This package includes construction drawings and specifications for a plumbing renovation project at the Department of Veterans Affairs medical center in Waco, Texas. The project involves demolishing existing plumbing systems and installing new domestic water, sanitary, and vent piping to support renovated training and administrative office spaces. Drawings show demolition plans, new piping layouts, fixture schedules, and plumbing details. Specifications reference material and installation standards.
The related federal contract opportunity is a sealed bid solicitation from the VA for construction services to complete the plumbing renovations according to the provided drawings and specifications. The solicitation number is 36C77622B0045 and bids are due on February 28, 2022. The construction work must be completed by January 2023. The solicitation is designated for a service-disabled veteran-owned small business set-aside. The awarded firm will be required to follow all applicable federal acquisition regulations.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:3
P M
P-001
PLUMBING ABBREVIATIONS,
SYMBOLS, AND LEGENDS
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
MEDICAL AIR
DOMESTIC HOT WATER RETURN
SANITARY SEWER, BELOW GRADE
DRAIN
MA MA MA
D D D
SAN SAN SAN
SOIL, WASTE, OR SANITARY SEWERSS SS SS
VENT (SANITARY)
LIMIT OF DEMOLITION
ANCHOR
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
STRAINER
FLOW ELEMENT
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FE
PIPE UP
PIPE DOWN
CO CLEAN OUT
HOSE BIB
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
GATE VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENTAV
PLUMBING PIPING SYMBOLS GENERAL PLUMBING SYMBOLS PLUMBING VALVE SYMBOLS
WCO WALL CLEAN OUT
THERMOSTATIC MIXING VALVE
PLUMBING GENERAL NOTES
1. ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED
CHASE OR ABOVE THE HARD SUSPENDED CEILING.
2. ACCESS PANELS ARE REQUIRED FOR ALL VALVES, TRAPS, CLEANOUTS,
CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND INSTALLED UNDER
THE ARCHITECTURAL SPECIFICATIONS.
3. PROVIDE ACOUSTICAL SEALANT PER SPECIFICATIONS SECTION 07 92 00 AT ALL
PIPE PENETRATIONS THROUGH SOUND RATED PARTITIONS.
4. SUBMIT COMPLETE CONSOLIDATED AND COORDINATED SHOP DRAWINGS FOR ALL
NEW SYSTEMS, AND FOR EXISTING SYSTEMS THAT ARE IN THE SAME AREAS. DO
NOT INSTALL EQUIPMENT FOUNDATIONS, EQUIPMENT, OR PIPING UNTIL
COORDINATION/SHOP DRAWINGS HAVE BEEN APPROVED.
O
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
P
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
R
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS WATER
RP RECIRCULATION PUMP
RWL RAIN WATER LEADER
S
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCATION
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
T
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
Y
YCO YARD CLEANOUT
YH YARD HYDRANT
G
GAL GALLON
GCO GRADE CLEANOUT
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H
H&CW HOT AND COLD WATER
HB HOSE BIB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)_
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
I
ICW INDUSTRIAL COLD WATER
ID INSIDE DIAMETER
IE INVERT ELEVATION
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
K
KW KILOWATT
KWH KILOWATT-HOUR
L
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
A
A/E ARCHITECT/ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG AIR GAP
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION,
AND AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANCIAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
AV ACID VENT
AW ACID WASTE
B
BFP REDUCED PRESSURE BACKFLOW PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CELSIUS
CA COMPRESSED AIR
CFM CUBIC FEET PER MINUTE
CGA COMPRESSED GAS ASSOCATION
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
D
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
E
EL ELEVATION
EMCS ENERGY MANAGEMENT CONTROL SYSTEM
EPA ENVIRONMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F
F FARENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
PLUMBING ABBREVIATIONS
WH
B C E F G H J K L N PA D M
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. DEMOLISH ALL SANITARY PIPING DOWN TO PENETRATIONS IN CONCRETE
SLAB. PREPARE BELOW GRADE PIPING FOR REUSE. PROVIDE TEMPORARY
CAPS OR PLUGS AS NECESSARY.
C. DEMOLISH ALL DOMESTIC WATER PIPING DOWN TO PENETRATIONS IN
CONCRETE SLAB OR PENETRATION INTO BUILDING. PREPARE PIPING
PENETRATION INTO BUILDING FOR REUSE. PROVIDE TEMPORARY CAPS OR
PLUGS AS NECESSARY.
B C E F G H J K L N PA D M
5" ø
S S
8 8
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PD111
PLUMBING DEMOLITION PLANS EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION PLAN
1. LOCATION OF SANITARY PIPE PENETRATION BELOW GRADE.
2. DEMOLISH EXISTING SINK AND ALL ASSOCIATED PIPING. PROVIDE CAPS AT
ALL ACTIVE MAINS.
3. DEMOLISH EXISTING WATER CLOSET AND ALL ASSOCIATED PIPING.
PROVIDE CAPS AT ALL ACTIVE MAINS.
4. DEMOLISH EXISTING URINAL AND ALL ASSOCIATED PIPING. PROVIDE CAPS
AT ALL ACTIVE MAINS.
5. LOCATION OF DOMESTIC WATER PIPE PENETRATION INTO BUILDING.
6. DEMOLISH DOMESTIC WATER HEATER AND ALL ASSOCIATED PIPING.
PROVIDE CAPS AT ALL ACTIVE MAINS.
7. DEMOLISH DRINKING FOUNTAIN AND ALL ASSOCIATED PIPING. PROVIDE
CAPS AT ALL ACTIVE MAINS.
8. DEMOLISH EXISTING HOSE BIBB AND ALL ASSOCIATED PIPING. PROVIDE
CAPS AT ALL ACTIVE MAINS.
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
BASEMENT PLUMBING DEMOLITION PLAN
B C E F G H J K L N PA D M
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. DEMOLISH ALL SANITARY PIPING DOWN TO PENETRATIONS IN CONCRETE
SLAB. PREPARE BELOW GRADE PIPING FOR REUSE. PROVIDE TEMPORARY
CAPS OR PLUGS AS NECESSARY.
C. DEMOLISH ALL DOMESTIC WATER PIPING DOWN TO PENETRATIONS IN
CONCRETE SLAB OR PENETRATION INTO BUILDING. PREPARE PIPING
PENETRATION INTO BUILDING FOR REUSE. PROVIDE TEMPORARY CAPS OR
PLUGS AS NECESSARY.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PD112
PLUMBING DEMOLITION PLANS EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
SECOND FLOOR PLUMBING DEMOLITION PLAN
1. DEMOLISH EXISTING SERVICE SINK AND ALL ASSOCIATED PIPING. PROVIDE
CAPS AT ALL ACTIVE MAINS.
2. DEMOLISH EXISTING SINK ON FIRST FLOOR AND ALL ASSOCIATED PIPING.
PROVIDE CAPS AT ALL ACTIVE MAINS.
3. DEMOLISH EXISTING WATER CLOSET AND ALL ASSOCIATED PIPING.
PROVIDE CAPS AT ALL ACTIVE MAINS.
4. DEMOLISH EXISTING URINAL AND ALL ASSOCIATED PIPING. PROVIDE CAPS
AT ALL ACTIVE MAINS.
B C E F G H J K L N PA D M
12-DWH-01
12-DHWP-01
ELEVATOR EQUIP
CORRIDOR
JANITOR
STORAGE
STORAGE
MECHANICAL
LOBBY
HAC
ELECTRICAL
IT
CONFERENCE /
BREAK
TRAINING
OPEN OFFICE
OFFICE
OFFICE
WOMEN'S
RESTROOM
OFFICE
MEN'S RESTROOM
2"ø DCW 3/4"ø DHWR 3/4"ø DHW
3/4"ø DHW
3/4"ø DCW
2"ø DCW 3/4"ø DHWR
3/4"ø DHW
2"ø DCW 1"ø DHW
3/4"ø DHW 3/4"ø DHWR
2"ø DCW
P-413P-413
P-413P-413
P-604
P-402
P-201
1/2"ø DHW
1/2"ø DCW
P-804 P-804
P-502
FD-C
FD-C
FD-E
P-103
P-103P-103 FD-C
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PP110
BASEMENT PLUMBING PIPING
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
BASEMENT PLUMBING PIPING PLAN
1. EXISTING CONNECTION TO SITE DOMESTIC COLD WATER SUPPLY.
2. DOMESTIC WATER RISERS TO SERVE RESTROOM PLUMBING FIXTURES ON
FIRST AND SECOND FLOORS.
3. DOMESTIC WATER RISERS TO SERVE HAC AND BREAK ROOM PLUMBING
FIXTURES ON FIRST AND SECOND FLOORS.
4. INSTALL WATER METER AND BACKFLOW PREVENTER ON DOMESTIC COLD
WATER PIPE. REFER TO SPECIFICATION SECTION 22 11 00.
5. INSTALL ELECTRONIC TRAP PRIMER CONTROLLER. PROVIDE 1/2" DOMESTIC
COLD WATER CONNECTION TO EACH FLOOR DRAIN SERVING THE
BASEMENT AND FIRST FLOOR. REFER TO SPECIFICATION SECTION 22 13 00.
B C E F G H J K L N PA D M
JANITOR
OPEN OFFICE
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
PORCH
PORCH
ENTRY
LOBBY
ELEC
IT
OFFICE
OFFICE
MECHANICAL
CORRIDOR
OFFICE
OFFICE
3/4"ø DHW
1"ø DCW
1"ø DCW
1/2"ø DHW
P-413P-413
P-413P-413 P-604
P-201
P-502
FD-E
FD-C
FD-C
P-103
P-103P-103
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PP111
FIRST FLOOR PLUMBING PIPING
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
FIRST FLOOR PLUMBING PIPING PLAN
1. DOMESTIC WATER RISERS TO SERVE RESTROOM PLUMBING FIXTURES ON
FIRST AND SECOND FLOORS.
2. DOMESTIC WATER RISERS TO SERVE HAC AND BREAK ROOM PLUMBING
FIXTURES ON FIRST AND SECOND FLOORS.
3. INSTALL ELECTRONIC TRAP PRIMER CONTROLLER. PROVIDE 1/2" DOMESTIC
COLD WATER CONNECTION TO EACH FLOOR DRAIN SERVING THE SECOND
FLOOR. REFER TO SPECIFICATION SECTION 22 13 00.
B C E F G H J K L N PA D M
STAIR
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
CORRIDOR
UPPER PORCH
UPPER PORCH
LOBBY
ELEC
IT
BREAK
CONFERENCE
OFFICE
OPEN OFFICE
OFFICE
MECHANICAL
JANITOR
1/2"ø DCW
3/4"ø DHW 3/4"ø DHWR
1/2"ø DCW
1/2"ø DHW
3/4"ø DHW
1"ø DCW
1"ø DCW
1/2"ø DHW P-413P-413
P-413P-413
P-402
P-201
P-604P-604
P-502
FD-E
FD-C
FD-C
P-103
P-103
P-103
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PP112
SECOND FLOOR PLUMBING PIPING
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
SECOND FLOOR PLUMBING PIPING PLAN
1. DOMESTIC WATER RISERS TO SERVE RESTROOM PLUMBING FIXTURES ON
FIRST AND SECOND FLOORS.
2. DOMESTIC WATER RISERS TO SERVE HAC AND BREAK ROOM PLUMBING
FIXTURES ON FIRST AND SECOND FLOORS.
B C E F G H J K L N PA D M
ELEVATOR EQUIP
CORRIDOR
JANITOR
STORAGE
STORAGE
MECHANICAL
LOBBY
HAC
ELECTRICAL
IT
CONFERENCE /
BREAK
TRAINING
OPEN OFFICE
OFFICE
OFFICE
WOMEN'S RESTROOM
OFFICE
MEN'S RESTROOM
4"ø SS
3" ø S
S 4" ø
S S
2"ø SS
2"ø SS
4" ø
S S
2"ø SS
5"ø SS
1 1/2"ø VENT
2" ø
S S
3"ø SS
P-413P-413 P-413
P-402
P-201
P-604P-604
P-413
FD-E
2"ø SS
FD-C
FD-C
P-502
P-103
P-103P-103 FD-C
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:5
P M
PW110
BASEMENT PLUMBING SANITARY
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
BASEMENT PLUMBING SANITARY PLAN
1. CONNECT NEW SANITARY RISER TO EXISTING BELOW GRADE PIPING.
2. VENT RISER PIPE UP.
3. SANITARY SEWER RISER PIPE UP TO LEVEL 1 AND LEVEL 2.
B C E F G H J K L N PA D M
JANITOR
OPEN OFFICE
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
PORCH
PORCH
ENTRY
LOBBY
ELEC
IT
MECHANICAL
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
1 1/2"ø VENT
2"ø SS
1 1/2"ø VENT P-413P-413
P-413P-413
P-201
FD-C
FD-C
FD-E
3"ø SS
2"ø SS 2"ø SS
1 1/2"ø SS
P-502
P-103P-103
P-103
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:5
P M
PW111
FIRST FLOOR PLUMBING SANITARY
PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
FIRST FLOOR PLUMBING SANITARY PLAN
1. SANITARY SEWER RISER PIPE UP/DOWN.
2. SANITARY SEWER RISER PIPE DOWN.
3. VENT RISER PIPE UP/DOWN.
4. VENT RISER PIPE UP.
B C E F G H J K L N PA D M
STAIR
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
CORRIDOR
UPPER PORCH
UPPER PORCH
LOBBY
ELEC
IT
OFFICE
OPEN OFFICE
OFFICE
MECHANICAL
JANITOR
BREAK
CONFERENCE
2"ø VENT
4"ø VENT
P-413P-413
P-413P-413
P-402
P-201
P-604P-604
2"ø VENT
1 1/2"ø VENT
FD-E
FD-C
FD-C
1 1/2"ø VENT
2"ø VENT
P-502
P-103P-103
P-103
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:5
P M
PW112
SECOND FLOOR PLUMBING
SANITARY PLAN
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
32'16'8'4'2'0'
P la n N o rt h
Tru e N orth
1/8" = 1'-0"
SECOND FLOOR PLUMBING SANITARY PLAN
1. CONNECT NEW VENT RISER UP TO EXISTING VTR.
2. VENT RISER PIPE DOWN TO LEVEL 1.
3. VENT RISER PIPE DOWN TO LEVEL 1 AND BASEMENT.
4. SANITARY SEWER RISER PIPE DOWN TO BOTH LEVEL 1 AND BASEMENT.
5. SANITARY SEWER RISER PIPE DOWN TO LEVEL 1.
H E
A T
E R
A B
O V
E
F
LO
O R
DOMESTIC WATER HEATER
FLOOR
NOTES:
1. SEE PLUMBING DRAWINGS FOR PIPING CONNECTIONS.
2. PROVIDE HOSE CONNECTION TO DRAIN.
D H
W
DHWR
DCW
DRAIN
TEMPERATURE & PRESSURE
RELIEF VALVE BY
MANUFACTURER OF
DOMESTIC WATER HEATER
ROUTE TO NEAREST FLOOR
DRAIN
THERMOMETER
WALL MOUNTED PER
MANUFACTURER'S
RECOMMENDATIONS
3. PROVIDE WATER METER PER DETAIL
5 GALLON
POTABLE WATER
EXPANSION TANK.
AO SMITH PMC-5
OR APPROVED
EQUAL.
NOTES:
1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.
BALL OR
BUTTERFLY
VALVE TYP
BALANCING
DEVICE
PIPE HANGERS - PROVIDE
DOUBLE DEFLECTION
NEOPRENE TYPE HN FOR
FIRST TWO ON EACH SIDE
OF PUMP - SEE NOTE NO 1
FLEXIBLE
CONNECTION
PRESSURE
GAUGE
1/2"
STRAINER
ELEVATION
N.C.80 MECH
STRAINER
SUPPORT
BRACKET
ANCHORED
TO WALL
OR COLUMN
BYPASS
WATER
METER
FLOOR
3' 6"
HW
NOTES:
1. MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED BY
METER MANUFACTURER.
TEFE
TE
SUPPLY
FLOW ELEMENT
INTERFACE
WITH METERING
STATION
BACNET
INTERFACE
OUTLET
TEMPERATURE ELEMENT
<= 5 FEET AFF
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
P-501
PLUMBING DETAILS EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
NTS
CONNECTIONS TO DOMESTIC WATER HEATER
NTS
IN-LINE PUMPS - WATER CONNECTIONS
NTS
WATER METER INSTALLATION
NTS
WATER FLOW MEASURING STATION (WITH BTU METER)
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
P-601
PLUMBING SCHEDULES EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD RDT
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
PLUMBING PUMP SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
TYPE FLUID FLOW (GPM) HEAD (FT)
TEMPERATURE
(°F)
MIN % EFF
NOMINAL
POWER (HP)
PHASE VOLTAGE
SPEED
CONTROL
REMARKS
12-DHWP-01 004 - MECHANICAL BLDG 12
DOMESTIC HOT
WATER
IN-LINE
CIRCULATOR
WATER 3.50 GPM 5 130.0 °F 35 .0125 1 115 VSD
BASIS OF DESIGN ECOCIRC 19-16 OR
APPROVED EQUAL
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION CW CONNECTION HW CONNECTION WASTE CONNECTION VENT CONNECTION REMARKS
FD-C FLOOR DRAIN 1/2" - 3" - PROVIDE CONNECTION TO ELECTRONIC TRAP PRIMER.
FD-E FLOOR DRAIN 1/2" - 3" - PROVIDE CONNECTION TO ELECTRONIC TRAP PRIMER.
P-103 WATER CLOSET - WALL MOUNTED 1" - 3" 2"
P-201 URINAL - SIPHON JET 3/4" - 2" 1 1/2"
P-402 LAVATORY 3/4" 3/4" 1 1/2" 1 1/2"
P-413 LAVATORY 3/4" 3/4" 1 1/2" 1 1/2"
P-502 SERVICE SINK 1/2" 1/2" 3" 1 1/2"
P-604 ELECTRIC WATER COOLER - DUAL HEIGHT 3/4" - 1 1/2" 1 1/2"
P-804 HOSE BIB 1/2" - - -
ELECTRIC WATER HEATER SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
TYPE
RECOVERY
@ 60°F RISE
RELIEF VALVE
SETTING NO OF
ELEMENTS
ELECTRICAL INPUT
REMARKS
GAL/HR PSIG TOTAL kW kW PER
ELEMENT
PHASE VOLTAGE
12-DWH-01 004 - MECHANICAL BLDG 12
DOMESTIC HOT
WATER
INSTANTANEOUS
ELECTRIC
13.33 GPM 70 12 72 6 3 208
TANKLESS INC. CE 72KW OR APPROVED
EQUAL
DOMESTIC WATER METER SCHEDULE
MARK LOCATION
SYSTEM AND/OR
SERVICE
MIN INLET
PRESSURE
NOMINAL
SIZE
REMARKS
12-DWM-1 004 - MECHANICAL
DOMESTIC COLD
WATER
150 PSI 2"ø-2"ø
BASIS OF DESIGN FLOMEC
OM050 OR APPROVED EQUAL
BASEMENT
LEVEL 1
LEVEL 2
ROOF
567'-6"
556'-6"
578'-6"
589'-0"
P-413
P-413
P-413
P-413
P-201
P-103
P-103 P-402
P-413
P-413
P-201
P-103
P-103
P-103
P-413
P-413
P-414P-413
P-413
P-201
P-103
P-103
P-103
P-413
P-413
P-604
P-604
P-502
P-502
P-502
12-DWH-01EXISTING 2"
CONNECTION
P-604
P-604
P-604 P-604
1/2" DCW
2" DCW 2" DCW
3/4" DCW
P-804
2" DCW
3/4" DCW
1" DCW
2" DCW 2" DCW
3/4" DCW 1 1/2"
DCW
1 1/2"
DCW
P-804
1/2" DCW
P-1031/2" DCW
1/2" DCW
2" DCW
2" DCW
1" DCW
3/4" DCW2" DCW3/4" DCW
1" DCW
1" DCW
3/4" DCW
1" DCW
1" DCW
1/2" DCW
TP
CV
3/4"
DCW
1/2"
DCW
TP
CV
3/4"
DCW
BASEMENT
LEVEL 1
LEVEL 2
ROOF
567'-6"
556'-6"
578'-6"
589'-0"
12-DWH-01
12-DHWP-01
P-413
P-413
P-413
P-413 P-414
P-413
P-413
P-413
P-413
P-413
P-413
P-413
P-413
P-414 P-502
P-502
P-502
1/2" DHW 1/2" DHWR
3/4" DHWR3/4" DHW
3/4" DHW
3/4" DHW
1" DHW3/4" DHWR
3/4" DHWR
3/4" DHW3/4" DHWR
3/4" DHWR
1/2" DHWR
1/2" DHW
1/2" DHWR
1/2" DHW
1/2" DHWR
3/4" DHWR
3/4" DHW
3/4" DHW
3/4" DHWR
3/4" DHWR
3/4" DHW
3/4" DHWR
3/4" DHW
1/2" DHW
1/2" DHWR
1/2" DHW
1/2" DHWR
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:4
P M
PP601
PLUMBING PIPING RISER DIAGRAM EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD CK
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
NTS
PLUMBING DOMESTIC COLD WATER RISER DIAGRAM
NTS
PLUMBING DOMESTIC HOT WATER RISER DIAGRAM
BASEMENT
LEVEL 1
LEVEL 2
ROOF
567'-6"
556'-6"
578'-6"
589'-0"
4" VENT
2" SS
P-413P-413 P-604
P-413 P-604
P-413 P-604
P-103P-103P-103
P-201
P-103
P-201
P-103P-103 P-413
P-101
P-201
P-103P-103 P-414
P-502
P-502
P-502FD-E
P-402
5" SS
2" SS 4" SS
4" SS 3" SS 4" SS
1 1/2" VENT
FD-C FD-C
FD-C FD-C
FD-C
FD-C
FD-C FD-C
P-413
1 1/2" VENT
4" SS 4" SS
3" SS
3" SS
1 1/2" VENT2" VENT
2" VENT1 1/2" VENT
2" SS
3" SS2" SS
2" SS
4" SS
2" SS
2" SS
3" SS
1 1/2" SS
2" VENT
2" VENT2" VENT
4" SS
4" SS 2" SS
2" SS
2" SS
4" VENT
FD-C
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR INDIVIDUAL
PIPE CONNECTION SIZES.
00KEYNOTES
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
C :\U se rs
\V al ha lla
E ng in ee r 7 \D oc um en ts
\6
A 4-
-7
_B ld g.
_M ec h_
P lu m _R
_r th or nb ru gh S
6J X
V .rv t 2/
/2
2:
:5
P M
PW601
PLUMBING SANITARY RISER
DIAGRAM
EHRM TRAINING AND ADMIN
SPACE SUPPORT
4800 MEMORIAL DRIVE, WACO, TX 76711
674A4-21-703
02/10/2022 DD CK
100% CONSTRUCTION
DOCUMENTS
VEG 20.15
NTS
PLUMBING SANITARY RISER DIAGRAM