This document is a Timber Sale Appraisal for the Milo McIver Fire Salvage Timber Sale #9350 issued by the Oregon Parks and Recreation Department (OPRD). The project area is located in Clackamas County and Eugene City in the state of Oregon.

The appraisal details the timber volumes, grades, and values for the salvage timber, as well as the equipment, labor, and other costs associated with the harvesting, transportation, and post-harvest operations. The total sale value is estimated at $33,309.20, with total logging and project costs of $26,152.25. The minimum bid for the timber sale is $18,958.99. The appraisal also includes line items for road and landing construction/improvement, biomass processing, grass seeding, and other miscellaneous activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

spp./unit grade acres total mbf pond values total value Douglas-fir SM 0 $750.00 -$ Douglas-fir 2S 0 $725.00 -$ Douglas-fir 3S 46 $675.00 31,050.00$ Douglas-fir 4S 0 $550.00 -$ grand fir U 0 $0.00 -$

1.7 46 31,050.00$

MBF/AC 27.06

activity units cost/qty total cost

Feller Buncher ea. 1,200.00$ -$ skidder ea. 1,200.00$ -$ Processor/Harvester ea. 1,200.00$ 1,200.00$ Forwarder ea. 1,200.00$ -$ Yarding Equipment ea. 1,200.00$ -$ stroke boom delimber ea. 1,200.00$ -$ log loader ea. 1,200.00$ 1,200.00$ Dozer (road/landing construction and improvement) ea. 1,200.00$ -$ Excavator (with bucket and thumb/trash rake for clean up) ea. 1,200.00$ -$ Grader ea. 1,200.00$ -$ Industrial Biomass Chipper ea. 1,200.00$ 1,200.00$

Mini-excavator (mastication/road brushing) ea. 600.00$ -$ Back hoe (ditch work) ea. 600.00$ -$ Dump Truck (for end haul as needed) ea. 600.00$ -$ EQUIPMENT WASH ea. 1,000.00$ 2,000.00$

5,600.00$

Milo McIver - 2022 FIRE SALVAGE

PROJECT AREA - TIMBER SALVAGE: VOLUME BY GRADE & VALUE

PROJECT AREA 01 - TIMBER SALVAGE: TIMBER SALE APPRAISAL WORKSHEET

qty

MOVE-IN

LARGE EQUIPMENT MOVE-IN

1.7

SMALL EQUIPMENT MOVE-IN

SUB-TOTAL

OregonBuys Bid# S-63400-00005614 ATTACHMENT 5 Timber Sale Appraisal

Road Brushing ft. 1.25$ -$ Create/Improve Ditchline ft. 1.50$ -$ Road Grade/Shape/Compact ft. 3.00$ -$

Difficult - Steep slopes, heavy blasting, > 20% end haul. sta. 4,750.00$ -$

Moderate - Moderate excavation, < 65% slope, < 20% end haul. sta. 2,025.00$

Simple - No blasting or end haul, moderate slopes. sta. 500.00$ -$ Road Reconstruction - Improve existing road sta. 500.00$ -$ Pioneering only sta. 500.00$ -$

Difficult - Steep slopes, heavy blasting, > 20% end haul. ea. 6,750.00$ -$ Moderate - Minimal excavation, < 65% slope, < 20% end haul, standard 100'X100' landing.

ea. 4,050.00$ -$

Simple - No blasting or end haul, moderate slopes, roadside or 50'X50' landing.

ea. 1,350.00$ -$

Simple Clearing - to create landing location ea. 750.00$ -$ Landing Improvement ea. 750.00$ -$ Turn Around ea. 500.00$ -$

Hand Felling per mbf 36.00$ -$ Limbing/Bucking day 450.00$ -$ Feller Buncher per mbf 50.00$ -$ Skidder per mbf -$ -$ Cable Yarding per mbf -$ -$ Processor/Harvester per mbf 67.00$ 3,015.00$ Forwarder per mbf -$ -$ Stroke Boom Delimber per mbf 50.00$ -$ Log Loader day 750.00$ 3,000.00$ Hauling day 850.00$ 3,400.00$

9,415.00$

0.00 0.00

0.00

LANDING CONSTRUCTION

SUB-TOTAL

HARVEST OPERATIONS

45.00 0.00

0.00

0.00

0.00

SUB-TOTAL

4.00 4.00

0.00

ROAD & LANDING CONSTRUCTION &/OR IMPROVEMENT

ROAD IMPROVEMENT

0.00 0.00 0.00

ROAD CONSTRUCTION

0.00

0.00

0.00 0.00

Skid Trail/Road Rehab. days 500.00$ -$ Landing Rehab. - Simple ea. 250.00$ -$ Landing Rehab. - Moderate ea. 750.00$ -$ Landing Rehab. - Difficult ea. 1,500.00$ -$ Road Rehab. - Difficult sta. 500.00$ -$ Spot Rock (delivered) cy. 32.00$ -$

Total Road Rock cy. 32.00$ -$

Excavator, Pile Slash hr. 150.00$ -$

BIOMASS - Excavator, Loading day 750.00$ 1,500.00$ BIOMASS - Tub Grinding days 2,500.00$ -$ BIOMASS - Trucking days 850.00$ 1,700.00$

CHIPPING - Vertical Chipper, whole tree day 2,500.00$ 5,000.00$ CHIPPING - Labor (2 person) day 250.00$ 500.00$

SLASH BURNING - Mini-excavator hr. 100.00$ -$ SLASH BURNING - Labor (2 person) hr. 100.00$ -$

Hazard Tree Felling 14 trees ea. 50.00$ 700.00$ Equipment (excavator) hr. 150.00$ -$ Laborer hr. 50.00$ -$

Seed lb. 382.50$ Weed Free Straw Bales ea. 150.00$ Labor for Seed/Mulch (1 person)assume 500 ft/day day 125.00$

10,057.50$

2.00 0.00

POST HARVEST OPERATIONS

0.00 0.00

2.00

2.00 2.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00

SUB-TOTAL

GRASS SEEDING

Felling ea. 1.00$ -$ Lop & Scatter day 250.00$ -$ Pile Slash day 500.00$ -$ Skidding day 150.00$ -$ Mastication day 2,000.00$ -$ Pruning hr. 75.00$ -$

Branding & Painting/Scaling mbf 7.00$ 322.00$ Fuel gall 3.50$ 757.75$

1,079.75$

26,152.25$ P&R

0.00% -$

PROJECT AREA 26,152.25$

26,115.94$ 52,268.19$

SALE VALUE 33,309.20$

MINIMUM BID: Timber Value - Total Costs / Total MBF #DIV/0!

OR

18,958.99$

TOTAL - LOGGING AND PROJECT COSTS

TOTAL COST: (if minimum bid is in the negative) = Total Logging and Project Costs - Sale Value

SUB-TOTAL

TOTAL PROFIT OR COSTS

LOGGING & PROJECT COSTS

PROFIT & RISK

SUB-TOTAL

OTHER

NON-MERCHANTABLE TREES