Attachment 5 - Redacted Brand Name Justification.pdf

PDF 1 MB Posted

Attached to
Y1DZ--519-371 Construct New CLC Phase III Minor Construction - Big Spring, TX VAMC
Solicitation number
36C77626B0011_1
Issued by

About this file

This is a Justification and Approval (J&A) document for other than full and open competition for a construction project. The Department of Veterans Affairs (DVA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) is procuring services for the Construct Community Living Center (CLC) Phase III Construction project at the West Texas VA Health Care System (WTVAHCS) in Big Spring, Texas. The proposed procurement, Invitation for Bid (IFB) 36C77626B0011, will be awarded as a firm-fixed price contract with an estimated construction magnitude between $10,000,000 and $20,000,000.

The procurement requires three specific brand-name items for which the VA cannot accept equal or alternate products: (1) Motorola Avigilon security camera and monitoring system for complete installation, programming, and licensing of digital video capture and recording equipment; (2) HID physical security access control system for complete installation and programming of card readers and communication components; and (3) Siemens Desigo fire alarm system for complete installation and programming of fire alarm initiating and notification appliances. The justification cites standardization throughout the facility as the primary rationale, noting that alternative manufacturers' systems would create significant cost duplication and operational incompatibilities with existing equipment. The procurement is competed as a Service-Disabled Veteran-Owned Small-Business (SDVOSB) set-aside. Market research confirmed Buy American Act compliance for all three items, with Motorola Avigilon manufactured in Plano, Texas; HID in Austin, Texas; and Siemens Desigo available through GSA Advantage Catalog. The Contracting Officer has determined that anticipated costs are fair and reasonable, and the justification was certified by Marcus J. Fernandez, Engineering Technician, and approved by Richelle N. Gray, Contracting Officer, both with PCAC.

View the file

Other files

File Type Posted
36C77626B0011 0019.docx DOCX document
Tech Questions Tracker - Big Spring CLC Phase III Minor - 16 OCT 26 Responses.pdf PDF
Tech Questions Tracker - Big Spring CLC Phase III Minor - 08 OCT 26 Responses.pdf PDF
36C77626B0011 0018.docx DOCX document
36C77626B0011 0017.docx DOCX document
36C77626B0011 0016.docx DOCX document
36C77626B0011 0015.docx DOCX document
Tech Questions Tracker - Big Spring CLC Phase III Minor - 16 SEP 26 Responses.pdf PDF
36C77626B0011 0014.docx DOCX document
Wage Determination - Howard County TX - 5-18-26.pdf PDF
36C77626B0011 0013.docx DOCX document
36C77626B0011 0012.docx DOCX document
Tech Questions Tracker - Big Spring CLC Phase III Minor - 01 SEP 26 Responses.pdf PDF
519-371-28 _Big Springs_CLC Phase 3_Issue for Bid Specifications 26AUG26.pdf PDF
Big Spring VA CLC Ph3 - 22 63 00 GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES.pdf PDF
36C77626B0011 0011.docx DOCX document
Tech Questions Tracker - Big Spring CLC Phase III Minor - 26 AUG 26 Responses.pdf PDF
RFI 117 - Electrical Fire Place Cutsheet.pdf PDF
RFI 110 - PATIENT LIFT - P-440_User_Manual_WGS_21DEC20101.pdf PDF
GeoTech Report_8267 Big Spring VA - CLC Phase 3.pdf PDF
09 67 23.60 - Resinous Urethane and Epoxy Mortar Flooring RES-6A AND RES-6B.pdf PDF
Brand Name Justification - Big Spring CLC Phase III - Redacted.pdf PDF
519-371-28 _Big Springs_CLC Phase 3_Issue For Bid_Drawings REVISED 26 AUG26.pdf PDF
36C77626B0011 0010.docx DOCX document
36C77626B0011 0009.docx DOCX document
C - 52.212-4 - Construction.docx DOCX document
36C77626B0011 0008.docx DOCX document
36C77626B0011 0007.docx DOCX document
36C77626B0011 0006.docx DOCX document
36C77626B0011 0005.docx DOCX document
36C77626B0011 0004.docx DOCX document
36C77626B0011 0003.docx DOCX document
36C77626B0011 0002.docx DOCX document
CLC Phase 3 Sign-In Sheet.pdf PDF
36C77626B0011 0001.docx DOCX document
36C77626B0011_1.docx DOCX document
Attachment 1 - Specifications - REV2 25FEB26.pdf PDF
Attachment 4 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 3 - PCRA CLC Phase 3.pdf PDF
Attachment 6 - Wage Determination - Howard County TX - 1-2-26.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 7 - Site Visit Instructions.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .