Attachment_5_Schedule_of_Work_Items.docx

DOCX document 37 KB Posted

Attached to
HAULOUT OF THE R/V STURGEON
Solicitation number
140G0226R0020
Issued by

About this file

This is a Schedule of Pricing document for the maintenance and repair of the Research Vessel STURGEON haulout project. The document outlines a comprehensive scope of work organized by specification sections, including hauling and blocking, hull cleaning and coating, underwater inspections, propulsion system maintenance, bow thruster and rudder inspections, anchor windlass testing, tank cleaning, crane servicing, and engine room cleaning. Several items are designated as optional, including painting of engine and generator room bilges, installation of motorized louvers on intake and exhaust air systems, and main engine overhaul. The pricing structure is based on fully-loaded labor rates for shipyard labor and crane/forklift operations, with separate material and subcontractor markups applied to change orders if necessary.

The contractor's labor rates are defined as direct production man-hours at the journeyman level for skilled trades including welding, machining, electrical work, pipefitting, diesel mechanics, nondestructive testing, and marine-related specializations. Project management and engineering support functions are incorporated into the fully-loaded rate for direct production man-hours and include planning, quality assurance, testing, engineering design, and lofting activities. The document specifies that pricing proposals shall include only direct production labor costs, with no separate charges for supervisory, project management, or engineering functions. This Schedule of Pricing serves as the basis for negotiating the firm-fixed price contract award and any potential change orders throughout the performance period of November 10, 2026, through April 15, 2027.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 10, 2014, Rev 3 Schedule of Pricing Maintenance and Repair of Research Vessel STURGEON

OPTION

SPEC. REF.

WORK ITEM
PRICE
4.1
Hauling, Blocking and Launching
6.1
Hull High Pressure Wash and Visual Inspection
6.2
Underwater Hull Coating
6.3
ABS Survey - Load Line
6.4
Clean and Inspect All Tanks and Voids
7.1
Inspect Propulsion Shafts and Propeller in Place
7.2
Inspect, Clean, and Refurbish Propellers
7.3
Remove Propulsion Shafts and Inspect
7.4
Bow Thruster Inspection and Maintenance
7.5
Inspect Rudders
8.1
Inspect & Test Anchor Windlass
8.2
Repair Port Wing Tank Vent
8.3
OPTION: Paint Engine Room & Generator Room Bilges
8.4
OPTION: Install Motorized Louvers on Intake & Exhaust Air
8.5
Flush Water Tank Coating Repairs
8.6
Install Marport Hydrophones in Stern Pockets
8.7
Service Crane Cylinders & Load Test Crane
8.8
OPTION: Main Engine Overhaul
8.9
Clean Ship

TOTAL

LABOR RATES

Shipyard Labor
$/hr
Crane/forklift
$/hr
Material Markup
%
Subcontractor Markup
%

Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:

140G0122C0001 Attachment D Schedule of Pricing

Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing

Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:

Planning Quality Assurance Testing Engineering Design Lofting

G14PS00428
Attachment D Schedule of Pricing

Amendment 0002