Attachment 5 - Sample_Inspection.doc
DOC document 156 KB Posted
- Solicitation number
- 1284LM26Q0059
- Issued by
-
Department of Agriculture Forest Service
About this file
This file is a sample planting inspection sheet and explanatory notes used for evaluating tree planting work quality on federal forestry contracts. The inspection sheet document demonstrates the Forest Service's standardized methodology for assessing contractor performance on tree planting projects, specifically detailing how inspectors evaluate both above-ground and below-ground tree conditions across multiple sample plots.
The inspection sheet format requires contractors and inspectors to record detailed information for each plot, including the number of planted trees, plantable and unplantable spots, spacing violations, and quality defects such as inadequate scalping, shade violations, firmness problems, depth issues, and root trimming. The document establishes acceptance criteria requiring 93% quality compliance and provides a specific calculation methodology: (satisfactory trees dug × number of trees above ground ÷ plantable spots) × 100. The sample inspection shown covers 10 plots totaling 60 plantable spots with 64 trees planted, resulting in a final quality score of 90.235%—below the required 93% threshold. Contractors failing to meet quality standards receive financial penalties (10% of bid price in this example) plus charges for wasted trees. The explanatory notes analyze each of the 10 sample plots, detailing specific violations encountered (such as air pockets, rotten wood, improper spacing, and shade deficiencies) and explaining how those defects are recorded and calculated into the final quality percentage. This template is used by the USDA Forest Service to standardize inspection procedures and establish consistent quality expectations across forestry contracting work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30 AMD 0001.pdf | ||
| Attachment 2 - Detailed Information Chart AMD 0001.docx | DOCX document | |
| Attachment 6 - Project Maps AMD 0001.pdf | ||
| LMIR BPA Call Order Form AMD 0001.doc | DOC document | |
| LMIR BPA Call Order Form 1284LM26Q0059.doc | DOC document | |
| Attachment 3 - FSH2409.17.doc | DOC document | |
| Attachment 2 - Detailed Information Chart.docx | DOCX document | |
| Attachment 7 - Wage Determinations.pdf | ||
| Attachment 1 - Supplemental Contract Information.docx | DOCX document | |
| Attachment 4 - Planting Inspection Sheet.doc | DOC document | |
| Attachment 6 - Project Maps.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: AG-xxxx-S-16-xxxx
Exhibit 5
SAMPLE PLANTING INSPECTION SHEET AND EXPLANATORY NOTES
PLANTING INSPECTION SHEET – CONTRACT AND FORCE ACCOUNT (FSH 2409.17)
FOREST
Kootenai
DISTRICT
Cascade
INSPECTOR
R. Needles
CONTRACT NUMBER
R1-00020-03
COR
P. Greenup
PLOT
SIZE 1/50th ac
| STAND NUMBER 20003001 |
| CONTRACTOR |
TreesRUs, Inc
SUB ITEM
NUMBER 3.1
ACRES
AVERAGE
SPACING 12x12
MAX TREES/
PLOT 7
| SHEET |
NUMBER 1 OF 1
| DATE |
| Plot No. * |
| (2) |
| (3) |
| (4) |
| (5) |
| (6) |
| (7) |
| (8) |
| (9) |
| (10) |
| (11) |
| Remarks |
| Examine & Tally Planted Trees |
| Desired No. of Plantable Spots |
| No. Unplantable Spots |
| Actual No. Plantable Spots |
| Maximum No. Allowable Trees |
| No. Planted |
Trees
| No. Wasted Trees |
| No. Trees Statis. AboveGround |
| No. Trees Dug |
| No.Trees Statis. Below Ground |
| (1) |
| (2) |
| (3) |
| (4) |
| (5) |
| (6) |
| (7) |
| (8) |
| (9) |
| (10) |
| (11) |
| 5/1 |
| 1 |
| C |
| √ |
| √ |
| √ |
| √ |
| √ |
| 6 |
| 0 |
| 6 |
| 7 |
| 6 |
| 0 |
| 5 |
Small scalp
| 2 |
| 2 |
| 2 |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| 6 |
| 1 |
| 5 |
| 6 |
| 7 |
| 1 |
| 6 |
M
| 2 |
| 1 |
| Rotten wood in hole |
| 3 |
| √ |
| X |
| √ |
| √ |
| √ |
| 6 |
| 0 |
| 6 |
| 7 |
| 5 |
| 0 |
| 4 |
Did not shade by stump
| √ |
| √ |
| 2 |
| 2 |
| 4 |
| √ |
| √ |
| √ |
| √ |
| √ |
| S |
| √ |
| 6 |
| 2 |
| 4 |
| 5 |
| 7 |
| 2 |
| 5 |
Seedlings too close
| √ |
| √ |
| 2 |
| 2 |
| 5 |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| 6 |
| 0 |
| 6 |
| 7 |
| 7 |
| 0 |
| 7 |
F
| 3 |
| 2 |
| Air pocket |
| 6 |
| √ |
| √ |
| X |
| √ |
| √ |
| D |
| 6 |
| 0 |
| 6 |
| 7 |
| 6 |
| 0 |
| 4 |
No shade; shallow planted tree
| 2 |
| 2 |
| 7 |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| 6 |
| 0 |
| 6 |
| 7 |
| 7 |
| 0 |
| 7 |
| 3 |
| 3 |
| 8 |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| 6 |
| 1 |
| 5 |
| 6 |
| 7 |
| 1 |
| 6 |
| 2 |
| 2 |
| 9 |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| √ |
| 6 |
| 0 |
| 6 |
| 7 |
| 8 |
| 1 |
| 7 |
| L |
| √ |
| 3 |
| 2 |
| Roots were trimmed |
| 10 |
| √ |
| √ |
| √ |
| √ |
| 6 |
| 3 |
| 3 |
| 4 |
| 4 |
| 0 |
| 4 |
Acceptable established trees on plot
| 2 |
| 2 |
*First line for above ground.
Second line for below ground.
| TOTALS |
| 60 |
| 7 |
| 53 |
| 63 |
| 64 |
| 5 |
| 55 |
| 23 |
| 20 |
| FINAL % = 90% |
Calculation: Col 9 x Col. 11 x 100 = 55 x 20 x 100 = 90.235 Wasted trees on plots = 5
Col. 5 Col. 10 53 23
Submitted by Rob Needles, Inspector. 5/2/2003 All information is correct and complete.
Exhibit 5 (Continued)
SAMPLE PLANTING INSPECTION AND EXPLANATORY NOTES
Note that the Contractor filled out the Inspection Sheet header completely. The Forest, District, Contract Number, COR, Stand Number, Subitem, Acres, and Avg. spacing are information provided by the Government either directly or within the contract.
The Contractor provided the name of the (Contractor) Inspector, plot size, max trees/plot (based on contract tables), sheet number, and calculated the final quality. The Contractor assured that all columns and math were correctly done. The Contractor’s inspector signed and dated the inspection records and certified that the information was correct and accurate.
Based on the sample Inspection Sheet, the plot information was completed based on these observations:
Plot 1: Six trees were planted on the plot. The first tree did not have the required scalp width and received a C for scalping/clearing violation. Other trees were satisfactory above ground. There were no voids on the plot greater than 144 sq feet (12 x 12 spacing), so –0- unplantable spots are recorded. The inspector dug two trees, which is the minimum number based on 5 satisfactory trees in the above ground inspection. Both were properly planted.
Plot 2: There were seven planted trees on the plot, all satisfactory above ground. The inspector found a void on the plot with no trees that was larger than 144 sq. ft. The inspector checked for plantability and it unplantable. One unplantable spot was recorded. This caused one wasted tree in column 8. Note that the satisfactory trees recorded in column 9 is six (not seven- cannot exceed the maximum allowable trees, col. 6). In the below ground inspection, a piece of rotten wood was found in the hole, which is a foreign material violation (F).
Plot 3: There were five planted trees. One tree was not planted by a stump, which was a shade violation (X) since the contract required that all trees be planted by stationary shade when it is available. There were no voids on the plot of 144 sq, ft that were unplantable. The two sample trees that were dug were satisfactorily planted based on below ground requirements.
Plot 4: There were seven planted trees. Two trees were planted five feet apart (minimum spacing was 50% of 12 feet or 6 ft). A spacing violation (S) is recorded for one of the trees. The other trees were satisfactory. The inspector found two voids on the plot that were unplantable, each at least 144 sq ft (approximate square or circle), and recorded –2- unplantable spot in column 4. Based on only four planting spots, the maximum allowable trees is five. Since seven trees were planted, two trees are wasted. Only five trees are recorded in column 9. Two trees were dug and both were properly planted.
Plot 5: Seven trees were planted and all were satisfactorily planted above ground. There were no unplantable voids equal to 144 sq. ft. The below ground inspection revealed an air pocket in the lower part of the hole which is a Firmness violation (F).
Plot 6: There were six trees planted. One tree was not shaded which is a shade violation (X) since the contract required shade when it was available. Another tree was planted high with the root collar above the ground surface so a depth violation (D) was recorded. Four trees are identified as satisfactory. Based on this, two trees were dug from the four that were satisfactory above ground; and found to be planted properly.
Plot 7: There were seven trees planted all of which were satisfactory. No unplantable voids existed. Three trees were dug based on seven satisfactory trees; they were satisfactory.
Plot 8: Seven trees were planted all of which were satisfactory. Although they tended to be closer than 12 feet apart, they were not closer than 6 feet apart, so no violation occurred. There was a void on the plot about 14x14 in size with no trees, and was found to be unplantable after the inspector checked for plantability. One unplantable spot was noted. Since seven trees were planted but the maximum number of allowable trees is six (due to one unplantable spot), there is one wasted tree in column 8. Only six trees count as satisfactorily planted above ground (cannot exceed col. 6), thus two trees were dug and were satisfactory.
Exhibit 5 (Continued) Plot 9: Eight trees were planted. They tended to be closer than 12 feet apart but were not closer than 6 feet, thus no violation. There were no unplantable voids on the plot. The maximum allowable trees is seven, thus one wasted tree is recorded in col. 8. Three trees were dug based on seven satisfactory planted trees (cannot exceed col. 6).
The roots on one of the trees had been stripped either during planting or before planting. (if before planting, the planter should not have planted the tree) resulting in a violation for altered root length (L).
Plot 10: Four trees were planted, and each was satisfactorily planted. Almost half of the plot could not be planted because there were small trees that met the requirements for acceptable established trees. This accounted for about three areas of 12x12 feet in size that were taken up with the residuals accounting for three unplantable spots. Two trees were dug and found to be satisfactory.
Following the inspection, all numbers were checked and totaled. The final quality is calculated based on the equation provided on the backside of the inspection sheet.
Evaluation: It should be noted that as a final inspection, the Contractor failed to meet the required 93% quality for acceptable work. He would receive –10% of the bid price for this unit or pay item depending on how the contract is written. Although the Contractor over-planted, it helped to compensate for the above ground errors. It was the below ground errors that caused work to be unacceptable.
The over-plant also resulted in 5 wasted trees on the plots, which computes to 25 trees per acre that are excess. The Contractor should be assessed the wasted tree charges.
File details come from the government source that posted it. Updated .