Attachment 5 - Price Matrix.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Upgrade Existing OR Suite for Fire Code Federal contract opportunity
- Solicitation number
- 36C24825R0044
About this file
This is a pricing matrix template spreadsheet that contractors must complete to break down their proposed costs for upgrading the Operating Room Suite at the VA Medical Center in Miami, Florida. The template is organized according to standard construction divisions (1-34) and requires bidders to itemize both labor and material costs for each division, including general requirements, concrete, masonry, electrical, HVAC, fire suppression, and other building systems.
The pricing template includes calculation fields for overhead percentage, profit percentage, and bond percentage to be applied to the division subtotals. The final total price is automatically calculated based on the sum of all divisions plus the applicable overhead, profit and bond amounts. The template requires basic contractor information including company name, address, project number, and project title.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - Attachment 6 - RFI Responses 36C24825R0044 - 546-22-143 - BB Upgrade Existing OR Suite for Fire Code Compliance.xlsx | XLSX spreadsheet | |
| S02 - Attachment 7 - Past Performance Questionnaire.docx | DOCX document | |
| 36C24825R0044 0001.pdf | ||
| Attachment 3 - Wage Determination - Miami Dade.pdf | ||
| S02 Solicitation 36C24825R0044.pdf | ||
| Attachment 4 - Experience Modification Rate.pdf | ||
| Attachment 2 - AE Specifications.pdf | ||
| Attachment 1 - AE Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Base Offer Cost Breakdown
| Project Number: | Date: | ||
| Project Title | |||
| Project Location | |||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
| Item | Description | Labor Cost | Material Cost | Total Cost |
| Division 1 | General Requirements | $- | $- | $- |
| Division 2 | Existing Conditions | - | - | - |
| Division 3 | Concrete | - | - | - |
| Division 4 | Masonry | - | - | - |
| Division 5 | Metals | - | - | - |
| Division 6 | Wood and Plastic | - | - | - |
| Division 7 | Thermal & Moisture Protect | - | - | - |
| Division 8 | Doors and Windows | - | - | - |
| Division 9 | Finishes | - | - | - |
| Division 10 | Specialties | - | - | - |
| Division 11 | Equipment | - | - | - |
| Division 12 | Furnishings | - | - | - |
| Division 13 | Special Construction | - | - | - |
| Division 14 | Conveying Equipment | - | - | - |
| Division 21 | Fire Suppression | - | - | - |
| Division 22 | Plumbing | - | - | - |
| Division 23 | HVAC | - | - | - |
| Division 26 | Electrical | - | - | - |
| Division 27 | Communications | - | - | - |
| Division 28 | Electronic Safety & Security | - | - | - |
| Division 31 | Earthwork | - | - | - |
| Division 32 | Exterior Improvements | - | - | - |
| Division 33 | Utilities | - | - | - |
| Division 34 | Transportation Subtotal | - | - | - |
| Division Subtotals : | $- | $- | $- |
| Overhead % | 0.00% | - |
| Profit % | 0.00% | - |
| Bond % | 0.00% | - |
| Overhead/Profit Subtotals : | $- |
Total Price $- $- $-