This document includes an electrical site plan and specifications for renovations to the EHRM Training and Admin Space at the Department of Veterans Affairs facility in Waco, Texas. Key work includes demolishing an existing transformer and associated wiring, installing new medium voltage transformers and secondary conductors in a new ductbank, providing new pole-mounted LED area lights, and making building penetrations for power. The solicitation is for construction services to complete this work per the specifications and drawings by August 2022.

View the file

Other files

File Type Posted
36C77622B0045 0002.docx DOCX document
Attachment 2 - 18708 Asbestos Re-inspection Final Report Bldg 12.pdf PDF
36C77622B0045 0001.docx DOCX document
Attachment 3 - Site Visit Sign-In Sheet 36C77622B0045 EHRM Waco.pdf PDF
Attachment 1 - Technical Questions - Waco EHRM Training Admin Support Space.docx DOCX document
Attachment 9 - LAND.pdf PDF
Attachment 14 - Mechanical Catalog Cuts of Equipment_100PCT.pdf PDF
Attachment 11 - ELEC.pdf PDF
Attachment 17 - Wage rates revised 6.17.22 - saved 7.7.22.pdf PDF
36C77622B0045.docx DOCX document
Attachment 4 - CIVIL.pdf PDF
Attachment 18 - VHA Suppl. Contract Rqmnts for Combatting COVID-19 Updated 12-14-2021.pdf PDF
Attachment 5 - COMB_Part1.pdf PDF
Attachment 20 - Site Visit Map Denoting B221 location as Orange color.pdf PDF
Attachment 3 - ARCH.pdf PDF
Attachment 6 - COMB_Part2.pdf PDF
Attachment 19 - Contractor Safety and Environmental Record Evaluation Form.docx DOCX document
Attachment 16 - VA Notice of Limitations on Subcontracting-Certificate of Compliance.docx DOCX document
Attachment 12 - PLUB.pdf PDF
Attachment 8 - GEN.pdf PDF
Attachment 10 - Lighting Manufacturers Information.pdf PDF
Attachment 1 - 674A4-21-703 100PCT SPECIFICATIONS - COMBINED.pdf PDF
Attachment 15 - Mechanical Calculations.pdf PDF
Attachment 13 - MECH.pdf PDF
Attachment 7 - FIRE.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

E

PBA-19,21

PP3

PBA-16,18

PP2

PBA-20,22

PP2

xd/xe xh/xi xf/xg

A. DEMOLISH EXISTING TRANSFORMER CIRCUIT, ON PRIMARY SIDE TO

NEAREST MANHOLE. FIELD VERIFY LOCATION OF NEAREST MANHOLE.

B. REMOVE WIRING, REUSE EXISTING CONDUIT FOR NEW TRANSFORMER

WIRING.

C. REFER TO ELECTRICAL ONE LINE DIAGRAM ON SHEET E-601 FOR

TRANSFORMER DETAILS.

E-410

EXISTING

UNDERGROUND

CONDUCTORS

00KEYNOTES

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Issued:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

C :\U se rs

\V al ha lla

E ng in ee r 7 \D oc um en ts

\6

A 4-

-7

_B ld g.

_E le c_

R

_r th or nb ru gh

S 6J

X V

.rv t

2/

/2

2:

:4

P

M

ES101

ELECTRICAL SITE PLAN EHRM TRAINING AND ADMIN

SPACE SUPPORT

4800 MEMORIAL DRIVE, WACO, TX 76711

674A4-21-703

02/10/2022 RA MLS

100% CONSTRUCTION

DOCUMENTS

VEG 20.15

64'32'16'8'4'0'

P la n N o rt h

Tru e N orth

1/16" = 1'-0"

ELECTRICAL SITE PLAN

1. EXISTING ELECTRICAL MANHOLE F. DISCONNECT EXISTING

TRANSFORMER AND REMOVE PRIMARY SIDE CONDUCTORS BACK TO

EXISTING MANHOLE.

2. REMOVE EXISTING DISCONNECTS AND ASSOCIATED WIRING BACK TO

PANEL. CUT AND CAP CONDUIT AT GRADE.

3. REMOVE EXISTING TRANSFORMER AND TRANSFORMER PAD.

4. THE CONTRACTOR WILL PROVIDE LED AREA LIGHTS MOUNTED ON 30

FOOT POLE WITH CONCRETE BASE AS PER DETAIL 10 ON SHEET E-501.

THE POLE SHALL HAVE THREE ARMS AND THREE LUMINAIRES. THE

LUMINAIRES SHALL MATCH EXISTING POLE MOUNTED LUMINAIRES

LOCATED IN ADJACENT AREAS OR BE SIMILAR WITH THE SAME LUMEN

OUTPUT AND DISTRIBUTION PATTERN. THE POLE MOUNTED LUMINAIRES

SHALL BE POWERED FROM CIRCUIT SHOWN. FURNISH AND INSTALL LIGHT

POLE. REFER TO SPECIFICATION SECTION 01 00 00.

5. THE CONTRACTOR WILL PROVIDE LED AREA LIGHTS MOUNTED ON 30

FOOT POLE WITH CONCRETE BASE AS PER DETAIL 10 ON SHEET E-501.

THE POLE SHALL HAVE TWO ARMS AND TWO LUMINAIRES. THE

LUMINAIRES SHALL MATCH EXISTING POLE MOUNTED LUMINAIRES

LOCATED IN ADJACENT AREAS OR BE SIMILAR WITH THE SAME LUMEN

OUTPUT AND DISTRIBUTION PATTERN. THE POLE MOUNTED LUMINAIRES

SHALL BE POWERED FROM CIRCUITS SHOWN. FURNISH AND INSTALL

LIGHT POLES. REFER TO SITE DEMO ON SHEET ES101 FOR RELATED

WORK. REFER TO SPECIFICATION SECTION 01 00 00.

6. ELECTRICAL CONTRACTOR SHALL PROVIDE MEDIUM VOLTAGE

TRANSFORMER PER SPECIFICATION SECTION 26 12 19. REFER TO SHEET

E-504 AND E-601 FOR MORE INFORMATION.

7. NEW SECONDARY SIDE CONDUCTORS MAIN DISTRIBUTION ELECTRICAL

EQUIPMENT. SEE DETAIL 6 ON SHEET E-501 FOR DUCTBANK DETAILS.

REFER TO FEEDER SCHEDULE ON SHEET E-508 FOR MORE INFORMATION.

COORDINATE WITH CIVIL FOR PHASING ON INSTALLING PORTION OF

SIDEWALK AFTER DUCTBANK IS LAID IN. SCHEDULE INSTALLATION OF

DUCTBANK AND CONDUIT PRIOR TO INSTALL OF SIDEWALK.

8. PROVIDE CONNECTORS FOR TRANSITION OF CONDUIT INTO THE

BUILDING. MAKE PENETRATIONS INTO THE BUILDING AT NOT MORE THAN

12” ABOVE GRADE.

9. PROVIDE JUNCTION BOX ADJACENT TO CONCRETE PAD FOR STAIRWAY.

PROVIDE SURFACE MOUNTED CONDUIT UP ALONG VERTICAL BEAMS OF

STAIRWELL TO PROVIDE POWER FOR LIGHTING CIRCUIT.

10. PROVIDE NEW MEDIUM VOLTAGE CABLES TO MATCH EXISTING, THRU

DUCTBANK AND SPLICE IN MANHOLE TO CABLES PREVIOUSLY FEEDING

BLDG 12. PROVIDE DUCTBANK PER DETAIL 6 ON SHEET E-501 AND PER

SPECIFICATION SECTION 26 05 41.

32'16'8'4'2'0'

P la n N o rt h

Tru e N orth

1/16" = 1'-0"

ELECTRICAL SITE PLAN DEMO

9 9