The file's text, extracted by GovTribe without its formatting.
Attachment 002, Page 13 of 13 2026 GMUG Tree Planting Gunnison RD, GMUG NF
Attachment 002
Tree Planting – DETAILED INFORMATION CHART
Item 1 – Taylor Park Area
| Sub-item or Planting Unit |
| 1-1 |
| 1-2 |
| 1-3 |
| 1-4 |
| FACTS ID |
| 100322-009 |
| 950601TAFW-001 |
| 950601TAFW-002 |
| 950601TAFW-003 |
| Unit Name |
| Forest Hill Tailings |
| Taylor Firewood Unit 1 |
| Taylor Firewood Unit 2 |
| Taylor Firewood Unit 3 |
| FACTS Acres |
| 9 |
| 3.3 |
| 0.4 |
| 2.7 |
| Net Planting Acres |
| 9 |
| 3.3 |
| 0.4 |
| 2.7 |
| Portion Net Planting Acres With Plantable Spots |
| 1.00 |
| 0.50 |
| 0.90 |
| 0.95 |
| Desired TPA |
| 302 |
| 538 |
| 538 |
| 680 |
| Estimated Number of Trees Needed |
| 2,700 |
| 900 |
| 200 |
| 1,700 |
| Average Spacing 4.8 |
| 12’x 12’ |
| 9’x 9’ |
| 9’x 9’ |
| 8’x 8’ |
| Seed Lot 4.11 |
| PICO-486-098-09 |
| PICO-486-098-08 |
| PICO-486-098-08 |
| PICO-486-098-08 |
| Boundary Marking - See Project Map 3 |
| Blue Flagging. |
| Obvious Edge. |
| Obvious Edge to Park Edge. |
| Obvious Edge to Park Edge. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Tree Shelter Type 4.13 |
| None |
Tree Shade Cards
Tree Shade Cards
| Average Slope |
| 7% |
| 7% |
| 7% |
| 7% |
| Average Elevation |
| 9,800’ |
| 9,800’ |
| 9,800’ |
| 9,800’ |
| Direct Vehicle Access1 |
| Yes |
| No |
| Yes |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 300 feet |
| 770 feet |
| 140 feet |
| 130 feet |
| Delivery Point(s) |
| Along FR 748. |
| End logging spur off FR 209.1G. |
| End logging spur off FR 209.1G. |
| FR 209.1G and logging spur. |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
1Vehicle Access 4.1.1. All roads may be impassible when wet or snow covered.
Item 1 – Taylor Park Area
| Sub-item or Planting Unit |
| 1-5 |
| 1-6 |
| 1-7 |
| 1-8 |
| FACTS ID |
| 950601TAFW-004 |
| 950601TAFW-P05 |
| 950601TAFW-006 |
| 950601TAFW-007 |
| Unit Name |
| Taylor Firewood Unit 4 |
| Taylor Firewood Unit 5 |
| Taylor Firewood Unit 6 |
| Taylor Firewood Unit 7 |
| FACTS Acres |
| 10.6 |
| 7.8 |
| 4.4 |
| 8.3 |
| Net Planting Acres |
| 10.6 |
| 7.8 |
| 4.4 |
| 8.3 |
| Portion Net Planting Acres With Plantable Spots |
| 0.90 |
| 0.95 |
| 0.80 |
| 0.80 |
| Desired TPA |
| 680 |
| 680 |
| 538 |
| 538 |
| Estimated Number of Trees Needed |
| 6,500 |
| 5,000 |
| 1,900 |
| 3,600 |
| Average Spacing 4.8 |
| 8’x 8’ |
| 8’x 8’ |
| 9’x 9’ |
| 9’x 9’ |
| Seed Lot 4.11 |
| PICO-486-098-09 |
| PICO-486-098-09 |
| PICO-486-100-15 |
| PICO-486-100-15 |
| Boundary Marking - See Project Map 4 |
| Obvious Edge to Park Edge. |
| Obvious Edge to Park Edge. |
| Obvious Edges. |
Obvious Edges.
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
Tree Shade Cards Tree Shade Cards
| Average Slope |
| 7% |
| 7% |
| 7% |
| 4% |
| Average Elevation |
| 9,800’ |
| 9,800’ |
| 10,000’ |
| 10,000’ |
| Direct Vehicle Access1 |
| Yes |
| No |
| Yes |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 470 feet |
| 480 feet |
| 990 feet |
| 790 feet |
| Delivery Point(s) |
| Along logging spur off FR 209.1G. |
| FR 209.1G. |
| Temporary road off FR 587. |
| FR 209.1G and logging spur. |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 1 – Taylor Park Area
| Sub-item or Planting Unit |
| 1-9 |
| 1-10 |
| 1-11 |
| 1-125 |
| FACTS ID |
| 1004010033-P01 |
| 950701MURN-000 |
| 950701MURR-003 |
| 950701MUSI-004 |
| Unit Name |
| Stagestop TS CC 5 |
| Murdie Subdivision Northeast Unit |
| Murdie Subdivision Northwest Unit |
| Murdie Subdivision The Sickle |
| FACTS Acres |
| 3.1 |
| 12.3 |
| 11.7 |
| 3.6 |
| Net Planting Acres |
| 3.1 |
| 12.3 |
| 11.7 |
| 3.6 |
| Portion Net Planting Acres With Plantable Spots |
| 0.60 |
| 0.80 |
| 0.95 |
| 0.80 |
| Desired TPA |
| 680 |
| 538 |
| 680 |
| 680 |
| Estimated Number of Trees Needed |
| 1,300 |
| 5,300 |
| 7,600 |
| 2,000 |
| Average Spacing 4.8 |
| 8’x 8’ |
| 9’x 9’ |
| 8’x 8’ |
| 8’x 8’ |
| Seed Lot 4.11 |
| PICO-486-100-15 |
| PICO-486-098-08 |
| PICO-486-098-08 |
| PICO-486-098-08 |
| Boundary Marking - See Project Map 4 |
| Obvious Edge to Park Edge. |
| Obvious Edge to Park Edge. |
| Obvious Edge to Park Edge. |
| Obvious Edge to Park Edge. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
Tree Shade Cards
| Tree Shade Cards |
| Tree Shade Cards |
| Tree Shade Cards |
| Average Slope |
| 7% |
| 7% |
| 8% |
| 8% |
| Average Elevation |
| 9,800’ |
| 9,800’ |
| 9,800’ |
| 9,800’ |
| Direct Vehicle Access1 |
| No |
| Yes |
| Yes |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 1,170 feet |
| 470 feet |
| 610 feet |
| 180 feet |
| Delivery Point(s) |
| End of logging spur off FR 209.1G. |
| Along FR 209.1G. |
| Along FR 209.G1. |
| Along FR 209.G1. |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
5Units 1-12 and 1-13 are intended to be the final planting units for Item 1 for using the remaining lodgepole pine seedlings available.
Item 1 – Taylor Park Area
| Sub-item or Planting Unit |
| 1-135 |
Totals
(Units 1-1 to 1-13)
| Unit Name |
| Murdie Subdivision East Side |
106 Acres
95 Acres
| Portion Net Planting Acres With Plantable Spots |
| 0.75 |
| Estimated Number of Trees Needed |
| 4,100 |
42,800 Trees2
| Average Spacing 4.8 |
| 12’x 12’ |
| Seed Lot 4.11 |
| PICO-486-098-08 |
| Boundary Marking - See Project Map 4 |
| Obvious Edge, Fenceline, to Park Edge. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Tree Shelter Type 4.13 |
| Tree Shade Cards |
| Direct Vehicle Access1 |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 560 feet |
| Delivery Point(s) |
| Along FR 587 and FR 209.1G. |
| Alternative Delivery Point |
| NA |
5Units 1-12 and 1-13 are intended to be the final planting units for Item 1 for using the remaining lodgepole pine seedlings available.
2There will be 42,660 lodgepole pine seedlings delivered to Gunnison for Item 1.
Item 2 – Lujan Creek Area
| Sub-item or Planting Unit |
| 2-1 |
| 2-2 |
| 2-3 |
| 2-4 |
| FACTS ID |
| 870302CDFO-004 |
| 870302LUJN-001 |
| 2022LUJAN5-001 |
| 2024LUJAN6-001 |
| Unit Name |
| CDFour Small Sale |
| Lujan 1 Small Sale |
| Lujan 5 Salvage Sale |
| Lujan 5 Salvage Sale |
| FACTS Acres |
| 9 |
| 3.3 |
| 13.8 |
| 9.4 |
| Net Planting Acres |
| 9 |
| 3.3 |
| 13.8 |
| 9.4 |
| Portion Net Planting Acres With Plantable Spots |
| 0.50 |
| 0.50 |
| 0.80 |
| 0.70 |
| Desired TPA |
| 360 |
| 360 |
| 436 |
| 538 |
| Estimated Number of Trees Needed |
| 1,600 |
| 600 |
| 4,800 |
| 3,500 |
| Average Spacing 4.8 |
| 11’x 11’ |
| 11’x 11’ |
| 10’x 10’ |
| 9’x 9’ |
| Seed Lot 4.11 |
| PIEN-243-110-94 |
| PIEN-243-110-94 |
| PIEN-243-110-94 |
| PIEN-243-110-94 |
| Boundary Marking - See Project Map 6 |
| Obvious Edges and Road. |
| Road to Park Edge. |
| Obvious Edges. |
| Road to Road. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Tree Shelter Type 4.13 |
| None |
| None |
| None |
| None |
| Average Aspect |
| NW |
| NW |
| NW |
| SW |
| Average Slope |
| 27% |
| 18% |
| 23% |
| 42% |
| Average Elevation |
| 10,300’ |
| 10,200’ |
| 10,500’ |
| 10,500’ |
| Direct Vehicle Access1 |
| Yes |
| Yes |
| No |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 570 feet |
| 125 feet |
| 1,350 feet |
| 225 feet |
| Delivery Point(s) |
| Along FR 785. |
| Along FR 785. |
| Along FR 785. |
| Along FR 785.1A. |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 2 – Divide Salvage Area
| Sub-item or Planting Unit |
| 2-5 |
| 2-6 |
| 2-7 |
| 2-8 |
| FACTS ID |
| 870102DIVD-003 |
| 870102DIVD-003 |
| 870102DIVD-003 |
| 850211LATR-001 |
| Unit Name |
| Divide Salvage Unit 3 Landing |
| Divide Salvage Unit 3 Middle |
| Divide Salvage Unit 3 East |
| Last Tree Salvage Unit 1 |
| FACTS Acres |
| 0.6 |
| 38.1 |
| 34.4 |
| 72.9 |
| Net Planting Acres |
| 0.6 |
| 38.1 |
| 18.4 |
| 72.9 |
| Portion Net Planting Acres With Plantable Spots |
| 0.70 |
| 0.70 |
| 0.70 |
| 0.50 |
| Desired TPA |
| 436 |
| 436 |
| 436 |
| 302 |
| Estimated Number of Trees Needed |
| 200 |
| 11,700 |
| 5,600 |
| 11,000 |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| 12’x 12’ |
| Seed Lot 4.11 |
| PIEN-243-110-94 |
| PIEN-243-110-94/111-13 |
| PIEN-243-111-13 |
| PIEN-243-111-13 |
| Boundary Marking - See Project Map 7 & 9 |
| Flagged In Blue. |
| Flagged In Blue. |
| Flagged In Blue. |
| Obvious Edges to Unit Boundary. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Tree Shelter Type 4.13 |
| None |
| None |
| None |
| None |
| Average Slope |
| 17% |
| 16% |
| 22% |
| 13% |
| Average Elevation |
| 10,500’ |
| 10,600’ |
| 10,700’ |
| 10,700’ |
| Direct Vehicle Access1 |
| No |
| No |
| No |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 480 feet |
| 2,200 feet |
| 14,390 feet |
| 750 feet |
| Delivery Point(s) |
| From FR 787 Switchback. |
| From FR 787 Switchback. |
| From FR 787 Switchback. |
| Along FR 788.1L. |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 2 – Slumgullion Area
| Sub-item or Planting Unit |
| 2-9 |
| 2-10 |
| 2-11 |
| Totals |
| FACTS ID |
| 850211LATR-002 |
| 850211LATR-003 |
| 850209RAMB-P1E |
| (Units 2-1 to 2-11) |
| Unit Name |
| Last Tree Salvage Unit 2 |
| Last Tree Salvage Unit 3 |
| Rambo Salvage Unit 1 East End |
| FACTS Acres |
| 68.4 |
| 74.5 |
| 44.4 |
| 353 Acres |
| Net Planting Acres |
| 68.4 |
| 74.5 |
| 44.4 |
| 337 Acres |
| Portion Net Planting Acres With Plantable Spots |
| 0.50 |
| 0.60 |
| 0.80 |
| Estimated Number of Trees Needed |
| 10,300 |
| 19,500 |
| 19,100 |
| 87,900 Trees2 |
| Average Spacing 4.8 |
| 12’x 12’ |
| 10’x 10’ |
| 9’x 9’ |
| Seed Lot 4.11 |
| PIEN-243-111-13 |
| PIEN-243-111-13 |
| PIEN-243-111-13 |
| Boundary Marking - See Project Map 9 & 10 |
| Obvious Edge and Blue Flag Line SW |
| Obvious Edge Blue Flag Lines. |
| Unit Boundary East to Obvious Edge. Rocky Area Flagged Out in Blue. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Tree Shelter Type 4.13 |
| None |
| None |
| None |
| Average Slope |
| 18% |
| 16% |
| 10% |
| Average Elevation |
| 10,900’ |
| 10,800’ |
| 11,300’ |
| Direct Vehicle Access1 |
| No |
| No |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 650 feet |
| 1,030 feet |
| 800 feet |
| Delivery Point(s) |
| Along FR 788.1L. |
| Along FR 788.1L. |
| Along FR 735. |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
5Unit 2-11 is intended to be the final planting units for Item 2 for using the remaining spruce seedlings available. Acres and number of trees to be used will vary from the number presented given variations in use in other Item 2 plant units.
2There will be 87,936 Engleman spruce seedlings delivered to Gunnison for Item 2.
Tree Planting- Detailed Information Chart (Item 3, North Zone) Item 3 – North Zone Project Area
| Sub-item or Planting Unit |
| 3-1 |
| 3-2 |
| 3-3 |
| 3-4 |
| FACTS ID |
| 020402LONGSLOUGH001 |
| 020402LONGSLOUGH002 |
| 020402LONGSLOUGH003 |
| 020402LONGSLOUGH009 |
| Unit Name |
| Long Slough Unit 1 |
| Long Slough Unit 2 |
| Long Slough Unit 3 |
| Long Slough Unit 9 |
| FACTS Acres |
| 65.3 |
| 41.9 |
| 9.4 |
| 43.8 |
| Net Planting Acres |
| 16.3 |
| 12.8 |
| 3.4 |
| 10.8 |
| Portion Net Planting Acres With Plantable Spots |
| 0.60 |
| 0.60 |
| 0.50 |
| 0.50 |
| Desired TPA |
| 436 |
| 436 |
| 436 |
| 436 |
| Estimated Number of Trees Needed |
| 4200 (14 boxes) |
| 3300 (11 boxes) |
| 600 (2 boxes) |
| 2400 (8 boxes) |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| Seed Lot 4.11 |
| ES-223-103-16 |
| ES-223-103-16 |
| ES-223-103-16 |
| ES-223-103-16 |
| Boundary Marking - See Project Map 11 |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
None
None
None
| Average Aspect |
| North |
| North |
| North |
| North |
| Average Slope |
| 20 |
| 20 |
| 25 |
| 15 |
| Average Elevation |
| 10000 |
| 10000 |
| 10000 |
| 10100 |
| Direct Vehicle Access1 |
| Yes |
| Yes |
| Yes |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 1,000’ |
| 1,900’ |
| 1,100’ |
| 750’ |
| Delivery Point(s) |
| Off NFSR 254.1A |
| Off NFSR 254.1A |
| Off NFSR 254.1A |
| Highway 65 Pulloff |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 3 – North Zone Project Area
| Sub-item or Planting Unit |
| 3-5 |
| 3-6 |
| 3-7 |
| 3-8 |
| FACTS ID |
| 020402LONGSLOUGH010 |
| 020402LONGSLOUGH011 |
| 020408HUBBARD000001 |
| 020408HUBBARD000011 |
| Unit Name |
| Long Slough Unit 10 |
| Long Slough Unit 11 |
| Hubbard Unit 1 |
| Hubbard Unit 11 |
| FACTS Acres |
| 83.3 |
| 104.8 |
| 63.3 |
| 31.7 |
| Net Planting Acres |
| 24.7 |
| 21.5 |
| 9.3 |
| 4.6 |
| Portion Net Planting Acres With Plantable Spots |
| 0.67 |
| 0.67 |
| 0.80 |
| 0.60 |
| Desired TPA |
| 436 |
| 436 |
| 436 |
| 436 |
| Estimated Number of Trees Needed |
| 7200 (24 boxes) |
| 6300 (21 boxes) |
| 2700 (9 boxes) |
| 1200 (4 boxes) |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| Seed Lot 4.11 |
| ES-223-103-16 |
| ES-223-103-16 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| Boundary Marking - See Project Map 11 & 12 |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
None
None
| Average Aspect |
| North |
| North |
| East |
| East |
| Average Slope |
| 25 |
| 20 |
| 15 |
| 15 |
| Average Elevation |
| 10,200’ |
| 10,200’ |
| 9,600’ |
| 9,600’ |
| Direct Vehicle Access1 |
| Yes |
| Yes |
| No |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 800’ |
| 1400’ |
| 2200’ |
| 600’ |
| Delivery Point(s) |
| End of NFSR 250 |
| End of NFSR 250 |
| East side of Unit Along NFSR 701 and Top of Unit along NFSR 705.1A |
| End of NFSR 718.1B and Along 705.1A |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 3 – North Zone Project Area
| Sub-item or Planting Unit |
| 3-9 |
| 3-10 |
| 3-11 |
| 3-12 |
| FACTS ID |
| 020408HUBBARD000015 |
| 020408HUBBARD000016 |
| 020408HUBBARD000019 |
| 020408HUBBARD000020 |
| Unit Name |
| Hubbard Unit 15 |
| Hubbard Unit 16 |
| Hubbard Unit 19 |
| Hubbard Unit 20 |
| FACTS Acres |
| 9.4 |
| 35.8 |
| 34.8 |
| 47.4 |
| Net Planting Acres |
| 12.2 |
| 4.9 |
| 6.9 |
| 7.2 |
| Portion Net Planting Acres With Plantable Spots |
| 0.7 |
| 0.67 |
| 0.8 |
| 0.7 |
| Desired TPA |
| 436 |
| 436 |
| 436 |
| 436 |
| Estimated Number of Trees Needed |
| 3600 (12 boxes) |
| 2100 (7 boxes) |
| 2400 (8 boxes) |
| 2100 (7 boxes) |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| Seed Lot 4.11 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| Boundary Marking - See Project Map 12 |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
None
None
| Average Aspect |
| Northeast |
| North |
| Northeast |
| East |
| Average Slope |
| 15 |
| 15 |
| 20 |
| 20 |
| Average Elevation |
| 9500’ |
| 9500’ |
| 9600’ |
| 9300’ |
| Direct Vehicle Access1 |
| Yes |
| Yes |
| Yes |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 1,200’ |
| 1,200’ |
| 900’ |
| 700’ |
| Delivery Point(s) |
| NFSR 718 |
| NFSR 701 and 718.1C |
| NFSR 705.1A |
| NFSR 705.1A |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 3 – North Zone Project Area
| Sub-item or Planting Unit |
| 3-13 |
| 3-14 |
| 3-15 |
| 3-16 |
| FACTS ID |
| 020408HUBBARD000021 |
| 5503002001 |
| 5503002002 |
| 5503002003 |
| Unit Name |
| Hubbard Unit 21 |
| Cow Creek 1 |
| Cow Creek 2 |
| Cow Creek 3 |
| FACTS Acres |
| 89.2 |
| 11.2 |
| 22.4 |
| 46.5 |
| Net Planting Acres |
| 17.1 |
| 3.1 |
| 5.1 |
| 9.7 |
| Portion Net Planting Acres With Plantable Spots |
| 0.70 |
| 0.8 |
| 0.8 |
| 0.7 |
| Desired TPA |
| 436 |
| 436 |
| 436 |
| 436 |
| Estimated Number of Trees Needed |
| 5100 (17 boxes) |
| 1200 (4 boxes) |
| 1800 (6 boxes) |
| 3000 (10 boxes) |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| Seed Lot 4.11 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| Boundary Marking - See Project Map 12 & 13 |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
None
None
| Average Aspect |
| East |
| North |
| North |
| North |
| Average Slope |
| 15 |
| 20 |
| 15 |
| 10 |
| Average Elevation |
| 9600’ |
| 9700’ |
| 9600’ |
| 9600’ |
| Direct Vehicle Access1 |
| Yes |
| No |
| No |
| No |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 900’ |
| 1200’ |
| 1500’ |
| 1700’ |
| Delivery Point(s) |
| NFSR 705.1A |
| South/East side of Unit Along NFSR 701 |
| South/East side of Unit Along NFSR 701 |
| North side of Unit along NFSR 705 |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 3 – North Zone Project Area
| Sub-item or Planting Unit |
| 3-17 |
| 3-18 |
| 3-19 |
| 3-20 |
| FACTS ID |
| 5503002004 |
| 5503002005 |
| 5503002006 |
| 5503002013 |
| Unit Name |
| Cow Creek 4 |
| Cow Creek 5 |
| Cow Creek 6 |
| Cow Creek 13 |
| FACTS Acres |
| 18 |
| 15.8 |
| 25.6 |
| 19.4 |
| Net Planting Acres |
| 3.8 |
| 4.3 |
| 7.5 |
| 4.4 |
| Portion Net Planting Acres With Plantable Spots |
| 0.7 |
| 0.8 |
| 0.8 |
| 0.8 |
| Desired TPA |
| 436 |
| 436 |
| 436 |
| 436 |
| Estimated Number of Trees Needed |
| 1200 (4 boxes) |
| 1500 (5 boxes) |
| 2700 (9 boxes) |
| 1500 (5 boxes) |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| Seed Lot 4.11 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| Boundary Marking - See Project Map 13 |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
None
| Average Aspect |
| North |
| East |
| East |
| Northwest |
| Average Slope |
| 20 |
| 15 |
| 15 |
| 15 |
| Average Elevation |
| 9600’ |
| 9400’ |
| 9500’ |
| 9500’ |
| Direct Vehicle Access1 |
| No |
| No |
| No |
| Yes |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 1600’ |
| 2300’ |
| 1700’ |
| 400’ |
| Delivery Point(s) |
| North side of Unit along NFSR 705 |
| South/East side of Unit Along NFSR 701 |
| South/East side of Unit Along NFSR 701 |
| South of Unit along NFSR 705 |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 3 – North Zone Project Area
| Sub-item or Planting Unit |
| 3-21 |
| 3-22 |
| 3-23 |
| 3-24 |
| FACTS ID |
| 5503002014 |
| 5503002016 |
| 5503002017 |
| 5503002018 |
| Unit Name |
| Cow Creek 14 |
| Cow Creek 16 |
| Cow Creek 17 |
| Cow Creek 18 |
| FACTS Acres |
| 18.6 |
| 39 |
| 80.8 |
| 35.1 |
| Net Planting Acres |
| 5.1 |
| 9.3 |
| 17.9 |
| 7.1 |
| Portion Net Planting Acres With Plantable Spots |
| 0.8 |
| 0.8 |
| 0.7 |
| 0.7 |
| Desired TPA |
| 436 |
| 436 |
| 436 |
| 436 |
| Estimated Number of Trees Needed |
| 1800 (6 boxes) |
| 2700 (9 boxes) |
| 5400 (18 boxes) |
| 2100 (7 boxes) |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| Seed Lot 4.11 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| Boundary Marking - See Project Map 13 |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
None
| Average Aspect |
| Northwest |
| West |
| North |
| North |
| Average Slope |
| 20 |
| 25 |
| 20 |
| 20 |
| Average Elevation |
| 9500’ |
| 9600’ |
| 9700’ |
| 9800’ |
| Direct Vehicle Access1 |
| No |
| No |
| No |
| No |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 1200’ |
| 2300’ |
| 2500’ |
| 1500’ |
| Delivery Point(s) |
| South of Unit along NFSR 705 |
| South of Unit along NFSR 705 |
| South of Unit along NFSR 705 |
| South of Unit along NFSR 705 |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 3 – North Zone Project Area
| Sub-item or Planting Unit |
| 3-25 |
| 3-26 |
| 3-27 |
| 3-28 |
| FACTS ID |
| 5503002019 |
| 5503002020 |
| 5503002021 |
| 5503002022 |
| Unit Name |
| Cow Creek 19 |
| Cow Creek 20 |
| Cow Creek 21 |
| Cow Creek 22 |
| FACTS Acres |
| 15.1 |
| 11.7 |
| 45 |
| 38.4 |
| Net Planting Acres |
| 3.9 |
| 2.5 |
| 11.3 |
| 10.0 |
| Portion Net Planting Acres With Plantable Spots |
| 0.8 |
| 0.8 |
| 0.7 |
| 0.7 |
| Desired TPA |
| 436 |
| 436 |
| 436 |
| 436 |
| Estimated Number of Trees Needed |
| 1500 (5 boxes) |
| 900 (3 boxes) |
| 3300 (11 boxes) |
| 3000 (10 boxes) |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| Seed Lot 4.11 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| Boundary Marking - See Project Map 13 |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
None
| Average Aspect |
| East |
| South |
| North |
| North |
| Average Slope |
| 10 |
| 15 |
| 20 |
| 20 |
| Average Elevation |
| 9700’ |
| 9500’ |
| 9300’ |
| 9400’ |
| Direct Vehicle Access1 |
| Yes |
| Yes |
| No |
| No |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 600’ |
| 600’ |
| 1900’ |
| 1400’ |
| Delivery Point(s) |
| South of Unit along NFSR 705 |
| South of Unit along NFSR 705 |
| South of Unit along NFSR 705 |
| South of Unit along NFSR 705 |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
| NA |
Item 3 – North Zone Project Area
| Sub-item or Planting Unit |
| 3-29 (30) |
| 3-30 (31) |
| 3-31 (29) |
| Totals |
FACTS ID
| Unit Name |
| Sheep Flats 7 |
| Sheep Flats 8 |
| Sheep Flats 13 |
| FACTS Acres |
| 41 |
| 56 |
| 31 |
| 1,305.4 Acres (1,788) |
| Net Planting Acres |
| TBD |
| TBD |
| TBD |
| 261.8 Acres (693.8) |
| Portion Net Planting Acres With Plantable Spots |
| 0.7 |
| 0.6 |
| 0.5 |
| Estimated Number of Trees Needed |
| TBD- Outplants |
| TBD- Outplants |
| TBD- Outplants |
| 66,000 (220 boxes) |
| Average Spacing 4.8 |
| 10’x 10’ |
| 10’x 10’ |
| 10’x 10’ |
| Seed Lot 4.11 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| ES-04-223-095-77 |
| Boundary Marking - See Project Map 14 |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Blue Flagging and Orange Boundary paint. |
| Non-planting Areas 4.9 |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
| Rocky areas, large slash areas, roadsides, untreated pile burn ash pits, areas of advanced regeneration. |
Tree Shelter Type 4.13
| Average Aspect |
| North |
| North |
| North |
| Average Elevation |
| 10000’ |
| 10000’ |
| 10000’ |
| Direct Vehicle Access1 |
| Yes |
| No |
| No |
| Walk-in Distance in Feet to Center Unit 4.1.2 |
| 600’ |
| 1200’ |
| 1500’ |
| Delivery Point(s) |
| North of Unit along NFSR 279 |
| North of Unit along NFSR 279 |
| North of Unit along NFSR 279 |
| Alternative Delivery Point |
| NA |
| NA |
| NA |
5Units 3-29, 3-30, and 3-31 are intended to be the final planting units for Item 3 for using the remaining spruce seedlings available. Acres and number of trees to be used will vary from the number presented given variations in use in other Item 3 plant units.
2There will be 66,006 Engelmann spruce seedlings delivered to North Zone for Item 1.
Tree Planting – DETAILED INFORMATION CHART
| General Location |
| Taylor Park Area |
| Lujan, Divide, Slumgullion, Grand Mesa, and Overland Reservoir Areas |
Trees - Planting Stock
| Species To Plant |
| Lodgepole Pine (LP) |
| Engelmann Spruce (ES) |
| Stock Type |
| Container |
| Container |
Tree Planting
Clearing 4.4
| Minimum diameter (inches) |
| 16” |
| 16” |
| Maximum depth (inches) |
| Surface |
| Surface |
Scalping 4.5
| Minimum diameter (inches) |
| 16” |
| 16” |
| Maximum depth (inches) |
| 2” or Mineral Soil |
| 2” or Mineral Soil |
Acceptable Established Trees 4.10
| Species |
| Any Species |
| Any Species |
Shade / Protection Requirements
Natural Shade and Protection 4.7
Down Log (min. diameter & length)
Stump (minimum diameter & height)
Standing Dead Tree (minimum dbh)
| Rock (minimum diameter & height) |
| 8” & 6” |
| 8” & 6” |
| Max. distance plant from the above microsite protection materials |
| 4 inches |
| 4 inches |
| Planting Spot Selection 4.7.3 |
| 1. Stationary material first, then transportable shade. A tree shall be planted next to stationary material when it is available. When stationary material does not exist in the spacing allowance, shade shall be transported to the seedling. When neither stationary nor transportable material exists, no tree shall be planted. |
| 1. Stationary material first, then transportable shade. A tree shall be planted next to stationary material when it is available. When stationary material does not exist in the spacing allowance, shade shall be transported to the seedling. When neither stationary nor transportable material exists, no tree shall be planted. |
Tree Shade Cards 4.13