Attachment_4_Water_Pump_Specs.pdf
PDF 2 MB Posted
- Attached to
- San Luis NWRC PV System Federal contract opportunity
- Solicitation number
- 140F0322R0003
About this file
This document contains a federal contract opportunity for the design and installation of ground-mounted photovoltaic systems. The U.S. Fish and Wildlife Service is seeking a firm-fixed price design-build contract valued between $500,000 and $1,000,000 to install photovoltaic systems at the San Luis National Wildlife Refuge Complex in California. The solicitation is set aside for small businesses with a size standard of $39.5 million. A two-phase selection process will be used, with Phase I proposals due on April 6th, 2022 and focusing on past experience and performance. Phase II will evaluate technical approach, and invitations will be extended to no more than five contractors. The contract period is 365 days. Interested parties must register in the System for Award Management, and the acquisition is a total small business set-aside.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_Design_Build_Project_Scope.pdf | ||
| Attachment_5_Sno-Bird_Estimated_Energy_Usage_Deep_Well_Pumps.xlsx | XLSX spreadsheet | |
| Attachment_2_Performance_Specifications.pdf | ||
| Attachment_3_DB_General_Engineering_Requirements.pdf | ||
| Attachment_7_Other_Solicitation_Documents.pdf | ||
| Attachment_6_Davis-Bacon_Wage_Determination.pdf | ||
| Sol_140F0322R0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.00
CATALOG NUMBER: HO30V2BLF NAMEPLATE PART #: 422707-005
MODEL BF39 FR 286TPA TYPE AUI ENCL WPI
PH
INSUL
CLASS
SHAFT
END BRG
MAX
AMB
Asm.
Pos.
ID#
OPP
END BRG
DUTY
HP
VOLTS
FL
AMPS
SF
AMPS
SF
DESIGN
CODE
HP RPM
VOLTS
FL
AMPS
SF
AMPS
SF DESIGN CODE
NEMA NOM
EFFICIENCY
GUARANTEED
EFFICIENCY
NOM
PF
MAX
KVAR
KiloWatt
HZ
NEMA NOM
EFFICIENCY
GUARANTEED
EFFICIENCY
NOM
PF
MAX HZ
KVAR
UL DATA (IF APPLICABLE):
DIVISION CLASS I GROUP I
TEMP CODE CLASS II GROUP II
VFD DATA (IF APPLICABLE):
VOLTS
AMPS 38 76
TORQUE 1 89 TORQUE 2
VFD LOAD TYPE 1 VTQ VFD LOAD TYPE 2
VFD HERTZ RANGE 1 6-60 VFD HERTZ RANGE 2
VFD SPEED RANGE 1 180-1800 VFD SPEED RANGE 2
SERVICE FACTOR FL SLIP
NO. POLES MAGNETIZING AMPS
VECTOR MAX RPM Encoder PPR Radians / Seconds Encoder Volts
TEAO DATA (IF APPLICABLE):
HP (AIR OVER) HP (AIR OVER
M/S)
RPM (AIR
OVER)
RPM (AIR
OVER M/S)
FPM AIR
VELOCITY
FPM AIR
VELOCITY M/S
FPM AIR
VELOCITY SEC
7310 BEP 6210-2Z-J/C3
3 40 C
F
CONT
30 RPM
460 230
36 72
1.15 B G
92.4 84.5
7/28/2021 Berkeley Lab (Univ of California) Mail - How much is our PV saving us?
https://mail.google.com/mail/u/0?ik=362dca3f5c&view=pt&search=all&permmsgid=msg-f%3A1706547622728680159&simpl=msg-f%3A17065476227… 1/1
Kevin Watson <kjwatson@lbl.gov>
How much is our PV saving us?
Capra, Scott P <scott_capra@fws.gov> Wed, Jul 28, 2021 at 9:43 AM To: Kevin Watson <kjwatson@lbl.gov> Cc: "Forrest, Kim" <kim_forrest@fws.gov>, Billie Holecek <bmholecek@lbl.gov>, Gerald Robinson <gtrobinson@lbl.gov>
Kevin, I a�ached the pump usage for SNO DW-3 that is paid by our cooperator. If you need more data, I can ask him about accessing his account. The addi�onal documents include pump test reports that have pump specifica�ons for SNO DW 1 and 3. I can't find any documents regarding SNO DW - 5. I did get the specifica�ons from the pump itself ( 50 HP, 1800 RPM, 460 volts, 63 amps, and 3 phase).
Let me know if you need addi�onal informa�on and I'll see what I can put together.
Thanks, Sco� Capra Assistant Refuge Manager Merced Na�onal Wildlife Refuge Office: (209) 826-3508, ext. 125 Cell: (209) 587-5530
DOI Region 10 - California/ Great Basin https://www.facebook.com/SanLuisNWRC/
From: Kevin Watson <kjwatson@lbl.gov> Sent: Wednesday, July 28, 2021 8:54 AM To: Capra, Sco� P <scott_capra@fws.gov> Cc: Forrest, Kim <kim_forrest@fws.gov>; Billie Holecek <bmholecek@lbl.gov>; Gerald Robinson <gtrobinson@lbl.gov> [Quoted text hidden]
[Quoted text hidden]
3 attachments
SNO DW 3 PG E.pdf 188K
SNO DW 1 Pump Test.pdf 317K
SNO DW 3 Pump Test.pdf 590K https://www.facebook.com/SanLuisNWRC/ mailto:kjwatson@lbl.gov mailto:scott_capra@fws.gov mailto:kim_forrest@fws.gov mailto:bmholecek@lbl.gov mailto:gtrobinson@lbl.gov https://mail.google.com/mail/u/0?ui=2&ik=362dca3f5c&view=att&th=17aee0056d07c2df&attid=0.1&disp=attd&safe=1&zw https://mail.google.com/mail/u/0?ui=2&ik=362dca3f5c&view=att&th=17aee0056d07c2df&attid=0.2&disp=attd&safe=1&zw https://mail.google.com/mail/u/0?ui=2&ik=362dca3f5c&view=att&th=17aee0056d07c2df&attid=0.3&disp=attd&safe=1&zw
| NEW P17 well |
| UL DATA (IF APPLICABLE): |
| VFD DATA (IF APPLICABLE): |
| TEAO DATA (IF APPLICABLE): |
| P17 Well Information |
| p17 Well Information |
| SNO DW 1 Pump Test |
| SNO DW 3 Pump Test |
| SNO DW 5 Pump Test |
File details come from the government source that posted it. Updated .