This solicitation is for a construction project to support the Department of Veterans Affairs in Waco, Texas. The solicitation number is 36C77622B0045 and seeks offers for EHRM Training and Admin Support Space Construction at Waco, Texas, with a project description of construction work. The solicitation was issued by the Department of Veterans Affairs Headquarters and offers are due by the date specified in the solicitation. The construction project involves building administrative support spaces to support EHRM functions. Offerors should submit responses in accordance with the instructions and terms provided in the solicitation.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7\
D oc um en ts \6
A
4-
-7
_B ld g.
_A rc h_ R
_r th or nb ru gh S
6J X
V .r vt 2/
/2
2:
:0
P M
A-641
MATERIALS & FINISHES BOARD EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 BRD DR
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
CPT:LEE'S CARPET:
SANDCASTLE 204
MM2: FORBO MARMOLEUM:
FORREST GROUND T3234
PL: FORMICA: BELUGA BEIGE
PNT2: SHERWIN WILLIAMS: VAN
DYKE BROWN SW 7041
PNT1: SHERWIN WILLIAMS:
CONSERVATIVE SW 6183
VCT: ARMSTRONG :
SANDSTONE TAN GRAY # 52143
PNT3: SHERWIN WILLIAMS:
COLONIAL REVIVAL SEA GREEN
SW 2825
PNT4: SHERWIN WILLIAMS:
WOOL SKEIN SW 6148
SS1: DUPONT: CORIAN
SANDSTONE
RB: ROPPE 110 BROWN
976/978-969/970 SMOOTH
PNT: SHERWIN WILLIAMS: HIGH
REFLECTIVE WHITE SW 7757
SS2: DUPONT: CORIAN RAFFIA
WINDOW SILLS
MM3: FORBO MARMOLEUM:
ROSATO T3120
MM1:FORBO MARMOLEUM: SHITAKE
T3233
PT2: DALTILE: ILLUMINI SANDS
5/8 X 5/8 DECORATIVE MOSAIC
PT1: DALTILE : SEMI GLOSS ALMOND
WITH MATCHING COVE TOP
LVT: MANNINGTON : CROWN:
EXOTIC WALNUT MCC108
PT3: CROSSVILLE : MUDPIE 6X6
BATHROOM FLOOR TILE
FIRE ALARM CONTROL PANEL
AUXILIARY POWER SUPPLY
SMOKE DETECTOR
MANUAL PULL STATION
HEAT DETECTOR
MONITOR MODULE
CONTROL RELAY MODULE
STROBE ONLY(WALL MOUNT)
DOOR HOLDER
ANNUNCIATOR PANEL
TAMPER SWITCH
WATER FLOW SWITCH
DUCT DETECTOR
CO
CO DETECTOR
HORN/STROBE (WALL/CEILING MOUNT)
DOOR HOLDER
STROBE ONLY (WALL MOUNT)
WATER FLOW PRESSURE SWITCH
LOW-AIR PRESSURE SWITCH
(DRY VALVE)
FIRE
ALARM
PANEL
CAT 6
120v
AC
CAT 6
120v
AC
AUXILIARY
POWER
SUPPLY
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FA
.dw g
/15
/20
:43
:05 A
M
FA100
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFE
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
PROJECT SCOPE NARRATIVE
THE SCOPE OF THIS PROJECT IS TO DEMO ALL EXISTING FIRE ALARM PANEL
EQUIPMENT, WIRING, DEVICES AND PROVIDE A NEW FIRE ALARM SYSTEM FOR A
EXISTING BUILDING THAT WILL BE REMODELED FOR A CALL CENTER INCLUDING
MONITORING DRY PIPE VALVE FOR ATTIC.
SCOPE OF WORK
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
CODE ANALYSIS
NFPA 72 2019
NFPA 70 2020
NFPA 101 2018
VA FIRE PROTECTION DESIGN MANUAL, 7TH EDITION
GENERAL NOTES FIRE ALARM
PROJECT SHEET NOTES
1. THESE DRAWINGS DEPICT GENERAL LOCATIONS OF LIFE SAFETY EQUIPMENT & FIELD DEVICES.
EXACT ROUTING OF CONDUITS TO BE DETERMINED IN THE FIELD BY THE INSTALLING CONTRACTOR TO SUIT CONDITIONS. ALL CHANGES SHALL BE CLEARLY INDICATED ON THE RECORD DRAWINGS.
2. CONTRACTOR IS RESPONSIBLE FOR MAKING AND OBTAINING APPROVAL FOR ALL NECESSARY
ADJUSTMENTS IN CIRCUITING AS REQUIRED TO ACCOMMODATE THE RELOCATION OF EQUIPMENT
AND/OR DEVICES WHICH ARE AFFECTED BY ANY AUTHORIZED CHANGE. ALL CHANGES SHALL BE
CLEARLY INDICATED ON THE RECORD DRAWINGS.
3. A STAMPED SET OF APPROVED FIRE ALARM DRAWINGS SHALL BE AT THE JOB SITE AND SHALL BE
USED FOR INSTALLATION.
4. THE POWER CIRCUIT TO THE FACP AND TO THE FIRE ALARM POWER SUPPLIES SHALL BE ON A DEDICATED 120V, 20A BRANCH CIRCUIT BREAKER, AND SHALL HAVE A RED MARKING, LOCK-ON PROVISION AND SHALL BE IDENTIFIED AS "LIFE SAFETY BRANCH CIRCUIT." THE LOCATION OF THE CIRCUIT DISCONNECT MEANS (CIRCUIT BREAKER) SHALL BE PERMANENTLY IDENTIFIED AT THE FIRE
ALARM CONTROL UNIT.
5. DO NOT APPLY POWER EXCEPT IN THE PRESENCE OF A FACTORY TRAINED SIMPLEX/JCI TECHNICAL
REPRESENTATIVE.
6. ANY SMOKE DETECTOR HEAD INSTALLED BEFORE THE BUILDING IS CLEANED AND ACCEPTED SHALL
BE COVERED TO PROTECT FROM DUST. ANY FALSE ALARMS DUE TO DIRT CONTAMINATED HEADS
SHALL BE THE RESPONSIBILITY OF THE FIRE ALARM INSTALLER.
7. PROJECT WILL MAINTAIN THE FIRE RESISTANCE INTEGRITY OF ALL WALL, CEILING, AND ROOF
ASSEMBLIES ANY TIME THAT WORK IS NOT ACTIVELY BEING PERFORMED.
8. INSTALLATION OF DEVICES SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
POWER LIMITED AND NON-POWER LIMITED FIELD WIRING MUST BE INSTALLED WITHIN THE FACP
ENCLOSURE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND NEC.
9. ALL WIRING SHALL BE INSTALLED ACCORDING TO 2020 NFPA 70 (NEC).
10. FIRE ALARM CIRCUITS SHALL BE IDENTIFIED IN ACCORDANCE WITH APPROPRIATE SECTION OF NEC
760. MARK ALL FIRE ALARM WIRES IN ACCORDANCE WITH NEC 760 SECTIONS FOR POWER LIMITED
AND NON-POWER LIMITED WIRE.
11. FIRE ALARM CABLE SHALL BE INSTALL IN (RED) EMT CONDUIT RACEWAYS.
12. FIRE ALARM CABLE INSTALLED IN UNDERGROUND CONDUIT OR OTHER WET LOCATIONS SHALL BE UL
LISTED FOR WET LOCATIONS.
13. FIRE ALARM CIRCUITS EXTENDING BEYOND ONE BUILDING AND RUN OUTDOOR SHALL BE INSTALLED
IN ACCORDANCE WITH NFPA 70 ARTICLES 760, 770, 725 AND 800 WHERE APPLICABLE.
14. ALL WIRING, INCLUDING SHIELDS MUST BE DRY AND FREE OF SHORTS AND GROUNDS.
15. ALL SHIELDED WIRE MUST HAVE SHIELD CONTINUITY AT FULL LENGTH OF THE WIRE.
16. ONLY SYSTEM WIRING CAN BE RUN IN THE SAME CONDUIT.
17. 120VAC IS NOT PERMITTED IN THE SAME CONDUIT WITH LOW VOLTAGE WIRING.
18. MAINTAIN 40 PERCENT CONDUIT FILL RATIO AS PER NEC REQUIREMENTS.
PROPOSED SEQUENCE OF OPERATIONSTYPICAL DEVICE MOUNTING HEIGHTS
H
ACTUATOR
TOP OF UNIT
FACP NAC#
TOP OF CABINET
ENTIRE LENS OF STROBE
TOP OF DEVICE
CEILING
DIFFUSER
LIGHT
Min 7'6"
(90")
Min 6'8"
(80") 6'0" (72")
5'4" (64")
4'0" (48")
Max 6" below ceiling
Max 8"0"
(96")
ALL HEIGHTS ARE
MEASURED FROM (AFF)
ABOVE FINISHED FLOOR
3'0" (36")
1'6" (18")
LEGEND
RISER DIAGRAM
*TOTAL DEVICE COUNT NOT DEPICTED ON RISER DIAGRAM
AutoCAD SHX Text
NAC#
AutoCAD SHX Text F
AutoCAD SHX Text
AOM
AutoCAD SHX Text
AIM
AutoCAD SHX Text
FACP
AutoCAD SHX Text
ANN
AutoCAD SHX Text
VS
AutoCAD SHX Text
WF
AutoCAD SHX Text
DH
AutoCAD SHX Text
LA
AutoCAD SHX Text
PS
AutoCAD SHX Text
SBUSS(NETWORK)
AutoCAD SHX Text
AIM
AutoCAD SHX Text
AOM
AutoCAD SHX Text
COMMUNICATOR
AutoCAD SHX Text
SBUSS(NETWORK)
AutoCAD SHX Text 135%%d
AutoCAD SHX Text F
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text
FAA
AutoCAD SHX Text
MAP
12-AHU-01
5690 CFM
SUPPLY
B C E F G H J K L N PA D M
ELEVATOR EQUIP
CORRIDOR
JANITOR
STORAGE
STORAGE
MECHANICAL
LOBBY
WOMEN'S RESTROOM
HAC
ELECTRICAL
IT
011 CONFERENCE /
BREAK
TRAINING
OPEN OFFICE
OFFICE
OFFICE
OFFICE
MEN'S RESTROOM
ELEVATOR
FIRE ALARM CONTROL PANEL
AUXILIARY POWER SUPPLY
SMOKE DETECTOR
MANUAL PULL STATION
HEAT DETECTOR
MONITOR MODULE
CONTROL RELAY MODULE
STROBE ONLY(WALL MOUNT)
DOOR HOLDER
ANNUNCIATOR PANEL
TAMPER SWITCH
WATER FLOW SWITCH
DUCT DETECTOR
CO
CO DETECTOR
HORN/STROBE (WALL/CEILING MOUNT)
DOOR HOLDER
STROBE ONLY (WALL MOUNT)
WATER FLOW PRESSURE SWITCH
LOW-AIR PRESSURE SWITCH
(DRY VALVE)
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FA120
BASEMENT FIRE ALARM
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFE
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P l a n
N o r t h
T r u e
N o r t h
1/8" = 1'-0"
BASEMENT FIRE ALARM PLAN
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FA
.dw g
/15
/20
:43
:05 A
M
1. FIRE ALARM PANEL SHALL BE LOCATED IN ELECTRICAL ROOM AND
COORDINATED WITH ELECTRICAL
2. FA CONTRACTOR TO SUPPLY DUCT DETECTORS
LEGEND
A. REMOVE ALL EXISTING PANELS, EQUIPMENT, WIRING, AND
DEVICES SHALL BE REMOVED.
B. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER
NFPA 72 AND THE MANUFACTURER'S INSTRUCTIONS.
C. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED
UPON THE LOCATION OF DIFFUSERS, LIGHTS, AND OTHER
POTENTIAL OBSTRUCTIONS.
D. WALL MOUNT THE BOTTOM OF ALL AUDIBLE/VISUAL
APPLIANCES AT MIN. 80" A.F.F., NO MORE THAN 96" AFF OR
TOP AT 6" BELOW THE CEILING, WHICHEVER IS LOWER.
E. ALL WIRING INSTALLATION SHALL CONFORM TO THE NEC.
F. ALL WIRING SHALL BE INSTALLED IN CONDUIT.
G. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RETURN ALL WIRES TO THE PANEL FREE OF OPENS,
GROUNDS, SHORTS AND/OR ANY OTHER CONDITION THAT
MAY PREVENT THE PROPER OPERATION OF THE FIRE
ALARM SYSTEM.
H. ALL MATERIALS SHALL BE COMPATIBLE WITH THE
EXISTING CAMPUS SYSTEMS.
I. CIRCUIT NEW EQUIPMENT INTO THE SAME FIRE ALARM
ZONE THAT IS SERVING THE SPRINKLER ZONE.
J. PROVIDE THE NECESSARY FIRE ALARM DEVICE IN THE
ELEVATOR SHAFT AND MACHINE ROOMS PER
NON-COMBUSTIBLE ELEVATOR EQUIPMENT.
3. REPLACE EXISTING OUTSIDE NOTIFICATION WITH
WEATHER PROOF DEVICE
AutoCAD SHX Text
FACP
AutoCAD SHX Text
VS
AutoCAD SHX Text
WF
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
NAC#
AutoCAD SHX Text F
AutoCAD SHX Text
AOM
AutoCAD SHX Text
AIM
AutoCAD SHX Text
FACP
AutoCAD SHX Text
ANN
AutoCAD SHX Text
VS
AutoCAD SHX Text
WF
AutoCAD SHX Text
DH
AutoCAD SHX Text
LA
PS
12-AHU-02
5790 CFM
SUPPLY
B C E F G H J K L N PA D M
JANITOR
OPEN OFFICE
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
PORCH
PORCH
ENTRY
LOBBY
ELEC
IT
OFFICE
OFFICE
MECHANICAL
CORRIDOR
OFFICE
OFFICE
FIRE ALARM CONTROL PANEL
AUXILIARY POWER SUPPLY
SMOKE DETECTOR
MANUAL PULL STATION
HEAT DETECTOR
MONITOR MODULE
CONTROL RELAY MODULE
STROBE ONLY(WALL MOUNT)
DOOR HOLDER
ANNUNCIATOR PANEL
TAMPER SWITCH
WATER FLOW SWITCH
DUCT DETECTOR
CO
CO DETECTOR
HORN/STROBE (WALL/CEILING MOUNT)
DOOR HOLDER
STROBE ONLY (WALL MOUNT)
WATER FLOW PRESSURE SWITCH
LOW-AIR PRESSURE SWITCH
(DRY VALVE)
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FA121
FIRST FLOOR FIRE ALARM
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFEVEG 20.15
32'16'8'4'2'0'
P l a n
N o r t h
T r r t h
1/8" = 1'-0"
FIRST FLOOR FIRE ALARM PLAN
1. POWER SUPPLY SHALL BE LOCATED IN ELECTRICAL ROOM AND
COORDINATED WITH ELECTRICAL - ADD SMOKE IF POWER SUPPLY IS ADDED
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FA
.dw g
/15
/20
:43
:05 A
M
2. FA CONTRACTOR TO SUPPLY DUCT DETECTORS
100% CONSTRUCTION
DOCUMENTS
LEGEND
A. REMOVE ALL EXISTING PANELS, EQUIPMENT, WIRING, AND
DEVICES SHALL BE REMOVED.
B. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER
NFPA 72 AND THE MANUFACTURER'S INSTRUCTIONS.
C. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED
UPON THE LOCATION OF DIFFUSERS, LIGHTS, AND OTHER
POTENTIAL OBSTRUCTIONS.
D. WALL MOUNT THE BOTTOM OF ALL AUDIBLE/VISUAL
APPLIANCES AT MIN. 80" A.F.F., NO MORE THAN 96" AFF OR
TOP AT 6" BELOW THE CEILING, WHICHEVER IS LOWER.
E. ALL WIRING INSTALLATION SHALL CONFORM TO THE NEC.
F. ALL WIRING SHALL BE INSTALLED IN CONDUIT.
G. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RETURN ALL WIRES TO THE PANEL FREE OF OPENS,
GROUNDS, SHORTS AND/OR ANY OTHER CONDITION THAT
MAY PREVENT THE PROPER OPERATION OF THE FIRE
ALARM SYSTEM.
H. ALL MATERIALS SHALL BE COMPATIBLE WITH THE
EXISTING CAMPUS SYSTEMS.
I. CIRCUIT NEW EQUIPMENT INTO THE SAME FIRE ALARM
ZONE THAT IS SERVING THE SPRINKLER ZONE.
J. PROVIDE THE NECESSARY FIRE ALARM DEVICE IN THE
ELEVATOR SHAFT AND MACHINE ROOMS PER
NON-COMBUSTIBLE ELEVATOR EQUIPMENT.
AutoCAD SHX Text F
AutoCAD SHX Text
ANN
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
NAC#
AutoCAD SHX Text
NAC#
AutoCAD SHX Text F
AutoCAD SHX Text
AOM
AutoCAD SHX Text
AIM
AutoCAD SHX Text
FACP
AutoCAD SHX Text
ANN
AutoCAD SHX Text
VS
AutoCAD SHX Text
WF
AutoCAD SHX Text
DH
AutoCAD SHX Text
LA
12-AHU-02
5790 CFM
SUPPLY
B C E F G H J K L N PA D M
STAIR
200WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
CORRIDOR
JANITOR
LOBBY
ELEC
IT
BREAK
209 CONFERENCE
OFFICE
OPEN OFFICE
OFFICE
216MECHANICAL
FIRE ALARM CONTROL PANEL
AUXILIARY POWER SUPPLY
SMOKE DETECTOR
MANUAL PULL STATION
HEAT DETECTOR
MONITOR MODULE
CONTROL RELAY MODULE
STROBE ONLY(WALL MOUNT)
DOOR HOLDER
ANNUNCIATOR PANEL
TAMPER SWITCH
WATER FLOW SWITCH
DUCT DETECTOR
CO
CO DETECTOR
HORN/STROBE (WALL/CEILING MOUNT)
DOOR HOLDER
STROBE ONLY (WALL MOUNT)
WATER FLOW PRESSURE SWITCH
LOW-AIR PRESSURE SWITCH
(DRY VALVE)
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FA122
SECOND FLOOR FIRE ALARM
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFE
DEVELOPMENT
VEG 20.15
32'16'8'4'2'0'
P l a n
N o r t h
T r r t h
1/8" = 1'-0"
SECOND FLOOR FIRE ALARM PLAN
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FA
.dw g
/15
/20
:43
:05 A
M
1. POWER SUPPLY SHALL BE LOCATED IN ELECTRICAL ROOM AND
COORDINATED WITH ELECTRICAL - ADD SMOKE IF POWER SUPPLY IS ADDED
2. FA CONTRACTOR TO SUPPLY DUCT DETECTORS
100% DESIGN
A. REMOVE ALL EXISTING PANELS, EQUIPMENT, WIRING, AND
DEVICES SHALL BE REMOVED.
B. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER
NFPA 72 AND THE MANUFACTURER'S INSTRUCTIONS.
C. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED
UPON THE LOCATION OF DIFFUSERS, LIGHTS, AND OTHER
POTENTIAL OBSTRUCTIONS.
D. WALL MOUNT THE BOTTOM OF ALL AUDIBLE/VISUAL
APPLIANCES AT MIN. 80" A.F.F., NO MORE THAN 96" AFF OR
TOP AT 6" BELOW THE CEILING, WHICHEVER IS LOWER.
E. ALL WIRING INSTALLATION SHALL CONFORM TO THE NEC.
F. ALL WIRING SHALL BE INSTALLED IN CONDUIT.
G. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RETURN ALL WIRES TO THE PANEL FREE OF OPENS,
GROUNDS, SHORTS AND/OR ANY OTHER CONDITION THAT
MAY PREVENT THE PROPER OPERATION OF THE FIRE
ALARM SYSTEM.
H. ALL MATERIALS SHALL BE COMPATIBLE WITH THE
EXISTING CAMPUS SYSTEMS.
I. CIRCUIT NEW EQUIPMENT INTO THE SAME FIRE ALARM
ZONE THAT IS SERVING THE SPRINKLER ZONE.
J. PROVIDE THE NECESSARY FIRE ALARM DEVICE IN THE
ELEVATOR SHAFT AND MACHINE ROOMS PER
NON-COMBUSTIBLE ELEVATOR EQUIPMENT.
LEGEND
3. PROVIDE MODULES FOR DRY PIPE VALVE IN MECH ROOM 205 FOR ATTIC
SYSTEM.
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
VS
AutoCAD SHX Text
PS
AutoCAD SHX Text
LA
AutoCAD SHX Text
NAC#
AutoCAD SHX Text
NAC#
AutoCAD SHX Text F
AutoCAD SHX Text
AOM
AutoCAD SHX Text
AIM
AutoCAD SHX Text
FACP
AutoCAD SHX Text
ANN
AutoCAD SHX Text
VS
AutoCAD SHX Text
WF
AutoCAD SHX Text
DH
AutoCAD SHX Text
LA
B C E F G H J K L N PA D M
FIRE ALARM CONTROL PANEL
AUXILIARY POWER SUPPLY
SMOKE DETECTOR
MANUAL PULL STATION
HEAT DETECTOR
MONITOR MODULE
CONTROL RELAY MODULE
STROBE ONLY(WALL MOUNT)
DOOR HOLDER
ANNUNCIATOR PANEL
TAMPER SWITCH
WATER FLOW SWITCH
DUCT DETECTOR
CO
CO DETECTOR
HORN/STROBE (WALL/CEILING MOUNT)
DOOR HOLDER
STROBE ONLY (WALL MOUNT)
WATER FLOW PRESSURE SWITCH
LOW-AIR PRESSURE SWITCH
(DRY VALVE)
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FA122
SECOND FLOOR FIRE ALARM
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFE
DEVELOPMENT
VEG 20.15
32'16'8'4'2'0'
P l a n
N o r t h
T r r t h
1/8" = 1'-0"
SECOND FLOOR FIRE ALARM PLAN
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FA
.dw g
/15
/20
:43
:05 A
M
1. ACCESS HATCH
100% DESIGN
A. REMOVE ALL EXISTING PANELS, EQUIPMENT, WIRING, AND
DEVICES SHALL BE REMOVED.
B. ALL FIRE ALARM EQUIPMENT SHALL BE INSTALLED PER
NFPA 72 AND THE MANUFACTURER'S INSTRUCTIONS.
C. ALL INITIATING DEVICES SHALL BE FIELD LOCATED BASED
UPON THE LOCATION OF DIFFUSERS, LIGHTS, AND OTHER
POTENTIAL OBSTRUCTIONS.
D. WALL MOUNT THE BOTTOM OF ALL AUDIBLE/VISUAL
APPLIANCES AT MIN. 80" A.F.F., NO MORE THAN 96" AFF OR
TOP AT 6" BELOW THE CEILING, WHICHEVER IS LOWER.
E. ALL WIRING INSTALLATION SHALL CONFORM TO THE NEC.
F. ALL WIRING SHALL BE INSTALLED IN CONDUIT.
G. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO RETURN ALL WIRES TO THE PANEL FREE OF OPENS,
GROUNDS, SHORTS AND/OR ANY OTHER CONDITION THAT
MAY PREVENT THE PROPER OPERATION OF THE FIRE
ALARM SYSTEM.
H. ALL MATERIALS SHALL BE COMPATIBLE WITH THE
EXISTING CAMPUS SYSTEMS.
I. CIRCUIT NEW EQUIPMENT INTO THE SAME FIRE ALARM
ZONE THAT IS SERVING THE SPRINKLER ZONE.
J. PROVIDE THE NECESSARY FIRE ALARM DEVICE IN THE
ELEVATOR SHAFT AND MACHINE ROOMS PER
NON-COMBUSTIBLE ELEVATOR EQUIPMENT.
LEGEND
AutoCAD SHX Text
NAC#
AutoCAD SHX Text F
AutoCAD SHX Text
AOM
AutoCAD SHX Text
AIM
AutoCAD SHX Text
FACP
AutoCAD SHX Text
ANN
AutoCAD SHX Text
VS
AutoCAD SHX Text
WF
AutoCAD SHX Text
DH
AutoCAD SHX Text
LA
SPRINKLER HAZARD LEGEND
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
12"12"
12"12"
SPRINKLER HEAD POSITION AT ACOUSTIC
CEILING TILES
2'x4' TILE2'x2' TILE
F l g
S p i g o t
ICTAULIC
FIRELOCK
4"
ICTAULIC
FIRELOCK
4"
I
C
T
A
U
L
I
C
F
I
R
E
L
O
C
K
ICTAULIC
FIRELOCK
4"
I C
T A
U L
I C
F I R
E L
O C
K
I C
T A
U L I C
F I R
E L O
C K
SYM CNT POSITION FINISH TEMP K-FACTOR NPT SIN MFG. MODEL#
38 UPR BRASS 200 5.60 1/2" TY3131 Tyco TY-FRB 90 PEND CHROME 155 5.60 1/2" TY3231 Tyco TY-FRB 1 SIDE BRASS 286 5.60 1/2" TY3331 Tyco TY-FRB
OR EQUIVALENT
SCOPE OF WORK
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FP
.dw g
/15
/20
:43
:05 A
M
FP100
FIRE SPRINKLER NOTES AND
DETAILS PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFE
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
THE SCOPE OF WORK FOR THIS PROJECT IS TO RETROFIT A WET PIPE SPRINKLER SYSTEM INTO AN EXISTING BUILDING AND A DRY SYSTEM INTO THE ATTIC. THE SCOPE INCLUDES REMOVAL / DEMO OF ALL EXISTING FIRE SPRINKLER PIPING, HEADS, HANGERS AND EQUIPMENT ASSOCIATED WITH THE SPRINKLER SYSTEM BACK TO
SUPPLY FLANGE AND REPLACE WITH NEW EQUIPMENT.
GENERAL NOTES
1. WATER SUPPLY SHALL BE VERIFIED BY INSTALLING CONTRACTOR. WATER FLOW SHALL BE WITHIN 12
MONTHS OF INSTALLATION.
2. THE COMBINED REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS ARE APPLICABLE TO THE
DESIGN AND INSTALLATION OF THIS SYSTEM.
3. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF
A COMPLETE AND PROPERLY FUNCTIONING FIRE SPRINKLER SYSTEM.
4. THE EQUIPMENT SPECIFIED ON THE DRAWINGS HAS BEEN SELECTED AS THE BASIS FOR DESIGN. THE USE OF REVIEWED OR SPECIFIED EQUALS SHALL BE COORDINATED BY THE CONTRACTOR FOR SPACE
REQUIREMENTS, EQUIPMENT DIMENSIONS AND PERFORMANCE.
5. DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL DESIGN, ARRANGEMENT AND EXTENT OF
THE SYSTEMS. DO NOT SCALE DRAWINGS NOR USE AS SHOP DRAWINGS. WHERE ALTERNATE
ROUTING, OFFSETS AND TRANSITIONS ARE REQUIRED FOR THE COORDINATION OF ALL WORK, THE
CONTRACTOR SHALL MAKE CHANGES WITHOUT ADDITIONAL COSTS.
6. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL NEW EQUIPMENT AND
PIPING WITH ALL OTHER TRADES PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND SYSTEM
INSTALLATION, SO AS NOT TO INTERFERE WITH THE ROUTING OF NEW DUCTWORK, PLUMBING,
PIPING, ETC. CONTRACTOR SHALL REVIEW ALL PROJECT DOCUMENTS INCLUDING, BUT NOT LIMITED
TO, THE FOLLOWING: ARCHITECTURAL, ELECTRICAL, MECHANICAL, STRUCTURAL, SITE/CIVIL
DOCUMENTS FOR THE COORDINATION OF THE SPRINKLER SYSTEM DESIGN AND INSTALLATION.
7. SEAL ALL PENETRATIONS THROUGH FIRE-RESISTANCE RATED WALLS, CEILINGS AND FLOORS WITH UL LISTED ASSEMBLIES AS REQUIRED TO MAINTAIN THE INTEGRITY OF THE FIRE-RESISTANCE RATING.
8. PROVIDE ALL FITTINGS, RISER NIPPLES, ARM-OVERS, HANGERS, ETC. TO MAINTAIN CONFORMANCE WITH APPLICABLE STANDARDS AND TO POSITION THE SPRINKLER HEADS IN THE PROPER LOCATIONS.
9. FIRE SUPPRESSION SYSTEM TO BE HYDRAULICALLY CALCULATED BASED ON NFPA 13, WITH A SAFETY
FACTOR OF 10% UP TO 10 PSI OF THE WATER SUPPLY CURVE PER VA DESIGN GUIDELINES.
10. THE FIRE SPRINKLER CONTRACTOR SHALL SECURE THE SITE FLOW TEST INFORMATION AND
DOCUMENTATION FROM THE LOCAL WATER DEPARTMENT PRIOR TO THE DESIGN OF THE FIRE
SPRINKLER SYSTEM. THE WATER FLOW TEST SHALL BE NO OLDER THAN ONE YEAR FROM THE DATE
OF SYSTEM INSTALLATION.
11. SPRINKLERS SHALL BE SPACED PER NFPA 13 REGARDING OBSTRUCTIONS, BEAM POCKETS, HVAC
DUCTWORK, PENETRATIONS AND ANY OTHER CLEARANCE RELATED ITEMS. CONTRACTOR SHALL
VERIFY ALL SPACING AND OBSTRUCTIONS PRIOR TO INSTALLATION.
12. INSTALL SPRINKLERS IN THE CENTER OR QUARTER POINT OF CEILING TILES, WHERE APPLICABLE.
13. SPRINKLER CONTRACTOR TO COORDINATE SPRINKLER HEAD FINISHES WITH OWNER PRIOR TO THE
PURCHASE AND INSTALLATION OF SPRINKLERS.
14. FIRE SPRINKLER SHOP DRAWINGS SHALL LOCATE AND DESCRIBE GUIDES, ANCHORS AND HANGERS FOR ALL PIPING. FIRE SPRINKLER SHOP DRAWINGS TO PROVIDE PROTECTION FOR UNDERNEATH
DUCTWORK AND OTHER OBSTRUCTIONS AS NEEDED.
15. FIRE SPRINKLER SHOP DRAWINGS SHALL PROVIDE DIMENSIONALLY LOCATED PIPE MAINS AND BRANCH LINES TO FACILITIES STRUCTURE SUCH AS COLUMN LINES, WALLS, RECOGNIZED BENCH
MARKS, ETC.
16. ALL SPRINKLER HEADS INSTALLED SHALL BE NEW.
17. PROVIDE FIELD COORDINATION OF PIPING AND SPRINKLER HEAD INSTALLATIONS WITH EXISTING
DUCTWORK, LIGHTS, SMOKE DETECTORS, DIFFUSERS, ETC.
18. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO
PURCHASE OF ANY MATERIALS AND THE COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL
NOTIFY THE ARCHITECT OF ANY DISCREPANCIES FOR RESOLUTION.
19. COORDINATE ANY REQUIRED SPRINKLER SYSTEM RISER SHUTDOWNS THAT OCCUR DURING
CONSTRUCTION WITH ARCHITECT, OWNER, AND AHJ PRIOR TO PERIOD OF SHUTDOWN.
20. ALL DRY PIPE PIPING SHALL BE SLOPED TO PROVIDE PROPER DRAINAGE PER NFPA 13.
21. PROVIDE DRUM DRIPS AS REQUIRED PER NFPA 13.
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FIRE PROTECTION SYMBOL LEGEND
XX'-X"
X
PIPE PLUG
PIPE HANGER
PIPE COUPLING
PIPE ELEVATION
HYDRAULIC NODE
HORN STROBE
PIPE RISE
SYSTEM RISER
PIPE CAP
PIPE REDUCER
2-WAY EARTHQUAKE BRACE
HEAD ELEVATION
FIRE DEPT CONNECTION
CONTROL VALVE
AUXILARY DRAIN
SHEET NOTE
PIPE DROP
TC INSP. TEST CONN.
X X'-X"
SPRINKLER HEAD POSITION
SPRINKLER HEADS LEGEND
LEGEND
4-WAY EARTHQUAKE BRACE
SPRINKLER BRANCH LINE OUTLET
(SPRINKLER OUTLET SHALL BE TO
THE SIDE, NOT DOWN.)
TEE CLAMP, CENTER ON TILES AS
INDICATED ON ARCH. REFLECTED
CEILING PLAN
CEILING TILE
CEILING GRID TEE
TYPICAL SPRINKLER HEAD
PIPE CLAMP
FLEXIBLE PIPE
1" CAST IRON SCR.
90 DEG. ELL
1" CAST IRON SCR. 90 DEG. ELL OR
TEE (AS REQ'D)
SPRINKLER BRANCH LINE PIPING
(SPRINKLER OUTLET MAY BE
TURNED DOWN, DEPENDING ON
SITUATION.)
1" PIPING TO PENDENT SPRINKLER HEAD
LINE OF SUSPENDED CEILING
HARD PIPE OPTION
FLEXIBLE PIPE OPTION
1" BLACK SCH.
40 NIPPLE
TYPICAL SPRINKLER HEAD
SUPPLY DETAIL FOR SEMI RECESSED SPRINKLER HEADS
REMOVE PIPING TO
SUPPLY FLANGE
REUSE EXISTING
CORE FOR FIRE
DEPARTMENT
CONNECTION
SPRINKLER HAZARDNEW RISER DETAIL
FIRE HYDRANT FLOW TEST
SEE CIVIL SHEET CU101 FOR UNDERGROUND
EXISTING SPRINKLER RISER - DEMO
EXISTING 8" UNDERGROUND
6" BACKFLOW DOUBLE CHECK WITH GRV - BUTTERFLY VALVES & TAMPER SWITCHES
READY RISER
PRESSURE GAUGE - SUPPLY SIDE
TO BACK FLOW FORWARD FLOW SYSTEM FLUSHING CONNECTION
4" BUTTERFLY VALVE WITH TAMPERS (NORMALLY CLOSED)
TO FIRE DEPARTMENT CONNECTION 4" x 2-1/2" x 2-1/2" CONNECTION -COORDINATION
WITH EXISTING FDC HOLE IN BUILDING
4" CHECK VALVE FOR FDC - COORDINATE WITH EXISTING LOCATION
TO SPRINKLER SYSTEM
SPRINKLER HEAD BOX & HYDRAULIC CALCULATION PLACARDS
PIPE STANDS OR HANGERS TO SUPPORT PIPE
KEYED NOTES
PRESSURE GAUGE - SYSTEM SIDE
DEMOLISH EXISTING SYSTEM BACK TO FLOOR
FLANGE. PROVIDE NEW SYSTEM SYSTEM.
3/4" OR LARGER
2-1/2", 3", 3-1/2" 1-1/4" OR LARGER
4" AND LARGER 2" OR LARGER
DRAIN SIZE
RISER OR MAIN SIZE
UP TO 2"
SIZE OF DRAIN
CONNECTION
CODE ANALYSIS
NUMBER OF STORIES: 3 w/ ATTIC
SPRINKLER SYSTEM TYPE: WET & DRY
NFPA 13: 2019
VA FIRE PROTECTION DESIGN MANUAL, 7TH EDITION
PROVIDE DRY PIPE SYSTEM FOR ATTIC. DRY PIPE VALVE
LOCATED IN 3RD FLOOR MECH ROOM.
FLOOR
1. THE FIRE DEPARTMENT CONNECTION SHALL BE
INSTALLED AT A MIN OF 18" AND A MAX OF 48" ABOVE
THE SURROUNDING GRADE.
2. THE FIRE DEPARTMENT CONNECTIONS SHALL BE A
4" x 2-1/2" x 2-1/2" w/ IDENTIFICATION PLATE SHALL BE
LETTERED "AUTO SPKR" AND CAPS OR PLUGS.
3. THE SUPPLY LINE SIZE FROM THE FIRE DEPARTMENT
CONNECTION TO THE RISER MANIFOLD SHALL BE
EQUIVALENT FIRE SPRINKLER RISER OR GREATER.
4. A HORN STROBE ON EXTERIOR WALL 10'-0" ABOVE
FINISHED GRADE AND LOCATED WITHIN 20'-0" OF
THE FIRE DEPARTMENT CONNECTION SHALL BE
BY THE FIRE ALARM CONTRACTOR.
4"
1/2" WALL PLATE
1" BALL DRIP
FOR CONTINUATION
SEE RISER DETAIL
4" DRAIN ELL
4" CHECK VALVE
12 X 12 ACCESS
PANEL
12 X 12 ACCESS PANELEXTERIOR
WALL
1" SUPPLY FROM FIRE
SPRINKLER SYSTEM
1" GLOBE VALVE
(NORMALLY OPEN)
2" DRUM DRIP LEG
MINIMUM 12" LENGTH
1" GLOBE VALVE
WITH SIGNAGE
(NORMALLY CLOSED)
SEAL OPENING WITH
GROUT AND PROVIDE
ESCUTCHEON
ON INSIDE WALL
1" GALVANIZED
WALL PLATE
1" GALVANIZED
45-DEGREE ELBOW
WITH SMOOTH
BORE CORROSION
RESISTANT OUTLET
GIVING FLOW EQUIV.
TO ONE SPRINKLER
FLOOR
FASTEN SECURELY TO WALL
4"x 2-1/2" x2-1/2" 2-WAY FDC W/ 2-
2-1/2" KNOX CAPS
4" TXG
GALV.
4"
12"
MIN
48"
MIN
REUSE EXISTING
CORED HOLE FOR NEW
4" FDC PIPING AND NEW
WALL PLATE
EXTERIOR
WALL
DRY PIPE VALVE DETAIL
REVISED FIRE DEPARTMENT CONNECTION
DRUM DRIP DETAIL
14 FROM WET PIPE SPRINKLER SYSTEM
15 BUTTERY VALVE - WITH TAMPER SWITCH
16 MAIN DRAIN - TO FLOOR DRAIN
17 AIR MAINTENANCE DEVICE
18 PS40 PRESSURE SWITCH - (SUPERVISOR)
19 PS10 PRESSURE SWITCH - (FLOW)
20 TO DRY SYSTEM IN ATTIC
21 DRY PIPE VALVE
22 AIR COMPRESSOR ON RUBBER ISOLATION PADS
B C E F G H J K L N PA D M
ELEVATOR EQUIP
CORRIDOR
JANITOR
STORAGE
STORAGE
MECHANICAL
LOBBY
WOMEN'S RESTROOM
HAC
ELECTRICAL
IT
011 CONFERENCE /
BREAK
TRAINING
OPEN OFFICE
OFFICE
OFFICE
OFFICE
MEN'S RESTROOM
ELEVATOR
SPRINKLER HAZARD LEGEND
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FP120
BASEMENT FIRE SPRINKLER
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFEVEG 20.15
32'16'8'4'2'0'
P l a n
N o r t h
T r r t h
1/8" = 1'-0"
BASEMENT FIRE SPRINKLER PLAN
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FP
.dw g
/15
/20
:43
:05 A
M
1. USE EXISTING PENETRATIONS FOR PIPE WHEN TRANSITIONING BETWEEN
FLOORS
2. EXISTING FIRE SPRINKLER RISER LOCATION
A. DEMO ALL PIPE TO FLANGE.
B. REUSE EXISTING PENETRATION HOLES
C. BASEMENT AND FIRST FLOOR CEILING HEIGHTS 8'-6" UNO.
D. SECOND FLOOR CEILING HEIGHT 8'-0" UNO.
E. SMALL ROOM RULE ACCEPTABLE PER NFPA 13
F. PROVIDE AIR VENT ON TOP FLOOR
G. VERIFY ARCHITECTURAL FOR CEILING POCKET
ELEVATIONS.
H. PROVIDE AUX DRAINS AS REQUIRED.
3. EXISTING FDC CORE LOCATION TO REMAIN. PROVIDE NEW PIPING, FDC,
WALL PLATE AND BALL DRIP.
4. CEILING POCKETS MEET THE EXCEPTIONS PER NFPA 13 8.6.7. REFERENCE
ARCHITECTURAL SHEETS FOR CEILING ELEVATIONS
5. PROVIDE TAMPERED BALL VALVE FOR SPRINKLER HEAD IN ELEVATOR
SHAFT.
1 2
5 6. SEE EXISTING UNDERGROUND ON CIVIL SHEETS
7. HEAD UNDER STAIR LANDING
8. INSTALL STANDARD RESPONSE SPRINKLERS WITH INTERMEDIATE
TEMPERATURE RATING 93°C (200°F) OR HIGHER IN ELEVATOR SHAFTS,
ELEVATOR PITS, AND ELEVATOR MACHINE ROOMS
100% CONSTRUCTION
DOCUMENTS
B C E F G H J K L N PA D M
JANITOR
OPEN OFFICE
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
PORCH
PORCH
ENTRY
LOBBY
ELEC
IT
OFFICE
OFFICE
MECHANICAL
CORRIDOR
OFFICE
OFFICE
SPRINKLER HAZARD LEGEND
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FP121
FIRST FLOOR FIRE SPRINKLER
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFEVEG 20.15
32'16'8'4'2'0'
P l a n
N o r t h
T r r t h
1/8" = 1'-0"
FIRST FLOOR FIRE SPRINKLER PLAN
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FP
.dw g
/15
/20
:43
:05 A
M
1. CEILING POCKETS MEET THE EXCEPTIONS PER NFPA 13 8.6.7.
REFERENCE ARCHITECTURAL SHEETS FOR CEILING ELEVATIONS
1 1
A. DEMO ALL PIPE TO FLANGE.
B. REUSE EXISTING PENETRATION HOLES.
C. BASEMENT AND FIRST FLOOR CEILING HEIGHTS 8'-6" UNO.
D. SECOND FLOOR CEILING HEIGHT 8'-0" UNO.
E. SMALL ROOM RULE ACCEPTABLE PER NFPA 13.
F. PROVIDE AIR VENT ON TOP FLOOR.
G. VERIFY ARCHITECTURAL FOR CEILING POCKET
ELEVATIONS.
H. PROVIDE AUX DRAINS AS REQUIRED.
2. PORCHES ARE NON-COMBUSTIBLE. SPRINKLERS ARE NOT
REQUIRED PER NFPA 9.2.2.
B C E F G H J K L N PA D M
STAIR
200WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
CORRIDOR
JANITOR
LOBBY
ELEC
IT
BREAK
209 CONFERENCE
OFFICE
OPEN OFFICE
OFFICE
216MECHANICAL
SPRINKLER HAZARD LEGEND
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FP122
SECOND FLOOR FIRE SPRINKLER
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFEVEG 20.15
32'16'8'4'2'0'
P l a n
N o r t h
T r r t h
1/8" = 1'-0"
SECOND FLOOR FIRE SPRINKLER PLAN
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FP
.dw g
/15
/20
:43
:05 A
M
1. PROVIDE HEADS AT TOP AND BOTTOM OF STAIR
A. DEMO ALL PIPE TO FLANGE.
B. REUSE EXISTING PENETRATION HOLES
C. BASEMENT AND FIRST FLOOR CEILING HEIGHTS 8'-6" UNO.
D. SECOND FLOOR CEILING HEIGHT 8'-0" UNO.
E. SMALL ROOM RULE ACCEPTABLE PER NFPA 13
F. PROVIDE AIR VENT ON TOP FLOOR
G. VERIFY ARCHITECTURAL FOR CEILING POCKET
ELEVATIONS.
H. PROVIDE AUX DRAINS AS REQUIRED.
2. COORDINATE WITH DEPTH OF LIGHT IN FIELD
3. CEILING POCKETS MEET THE EXCEPTIONS PER NFPA 13 8.6.7.
REFERENCE ARCHITECTURAL SHEETS FOR CEILING ELEVATIONS
3 3 3 3 3 3
333333
4. LOCATION OF ATTIC DRY PIPE VALVE - MECHANICAL ROOM
5. REUSE EXISTING ATTIC FEED LOCATION FROM FLOOR BELOW
B C E F G H J K L N PA D M
SPRINKLER HAZARD LEGEND
ORDINARY GROUP 1
HAZARD
.15 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
LIGHT HAZARD
.10 GPM / 1500 SQ. FT
100 GPM HOSE
WET SYSTEM
ORDINARY GROUP 2
HAZARD
.20 GPM / 1500 SQ. FT
250 GPM HOSE
WET SYSTEM
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
12364 W. ALAMEDA PKWY.
SUITE #135
LAKEWOOD CO 80228
(303) 985-2050
WWW.VERITASFIRE.COM
FP123
ATTIC FIRE SPRINKLER PLAN EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 KLM VFEVEG 20.15
32'16'8'4'2'0'
P l a n
N o r t h
T r r t h
1/8" = 1'-0"
ATTIC FIRE SPRINKLER PLAN
C:
\U se rs\
Va lha lla E ng ine er 7\
De sk top \T es t\2
0.1 5 C
AD
\N ew C ad \67
4A 4-
-7
V
EG
.15
CA
D\
W
AC
O
FP
.dw g
/15
/20
:43
:05 A
M
1. PROVIDE HEADS UNDER ALL DUCT WORK OVER 4'-0" WIDE
A. DEMO ALL PIPE TO FLANGE.
B. REUSE EXISTING PENETRATION HOLES
C. BASEMENT AND FIRST FLOOR CEILING HEIGHTS 8'-6" UNO.
D. SECOND FLOOR CEILING HEIGHT 8'-0" UNO.
E. SMALL ROOM RULE ACCEPTABLE PER NFPA 13
F. PROVIDE AIR VENT ON TOP FLOOR
G. VERIFY ARCHITECTURAL FOR CEILING POCKET
ELEVATIONS.
H. ATTIC LAYOUT WILL NEED TO FIELD VERIFIED WITH
EXISTING STRUCTURE.
I. PROVIDE DRUM DRIPS AND AUX DRAIN AS REQUIRED
2. BRANCH LINE PIPING SLOPE 1/2" PER 10'-0"
3. SPRINKLER MAIN PIPING SLOPE 1/4" PER 10'-0"
4. REUSE EXISTING ATTIC FEED LOCATION FROM FLOOR BELOW
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:3
P M
P-001
PLUMBING ABBREVIATIONS,
SYMBOLS, AND LEGENDS
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
MEDICAL AIR
DOMESTIC HOT WATER RETURN
SANITARY SEWER, BELOW GRADE
DRAIN
MA MA MA
D D D
SAN SAN SAN
SOIL, WASTE, OR SANITARY SEWERSS SS SS
VENT (SANITARY)
LIMIT OF DEMOLITION
ANCHOR
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
STRAINER
FLOW ELEMENT
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FE
PIPE UP
PIPE DOWN
CO CLEAN OUT
HOSE BIB
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
GATE VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENTAV
PLUMBING PIPING SYMBOLS GENERAL PLUMBING SYMBOLS PLUMBING VALVE SYMBOLS
WCO WALL CLEAN OUT
THERMOSTATIC MIXING VALVE
PLUMBING GENERAL NOTES
1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED
CHASE OR ABOVE THE HARD SUSPENDED CEILING.
2. ACCESS PANELS ARE REQUIRED FOR ALL VALVES, TRAPS, CLEANOUTS,
CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER
THE ARCHITECTURAL SPECIFICATIONS.
3. PROVIDE ACOUSTICAL SEALANT PER SPECIFICATIONS SECTION 07 92 00 AT ALL
PIPE PENETRATIONS THROUGH SOUND RATED PARTITIONS.
4. SUBMIT COMPLETE CONSOLIDATED AND COORDINATED SHOP DRAWINGS FOR ALL
NEW SYSTEMS, AND FOR EXISTING SYSTEMS THAT ARE IN THE SAME AREAS. DO
NOT INSTALL EQUIPMENT FOUNDATIONS, EQUIPMENT, OR PIPING UNTIL
COORDINATION/SHOP DRAWINGS HAVE BEEN APPROVED.
O
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
P
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
R
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS WATER
RP RECIRCULATION PUMP
RWL RAIN WATER LEADER
S
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCATION
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
T
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
Y
YCO YARD CLEANOUT
YH YARD HYDRANT
G
GAL GALLON
GCO GRADE CLEANOUT
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H
H&CW HOT AND COLD WATER
HB HOSE BIB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)_
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
I
ICW INDUSTRIAL COLD WATER
ID INSIDE DIAMETER
IE INVERT ELEVATION
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
K
KW KILOWATT
KWH KILOWATT-HOUR
L
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
A
A/E ARCHITECT/ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG AIR GAP
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION,
AND AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANCIAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
AV ACID VENT
AW ACID WASTE
B
BFP REDUCED PRESSURE BACKFLOW PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CELSIUS
CA COMPRESSED AIR
CFM CUBIC FEET PER MINUTE
CGA COMPRESSED GAS ASSOCATION
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
D
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
E
EL ELEVATION
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
EPA ENVIRONMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F
F FARENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
PLUMBING ABBREVIATIONS
WH
B C E F G H J K L N PA D M
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. DEMOLISH ALL SANITARY PIPING DOWN TO PENETRATIONS IN CONCRETE
SLAB. PREPARE BELOW GRADE PIPING FOR REUSE. PROVIDE TEMPORARY
CAPS OR PLUGS AS NECESSARY.
C. DEMOLISH ALL DOMESTIC WATER PIPING DOWN TO PENETRATIONS IN
CONCRETE SLAB OR PENETRATION INTO BUILDING. PREPARE PIPING
PENETRATION INTO BUILDING FOR REUSE. PROVIDE TEMPORARY CAPS OR
PLUGS AS NECESSARY.
B C E F G H J K L N PA D M
5" ø
S S
8 8
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PD111
PLUMBING DEMOLITION PLANS EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION PLAN
1. LOCATION OF SANITARY PIPE PENETRATION BELOW GRADE.
2. DEMOLISH EXISTING SINK AND ALL ASSOCIATED PIPING. PROVIDE CAPS AT
ALL ACTIVE MAINS.
3. DEMOLISH EXISTING WATER CLOSET AND ALL ASSOCIATED PIPING.
PROVIDE CAPS AT ALL ACTIVE MAINS.
4. DEMOLISH EXISTING URINAL AND ALL ASSOCIATED PIPING. PROVIDE CAPS
AT ALL ACTIVE MAINS.
5. LOCATION OF DOMESTIC WATER PIPE PENETRATION INTO BUILDING.
6. DEMOLISH DOMESTIC WATER HEATER AND ALL ASSOCIATED PIPING.
PROVIDE CAPS AT ALL ACTIVE MAINS.
7. DEMOLISH DRINKING FOUNTAIN AND ALL ASSOCIATED PIPING. PROVIDE
CAPS AT ALL ACTIVE MAINS.
8. DEMOLISH EXISTING HOSE BIBB AND ALL ASSOCIATED PIPING. PROVIDE
CAPS AT ALL ACTIVE MAINS.
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN
B C E F G H J K L N PA D M
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. DEMOLISH ALL SANITARY PIPING DOWN TO PENETRATIONS IN CONCRETE
SLAB. PREPARE BELOW GRADE PIPING FOR REUSE. PROVIDE TEMPORARY
CAPS OR PLUGS AS NECESSARY.
C. DEMOLISH ALL DOMESTIC WATER PIPING DOWN TO PENETRATIONS IN
CONCRETE SLAB OR PENETRATION INTO BUILDING. PREPARE PIPING
PENETRATION INTO BUILDING FOR REUSE. PROVIDE TEMPORARY CAPS OR
PLUGS AS NECESSARY.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PD112
PLUMBING DEMOLITION PLANS EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
SECOND FLOOR PLUMBING DEMOLITION PLAN
1. DEMOLISH EXISTING SERVICE SINK AND ALL ASSOCIATED PIPING. PROVIDE
CAPS AT ALL ACTIVE MAINS.
2. DEMOLISH EXISTING SINK ON FIRST FLOOR AND ALL ASSOCIATED PIPING.
PROVIDE CAPS AT ALL ACTIVE MAINS.
3. DEMOLISH EXISTING WATER CLOSET AND ALL ASSOCIATED PIPING.
PROVIDE CAPS AT ALL ACTIVE MAINS.
4. DEMOLISH EXISTING URINAL AND ALL ASSOCIATED PIPING. PROVIDE CAPS
AT ALL ACTIVE MAINS.
B C E F G H J K L N PA D M
12-DWH-01
12-DHWP-01
ELEVATOR EQUIP
CORRIDOR
JANITOR
STORAGE
STORAGE
MECHANICAL
LOBBY
HAC
ELECTRICAL
IT
CONFERENCE /
BREAK
TRAINING
OPEN OFFICE
OFFICE
OFFICE
WOMEN'S
RESTROOM
OFFICE
MEN'S RESTROOM
2"ø DCW 3/4"ø DHWR 3/4"ø DHW
3/4"ø DHW
3/4"ø DCW
2"ø DCW 3/4"ø DHWR
3/4"ø DHW
2"ø DCW 1"ø DHW
3/4"ø DHW 3/4"ø DHWR
2"ø DCW
P-413P-413
P-413P-413
P-604
P-402
P-201
1/2"ø DHW
1/2"ø DCW
P-804 P-804
P-502
FD-C
FD-C
FD-E
P-103
P-103P-103 FD-C
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PP110
BASEMENT PLUMBING PIPING
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
BASEMENT PLUMBING PIPING PLAN
1. EXISTING CONNECTION TO SITE DOMESTIC COLD WATER SUPPLY.
2. DOMESTIC WATER RISERS TO SERVE RESTROOM PLUMBING FIXTURES ON
FIRST AND SECOND FLOORS.
3. DOMESTIC WATER RISERS TO SERVE HAC AND BREAK ROOM PLUMBING
FIXTURES ON FIRST AND SECOND FLOORS.
4. INSTALL WATER METER AND BACKFLOW PREVENTER ON DOMESTIC COLD
WATER PIPE. REFER TO SPECIFICATION SECTION 22 11 00.
5. INSTALL ELECTRONIC TRAP PRIMER CONTROLLER. PROVIDE 1/2" DOMESTIC
COLD WATER CONNECTION TO EACH FLOOR DRAIN SERVING THE
BASEMENT AND FIRST FLOOR. REFER TO SPECIFICATION SECTION 22 13 00.
B C E F G H J K L N PA D M
JANITOR
OPEN OFFICE
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
PORCH
PORCH
ENTRY
LOBBY
ELEC
IT
OFFICE
OFFICE
MECHANICAL
CORRIDOR
OFFICE
OFFICE
3/4"ø DHW
1"ø DCW
1"ø DCW
1/2"ø DHW
P-413P-413
P-413P-413 P-604
P-201
P-502
FD-E
FD-C
FD-C
P-103
P-103P-103
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PP111
FIRST FLOOR PLUMBING PIPING
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
FIRST FLOOR PLUMBING PIPING PLAN
1. DOMESTIC WATER RISERS TO SERVE RESTROOM PLUMBING FIXTURES ON
FIRST AND SECOND FLOORS.
2. DOMESTIC WATER RISERS TO SERVE HAC AND BREAK ROOM PLUMBING
FIXTURES ON FIRST AND SECOND FLOORS.
3. INSTALL ELECTRONIC TRAP PRIMER CONTROLLER. PROVIDE 1/2" DOMESTIC
COLD WATER CONNECTION TO EACH FLOOR DRAIN SERVING THE SECOND
FLOOR. REFER TO SPECIFICATION SECTION 22 13 00.
B C E F G H J K L N PA D M
STAIR
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
CORRIDOR
UPPER PORCH
UPPER PORCH
LOBBY
ELEC
IT
BREAK
CONFERENCE
OFFICE
OPEN OFFICE
OFFICE
MECHANICAL
JANITOR
1/2"ø DCW
3/4"ø DHW 3/4"ø DHWR
1/2"ø DCW
1/2"ø DHW
3/4"ø DHW
1"ø DCW
1"ø DCW
1/2"ø DHW P-413P-413
P-413P-413
P-402
P-201
P-604P-604
P-502
FD-E
FD-C
FD-C
P-103
P-103
P-103
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PP112
SECOND FLOOR PLUMBING PIPING
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
SECOND FLOOR PLUMBING PIPING PLAN
1. DOMESTIC WATER RISERS TO SERVE RESTROOM PLUMBING FIXTURES ON
FIRST AND SECOND FLOORS.
2. DOMESTIC WATER RISERS TO SERVE HAC AND BREAK ROOM PLUMBING
FIXTURES ON FIRST AND SECOND FLOORS.
B C E F G H J K L N PA D M
ELEVATOR EQUIP
CORRIDOR
JANITOR
STORAGE
STORAGE
MECHANICAL
LOBBY
HAC
ELECTRICAL
IT
CONFERENCE /
BREAK
TRAINING
OPEN OFFICE
OFFICE
OFFICE
WOMEN'S RESTROOM
OFFICE
MEN'S RESTROOM
4"ø SS
3" ø S
S 4" ø
S S
2"ø SS
2"ø SS
4" ø
S S
2"ø SS
5"ø SS
1 1/2"ø VENT
2" ø
S S
3"ø SS
P-413P-413 P-413
P-402
P-201
P-604P-604
P-413
FD-E
2"ø SS
FD-C
FD-C
P-502
P-103
P-103P-103 FD-C
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:5
P M
PW110
BASEMENT PLUMBING SANITARY
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
BASEMENT PLUMBING SANITARY PLAN
1. CONNECT NEW SANITARY RISER TO EXISTING BELOW GRADE PIPING.
2. VENT RISER PIPE UP.
3. SANITARY SEWER RISER PIPE UP TO LEVEL 1 AND LEVEL 2.
B C E F G H J K L N PA D M
JANITOR
OPEN OFFICE
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
PORCH
PORCH
ENTRY
LOBBY
ELEC
IT
MECHANICAL
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
1 1/2"ø VENT
2"ø SS
1 1/2"ø VENT P-413P-413
P-413P-413
P-201
FD-C
FD-C
FD-E
3"ø SS
2"ø SS 2"ø SS
1 1/2"ø SS
P-502
P-103P-103
P-103
A. CONTRACTOR SHALL FIELD VERIFY ALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .