SQUARE ELBOWS ONLY WHERE DETAILED OR

AS APPROVED BY A/E WHERE SPACE CONSTRAINTS DO NOT ALLOW

ROUNDED ELBOWS.

- DUCTWORK ELBOWS, CONNECTIONS AND JOINTS ARE DEPICTED

BASED ON STANDARD REVIT MODEL PROGRAMMING. REFER TO

DETAILS AND SPECIFICATION FOR REQUIRED DUCTWORK

CONSTRUCTION.

COORDINATE WITH ARCHITECTURAL TRADE FOR LOUVER HEIGHT,

LOCATION AND SIZE. LOUVER TO BE 1'-0" MINIMUM ABOVE GRADE.

BLAST RATED LOUVER. SEE ARCHITECTURAL PLANS. 2

- X=X'-X" IS THE DISTANCE FROM FINISHED FLOOR TO THE BOTTOM OF

THE DUCT.

- DUCTWORK TO BE ROUTED AS HIGH AS POSSIBLE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

EXPAND PRIMARY CARE

OSCAR G. JOHNSON VA MEDICAL CENTER

325 H STREET,

IRON MOUNTAIN, MI 49801

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com

FULLY SPRINKLERED

KEY PLAN

Comm. Number: 5700.16

DECEMBER 4, 2020

585-336

U.S. Department of Veterans Affairs

100% DESIGN SUBMITTAL

Revisions: Date:

CONSULTANT

Architecture | Planning | Interior Design

2224 S. Michigan Ave. | Suite 1400 Chicago, Illinois 60604-2595

(312)-554-1400

65% SUBMITTAL 04/28/2020

ZONE 1

ZONE 2

ZONE 3

ZONE 4

project number: 1180742

95% SUBMITTAL 07/24/2020

100% SUBMITTAL 12/04/2020

B

IM

/V

A G

L H

S E x p a n d P ri m a ry

C a re /V

A H

V A

C .r v t

/4 /2

:1

:2

P

M

D.A.S. K.K.S.

MH101

PIPE BASEMENT FLOOR DUCTWORK

PLAN

DWG. 109 OF 147

N

1/8" = 1'-0"MH101

PIPE BASEMENT DUCTWORK PLAN - NEW WORKF5

ALCOVE

UTILITY

SOILED

1267A

TOILET

PATIENT

1267B

GARAGE

AMBULANCE

LOCKERS

BREAK RM/

RM

EXAM

WORK RM

NURSE

ROOM

EXAM

RM

EXAM

RM

EXAM

RM

DECON

MEDICATION

UTILITY

SOILED

TOILET

PATIENT

RM

TREATMENT

RM

TREATMENT

ROOM

TREATMENT

MEDICATION

/SECURITY RM.

FIRE ALARM

TOILET

PATIENT

LOBBY

ELEVATOR

TOILET

1224A

ROOM

COAT

OFFICE

PHARMACY

PHARMACY

MAIN

VAULT

MED PREP

SECURE

TOILET

PATIENT

CLERKS

RM

EXAM

WORKRM

NURSE

RM

EXAM

ROOM

EXAM

RM

EXAM

SUPPLY

STERILE

ROOM

EXAM

ROOM

ANTE

1312A

STATION

NURSE

DICTATION

WORKRM

NURSE

RM

EXAM

RM

EXAM

LINEN

CLEAN

HOUSEKEEPING

TOILET

STAFF

ISOLATION

TREATMENT/

TREATMENT

SECURE

TOILET

WOMENS

LAB/EKG

BLOOD DRAW

LAB/EKG

BLOOD DRAW

PT. TOILET

1312B

EQUIPMENT

DISPENSING

OUTPATIENT

CLOSET

HSKPG

ELIGIBILITY

ENROLLMENT &

AREA

WAITING

AREA

CLERK

ELECTRICAL

CONSULTING

PHARMACY

DATA

DATA & PHONE

1218A

EQUIPMENT

ELEVATOR

VESTIBULE

AREA

WAITING

CONSULTING

1218B

CONSULTING

1218C

TRIAGE

STORAGE

WHLCHR

VESTIBULE

MRI

1304A

TOILET

STAFF

1340A

RM

CHANGING

1304C

RM

CHANGING

1304B

VESTIBULE

MRI

ROOM

EXAM

TOILET

PATIENT

ALCOVE

SCALE

TOILET

MENS

STAIR4

STAIR3

ALCOVE

PYXIS

FIRE

EQUIP

LO

CK

ER

S

BASEMENT ROOF

LDRY

CHUT

RM

EXAM

DNUP

UP

DN

VOLUNTEER

AREA

MECH.

CHASE

CARPET

CARPET TILE

TILE

MECH

SHAFT

FD

FE FE

MD

MDMD

MD

F

AHU

RF

EF

CRE

V A

V -1

N

V A

V -1

S

V A

V -1

V A

V -1

V A

V -1

V A

V -1

VAV-1408

VAV-1414

V A

V -1

VAV-1409

VAV-1401

V A

V -1

111111

V A

V -1

V A

V -1

2 2

VAV-1360

VAV-1371

VAV-1365

VAV-1363

VAV-1359

VAV-1374

V A

V -R

V A

V -1

EXISTING

FA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .