Attachment_4_Water_Pump_Specs.pdf

PDF 2 MB Posted

Attached to
San Luis NWRC PV System Federal contract opportunity
Solicitation number
140F0322R0003
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document contains a federal contract opportunity for the design and installation of ground-mounted photovoltaic systems. The U.S. Fish and Wildlife Service is seeking a firm-fixed price design-build contract valued between $500,000 and $1,000,000 to install photovoltaic systems at the San Luis National Wildlife Refuge Complex in California. The solicitation is set aside for small businesses with a size standard of $39.5 million. A two-phase selection process will be used, with Phase I proposals due on April 6th, 2022 and focusing on past experience and performance. Phase II will evaluate technical approach, and invitations will be extended to no more than five contractors. The contract period is 365 days. Interested parties must register in the System for Award Management, and the acquisition is a total small business set-aside.

View the file

Other files for this federal contract opportunity

Other files attached to San Luis NWRC PV System, newest first.
File Type Posted
Attachment_1_Design_Build_Project_Scope.pdf PDF
Attachment_5_Sno-Bird_Estimated_Energy_Usage_Deep_Well_Pumps.xlsx XLSX spreadsheet
Attachment_2_Performance_Specifications.pdf PDF
Attachment_3_DB_General_Engineering_Requirements.pdf PDF
Attachment_7_Other_Solicitation_Documents.pdf PDF
Attachment_6_Davis-Bacon_Wage_Determination.pdf PDF
Sol_140F0322R0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.00

CATALOG NUMBER: HO30V2BLF NAMEPLATE PART #: 422707-005

MODEL BF39 FR 286TPA TYPE AUI ENCL WPI

PH

INSUL

CLASS

SHAFT

END BRG

MAX

AMB

Asm.

Pos.

ID#

OPP

END BRG

DUTY

HP

VOLTS

FL

AMPS

SF

AMPS

SF

DESIGN

CODE

HP RPM

VOLTS

FL

AMPS

SF

AMPS

SF DESIGN CODE

NEMA NOM

EFFICIENCY

GUARANTEED

EFFICIENCY

NOM

PF

MAX

KVAR

KiloWatt

HZ

NEMA NOM

EFFICIENCY

GUARANTEED

EFFICIENCY

NOM

PF

MAX HZ

KVAR

UL DATA (IF APPLICABLE):

DIVISION CLASS I GROUP I

TEMP CODE CLASS II GROUP II

VFD DATA (IF APPLICABLE):

VOLTS

AMPS 38 76

TORQUE 1 89 TORQUE 2

VFD LOAD TYPE 1 VTQ VFD LOAD TYPE 2

VFD HERTZ RANGE 1 6-60 VFD HERTZ RANGE 2

VFD SPEED RANGE 1 180-1800 VFD SPEED RANGE 2

SERVICE FACTOR FL SLIP

NO. POLES MAGNETIZING AMPS

VECTOR MAX RPM Encoder PPR Radians / Seconds Encoder Volts

TEAO DATA (IF APPLICABLE):

HP (AIR OVER) HP (AIR OVER

M/S)

RPM (AIR

OVER)

RPM (AIR

OVER M/S)

FPM AIR

VELOCITY

FPM AIR

VELOCITY M/S

FPM AIR

VELOCITY SEC

7310 BEP 6210-2Z-J/C3

3 40 C

F

CONT

30 RPM

460 230

36 72

1.15 B G

92.4 84.5

7/28/2021 Berkeley Lab (Univ of California) Mail - How much is our PV saving us?

https://mail.google.com/mail/u/0?ik=362dca3f5c&view=pt&search=all&permmsgid=msg-f%3A1706547622728680159&simpl=msg-f%3A17065476227… 1/1

Kevin Watson <kjwatson@lbl.gov>

How much is our PV saving us?

Capra, Scott P <scott_capra@fws.gov> Wed, Jul 28, 2021 at 9:43 AM To: Kevin Watson <kjwatson@lbl.gov> Cc: "Forrest, Kim" <kim_forrest@fws.gov>, Billie Holecek <bmholecek@lbl.gov>, Gerald Robinson <gtrobinson@lbl.gov>

Kevin, I a�ached the pump usage for SNO DW-3 that is paid by our cooperator. If you need more data, I can ask him about accessing his account. The addi�onal documents include pump test reports that have pump specifica�ons for SNO DW 1 and 3. I can't find any documents regarding SNO DW - 5. I did get the specifica�ons from the pump itself ( 50 HP, 1800 RPM, 460 volts, 63 amps, and 3 phase).

Let me know if you need addi�onal informa�on and I'll see what I can put together.

Thanks, Sco� Capra Assistant Refuge Manager Merced Na�onal Wildlife Refuge Office: (209) 826-3508, ext. 125 Cell: (209) 587-5530

DOI Region 10 - California/ Great Basin https://www.facebook.com/SanLuisNWRC/

From: Kevin Watson <kjwatson@lbl.gov> Sent: Wednesday, July 28, 2021 8:54 AM To: Capra, Sco� P <scott_capra@fws.gov> Cc: Forrest, Kim <kim_forrest@fws.gov>; Billie Holecek <bmholecek@lbl.gov>; Gerald Robinson <gtrobinson@lbl.gov> [Quoted text hidden]

[Quoted text hidden]

3 attachments

SNO DW 3 PG E.pdf 188K

SNO DW 1 Pump Test.pdf 317K

SNO DW 3 Pump Test.pdf 590K https://www.facebook.com/SanLuisNWRC/ mailto:kjwatson@lbl.gov mailto:scott_capra@fws.gov mailto:kim_forrest@fws.gov mailto:bmholecek@lbl.gov mailto:gtrobinson@lbl.gov https://mail.google.com/mail/u/0?ui=2&ik=362dca3f5c&view=att&th=17aee0056d07c2df&attid=0.1&disp=attd&safe=1&zw https://mail.google.com/mail/u/0?ui=2&ik=362dca3f5c&view=att&th=17aee0056d07c2df&attid=0.2&disp=attd&safe=1&zw https://mail.google.com/mail/u/0?ui=2&ik=362dca3f5c&view=att&th=17aee0056d07c2df&attid=0.3&disp=attd&safe=1&zw

NEW P17 well
UL DATA (IF APPLICABLE):
VFD DATA (IF APPLICABLE):
TEAO DATA (IF APPLICABLE):
P17 Well Information
p17 Well Information
SNO DW 1 Pump Test
SNO DW 3 Pump Test
SNO DW 5 Pump Test

File details come from the government source that posted it. Updated .