Attachment 6 671-18-106 PCRA - FOUO _Signed_002.pdf
PDF 443 KB Posted
- Solicitation number
- 36C25726R0040
About this file
This is a Pre-Construction Risk Assessment (PCRA) Permit for a water softener replacement and repair project. The permit is issued for project 671-18-106 at an unspecified federal facility, with a project manager identified as Maria Hernandez (contact: 210-984-0503). The project start date is listed as 08/31/2026, with both completion and permit expiration dates set for 08/31/2026.
The activity is classified as large-scale, requiring comprehensive control measures including excavation safety plans, dust control plans, pollution prevention plans, dig-safe paperwork, and crane lift plans with specifications for crane placement, swing, and load evaluation. Additional mandatory requirements include fall protection and confined entry plans with trained staff, flood prevention and barrier planning for tunnel work during rain season, temporary bracing for structural repairs, and HVAC isolation protocols for the water softener room work area. An Infection Control Risk Assessment (ICRA) is required, with the permit signed and approved by Project Manager Maria Hernandez, Safety Officer Carnell Norris, and Construction Safety Committee Chair Osayande Omomoh as of February 28, 2024. All Activity Hazard Analyses and Control Plans must be made available to workers on-site.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
File details come from the government source that posted it. Updated .