Attachment_5_Sno-Bird_Estimated_Energy_Usage_Deep_Well_Pumps.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- San Luis NWRC PV System Federal contract opportunity
- Solicitation number
- 140F0322R0003
About this file
This document summarizes a federal contract opportunity issued by the U.S. Fish and Wildlife Service for photovoltaic systems. The agency seeks a firm fixed price design-build construction contract valued between $500,000 and $1,000,000 to install ground-mounted photovoltaic systems at the San Luis National Wildlife Refuge Complex in California. The NAICS code is 237130 and the small business size standard is $39.5 million. This will be a two-phase design-build procurement following FAR procedures 36.3 and 15.101. Phase I proposals are due April 6th and will be evaluated on past experience and performance, with the top five contractors invited to submit Phase II proposals. Phase II proposals will be evaluated on technical approach. The performance period is 365 days and this acquisition is set aside for small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_Performance_Specifications.pdf | ||
| Attachment_1_Design_Build_Project_Scope.pdf | ||
| Sol_140F0322R0003.pdf | ||
| Attachment_3_DB_General_Engineering_Requirements.pdf | ||
| Attachment_7_Other_Solicitation_Documents.pdf | ||
| Attachment_6_Davis-Bacon_Wage_Determination.pdf | ||
| Attachment_4_Water_Pump_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
San Juaquine RR
| Horsepower (HP) | RPMs | Voltage | Amperage | Phase | Power Draw (kW) | Operating Hours (Oct.-Mar.) | Energy Usage (kWh) | Rate Schedule | |
| SNO DW-1 (North) | 0 | 1765 | 480 | 40.4 | 3-phase | 0 | 4368 | - 0 | HAGC |
| SNO DW-3 (East) | 50 | 1780 | 480 | 60 | 3-phase | 37.25 | 4380 | 163,155 | |
| SNO DW-5 (South) | 50 | 1800 | 460 | 63 | 3-phase | 37.25 | 4380 | 163,155 | AG4B |
| Total Energy Usage (kWh) | 326,310 | ||||||||
| Estimated PV System Size | 195.51 | ||||||||
| Total allowable PV size | 215.06 |
| Horsepower (HP) | RPMs | Voltage | Amperage | Phase | Power Draw (kW) | Operating Hours (Oct.-Mar.) | Energy Usage (kWh) | Rate Schedule | |
| NEW P-17 | 30 | 1770 | 460 | 38 | 3-phase | 22.35 | 1952 | 43,627 | |
| EXISTING P-17 | 75 | 1800 | 115 | 69 | 3-phase | 55.875 | 1696 | 94,764 | |
| EXISTING P-17 PG&E data | 154,101 |
| Total Energy Usage (kWh) | 197,728 | |||||
| Estimated PV System Size | 118.47 | |||||
| Total allowable PV size | 130.32 | Total Energy Usage (kWh) | 138,391 | |||
| Estimated PV System Size | 82.92 | |||||
| 345.38 | Total allowable PV size | 91.21 | ||||
| Assumptions | ||||||
| 1 HP to wattage | 745 | 306 | kW | |||
| kWh per kW | 1669 | |||||
| Operating days (Oct to Mar) | 182 | |||||
| SNO DW-1 operations | Pump expected to run 24/7 from October to March |
SNO DW-3 operations Pump expected to run 24/7 for the first 11 days of the season, and then 8 hours per day for the rest of the season
SNO DW-5 operations Pump expected to run 24/7 from October to March
NEW P-17 operations 24/7 for first month, and then 8 hours per day for the rest of the season
OLD P-17 operations 24/7 for first month, and then 8 hours per day for the rest of the season
Energy Usage
| Horsepower (HP) | RPMs | Voltage | Amperage | Phase | Power Draw (kW) | Operating Hours (Oct.-Mar.) | Energy Usage (kWh) | Rate Schedule | |
| SNO DW-1 (North) | 30 | 1765 | 480 | 40.4 | 3-phase | 22.35 | 4368 | 97,625 | HAGC |
| SNO DW-3 (East) | 50 | 1780 | 480 | 60 | 3-phase | 37.25 | 1696 | 63,176 | |
| SNO DW-5 (South) | 50 | 1800 | 460 | 63 | 3-phase | 37.25 | 4368 | 162,708 | AG4B |
| Total Energy Usage (kWh) | 323,509 | ||||||||
| Estimated PV System Size | 193.83 | ||||||||
| Total allowable PV size | 213.22 |
| Horsepower (HP) | RPMs | Voltage | Amperage | Phase | Power Draw (kW) | Operating Hours (Oct.-Mar.) | Energy Usage (kWh) | Rate Schedule | |
| NEW P-17 | 30 | 1770 | 460 | 38 | 3-phase | 22.35 | 1952 | 43,627 | |
| EXISTING P-17 | 75 | 1800 | 115 | 69 | 3-phase | 55.875 | 1696 | 94,764 | |
| EXISTING P-17 PG&E data | 154,101 |
| Total Energy Usage (kWh) | 197,728 | |||||
| Estimated PV System Size | 118.47 | |||||
| Total allowable PV size | 130.32 | Total Energy Usage (kWh) | 138,391 | |||
| Estimated PV System Size | 82.92 | |||||
| 343.54 | Total allowable PV size | 91.21 | ||||
| Assumptions | ||||||
| 1 HP to wattage | 745 | 304 | kW | |||
| kWh per kW | 1669 | |||||
| Operating days (Oct to Mar) | 182 | |||||
| SNO DW-1 operations | Scott expects this pump to run 24/7 from October to March |
SNO DW-3 operations Scott expects this pump to run 24/7 for the first 11 days of the season, and then 8 hours per day for the rest of the season
SNO DW-5 operations Scott expects this pump to run 24/7 from October to March
NEW P-17 operations 24/7 for first month, and then 8 hours per day for the rest of the season
OLD P-17 operations 24/7 for first month, and then 8 hours per day for the rest of the season
PG&E Rates
| AG-4B | HAG-C | AG-4B | https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_AG-4.pdf | |||||
| Customer Charge ($ per meter per day) | $ 0.760 | Customer Charge | $ 1.430 | |||||
| TOU Meter Charge ($ per meter per day) | $ 0.197 | HAG-C | https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_AG.pdf | |||||
| Demand Charges ($/kW) | Secondary Voltate | Maximum Peak Demand Summer | $ 18.570 | |||||
| Demand Charges ($/kW) | Maximum Demand Summer | $ 10.630 | Maximum Demand Summer | $ 11.950 | ||||
| Maximum Demand Winter | $ 7.890 | Maximum Demand Winter | $ 11.950 | Who pays for SNO DW-3? | ||||
| Maximum Peak Demand Summer | $ 4.260 | |||||||
| Primary Voltage Discount Summer | $ 1.130 | Primary Voltage | Maximum Peak Demand Summer | $ 18.570 | ||||
| Primary Voltage Discount Winter | Maximum Demand Summer | $ 10.700 | ||||||
| Maximum Demand Winter | $ 10.700 | |||||||
| Energy Charges ($/kWh) | Peak Summer | $ 0.259 | ||||||
| Off-Peak Summer | $ 0.192 | Trans. Voltage | Maximum Peak Demand Summer | $ 18.570 | ||||
| Part-Peak Winter | $ 0.181 | Maximum Demand Summer | $ 3.090 | |||||
| Off-Peak Winter | $ 0.180 | Maximum Demand Winter | $ 3.090 |
| Energy Charges ($/kWh) | Peak Summer | $ 0.177 |
| Off-Peak Summer | $ 0.138 | |
| Peak Winter | $ 0.149 | |
| Off-Peak Winter | $ 0.124 | |
| Demand Charge Rate Limiter | $ 0.500 |
https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_AG.pdfhttps://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_AG-4.pdf
File details come from the government source that posted it. Updated .