Attachment 5 - Price Matrix.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Upgrade Existing OR Suite for Fire Code Federal contract opportunity
Solicitation number
36C24825R0044
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This is a pricing matrix template spreadsheet that contractors must complete to break down their proposed costs for upgrading the Operating Room Suite at the VA Medical Center in Miami, Florida. The template is organized according to standard construction divisions (1-34) and requires bidders to itemize both labor and material costs for each division, including general requirements, concrete, masonry, electrical, HVAC, fire suppression, and other building systems.

The pricing template includes calculation fields for overhead percentage, profit percentage, and bond percentage to be applied to the division subtotals. The final total price is automatically calculated based on the sum of all divisions plus the applicable overhead, profit and bond amounts. The template requires basic contractor information including company name, address, project number, and project title.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Base Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

File details come from the government source that posted it. Updated .