This is a set of architectural and engineering drawings for upgrading an existing Operating Room Suite to meet fire code compliance at the Miami VA Medical Center. The drawings detail construction work required across multiple disciplines including architectural modifications, fire protection, electrical, mechanical and telecommunications systems.

The drawings show installation of new fire/smoke barrier walls, self-latching doors with magnetic hold opens, combination fire/smoke dampers, duct smoke detectors, fire alarm devices, and exit signage in the 3rd floor OR suite area. Key components include extending existing cross-corridor walls to the deck, relocating scrubex dispensers and workstations, modifying electrical and data systems to accommodate the relocated equipment, and installing new fire alarm connections to door hold opens and smoke dampers. The work is to be performed in three phases during off-hours (Friday 6pm to Monday 6am) to minimize disruption to operations. The drawings provide detailed specifications for materials, mounting heights, wiring requirements, and fire-stopping methods to achieve the required fire ratings and code compliance.

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Existing OR Suite for Fire Code, newest first.
File Type Posted
S02 - Attachment 6 - RFI Responses 36C24825R0044 - 546-22-143 - BB Upgrade Existing OR Suite for Fire Code Compliance.xlsx XLSX spreadsheet
S02 - Attachment 7 - Past Performance Questionnaire.docx DOCX document
36C24825R0044 0001.pdf PDF
Attachment 5 - Price Matrix.xlsx XLSX spreadsheet
Attachment 3 - Wage Determination - Miami Dade.pdf PDF
S02 Solicitation 36C24825R0044.pdf PDF
Attachment 4 - Experience Modification Rate.pdf PDF
Attachment 2 - AE Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

XX

X

1/A101

X

A101

XX

TOILET ACCESSORY TAGX SIGNAGE TAG

A101

SIM

X

AREA OF WORK

B01- 3RD FLOOR

S T A

T E

OF FLO

R

I D A

R E G

IS

TERED ARC

H

IT

E C T

J A S

ON

H. RO

S S

AR101907

VA Project No.

RDC/JPA Project No.

Department of Veterans Affairs Medical Center

ARCHITECTURE PLANNING INTERIOR DESIGN

524 FERNWOOD AVENUE

ALTAMONTE SPRINGS, FLORIDA 32701

407.830.6522 P

RDC / JPA ARCHITECTURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

ENVIRONMENTAL

611 LUNKEN PARK DRIVE

CINCINNATI, OH 45226

513.321.5816 P

TERRACON CONSULTING, INC.

ENGINEERING / MECHANICAL

305 EAST DRIVE SUITE H

MELBOURNE, FL 32904

321.345.9026 P

ABOVE GROUP, INC.

/1 /2

:0

:0

A M

Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor

10/18/2024

COVER SHEET

G001

JWCS

546-22-143

Miami, FL

B01

Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor 1201 NW 16th Street Miami, FL 33136 PROJECT #: 546-22-143

Matthew King

BID DOCUMENTS

24119.00

G001 COVER SHEET

G100 CODE DATA

AE101 3RD FLOOR PLAN

AE102 DOOR SCHEDULE AND DETAILS

GENERAL CONSTRUCTION NOTES

* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE

CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,

INTERNATIONAL BUILDING CODE, AND OTHER CODES AS IDENTIFIED IN VHA

PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE

ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,

TECHNICAL INFORMATION LIBRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND

DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13

WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS

TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT

EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED

WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH

ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT

ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF

NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO

REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT

SURFACES TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND

DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW

MATERIALS.

DRAWING INDEX

LEGEND

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO

BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE

SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT

THROUGH FINISHED OPENINGS.

8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,

HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS

AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT

DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL

WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.

9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS

SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A

PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS

INDICATED AT SIMILAR CONDITIONS.

10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL

SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE

THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE

NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR

SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.

11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED

WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF

THE WALL.

12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO

AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER

RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS

RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS

IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY

FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

MIAMI, V.A. HEALTHCARE SYSTEM SITE PLAN

E-001 ELECTRICAL LEGENDS & SYMBOLS

ED103 3RD FLOOR PLAN- ELECTRICAL EQUIPMENT - DEMOLITION

EP103

E-601 ELECTRICAL DIAGRAMS

FA001 FIRE ALARM LEGENDS & SYMBOLS

3RD FLOOR PLAN- ELECTRICAL EQUIPMENT - NEW WORK

FA103 3RD FLOOR PLAN- FIRE ALARM - NEW WORK

E-501 ELECTRICAL DETAILS

FA501 FIRE ALARM DETAILS

M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS

MH101 3RD FLOOR PLAN- MECHANICAL - NEW WORK

T-001

T-501 TECHNOLOGY - DETAILS

TECHNOLOGY LEGEND, ABBRVIATIONS, & GENERAL NOTES

TN103 3RD FLOOR PLAN - NEW WORK

Revisions Date

F

F

F F

F

F

F

F

F

F

FFF

F F

F

F

F

F

FF

F

F

F

F F

F

F

36"

F

F

F

F

EPEP

EP

EP

PFE

F

F

F

F

EP

FF

F

EP F

F

F

F

F

F

F

F

F

F

F

F

F F

F

F

FHC/FE

SOV

F

F

F

F

F

F

F

SOV SOVFE

FE

FE

F

F

F

SOV

SOV

SOV

SOV SOV SOV SOV

FE

FE

SOV

FE

SOV

S O V

SOV

FHC

SOV

SOV

SOV

FE

FHC

V

PYXIS

ROOF

F.H.C.

PROCEDURE ROOM

CONTROL AREA

SUTURE PROCEDURE

CORRIDOR

CORRIDOR

GENERAL

#9

#10

FOYER

TOILET

FOYER STAFF LOUNGE

DUCT

SPACE

DUCT

SPACE

MECHANICAL

COVERED

CORRIDOR

CORRIDOR

STERILE SUPPLY STORAGE ROOM

SPD DECONTAMINATION

F.H.C.

SPD

F. TOILET

M. TOILET

PREPARATION AREA

CORRIDOR

ANTE

MECH."

"OPEN

F.H.C.

SUPPLY

F.H.C.

STATION

CENTRAL

HOUSEKEEPING

CHIEF SPD

SPD ADMINISTRATION

ASSISTANT

CHIEF SPD

LINEN CHUTE

TEL. CL.ELECTRICAL

CLOSET

F.H.C.

HOUSEKEEPING

SPD/O.R. SUPPLY ROOM

DECONTAMINATION

SUPPLY

SPACE

DUCT

SPACE

DUCT

STEAM STERILIZER

ELECT. CLOSET

ED. COORD.

HOUSEKEEPING

TANK STOR.

DECONTANINATION

STAIR

STAIR

MEA-39

MEA-38

MEA-44

CLOSET

CLOSET

WASHER/DISINFECTOR

BREAKOUT

STORAGE AREA

EQUIPMENT ROOM

CORRIDOR

TELECOM

FILM LIBRARY

CR READING

STATION 4

RAMP UP

UP

CR READING

STATION 3

CR READING

STATION 2

CR READING

STATION 1

FOYER 2

LIBRARY

OFFICE

COMM. CL.

COMPUTER CENTER

SPD/O.R. DECONTAMINATION

STAIR

ELECT. CL. COMPUTER ROOM

STAIR

ROOM

STERILIZER

ROOM

FOYER

SIEMENS ELECTRICAL

MECH."

"OPEN

LOCKERS VEST.

LOCKER ROOM

SHOWER AREA

LOUNGE AREA

LOCKER ROOM

NOURISHMENT

KITCHEN

DICTATION

H.A.C.

SHOWER AREA

(MALE)

(FEMALE)

(MALE)

CYSTOSCOPY ROOM #1

CYSTOSCOPY ROOM #2

INST. PREP. & STOR.

CONTROL

SUB-STER.

SCUB-UP

F.H.C.

TELEPHONE

CLOSET

ELECT. ROOM HEAD NURSE

PASSAGE

PASSAGE

CORRIDOR

ANESTHESIA OFF.

P.A.C.U.

NURSE STATION

MED. PREP.

ISOLATION ROOM

SOILED

CLEAN

TOILET

ANESTHESIA WORKROOM

CONTROL ROOM

ANESTHESIA EQUIPMENT ROOM

GENERAL OR-1 GENERAL OR-2SCRUB-UP AREA

CLEAN CORE-1

SCRUB-UP AREA

CORRIDOR

SCRUB-UP AREA

PASSAGE PASSAGE

PASSAGE

H.A.C.

GURNEY ALCOVE

SCRUB-UP AREA

PASSAGE

F.H.C. CLEAN CORE-2

CLEAN CORE

BLOOD GAS

HEART/LUNG

MACH PREP.

SPECIAL OR-5

(NEURO)

SPECIAL OR-6

(CARDIAC)

SPECIAL OR-7

(ORTHO)

SUPPORT

F.H.C.

CLEAN CORE-2

GENERAL

STORAGE

GENERAL OR-3

(EYE)

GENERAL OR-4

(ENT)

MEDICAL SUPPLY

ELECTRICAL

CLOSET

EQUIPMENT

CLEANING

STERILE SURGICAL

INSTRUMENTS

ROOM

CORRIDOR

CORRIDOR

TEL. CL.

MEDICAL GAS

CONTROL VALVES

STORAGE ROOM STORAGE ROOM

EQUIPMENT

STORAGE

ROOM

ROOM

OFFICE

FOYER

SOFFIT

STORAGE

PASSAGE PASSAGE PASSAGE

C303

C304

C3 3-1

C308

C301 C301B

C301A

D311A

D311 D311BC3 1-1

C3 6-1

B325C

B325D1

B325D

B328

B329

B325E

C3 4B-1

B317N

B317L

B327

B326A2

B326

B327A

B324

T3-2E3-2

A301

B325J

B325D4

#7

#8

B325F

E3-1

B320

C302A22 C302A22A

S3 1

S3 8

M3 4 1

M3 8 1

M3 11 1

B325D3

B319

B325G

B325K

C3 3A-1

A304

C301F

C306F

C306EC306D

C306C

C306

C306B

C306A

C306A1

C303

B325D2

C307C

S3 7

E3 6 C304B

S3 6

B325

B325D5

B326A

B325L

C304B

B336

B336A

B336A1

B339

B336B

B339B339A

B338

B336B1

B337D

B337B

B337C B337A

B337

B337E

T3 3

B335 B334

C3 6A-1

C3 6A-1B

B333 B332

B331

B331A

B331B

B331C

B331D

B331E

B331F

C309

C309B

C309

B354 B351B352

B341A

B341

C3 7-1

B353

C3 71A-1 C3 71B-1

C3 71C-1

B350

B343

B346

C3 7-1C

B346C

B349

B346B B346A

B344 B347

B348

B345

B346C

C3 C15-1

C3 6A1A-1

C3 71C-1

C3 3A-1

C3 13D-1 C3 13D-1

B340A B354B

C307BB330

C308

B339A1

A304

C306

C3 4B-1

C307

C307A

C301C

C301D

C307

B327B

C307D

KEY PLAN

TOWER

MICU AMB

T 1-14

0-HR Smoke Partition - NFPA 101-8.4

1/2-HR Smoke Barrier (NFPA 101-19.3.7.3

1-HR Smoke Barrier - NFPA 101-8.5

1-HR Fire Barrier - NFPA 101-8.3

2-HR Fire Barrier - NFPA 101-8.3

Means of Egress

Existing Wall to Remain

New Wall

Suite

Suite

Not In Scope

CODE LEGEND

SUITE #1

Patient Care, Non-sleeping (18.2.5.7.3.1 and .2)

SUITE #3

Patient Care, Non-sleeping (18.2.5.7.3.1 and .2)

Travel Distance to adjacent Suite door:

Max. Allowable - 100' Actual = 97'

Travel Distance to Exit Access Corridor:

Max. Allowable - 100' Actual = 96'

Corridor (18.2.3.4(4))

Max. Allowable - 12,500 sf Actual = 7280 sf

Max. Allowable - 12,500 sf Actual = 8,174 sf

SMOKE COMPARTMENT

Corridor (18.2.3.4(4))

A2

SMOKE COMPARTMENT

C2

SMOKE COMPARTMENT

A1

SMOKE COMPARTMENT

C1

SMOKE COMPARTMENT

A3

Travel Distance to Exit:

Max. Allowable - 200' Actual = 167'

SUITE #2

Patient Care, Non-sleeping (18.2.5.7.3.1 and .2) Max. Allowable - 12,500 sf Actual = 4640 sf

Travel Distance to Exit:

Max. Allowable - 200' Actual = 155'

Travel Distance to adjacent Suite door:

Max. Allowable - 100' Actual = 58'

Travel Distance to Exit:

Max. Allowable - 200' Actual = 167'

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0 T1.0

T1.0

Area of work:

B01 3rd Floor

S T A

T E

OF FLO

R

I D A

R E G

IS

TERED ARC

H

IT

E C T

J A S

ON

H. RO

S S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:0

:0

A M

Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor

10/18/2024

CODE DATA

G100

JWCS

546-22-143

Miami, FL

B01

Matthew King

BID DOCUMENTS

24119.00

N Scale: 3/32" = 1'-0"

3rd Floor-Code Review Plan

BUILDING CODE SUMMARY

Project Name: VA Miami, Upgrade Existing OR Suite for Fire Code Compliance

Project Number: VA# 546-22-143 / RDCJPA# 24119.00

Project Address: VA Miami Healthcare System 1201 NW 16th Street Miami, FL 33136

Project Description: Upgrade existing Third Floor OR Suite for fire code compliance

Applicable Codes:

· VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) http://www.cfm.va.gov/til/www.cfm.va.gov/til/)

· 2024 NFPA 101, Life Safety Code (LSC)

· NFPA National Fire Codes, with the exception of NFPA 5000 and NFPA 900

· 2021 International Building Code (IBC), only when specifically referenced in VA Design Documents

· Occupational, Safety and Health Administration (OSHA) Standards.

· VA Seismic Design Requirements, H-18-8

· Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13), rev. 06/01/2024

2024 NFPA 101, LIFE SAFETY CODE

Chapter 6, Classification of Occupancy and Hazard Contents Health Care, Chapter 18

Chapter 7, Means of Egress Table 7.3.1.2, Occupant Load Factor: Health Care Use No change in occupant load.

Table A.7.6, Common Path, Dead End, and Travel Distance Limits: Health Care Use, Sprinklered Common path limit: 100 feet (18.2.5.2) Dead end limit: 30 feet (18.2.5.3) Travel distance limit: 200 feet (18.2.6.2.1)

Chapter 8, Features of Fire Protection Table A.8.2.1.2, Fire Resistance Ratings for Type II (222) Construction:

Exterior bearing walls, supporting more than one floor, columns or other bearing walls: 2 hour Supporting one floor only: 2 hour Supporting Roof only: 1 hour

Interior bearing walls, supporting more than one floor, columns or other bearing walls: 2 hour Supporting one floor only: 2 hour Supporting Roof only: 1 hour

Columns, supporting more than one floor, columns or other bearing walls: 2 hour Supporting one floor only: 2 hour Supporting Roof only: 1 hour

Beams, Girders, Trusses, and Arches, supporting more than one floor, columns or other bearing walls: 2 hour Supporting one floor only: 2 hour Supporting Roof only: 1 hour

Floor/Ceiling assemblies: 2 hour Roof Ceiling assemblies: 1 hour Interior nonbearing walls: 0 hour Exterior nonbearing walls: 0 hour

Chapter 9, Building Service and Fire Protection Equipment The building is equipped with a fire alarm system in accordance with 2024 NFPA 101 LSC, Sections 9.6 / 18.3.4.1.

The building is sprinklered throughout by an approved, supervised automatic sprinkler system in accordance with 2024 NFPA 101 LSC, Sections 9.7 / 18.3.5.

The building is supplied with portable fire extinguishers in accordance with 2024 NFPA 101 LSC, Sections 9.9 / 18.3.5.12

Chapter 10, Interior Finish, Contents, and Furnishings Table A.10.2.2, Interior Finish Classification Limitations: Health Care Use Exits: Class A Exit access corridors: Class A (Class B on lower portion of corridor) Other spaces: Class A (Class B in small individual rooms) New interior finishes on walls and ceilings are limited to Class A materials, except for small rooms (see 18.3.3.2.1) and lower portion of corridor walls (see 18.3.3.2.2).

Chapter 18, New Health Care Occupancies Table 18.1.6.1, Construction Type Limitations Construction Type II (222) / IB International Building Code Equivalent, Sprinklered More than 4 stories allowed (basements shall not be considered a story) Unlimited Area (International Building Code) 18.2.5.7.1.2* Suite Separation. Suites shall be separated from the remainder of the building, and from other suites, by walls and doors meeting the requirements of 18.3.6.2 through 18.3.6.5.

18.2.5.7.1.4 Suite Subdivision. The subdivision of suites shall be by means of noncombustible or limited-combustible partitions or partitions constructed with fire-retardant-treated wood enclosed with noncombustible or limited-combustible materials, and such partitions shall not be required to be fire rated. Sleeping suites not for patient care shall comply with the provisions of 18.2.5.7.4.

18.2.5.7.3.1 Patient Care Nonsleeping Suite Means of Egress.

(A) Patient care nonsleeping suites shall have exit access to a corridor complying with 18.3.6 or to a horizontal exit, directly from the suite.

(B) Patient care nonsleeping suites of more than 2,500 sf gross shall have not less than two exit access doors remotely located from each other.

(C) For suites requiring two exit access doors, one of the exit access doors shall be permitted to be to one of the following:

(1) An exit stair

(2) An exit passageway

(3) An exit door to the exterior

(4) Another suite, provided that the separation between the suites complies with the corridor requirements of

18.3.6.2 through 18.3.6.5.

18.2.5.7.3.2 Patient Care Nonsleeping Suite Maximum Size.

(A) Nonsleeping suites shall not exceed 12,500 sf gross floor area, unless otherwise provided in 18.2.5.7.3.2 (B).

(B) Nonsleeping suites greater than 12,500 sf gross floor area and not exceeding 15,000 sf gross floor area shall be permitted where provided with total (complete) coverage automatic smoke detection in accordance with 9.6.2.9 and 18.3.4.

18.2.5.7.3.3 Patient Care Nonsleeping Suite Travel Distance.

(A) Travel distance within a nonsleeping suite to an exit access door to another suite, an exit access corridor door, or a horizontal exit door from the suite shall not exceed 100 ft.

(B) Travel distance between any point in a nonsleeping suite and an exit shall not exceed 200 ft.

18.3.6.1. Corridor Separation. Corridors shall be separated from all other areas by partitions complying with

18.3.6.2. through 18.3.6.5.

18.3.6.3.1. Doors, including doors or panels to nurse servers and pass-through openings, protecting corridor openings shall be constructed to resist the passage of smoke

18.3.6.3.5. Doors shall be self-latching and provided with positive latching hardware.

18.3.7.1. Buildings containing health care facilities shall be subdivided by smoke barriers (see 18.2.4.3) unless otherwise permitted by 18.3.7.2 and 18.3.7.3…

18.3.7.3. Any required smoke barrier shall be constructed in accordance with Section 8.5 and shall have a minimum 1 hour fire resistance rating unless otherwise permitted by one of the exceptions (see the code book).

Chapter 43, Building Rehabilitation This project is a Modification as defined in 43.2.2.1.3.

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

N

36"

V

PYXIS

ROOF

F.H.C.

PROCEDURE ROOM

CONTROL AREA

SUTURE PROCEDURE

CORRIDOR

CORRIDOR

GENERAL

#9

#10

FOYER

DUCT

SPACE

DUCT

SPACE

MECHANICAL

COVERED

CORRIDOR

STERILE SUPPLY STORAGE ROOM

SPD DECONTAMINATION

F.H.C.

SPD

F. TOILET

M. TOILET

PREPARATION AREA

CORRIDOR

ANTE

MECH."

"OPEN

F.H.C.

SUPPLY

F.H.C.

STATION

CENTRAL

HOUSEKEEPING

CHIEF SPD

SPD ADMINISTRATION

ASSISTANT

CHIEF SPD

TEL. CL.ELECTRICAL

CLOSET

F.H.C.

SPD/O.R. SUPPLY ROOM

DECONTAMINATION

SUPPLY

SPACE

DUCT

SPACE

DUCT

STEAM STERILIZER

ELECT. CLOSET

ED. COORD.

TANK STOR.

DECONTANINATION

STAIR

STAIR

MEA-39

MEA-38

MEA-44

CLOSET

WASHER/DISINFECTOR

BREAKOUT

STORAGE AREA

EQUIPMENT ROOM

CORRIDOR

FILM LIBRARY

CR READING

STATION 4

RAMP UP

UP

CR READING

STATION 3

CR READING

STATION 2

CR READING

STATION 1

FOYER 2

LIBRARY

OFFICE

COMM. CL.

COMPUTER CENTER

SPD/O.R. DECONTAMINATION

STAIR

ELECT. CL. COMPUTER ROOM

STAIR

ROOM

STERILIZER

ROOM

FOYER

SIEMENS ELECTRICAL

MECH."

"OPEN

LOCKERS VEST.

LOCKER ROOM

LOUNGE AREA

LOCKER ROOM

NOURISHMENT

KITCHEN

DICTATION

H.A.C.

SHOWER AREA

(MALE)

(FEMALE)

(MALE)

CYSTOSCOPY ROOM #1

CYSTOSCOPY ROOM #2

INST. PREP. & STOR.

CONTROL

SUB-STER.

SCUB-UP

F.H.C.

TELEPHONE

CLOSET

ELECT. ROOM HEAD NURSE

PASSAGE

PASSAGE

CORRIDOR

ANESTHESIA OFF.

P.A.C.U.

NURSE STATION

MED. PREP.

ISOLATION ROOM

SOILED

CLEAN

TOILET

ANESTHESIA WORKROOM

CONTROL ROOM

ANESTHESIA EQUIPMENT ROOM

GENERAL OR-1 GENERAL OR-2SCRUB-UP AREA

CLEAN CORE-1

SCRUB-UP AREA

CORRIDOR

SCRUB-UP AREA

PASSAGE PASSAGE

PASSAGE

H.A.C.

GURNEY ALCOVE

SCRUB-UP AREA

PASSAGE

F.H.C. CLEAN CORE-2

CLEAN CORE

BLOOD GAS

HEART/LUNG

MACH PREP.

SPECIAL OR-5

(NEURO)

SPECIAL OR-6

(CARDIAC)

SPECIAL OR-7

(ORTHO)

SUPPORT

F.H.C.

CLEAN CORE-2

GENERAL

STORAGE

GENERAL OR-3

(EYE)

GENERAL OR-4

(ENT)

MEDICAL SUPPLY

ELECTRICAL

CLOSET

EQUIPMENT

CLEANING

STERILE SURGICAL

INSTRUMENTS

ROOM

CORRIDOR

TEL. CL.

MEDICAL GAS

CONTROL VALVES

STORAGE ROOM STORAGE ROOM

EQUIPMENT

STORAGE

ROOM

ROOM

OFFICE

FOYER

SOFFIT

STORAGE

PASSAGE PASSAGE PASSAGE

C303

C304

C3 3-1

C308

C301 C301B

C301A

C3 6-1

B325C

B325D1

B325D

B328

B329

B325E

C3 4B-1

B317N

B317L

B327

B326A2

B326

B327A

B324

T3-2E3-2

B325J

B325D4

#7

#8

B325F

E3-1

B320

C302A22 C302A22A

S3 1

S3 8

M3 4 1

M3 8 1

M3 11 1

B325D3

B319

B325G

B325K

C3 3A-1

C301F

C306F

C306EC306D

C306C

C306

C306B

C306A

C306A1

C303

B325D2

C307C

S3 7

E3 6 C304B

S3 6

B325

B325D5

B326A

B325L

C304B

B336

B336A

B339

B336B

B339B339A

B338

B336B1

B337D

B337B

B337C B337A

B337

B337E

T3 3

B335 B334

C3 6A-1

C3 6A-1B

B333 B332

B331

B331A

B331B

B331C

B331D

B331E

B331F

C309

C309B

C309

B354 B351B352

B341A

B341

C3 7-1

B353

C3 71A-1 C3 71B-1

C3 71C-1

B350

B343

B346

C3 7-1C

B346C

B349

B346B B346A

B344 B347

B348

B345

B346C

C3 C15-1

C3 6A1A-1

C3 71C-1

C3 3A-1

C3 13D-1 C3 13D-1

B340A B354B

C307BB330

C308

B339A1

C306

C3 4B-1

C307

C307A

C301C

C301D

C307

B327B

C307D

KEY PLAN

TOWER

MICU AMB

T 1-14

AE102

2,3,4

AE102

8,9,10

AE102

5,6,7

AE102

28.1

8.05

T1.0

T1.0

T1.0

T1.0

T1.0

PHASE I

WORK AREAS

PHASE II

WORK AREA

C3-6A-1

C3-7-1A

28.1

PHASE III

WORK AREAS

T1.0 T1.0

T1.0

T1.0

T1.0

ABOVE

CEILING

PHOTO

C3-7-1C

FIELD VERIFY

PRESENCE OF

LATCHING

HARDWARE

Area of work:

B01 3rd Floor

S T A

T E

OF FLO

R

I D A

R E G

IS

TERED ARC

H

IT

E C T

J A S

ON

H. RO

S S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:0

:5

A M

Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor

10/18/2024

3RD FLOOR PLAN

AE101

JWCS

546-22-143

Miami, FL

B01

Matthew King

BID DOCUMENTS

24119.00

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

N Scale: 1/8" = 1'-0"

PARTIAL 3RD FLOOR PLAN N

1. All doors in suite perimeter walls shall be self-latching.

2. All new walls shall be type S1.0-N unless noted otherwise.

3. All new finishes shall match existing, including but not limited to wall finishes, wall base, corner guard, railings, et al, as required to provide a complete finished appearance.

4. Provide prefabricated, reusable, temporary non-rated construction partitions to separate construction areas from other spaces. Coordinate exact locations with COR.

5. Temporarily remove and/or modify existing ceilings and other obstructing pipes, conduits, and other items/devices as required to perform work. Reinstall the same afterward. Replace damaged ceiling tile to match existing.

6. All work shall be performed between Friday evening (6:00 pm) and Monday morning (6:00 am) as coordinated with the COR. Outside of these work hours the site shall be free of all obstructions to exit access routes.

7. Cut voids in existing ceilings, wall protection wall base, and hand/crash rail as required to construct new walls at new door openings. Provide matching end/closure pieces as required to maintain finished appearance.

8. Provide temporary directional signage to exits during construction.

9. Infection Prevention and Control Risk classification: Class 3 and 4. See specification section 01 35 26, Safety Requirements.

GENERAL NOTES

8.05 Extend existing portion of cross-corridor wall to the underside of deck as required per wall type S1.0-S. Provide 1-HR firestopping system at penetrations similar to UL SYSTEM NO. W-L-8093 or approved equal. The contractor shall field measure the existing cable tray size, locations and all other conduits, pipes which will penetrate the extended wall. The contractor shall provide this information to the firestopping manufacturer prior to order of firestopping product for an engineering judgement.

28.1 Remove and relocate scrubex dispenser to room B339A. Remove workstations noted unless identified to remain.

KEY NOTES

ABOVE CEILING PHOTO AT CABLE TRAY

A. For temporay partition locations see Demolition Plans. Temporary partitions are suggested locations. Coordinate final location in field with C.O.R.

B. Verify all conditions in the field prior to fabrication, erection and construction.

C. Coordinate phase completion and start-up with requirements as set forth by the C.O.R. to maintain daily operations to near as normal as possible.

D. Coordinate location of job dumpster with the C.O.R. so as to disrupt daily operations as little as possible.

E. Coordinate access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.

F. Temporary door locations and sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with the C.O.R.

PHASING NOTES

G

Existing HVAC, medical gases, sprinklers and water supply to be maintained throughout as required during each phase of construction.Coordinate phasing with Mechanical and Plumbing contractor. Support and protect all lines during each phase of construction.

H. Provide and maintain negative air pressure at all construction.

Coordinate with HVAC contractor. See HVAC plans for temporary venting requirements and duct locations.

I. Existing power must be maintained throughout as required during each phase of construction.

J. Coordinate sequence construction with C.O.R. so that only one side of any corridor in use is obstructed at any one time.

KEY PLAN

TOWER

MICU AMB

T 1-14

DICTATION

B339A

Protect Existing Built-In Desk

Protect Existing Built-In Desk

Remove existing workstation

28.1

2.502.50

T1.0

S1.0-N

9.019.01

8.01

27.1

C3-6A-1

CORRIDOR

C3 6A1A-1

EQ EQ

/4

T O

C O

R N

E R

T1.0

ACTACT

8'-0"

CORRIDOR

C3 6A1A-1

2.01T1.0

2.01

8'-0"

/8

2.01

2.51

2.01

CORRIDOR

C3 6A1A-1

2.52

2.01

GURNEY AREA

B343

PASSAGE

C3 71A-1

PASSAGE

C3 71B-1

PASSAGE

C3 71A-1

/2

/8

2.01

8'-0"

T1.0

T1.0

T1.0

S1.0-N

2.01

2.012.01

2.51

GURNEY AREA

B343

PASSAGE

C3 71A-1

PASSAGE

C3 71B-1

PASSAGE

C3 71A-1

27.1

8.01

9.01

Align wall to corner

S1.0-N C3-7-1A

9.01

EQ 7'-0" EQ

PASSAGE

C3 71A-1

HALL

C3 71B-1

GURNEY AREA

B343

T1.0

T1.0

T1.0

PASSAGE

C3 7-1C

Protect Existing Wall-Mounted TV

Protect Existing Med Gas Valve Box

T1.0 T1.0

C3-7-1C

27.1

8'-0"

2.012.01

PASSAGE

C3 7-1C

PASSAGE

C3 7-1C-1

T1.0T1.0 S1.0-N

9.10

8'-0"

2.012.01

PASSAGE

C3 7-1C

PASSAGE

C3 7-1C-1

2.512.51

F1

2"

SEE

SCHED. 2"

S E

E S

C H

E D

U L E

3 1/4" SEE SCHEDULE 3 1/4"

/4

S E

E S

C H

E D

U L E

F3

SEE SCHED.

S E

E S

C H

E D

U L E

N

Tempered, clear glass to match lite size at existing cross-corridor doors.

SEE PLAN

1/2" 1/2"

H1J1

8.02

9.21

9.80

8.02

9.09

9.21

9.80

8.04

S1

9.08

7.827.82 1/2" 1/2"

SEE PLAN

1/2"1/2"

8.08

9.21

9.80

8.08

9.09

9.21

9.80

H3J3

7.82

9.08

7.82

1/2" 1/2"

/4

/4

S1.0-N

NON-RATED

SMOKE PARTITION

4 7/8"

9.219.21

9.02

9.80

7.82

7.82

4 7/8"

9.219.21

9.02

9.80

7.82

7.82

S1.0-S

1-HR RATED

SMOKE BARRIER,

UL Design #U465

NON-RATED

TEMPORARY

PREFABRICATED

PARTITION

8.06

T1.0

Ceiling

3rd Floor

Underside of Existing Structure

Area of work:

B01 3rd Floor

REFLECTED CEILING PLAN LEGEND

Supply Air Diffuser

Return Air Grille

2' x 4' light fixture

2' x 2' acoustical tile ceiling

Gypsum board / portland cement plaster ceiling / soffit - painted

DEMOLITION LEGEND

Wall to be Demolished

Existing Wall to Remain

Door and Frame to be Demolished

S T A

T E

OF FLO

R

I D A

R E G

IS

TERED ARC

H

IT

E C T

J A S

ON

H. RO

S S

AR101907

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1 /2

:0

:5

A M

Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor

10/18/2024

DOOR SCHEDULE AND DETAILS

AE102

JWCS

546-22-143

Miami, FL

B01

Matthew King

BID DOCUMENTS

24119.00

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

Scale: 1/4" = 1'-0"1 Enlarged Floor Plan -B339A

Scale: 1/4" = 1'-0"2 Enlarged Floors Plan -Suite #1

Scale: 1/4" = 1'-0"3 RCP New Work- Suite #1

Scale: 1/4" = 1'-0"4 RCP Demolition - Suite #1

Scale: 1/4" = 1'-0"6 RCP New Work- Suite #2

Scale: 1/4" = 1'-0"7 RCP Demolition - Suite #2

Scale: 1/4" = 1'-0"5 Enlarged Floor Plan- Suite #2

Scale: 1/4" = 1'-0"8 Enlarged Floor Plan - Suite #2

Scale: 1/4" = 1'-0"9 RCP New Work Suite #2 South

Scale: 1/4" = 1'-0"10 RCP Demolition - Suite #2 South

DOOR SCHEDULE

DOOR #

DOOR DESCRIPTION FRAME DESCRIPTION

FIRE

RATING

HDWE

SETTYPE MAT'L

SIZE

TYPE MAT'L HEAD JAMB# W H T

C3-6A-1 N HM 2 3'-6" 7'-0" 1 3/4" 1 HM H1 J1 1

C3-7-1A N HM 2 3'-6" 7'-0" 1 3/4" 1 HM H1 J1 1

C3-7-1C N HM 2 3'-6" 7'-0" 1 3/4" 3 HM H3 J3 2

2.01 Existing ACT ceiling to remain. Modify as required to perform new work. Any damaged tile shall be replaced to match existing.

2.50 Patch, repair, and paint disturbed walls to match existing.

2.51 Temporarily remove existing ACT ceiling and grid.

2.52 Remove and salvage existing light fixture for reinstallation.

7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.

8.01 Provide new exit access door(s). Provide magnetic hold open that ties into the fire alarm.

8.02 Hollow metal frame.

8.04 Hospital stops @ all interior hollow metal frames.

8.06 Prefabricated, reusable, temporary non-rated construction partition with door.

8.08 Double egress hollow metal frame.

9.01 Modify corner guard and/or wall protection as required.

9.02 3 5/8" non-structural metal framing @ 16" o.c.

9.08 Metal framing box header.

9.09 Double metal framing at jambs, typ.

9.10 Abutt new wall to existing soffit.

9.21 5/8" Type X gypsum board.

9.80 Acoustic insulation

27.1 Ceiling mounted exit sign.

28.1 Remove and relocate scrubex dispenser to room B339A. Remove workstations noted unless identified to remain.

KEY NOTES

N

FIRE ALARM ABBREVIATIONS

1PH SINGLE-PHASE

1P SINGLE POLE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE-PHASE

4/C FOUR-CONDUCTOR

4W FOUR-WIRE

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR ARMORED CABLE

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT, ADJOINING

ADO AUTOMATIC DOOR OPENER

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

ALT ALTERNATE

AMB OR A AMBIENT

ARCH ARCHITECT

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BAT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISH FLOOR

BLDG BUILDING

BPIP BOILER PLANT INSTRUMENTATION PANEL

BYP BY PASS

C CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

COMPT COMPARTMENT

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

OC ON CENTER

OD OUTSIDE DIAMETER

P POLE

PA PUBLIC ADDRESS

PB PANELBOARD, PULL BOX, OR PUSHBUTTON

PBPU PREFABRICATED BEDSIDE PATIENT UNIT

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

RGS RIGID GALVANIZED STEEL

RM ROOM

REQD REQUIRED

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SURF SURFACE

SW SWITCH

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

WP WEATHERPROOF

DB DECIBEL OR DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISTR DISTRIBUTION

DN DOWN

DRSW DOOR SWITCH

DWG DRAWING

EC EMPTY CONDUIT

EG EQUIPMENT GROUND

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

ESMT EASEMENT

EXIST EXISTING

FLEX FLEXIBLE METALLIC CONDUIT

FOUTT TELEPHONE FLOOR OUTLET

FP FIRE PROTECTION

FT FEET OR FOOT

FU SW FUSED SWITCH

G OR GND GROUND OR GENERATOR

GEN GENERATOR

GTB GROUND TERMINAL BOX

HOA HAND-OFF-AUTOMATIC

HT HEIGHT

HZ HERTZ

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

J-BOX JUNCTION BOX

LF LINEAR FEET (FOOT)

LTNG LIGHTING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MECH MECHANICAL

MH MANHOLE

MIN MINIMUM

MT MOUNT

MTD MOUNTED

MTG MOUNTING

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEUT OR N NEUTRAL

NIC NOT IN CONTRACT

NS NO SCALE

NTS NOT TO SCALE

ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION

FA1. ALL FIRE ALARM EQUIPMENT IS TO BE NEW, UL LISTED FOR FIRE SERVICE,

AND SHALL BE COMPATIBLE WITH THE EXISTING SIMPLEX FIRE ALARM

SYSTEM.

FA2. ALL WIRING AND CONDUIT IS TO CONFORM TO NEC ARTICLE 760. WIRING

SHALL BE UL LISTED, MINIMUM 300V TYPE FPLP PLENUM RATED SOLID

COPPER OR STANDARD COPPER WITH MAXIMUM 19 STRANDS.

FA3. LOW VOLTAGE CONDUCTORS: PROVIDE CONDUCTORS IN ACCORDANCE WITH

NFPA 70 AND NFPA 72, AND AS RECOMMENDED BY THE FIRE ALARM SYSTEM

MANUFACTURER. CONDUCTORS SHALL BE COPPER, MINIMUM NO. 14 AWG,

TWISTED SHIELDED PAIR.

FA4. SURVIVABILITY: PER AUTHORITY HAVING JURISDICTION, WIRING INSTALLED IN

METAL RACEWAY WITHIN BUILDINGS THAT ARE PROTECTED THROUGHOUT BY

SPRINKLERS SHALL BE CONSIDERED TO MEET THE REQUIREMENTS FOR

PATHWAY SURVIVABILITY LEVEL 2 IN ACCORDANCE WITH NFPA 72 (2010) AS A

2-HOUR PERFORMANCE ALTERNATIVE.

FA5. PROVIDE FIRE ALARM RELAY AND DUCT DETECTOR CONNECTED TO FIRE

ALARM SYSTEM, WITHIN 5' OF ALL DUCT PENETRATIONS THROUGH

FIRE/SMOKE WALLS, WHETHER INDICATED ON ELECTRICAL OR MECHANICAL

PLANS OR NOT.

FA6. ALL FIRE ALARM POWER CIRCUITS SHALL HAVE A DEDICATED 120V 20A

BREAKER THAT SHALL BE RED IN COLOR AND MECHANICALLY PROTECTED

(LOCKABLE IN THE "ON" POSITION), MARKED AS "FIRE ALARM CIRCUIT".

FA7. MINIMUM CANDELA RATING OF STROBES IS 15CD UNLESS NOTED OTHERWISE;

"##" ADJACENT TO DEVICE INDICATES THE CANDELA RATING. PROVIDE

SYNCHRONIZATION OF STROBES IN ALL ADJACENT AREAS WHERE STROBES

ARE VISIBLE TO EACH OTHER.

FA8. FIRE ALARM DESIGN IS IN ACCORDANCE WITH THE NATIONAL FIRE

PROTECTION ASSOCIATION (NFPA 72 - 2019) AND NATIONAL FIRE CODES (NFC).

WHERE A FIRE ALARM RISER IS INDICATED, IT IS DIAGRAMMATIC IN NATURE

AND NOT INTENDED TO REPRESENT A COMPLETE WIRING AND DEVICE

DISPLAY. ALL WIRING AND DEVICES SHALL BE IN ACCORDANCE WITH

SELECTED VENDOR'S POINT-BY-POINT WIRING DIAGRAM. REFER TO FLOOR

PLAN FOR DESIGN INTENT AND PROPOSED QUANTITY OF FIRE ALARM SYSTEM

COMPONENTS.

FA9. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO

SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE FIRE

ALARM SYSTEM BE PROVIDED WITH ALL THE NECESSARY EQUIPMENT,

WIRING, CONDUIT, AND CONTROLS, COMPLETELY COORDINATED WITH ALL

DISCIPLINES. THE MINIMUM FIRE ALARM DESIGN CRITERIA IN THESE

DOCUMENTS SHALL BE STRICTLY CONFORMED TO IN ACCORDANCE WITH

61G15-30.008. ANY ITEMS AND LABOR REQUIRED FOR A COMPLETE FIRE

ALARM SYSTEM, IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS,

LOCAL AUTHORITIES AND THESE CONTRACT DOCUMENTS SHALL BE

FURNISHED AT NO ADDITIONAL COST TO THE OWNER. THE FIRE ALARM

CONTRACTOR SHALL CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND

THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS.

FA10. FIRE ALARM CONTRACTOR SHALL BE AWARE OF THE TYPE OF FINISHES,

DECOR AND OCCUPANCY. COORDINATION WITH THE STAKEHOLDERS(S)

SHALL BE PERFORMED BY THE FIRE ALARM CONTRACTOR FOR PLACEMENT

OF FIRE ALARM DEVICES.

FA11. FIRE ALARM SYSTEM SHALL COMPLY WITH NFPA 70 AND 72 FOR PROPER

INSTALLATION PRACTICES.

FA12. FIRE ALARM PATHWAYS IN ALL AREAS SHALL BE IN 3/4" EMT, AND SHALL BE

FACTORY COATED RED. ALL FIRE ALARM WIRING SHALL BE ROUTED THROUGH

CONDUIT THAT IS STRICTLY DEDICATED FOR FIRE ALARM. NO OTHER

SYSTEMS MAY UTILIZE FIRE ALARM WIRING CONDUIT OR EMT.

FA13. ALL FIRE ALARM JUNCTION BOX AND PULL BOX COVERS SHALL BE FACTORY

COATED RED.

FA14. INCREASE BATTERY CAPACITY OF FIRE ALARM SYSTEMS TO ACCOMMODATE

ADDITIONAL LOAD.

FA15. PERFORM RE-ACCEPTANCE TESTING IN ACCORDANCE WITH NFPA 72.

FA16. FIRE ALARM CIRCUITS SHALL NOT HAVE SPLICES. CIRCUITS SHALL BE

EXTENDED FROM DEVICE AND APPLIANCE SCREW TERMINALS.

FIRE ALARM SYSTEM NOTESELECTRONIC SAFETY AND SECURITY SYMBOLS

SYMBOL DESCRIPTION

ALARM, FIRE, PANEL; LETTERS INDICATE AS FOLLOWS:

FACP = CONTROL PANEL

FACP

ALARM, SPEAKER/LIGHT, ONE ASSEMBLY. ADJUSTABLE

15CD, 30CD, 75CD UNLESS OTHERWISE NOTED

DETECTOR, SMOKESD

DETECTOR, SMOKE, FOR DUCT

DOOR HOLD OPEN

THIRD FLOOR

EXISTING

SIMPLEX

FIRE ALARM

PANEL

SS

ADDRESSABLE FIRE

ALARM PANEL WITH

BATTERY BACK UP

R R

P

TYPICAL CONTROL RELAYS

INDICATING DEVICES

TYPICAL INITIATION DEVICESSD

MANUAL PULL STATION

WATERFLOW SWITCH

SMOKE DETECTOR - SPOT TYPE

INPUTS

A C

T

IV

A T

E S

T R

O B

E S

T H

R O

U G

H O

U T

B U

IL

D

IN

G

D

IS

P

LA

Y A

LA

R

M C

O N

D

IT

IO

N

A T

F

IR

E A

LA

R

M C

O N

T R

O L

P A

N E

L

D

IS

P

LA

Y S

U P

E R

V

IS

O R

Y C

O N

D

IT

IO

N

A T

F

IR

E A

LA

R

M C

O N

T R

O L

P A

N E

L

D

IS

P

LA

Y S

U P

E R

V

IS

O R

Y C

O N

D

IT

IO

N

A T

F

IR

E A

LA

R

M A

N N

U N

C

IA

T O

R P

A N

E L

D

IS

P

LA

Y T

R O

U B

LE

C

O N

D

IT

IO

N

A T

F

IR

E A

LA

R

M C

O N

T R

O L

P A

N E

L

D

IS

P

LA

Y T

R O

U B

LE

C

O N

D

IT

IO

N

A T

F

IR

E A

LA

R

M A

N N

U N

C

IA

T O

R P

A N

E L

T R

A N

S M

IT

C

O N

T A

C T

ID

T

O S

U P

E R

V

IS

IN

G

S T

A T

IO

N

R E

C A

LL

E

LE

V

A T

O R

T O

F

IR

S T

F

LO

O R

R E

C A

LL

E

LE

V

A T

O R

T O

S E

C O

N D

F

LO

O R

A C

T

IV

A T

E F

LA

S

H

IN

G E

LE

V

A T

O R

H A

T L

IG

H

T

A C

T

IV

A T

E E

LE

V

A T

O R

S H

U N

T T

R

IP

OUTPUTS

NOTIFICATION

D E

-A C

T

IV

A T

E S

O U

N D

E R

B A

S E

A C

T

IV

A T

E S

O U

N D

E R

B A

S E

A B C D E F G H I J K L M N O P

INTERFACE

X X

X X

X X

X

X

X

NOTE: THIS MATRIX IS ONLY INTENDED TO SHOW THE MAJOR SYSTEM FUNCTIONS. SYSTEM SHALL ALSO

PERFORM INPUTS/OUTPUTS REQUIRED BY NFPA 72 AND THE MANUFACTURER.

X

X

REMOTE POWER SUPPLY TROUBLE

AC POWER FAILURE

LOW BATTERY

ANY OPEN CIRCUIT

ANY GROUND FAULT

ANY NOTIFICATION APPLIANCE CIRCUIT SHORT

ANY TROUBLE

XXX

XXX

XXX

XXX

XXX

XXX

XXX

FIRE ALARM CONTROL PANEL INTERFACE X

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /F lo ri d a M ia m i V

A /0

M ia m i V

A O

R F ir e

C o d e C o m p lia n c e

R

M

E F

A .r v t

/1 /2

:5

:1

P M

FA001

FIRE ALARM LEGENDS &

SYMBOLS

Miami VAMC OR Fire Code Compliance

MIAMI VA

10/16/2024 TDB WWS

100% CONSTRUCTION

DOCUMENTS

0124021

546-22-143

SHEET LIST

SHEET NUMBER SHEET NAME

FA001 FIRE ALARM LEGENDS & SYMBOLS

FA103 FLOOR PLAN - FIRE ALARM - NEW WORK

FA501 FIRE ALARM DETAILS

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

N.T.S

FIRE ALARM RISER DIAGRAM

N.T.S

FIRE ALARM MATRIX

Revisions Date

B

A N D

R G E

N T

P R

O F

E S

S

IONA L EN

G I N

E E

R

L I CENSE

F

LO R I D A

STATE OF

No. 92822

R

ON

M SA.

V

PYXIS

ROOF

F.H.C.

PROCEDURE ROOM

CONTROL AREA

SUTURE PROCEDURE

CORRIDOR

CORRIDOR

ROOF

GENERAL

#9

MECHANICAL

COVERED

SPD DECONTAMINATION

SPD

F. TOILET

M. TOILET

PREPARATION AREA

ANTE

MECH."

"OPEN

F.H.C.

SUPPLY

HOUSEKEEPING

ASSISTANT

CHIEF SPD

F.H.C.

SPD/O.R. SUPPLY ROOM

DECONTAMINATION

SUPPLY

DECONTANINATION

STAIR

MEA-38

MEA-44

CLOSET

WASHER/DISINFECTOR

EQUIPMENT ROOM

CR READING

STATION 4

RAMP UP

CR READING

STATION 3

CR READING

STATION 2

OFFICE

COMM. CL.

SPD/O.R. DECONTAMINATION

STAIR

ELECT. CL. COMPUTER ROOM

STAIR

STERILIZER

ROOM

SIEMENS ELECTRICAL

MECH."

"OPEN

LOCKERS VEST.

LOCKER ROOM

SHOWER AREA

LOUNGE AREA

LOCKER ROOM

NOURISHMENT

KITCHEN

DICTATION

H.A.C.

SHOWER AREA

(MALE)

(FEMALE)

(MALE)

CYSTOSCOPY ROOM #1

CYSTOSCOPY ROOM #2

INST. PREP. & STOR.

CONTROL

SUB-STER.

SCUB-UP

F.H.C.

TELEPHONE

CLOSET

ELECT. ROOM HEAD NURSE

PASSAGE

PASSAGE

CORRIDOR

ANESTHESIA OFF.

P.A.C.U.

NURSE STATION

MED. PREP.

ISOLATION ROOM

SOILED

CLEAN

TOILET

ANESTHESIA WORKROOM

CONTROL ROOM

ANESTHESIA EQUIPMENT ROOM

GENERAL OR-1 GENERAL OR-2SCRUB-UP AREA

CLEAN CORE-1

SCRUB-UP AREA

CORRIDOR

SCRUB-UP AREA

PASSAGE PASSAGE

PASSAGE

H.A.C.

GURNEY ALCOVE

SCRUB-UP AREA

PASSAGE

F.H.C. CLEAN CORE-2

CLEAN CORE

BLOOD GAS

HEART/LUNG

MACH PREP.

SPECIAL OR-5

(NEURO)

SPECIAL OR-6

(CARDIAC)

SPECIAL OR-7

(ORTHO)

SUPPORT

F.H.C.

CLEAN CORE-2

GENERAL

STORAGE

GENERAL OR-3

(EYE)

GENERAL OR-4

(ENT)

MEDICAL SUPPLY

ELECTRICAL

CLOSET

EQUIPMENT

CLEANING

STERILE SURGICAL

INSTRUMENTS

ROOM

CORRIDOR

TEL. CL.

MEDICAL GAS

CONTROL VALVES

STORAGE ROOM STORAGE ROOM

EQUIPMENT

STORAGE

ROOM

ROOM

STORAGE

PASSAGE PASSAGE PASSAGE

C303

C304

C3 3-1

C308

B325D1

B325D

B328

B329

B325E

B317N

B317L

B327

B327A

B325J

B325D4

#8

S3 8

M3 8 1

M3 11 1

B325D3

B319

B325K

C306F

C306EC306D

C306A

C306A1

B325D2

C307C

S3 7

E3 6 C304B

S3 6

B325D5

B325L

C304B

B336

B336A

B336A1

B339

B336B

B339B339A

B338

B336B1

B337D

B337B

B337C B337A

B337

B337E

T3 3

B335 B334

C3 6A-1

C3 6A-1B

B333 B332

B331

B331A

B331B

B331C

B331D

B331E

B331F

C309

C309B

C309

B354 B351B352

B341A

B341

C3 7-1

B353

C3 71A-1 C3 71B-1

C3 71C-1

B350

B343

B346

C3 7-1C

B346C

B349

B346B B346A

B344 B347

B348

B345

B346C

C3 C15-1

C3 6A1A-1

C3 71C-1C3 13D-1 C3 13D-1

B340A B354B

C307BB330

C308

B339A1

C306

C3 4B-1

C307

C307A

C307

B327B

C307D

P

SD

SD

SD

SD

SD

SD

SD

SD

P

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0

T1.0

ETR 15CD

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR ETR

ETR

ETR

ETR

15CD

15CD

ETR

ETR

15CD

15CD

ETR

ETR

ETR

ETR

ETR

ETR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /F lo ri d a M ia m i V

A /0

M ia m i V

A O

R F ir e

C o d e C o m p lia n c e

R

M

E F

A .r v t

/1 /2

:5

:1

P M

FA103

FLOOR PLAN - FIRE ALARM - NEW

WORK

Miami VAMC OR Fire Code Compliance

MIAMI VA

10/16/2024 TDB WWS

100% CONSTRUCTION

DOCUMENTS

0124021

546-22-143

DRAWING NOTES:

1. REFER TO SHEET FA501 FOR ADDITIONAL DETAILS.

NN

0 4' 8' 16' 24'

1/8" = 1'-0"

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

1/8" = 1'-0"1

THIRD FLOOR PLAN - FIRE ALARM - NEW WORK

CODED NOTES:

PROVIDE FIRE ALARM CONNECTION TO NEW DOOR HOLD OPEN.

NEW DUCT DETECTOR FOR SMOKE DAMPER LOCATION. DETECTOR AND WIRED BY ELECTRICAL

CONTRACTOR AND INSTALLED IN DUCT BY MECHANICAL CONTRACTOR.

EXISTING FIRE ALARM DEVICE TO BE RELOCATED TO NEW LOCATION SHOWN. STROBE SHALL BE NO MORE THAN 15' FROM THE END OF THE CORRIDOR PER NFPA 72. EXTEND ALL FIRE ALARM WIRING AS

REQUIRED FOR DEVICE RELOCATION.

Revisions Date

B

A N D

R G E

N T

P R

O F

E S

S

IONA L EN

G I N

E E

R

L I CENSE

F

LO R I D A

STATE OF

No. 92822

R

MOTORIZED FIRE/SMOKE

DAMPER BY DIVISION 23

TYPICAL SUPPLY/

RETURN AIR

DUCT

CLOSE IN ALARM AND

VERIFY CLOSED POSITION

COMMUNICATIONS

DEVICE IN DUCT SMOKE

DETECTOR

DUCT-MOUNTED

SMOKE DETECTOR

120V POWER

A

LA

R M

S

IG

N A

L

D A

M P

E R

IS

O

P E

N /C

LO

S

E D

S

IG

N A

L

C

LO

S E

D A

M P

E R

S

IG

N A

L

FCP

ASSOCIATED

SUPPLY/RETURN

FAN

MOTOR

STARTER

BAS

N O

R M

A L

C O

N T

R O

L

BY DIVISION 26 BY DIVISION 23

BY DIVISION 26 BY DIVISION 23

SHUT-DOWN IN ALARM

1'-0" MAX.

FINISHED

FLOOR

6'-8" MIN. TO 8'-0" MAX.

FROM STROB LENS TO

FLOOR, OR

WITHIN 0'-6" OF

FINISHED CEILING,

WHICHEVER IS

LOWER

STROBE

DEVICE

SPEAKER/STROBE

COMBINATION

DEVICE

0'-4" MIN. 3'-0" MIN.

SMOKE

DETECTOR

MOUNT DETECTOR

ON APPROVED BOX 6'-0" MAX. LENGTH FLEXIBLE RACEWAY TO DEVICE MOUNTED

ON SUSPENDED CEILING

AIR SUPPLY DIFFUSER OR

RETURN AIR OPENING

JUNCTION BOX

CONDUIT

INSTALL PER NATIONAL

ELECTRIC CODE

FLOOR-CEILING

ASSEMBLY

SUSPENDED

CEILING

SMOKE

DETECTOR

NOTE: MOUNT FIRE ALARM DEVICES ON APPROVED BOXES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

VA Project No.

AG Project No.

A u to d e s k D o c s /F lo ri d a M ia m i V

A /0

M ia m i V

A O

R F ir e

C o d e C o m p lia n c e

R

M

E F

A .r v t

/1 /2

:5

:2

P M

FA501

FIRE ALARM DETAILS Miami VAMC OR Fire Code Compliance

MIAMI VA

10/16/2024 TDB WWS

100% CONSTRUCTION

DOCUMENTS

0124021

546-22-143

524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523

N.T.S.

FIRE/SMOKE DAMPER SMOKE DETECTOR

2N.T.S.

FIRE ALARM DEVICE MOUNTING DETAIL

DRAWING NOTES:

1. HALF-TONE DETAILS ARE EXISTING TO REMAIN

Revisions Date

B

A N D

R G E

N T

P R

O F

E S

S

IONA L EN

G I N

E E

R

L I CENSE

F

LO R I D A

STATE OF

No. 92822

R

SPININ TAKE-OFF

RECTANGLE-TO-ROUND TAKE-OFF

DNUP

TRANSITION, SQUARE TO ROUND

CEILING EXHAUST

CEILING RETURN

STANDARD BRANCH TAKE-OFF

RADIUS ELBOW

TRANSITION, ECCENTRIC

CHANGE OF ELEVATION

TRANSITION, CONCENTRIC

SQUARE THROAT ELBOW W/ TURNING VANES

RECTANGULAR / ROUND BRANCH TAKE-OFF

OR ROUND / ROUND BRANCH TAKE-OFF

SQUARE THROAT TEE W/ TURNING VANES

RADIUS TEE

SUPPLY DIFFUSER OR GRILLE

(VERTICAL MOUNT, SIDEWALL)

RETURN / EXHAUST REGISTER OR GRILLE

(VERTICAL MOUNT, SIDEWALL)

CEILING DIFFUSER, ROUND NECK

(CEILING DIFFUSERS ARE 4-WAY THROW UNO)

CEILING DIFFUSER, RECTANGULAR OR SQUARE

NECK (CEILING DIFFUSERS ARE 4-WAY THROW

UNO)

HVAC ABBREVIATIONSHVAC SYMBOL LEGEND

SYMBOL DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL SYMBOL DESCRIPTION

CONDENSATE

CHILLED WATER RETURN

CHILLED WATER SUPPLY

PIPING LEGEND

SYMBOL DESCRIPTION

CHWS

CHWR

CD

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLYHHWS

HHWR

ELBOW, TURNED DOWN

CAP

ELBOW, 90°

ELBOW, TURNED UP

TEE, OUTLET DOWN

ELBOW, 45°

TEE, OUTLET UP

45° PIPE RISE (R)/DROP (D)

R R

FLOW DIRECTION

BASIC MATERIALS

MANUAL BALANCING DAMPER

MOTOR OPERATED CONTROL DAMPER

(MOD)

ACCESS DOORS, VERTICAL OR

HORIZONTAL

DUCT ELBOW, RETURN AIR

DUCT ELBOW, EXHAUST AIR

DUCT ELBOW, SUPPLY OR OUTSIDE AIR

NEW DUCTWORK, FIRST DIMENSION IS

SIDE SHOWN

MOTORIZED CONTROL DAMPER

HUMIDISTAT / HUMIDITY SENSOR

THERMOSTAT / TEMPERATURE SENSOR

DUCT SMOKE DETECTOR

T

H

DOWN UP

M

CONNECT TO EXISTING

DEMOLISH TO POINT INDICATED

CARBON DIOXIDE SENSORCO2

FIRE DAMPER (WITH ACCESS PANEL)

SMOKE DAMPER (WITH ACCESS PANEL)

EXISTING TO BE REMOVED (HEAVY, DASHED LINE)

EXISTING TO REMAIN (THIN, HALFTONED, SOLID LINE)

NEW (HEAVY, SOLID LINE)

DRAWING SYMBOLS

REVISION REFERENCE1

SHEET NOTE CALLOUT1

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE

COMPONENTS INDICATED IN DETAILS, RISER DIAGRAMS, CONTROL DIAGRAMS, AND/OR FLOW

DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR

CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND

APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN

GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY

CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR

OWNER'S DESIGN STANDARDS SHALL GOVERN.

CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.

TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR

FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH

AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO

OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.

DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC

DUCT CONSTRUCTION STANDARD.

INSTALL ALL FIRE DAMPERS, SMOKE DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS IN

ACCORDANCE WITH MANUFACTURE'S INSTALLATION DIRECTIONS. PROVIDE ACCESS DOORS TO

ALLOW COMPLETE INSPECTION AND MAINTENANCE OF ALL DEVICES.

PROVIDE 1.5R ELBOWS IN DUCTWORK AS INDICATED. IF 1.5R ELBOWS DO NOT FIT, PROVIDE 1.0R ELBOWS. IF 1.0R ELBOWS DO NOT FIT, PROVIDE 90-DEGREE RECTANGULAR DUCT ELBOWS WITH

TURNING VANES.

DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT

FURNISHED.

ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE

ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.

ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.

ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR

OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.

ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO

FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.

SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.

MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.

GENERAL NOTES

24x12

SD

FD

MOD

VD

APPLICABLE CODES

1.

2.

3.

4.

A.

5.

A.

B.

C.

D.

E.

6.

A.

B.

C.

D.

E.

F.

7.

VA HVAC DESIGN MANUAL (HVACDM) REV. MARCH 2024

VA SEISMIC DESIGN REQUIREMENTS (SDR) 2023 EDITION

VA SUSTAINABLE DESIGN MANUAL (SDM) REV. AUGUST 18, 2017

AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE):

VENTILATION OF HEALTH CARE FACILITIES (ASHRAE 170) 2024 EDITION

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):

NATIONAL ELECTRICAL CODE (NEC) 2023 EDITION

NATIONAL FIRE ALARM CODE (NFPA 72) 2022 EDITION

STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS (NFPA 90A)

2024 EDITION

HEALTH CARE FACILITIES CODE (NFPA 99) 2024 EDITION

LIFE SAFETY CODE (NFPA 101) 2024 EDITION

APPLICABLE PUBLICATIONS INCLUDING BUT NOT LIMITED TO:

AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY, INC. (MSS)

OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)

APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER

DESCRIPTIONDESCRIPTION

A/E ARCHITECT / ENGINEER

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

AHU AIR HANDLING UNIT

AP ACCESS PANEL

APPROX APPROXIMATE

ASTM AMERICAN STANDARDS TESTING MATERIALS

BAS BUILDING AUTOMATION SYSTEM

BOP BOTTOM OF PIPE

BHP BRAKE HORSEPOWER

BFV BUTTERFLY VALVE

BTU BRITISH THERMAL UNIT

CAV CONSTANT AIR VOLUME

CD CONDENSATE

CFM CUBIC FEET PER MINUTE

CL CENTER LINE

CO CLEAN OUT

COR CONTRACTING OFFICER'S REPRESENTATIVE

CT COOLING TOWER

CU CONDENSING UNIT

DB DRY BULB

DDC DIRECT DIGITAL CONTROLS

DN DOWN

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATING

EQUIP EQUIPMENT

ESP EXTERNAL STATIC PRESSURE

ETR EXISTING TO REMAIN

EWT ENTERING WATER TEMPERATURE

EX EXISTING

ºF DEGREES FAHRENHEIT

FAS FIRE ALARM SYSTEM

FD FIRE DAMPER

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

HP HORSEPOWER

HR HOUR

HZ HERTZ

IPLV INTEGRATED PART-LOAD VALUE

IN INCHES

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LD LINEAR DIFFUSER

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BTUs PER HOUR

MCA MINIMUM CIRCUIT AMPS

MIN MINIMUM

MOCP MAXIMUM OVER CURRENT PROTECTION

MOD MOTORIZED CONTROL DAMPER

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAT OUTSIDE AIR TEMPERATURE

PH PHASE

PRV PRESSURE REDUCING VALVE

PRS PRESSURE REDUCING STATION

PSI POUNDS PER SQUARE INCH

PSIG PSI GAUGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

PVC POLYVINYL CHLORIDE PIPE

RA RETURN AIR

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SD SMOKE DAMPER

SF SQUARE FEET

SP STATIC PRESSURE

SPEC SPECIFICATION

SS STAINLESS STEEL

STD STANDARD

TA TRANSFER AIR

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UL UNDERWRITER'S LABORATORY

U/G UNDERGROUND

UNO UNLESS NOTED OTHERWISE

V/PH VOTS/PHASE

VA U.S. DEPARTMENT OF VETERANS AFFAIRS

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

W WATTS

W/ WITH

WB WET BULB

NOTE: SOME SYMBOLS AND ABBREVIATIONS SHOWN MAY NOT PERTAIN TO THIS PROJECT

HOSE CONNECTION

TEE, SIDE CONNECTION

GATE VALVE

BALL VALVE

12X10 SA

INTERIOR DUCT DIMENSIONS IN INCHES. FIRST DIMENSION IS SIDE

SHOWN.

TYPICAL DUCTWORK TAG

SYSTEM TYPE (SA = SUPPLY AIR , RA = RETURN AIR, OA = OUTSIDE AIR,

EA = EXHAUST AIR, SS EA = STAINLESSSTEEL EXHAUST)

HANGERS MUST NOT DEFORM DUCT SHAPE

TRAPEZE HANGERS

SIZE BOLTS FOR LOAD

STRAP OR

ANGLE

OPTIONAL ATTACHMENTS STRAP

HANGER RODS,

WIRES OR

STRAPS

BAND; ONE HALF-

ROUND MAY BE USED IF

DUCT SHAPE IS

MAINTAINED

10" DIA. MAX. 36" DIA. MAX. 24" DIA. MAX.

SECURE

WIRE

HANGER LOAD

FASTENERS

6" MAX.

FIRE RESISTIVE

MATERIAL

METAL STUD

CONSTRUCTION

CAULKING (TYP.

OF 2)

DUCT MOUNTED SMOKE

DETECTOR TO BE INSTALLED

WITHIN 5'-0" OF DAMPER PER

MANUFACTURER'S

RECOMMENDATIONS, WITH

NO AIR INLETS OR OUTLETS

BETWEEN THE DETECTOR

AND THE DAMPER.

RETAINING ANGLES 1-1/2" x 1-1\2" x 1/4" MIN.

ALL SIDES

MANUFACTURER OR FIELD

FABRICATED

STEEL SLEEVE 16 GA. MIN.

WRAPPED SHEET METAL

DUCT

U.L. (555S) LABELED

FIRE/SMOKE DAMPER,

SECURE TO SLEEVE

PLAIN "S" SLIP (TYP. BREAK-

AWAY CONNECTION)

MOUNTING ANGLE 1"

MIN. OVERLAP ALL

SIDES

CLOSURE TAPE

DUCT WRAP W/VAPOR

BARRIER (TYP.)

CLEARANCE 1/4" PER

LINEAR

FOOT BOTH DIMENSIONS.

NOTES:

D…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .