Attachment 3 ALMD - Sprinkler Zone F-1 Basement.pdf

PDF 14 MB Posted

Attached to
Z2DA--FY26 - CON Replace Water Softener System - Project 671-18-106 (VA-26-00000201)
Solicitation number
36C25726R0040
Issued by

About this file

These are architectural and engineering drawings for the VA Medical Center, consisting of sprinkler piping plans and ceiling plans for Phase 5, Zones F-1 and F-2. The documents were prepared by Wilson Fire Protection, Inc. and are dated in the general timeframe of construction documentation.

The first page contains a detailed sprinkler piping plan for Phase 5, Zone F-2, showing the complete layout of piping systems, connection points, and fire protection infrastructure throughout the medical facility. The plan includes multiple detail sections and notes regarding installation specifications, materials, and construction requirements. The second page displays ceiling plans for both Phase 5 zones (F-1 and F-2), illustrating the layout of overhead systems, fixture locations, and coordination between structural and mechanical elements. Both drawings include a key plan indicating the location of the documented areas within the overall facility, standard revision blocks, and professional engineering notation typical of construction documents. These are technical design documents rather than a federal contract solicitation or procurement document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .