This is a specification summary document for the SSB Building Elevator Modernization project in Colorado. The document outlines the modernization requirements for elevators at the SSB (likely a state office building), detailing the technical specifications and upgrades necessary to bring the elevator systems to current standards. The project encompasses comprehensive modernization of existing elevator equipment, including mechanical and electrical components, control systems, and safety features. The scope specifies equipment upgrades, installation requirements, and compliance with current building codes and elevator safety regulations. Key deliverables include modernized elevator cars, updated hoisting machinery, new control systems, and enhanced safety mechanisms. The specification document establishes the technical baseline and performance standards that bidders must meet in their proposals for the elevator maintenance and modernization services contract.
The specification summary provides detailed technical requirements that serve as the foundation for vendor evaluation and contract award decisions. Prospective bidders must demonstrate capability to meet the specified equipment standards, installation methodologies, and ongoing maintenance commitments outlined in the document. The modernization project represents an investment in upgrading critical building infrastructure to ensure reliable, safe elevator operations and compliance with current regulatory standards. Bidders should carefully review all technical specifications, equipment requirements, and performance standards to ensure their proposed solutions align with the project requirements and can be delivered within the established timeline and budget parameters.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Colorado – State Services Building 1525 Sherman Street Install new Elevator Cab Interiors and Denver, CO 80203 Refurbish Car Door Operators and Hoistway Door Equipment Install New Elevator #4 Rear Hall Push Button Stations with Security Card Readers State of Colorado - Design & Construction Management - Project: 2024-070M23 – Replace Car Door Operators and Hoistway Door Equipment - Renovate Elevator Cabs – Install new Limited Access Hall Push Button Stations and Card Readers on Elevator #4 Rear Openings.
Passenger Elevators 1 – 4 – Scope of Work Summary and Schedule of Equipment (1
Description:
Speed/Capacity 500 FPM @ 3,000 Lbs.
Stops/Openings: Cars 1 & 3: eight (8) front openings (B, 1, 2, 3, 4, 5, 5, 6, 7)
Car 2: nine (9) front openings (SB, B, 1, 2, 3, 4, 5, 6, 7)
Car 4: Freight Elevator: nine (9) front openings (SB, B, 1, 2, 3, 4, 5, 6, 7) nine (9) rear openings (SB-R, B-R, 1-R, 2-R, 3-R, 4-R, 5-R, 6-R, 7-R)
Travel: Approximately 80 feet - Contractor to verify
Operation Four (4) Car Group - GAL - Galaxy
Machine Room:
Gearless Hoist Machine, Bedplate, Deflector Sheave, and Hoist Cables
Retain existing - Otis DC Gearless Hoist Machine
Controller Microprocessor/Computerized Elevator – Modify to accept new Car Door Operators
Power Conversion Retain existing - SCR Motor Drive Unit.
Governors Retain existing - Hollister-Whitney Governors
Hoistway:
Hoistway door equipment Remove the existing Montgomery - MAC Hoistway Door equipment and install new GAL or approved equal hoistway door tracks, hanger rollers, closers, interlocks, pickup rollers, retainers, door gibs, and fire stops.
Hoistway Doors & Entrances
Retain the existing Hoistway Doors and Entrances. Refinish the Main Floor “Bronze” Hoistway Entrances and Hoistway Door panels.
Wiring/Duct As needed, install new traveling cables, hoistway wiring, and machine room wiring.
Car:
Car Door Operator Remove the existing Montgomery MAC Car Door Operator and Header and install a new GAL - MOVFR or approved equal Car Door Operators, Headers, Track, Hanger Rollers, Clutch h, Linkage, Gate Switch, and Door Gibs.
Car Door Panels Install new #4 satin finish “Bronze” Car Door Panels.
State of Colorado – State Services Building 1525 Sherman Street Install new Elevator Cab Interiors and Denver, CO 80203 Refurbish Car Door Operators and Hoistway Door Equipment Install New Elevator #4 Rear Hall Push Button Stations with Security Card Readers State of Colorado - Design & Construction Management - Project: 2024-070M23 – Replace Car Door Operators and Hoistway Door Equipment - Renovate Elevator Cabs – Install new Limited Access Hall Push Button Stations and Card Readers on Elevator #4 Rear Openings.
Door Protection Device Provide new code compliant Janus 3D or approved equal.
Cab: Remove the existing Elevator Cab Panels, Handrails, Ceiling, and Flooring. Refinish the existing “Bronze” Front Return Panels, and Transom. Install new “Snap Cab – ACERO or approved equal (See Sketch # 70959 A - Owner to select final finishes and flooring) Install new #4 satin finish Bronze reveals. Provide new “Bronze” lower side and lower rear panels. (Layer 2) Provide Wilsonart Laminate (Wild Cherry, Matte) side and rear panels. (Layers 3 & 5) Provide new 5wl Bronze (Kelp, Clear) side and rear panels. (Layer 4) Install new Bronze drop ceiling with six (6) new LED illumination. Install new 2-inch “Bronze” rear flat Handrail. Provide new Cab Protective Pads and Pad Hooks. Install new Emer - Strands Porcelain Tile 6"x24" floor tile with base cove for wall to floor transition. Use 1/8" bed and head joints in colored grout to match tile color.
Signal Fixtures
Car Operating Panel Retain the existing Car Operating Panel.
Front Hall PB Station Retain the existing Hall Push Button Stations.
Elevator #4 Rear Hall PB Station
Remove the existing Rear Hall Push Button Stations and install new ADA compliant Rear Hall Push Button Stations with a 3 ½ X 5 inch “Smoked Glass” Security Card Reader cut-out. Security Card Reader to be provided by the Owner.
(1) Summary is just a brief outline to give general scope of work. If a discrepancy exists between the summary and body of the technical specifications, or if an item is not included in the summary, the body of the technical specifications should take precedence.