This is a set of architectural and engineering drawings for upgrading an existing Operating Room Suite to meet fire code compliance at the Miami VA Medical Center. The drawings detail construction work required across multiple disciplines including architectural modifications, fire protection, electrical, mechanical and telecommunications systems.
The drawings show installation of new fire/smoke barrier walls, self-latching doors with magnetic hold opens, combination fire/smoke dampers, duct smoke detectors, fire alarm devices, and exit signage in the 3rd floor OR suite area. Key components include extending existing cross-corridor walls to the deck, relocating scrubex dispensers and workstations, modifying electrical and data systems to accommodate the relocated equipment, and installing new fire alarm connections to door hold opens and smoke dampers. The work is to be performed in three phases during off-hours (Friday 6pm to Monday 6am) to minimize disruption to operations. The drawings provide detailed specifications for materials, mounting heights, wiring requirements, and fire-stopping methods to achieve the required fire ratings and code compliance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - Attachment 6 - RFI Responses 36C24825R0044 - 546-22-143 - BB Upgrade Existing OR Suite for Fire Code Compliance.xlsx | XLSX spreadsheet | |
| S02 - Attachment 7 - Past Performance Questionnaire.docx | DOCX document | |
| 36C24825R0044 0001.pdf | ||
| Attachment 5 - Price Matrix.xlsx | XLSX spreadsheet | |
| Attachment 3 - Wage Determination - Miami Dade.pdf | ||
| S02 Solicitation 36C24825R0044.pdf | ||
| Attachment 4 - Experience Modification Rate.pdf | ||
| Attachment 2 - AE Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
XX
X
1/A101
X
A101
XX
TOILET ACCESSORY TAGX SIGNAGE TAG
A101
SIM
X
AREA OF WORK
B01- 3RD FLOOR
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
J A S
ON
H. RO
S S
AR101907
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
RDC / JPA ARCHITECTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
ENVIRONMENTAL
611 LUNKEN PARK DRIVE
CINCINNATI, OH 45226
513.321.5816 P
TERRACON CONSULTING, INC.
ENGINEERING / MECHANICAL
305 EAST DRIVE SUITE H
MELBOURNE, FL 32904
321.345.9026 P
ABOVE GROUP, INC.
/1 /2
:0
:0
A M
Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor
10/18/2024
COVER SHEET
G001
JWCS
546-22-143
Miami, FL
B01
Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor 1201 NW 16th Street Miami, FL 33136 PROJECT #: 546-22-143
Matthew King
BID DOCUMENTS
24119.00
G001 COVER SHEET
G100 CODE DATA
AE101 3RD FLOOR PLAN
AE102 DOOR SCHEDULE AND DETAILS
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER CODES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
DRAWING INDEX
LEGEND
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,
HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS
AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL
WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. IF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
MIAMI, V.A. HEALTHCARE SYSTEM SITE PLAN
E-001 ELECTRICAL LEGENDS & SYMBOLS
ED103 3RD FLOOR PLAN- ELECTRICAL EQUIPMENT - DEMOLITION
EP103
E-601 ELECTRICAL DIAGRAMS
FA001 FIRE ALARM LEGENDS & SYMBOLS
3RD FLOOR PLAN- ELECTRICAL EQUIPMENT - NEW WORK
FA103 3RD FLOOR PLAN- FIRE ALARM - NEW WORK
E-501 ELECTRICAL DETAILS
FA501 FIRE ALARM DETAILS
M-001 MECHANICAL NOTES, LEGENDS, & SYMBOLS
MH101 3RD FLOOR PLAN- MECHANICAL - NEW WORK
T-001
T-501 TECHNOLOGY - DETAILS
TECHNOLOGY LEGEND, ABBRVIATIONS, & GENERAL NOTES
TN103 3RD FLOOR PLAN - NEW WORK
Revisions Date
F
F
F F
F
F
F
F
F
F
FFF
F F
F
F
F
F
FF
F
F
F
F F
F
F
36"
F
F
F
F
EPEP
EP
EP
PFE
F
F
F
F
EP
FF
F
EP F
F
F
F
F
F
F
F
F
F
F
F
F F
F
F
FHC/FE
SOV
F
F
F
F
F
F
F
SOV SOVFE
FE
FE
F
F
F
SOV
SOV
SOV
SOV SOV SOV SOV
FE
FE
SOV
FE
SOV
S O V
SOV
FHC
SOV
SOV
SOV
FE
FHC
V
PYXIS
ROOF
F.H.C.
PROCEDURE ROOM
CONTROL AREA
SUTURE PROCEDURE
CORRIDOR
CORRIDOR
GENERAL
#9
#10
FOYER
TOILET
FOYER STAFF LOUNGE
DUCT
SPACE
DUCT
SPACE
MECHANICAL
COVERED
CORRIDOR
CORRIDOR
STERILE SUPPLY STORAGE ROOM
SPD DECONTAMINATION
F.H.C.
SPD
F. TOILET
M. TOILET
PREPARATION AREA
CORRIDOR
ANTE
MECH."
"OPEN
F.H.C.
SUPPLY
F.H.C.
STATION
CENTRAL
HOUSEKEEPING
CHIEF SPD
SPD ADMINISTRATION
ASSISTANT
CHIEF SPD
LINEN CHUTE
TEL. CL.ELECTRICAL
CLOSET
F.H.C.
HOUSEKEEPING
SPD/O.R. SUPPLY ROOM
DECONTAMINATION
SUPPLY
SPACE
DUCT
SPACE
DUCT
STEAM STERILIZER
ELECT. CLOSET
ED. COORD.
HOUSEKEEPING
TANK STOR.
DECONTANINATION
STAIR
STAIR
MEA-39
MEA-38
MEA-44
CLOSET
CLOSET
WASHER/DISINFECTOR
BREAKOUT
STORAGE AREA
EQUIPMENT ROOM
CORRIDOR
TELECOM
FILM LIBRARY
CR READING
STATION 4
RAMP UP
UP
CR READING
STATION 3
CR READING
STATION 2
CR READING
STATION 1
FOYER 2
LIBRARY
OFFICE
COMM. CL.
COMPUTER CENTER
SPD/O.R. DECONTAMINATION
STAIR
ELECT. CL. COMPUTER ROOM
STAIR
ROOM
STERILIZER
ROOM
FOYER
SIEMENS ELECTRICAL
MECH."
"OPEN
LOCKERS VEST.
LOCKER ROOM
SHOWER AREA
LOUNGE AREA
LOCKER ROOM
NOURISHMENT
KITCHEN
DICTATION
H.A.C.
SHOWER AREA
(MALE)
(FEMALE)
(MALE)
CYSTOSCOPY ROOM #1
CYSTOSCOPY ROOM #2
INST. PREP. & STOR.
CONTROL
SUB-STER.
SCUB-UP
F.H.C.
TELEPHONE
CLOSET
ELECT. ROOM HEAD NURSE
PASSAGE
PASSAGE
CORRIDOR
ANESTHESIA OFF.
P.A.C.U.
NURSE STATION
MED. PREP.
ISOLATION ROOM
SOILED
CLEAN
TOILET
ANESTHESIA WORKROOM
CONTROL ROOM
ANESTHESIA EQUIPMENT ROOM
GENERAL OR-1 GENERAL OR-2SCRUB-UP AREA
CLEAN CORE-1
SCRUB-UP AREA
CORRIDOR
SCRUB-UP AREA
PASSAGE PASSAGE
PASSAGE
H.A.C.
GURNEY ALCOVE
SCRUB-UP AREA
PASSAGE
F.H.C. CLEAN CORE-2
CLEAN CORE
BLOOD GAS
HEART/LUNG
MACH PREP.
SPECIAL OR-5
(NEURO)
SPECIAL OR-6
(CARDIAC)
SPECIAL OR-7
(ORTHO)
SUPPORT
F.H.C.
CLEAN CORE-2
GENERAL
STORAGE
GENERAL OR-3
(EYE)
GENERAL OR-4
(ENT)
MEDICAL SUPPLY
ELECTRICAL
CLOSET
EQUIPMENT
CLEANING
STERILE SURGICAL
INSTRUMENTS
ROOM
CORRIDOR
CORRIDOR
TEL. CL.
MEDICAL GAS
CONTROL VALVES
STORAGE ROOM STORAGE ROOM
EQUIPMENT
STORAGE
ROOM
ROOM
OFFICE
FOYER
SOFFIT
STORAGE
PASSAGE PASSAGE PASSAGE
C303
C304
C3 3-1
C308
C301 C301B
C301A
D311A
D311 D311BC3 1-1
C3 6-1
B325C
B325D1
B325D
B328
B329
B325E
C3 4B-1
B317N
B317L
B327
B326A2
B326
B327A
B324
T3-2E3-2
A301
B325J
B325D4
#7
#8
B325F
E3-1
B320
C302A22 C302A22A
S3 1
S3 8
M3 4 1
M3 8 1
M3 11 1
B325D3
B319
B325G
B325K
C3 3A-1
A304
C301F
C306F
C306EC306D
C306C
C306
C306B
C306A
C306A1
C303
B325D2
C307C
S3 7
E3 6 C304B
S3 6
B325
B325D5
B326A
B325L
C304B
B336
B336A
B336A1
B339
B336B
B339B339A
B338
B336B1
B337D
B337B
B337C B337A
B337
B337E
T3 3
B335 B334
C3 6A-1
C3 6A-1B
B333 B332
B331
B331A
B331B
B331C
B331D
B331E
B331F
C309
C309B
C309
B354 B351B352
B341A
B341
C3 7-1
B353
C3 71A-1 C3 71B-1
C3 71C-1
B350
B343
B346
C3 7-1C
B346C
B349
B346B B346A
B344 B347
B348
B345
B346C
C3 C15-1
C3 6A1A-1
C3 71C-1
C3 3A-1
C3 13D-1 C3 13D-1
B340A B354B
C307BB330
C308
B339A1
A304
C306
C3 4B-1
C307
C307A
C301C
C301D
C307
B327B
C307D
KEY PLAN
TOWER
MICU AMB
T 1-14
0-HR Smoke Partition - NFPA 101-8.4
1/2-HR Smoke Barrier (NFPA 101-19.3.7.3
1-HR Smoke Barrier - NFPA 101-8.5
1-HR Fire Barrier - NFPA 101-8.3
2-HR Fire Barrier - NFPA 101-8.3
Means of Egress
Existing Wall to Remain
New Wall
Suite
Suite
Not In Scope
CODE LEGEND
SUITE #1
Patient Care, Non-sleeping (18.2.5.7.3.1 and .2)
SUITE #3
Patient Care, Non-sleeping (18.2.5.7.3.1 and .2)
Travel Distance to adjacent Suite door:
Max. Allowable - 100' Actual = 97'
Travel Distance to Exit Access Corridor:
Max. Allowable - 100' Actual = 96'
Corridor (18.2.3.4(4))
Max. Allowable - 12,500 sf Actual = 7280 sf
Max. Allowable - 12,500 sf Actual = 8,174 sf
SMOKE COMPARTMENT
Corridor (18.2.3.4(4))
A2
SMOKE COMPARTMENT
C2
SMOKE COMPARTMENT
A1
SMOKE COMPARTMENT
C1
SMOKE COMPARTMENT
A3
Travel Distance to Exit:
Max. Allowable - 200' Actual = 167'
SUITE #2
Patient Care, Non-sleeping (18.2.5.7.3.1 and .2) Max. Allowable - 12,500 sf Actual = 4640 sf
Travel Distance to Exit:
Max. Allowable - 200' Actual = 155'
Travel Distance to adjacent Suite door:
Max. Allowable - 100' Actual = 58'
Travel Distance to Exit:
Max. Allowable - 200' Actual = 167'
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0 T1.0
T1.0
Area of work:
B01 3rd Floor
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
J A S
ON
H. RO
S S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:0
:0
A M
Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor
10/18/2024
CODE DATA
G100
JWCS
546-22-143
Miami, FL
B01
Matthew King
BID DOCUMENTS
24119.00
N Scale: 3/32" = 1'-0"
3rd Floor-Code Review Plan
BUILDING CODE SUMMARY
Project Name: VA Miami, Upgrade Existing OR Suite for Fire Code Compliance
Project Number: VA# 546-22-143 / RDCJPA# 24119.00
Project Address: VA Miami Healthcare System 1201 NW 16th Street Miami, FL 33136
Project Description: Upgrade existing Third Floor OR Suite for fire code compliance
Applicable Codes:
· VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) http://www.cfm.va.gov/til/www.cfm.va.gov/til/)
· 2024 NFPA 101, Life Safety Code (LSC)
· NFPA National Fire Codes, with the exception of NFPA 5000 and NFPA 900
· 2021 International Building Code (IBC), only when specifically referenced in VA Design Documents
· Occupational, Safety and Health Administration (OSHA) Standards.
· VA Seismic Design Requirements, H-18-8
· Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13), rev. 06/01/2024
2024 NFPA 101, LIFE SAFETY CODE
Chapter 6, Classification of Occupancy and Hazard Contents Health Care, Chapter 18
Chapter 7, Means of Egress Table 7.3.1.2, Occupant Load Factor: Health Care Use No change in occupant load.
Table A.7.6, Common Path, Dead End, and Travel Distance Limits: Health Care Use, Sprinklered Common path limit: 100 feet (18.2.5.2) Dead end limit: 30 feet (18.2.5.3) Travel distance limit: 200 feet (18.2.6.2.1)
Chapter 8, Features of Fire Protection Table A.8.2.1.2, Fire Resistance Ratings for Type II (222) Construction:
Exterior bearing walls, supporting more than one floor, columns or other bearing walls: 2 hour Supporting one floor only: 2 hour Supporting Roof only: 1 hour
Interior bearing walls, supporting more than one floor, columns or other bearing walls: 2 hour Supporting one floor only: 2 hour Supporting Roof only: 1 hour
Columns, supporting more than one floor, columns or other bearing walls: 2 hour Supporting one floor only: 2 hour Supporting Roof only: 1 hour
Beams, Girders, Trusses, and Arches, supporting more than one floor, columns or other bearing walls: 2 hour Supporting one floor only: 2 hour Supporting Roof only: 1 hour
Floor/Ceiling assemblies: 2 hour Roof Ceiling assemblies: 1 hour Interior nonbearing walls: 0 hour Exterior nonbearing walls: 0 hour
Chapter 9, Building Service and Fire Protection Equipment The building is equipped with a fire alarm system in accordance with 2024 NFPA 101 LSC, Sections 9.6 / 18.3.4.1.
The building is sprinklered throughout by an approved, supervised automatic sprinkler system in accordance with 2024 NFPA 101 LSC, Sections 9.7 / 18.3.5.
The building is supplied with portable fire extinguishers in accordance with 2024 NFPA 101 LSC, Sections 9.9 / 18.3.5.12
Chapter 10, Interior Finish, Contents, and Furnishings Table A.10.2.2, Interior Finish Classification Limitations: Health Care Use Exits: Class A Exit access corridors: Class A (Class B on lower portion of corridor) Other spaces: Class A (Class B in small individual rooms) New interior finishes on walls and ceilings are limited to Class A materials, except for small rooms (see 18.3.3.2.1) and lower portion of corridor walls (see 18.3.3.2.2).
Chapter 18, New Health Care Occupancies Table 18.1.6.1, Construction Type Limitations Construction Type II (222) / IB International Building Code Equivalent, Sprinklered More than 4 stories allowed (basements shall not be considered a story) Unlimited Area (International Building Code) 18.2.5.7.1.2* Suite Separation. Suites shall be separated from the remainder of the building, and from other suites, by walls and doors meeting the requirements of 18.3.6.2 through 18.3.6.5.
18.2.5.7.1.4 Suite Subdivision. The subdivision of suites shall be by means of noncombustible or limited-combustible partitions or partitions constructed with fire-retardant-treated wood enclosed with noncombustible or limited-combustible materials, and such partitions shall not be required to be fire rated. Sleeping suites not for patient care shall comply with the provisions of 18.2.5.7.4.
18.2.5.7.3.1 Patient Care Nonsleeping Suite Means of Egress.
(A) Patient care nonsleeping suites shall have exit access to a corridor complying with 18.3.6 or to a horizontal exit, directly from the suite.
(B) Patient care nonsleeping suites of more than 2,500 sf gross shall have not less than two exit access doors remotely located from each other.
(C) For suites requiring two exit access doors, one of the exit access doors shall be permitted to be to one of the following:
(1) An exit stair
(2) An exit passageway
(3) An exit door to the exterior
(4) Another suite, provided that the separation between the suites complies with the corridor requirements of
18.3.6.2 through 18.3.6.5.
18.2.5.7.3.2 Patient Care Nonsleeping Suite Maximum Size.
(A) Nonsleeping suites shall not exceed 12,500 sf gross floor area, unless otherwise provided in 18.2.5.7.3.2 (B).
(B) Nonsleeping suites greater than 12,500 sf gross floor area and not exceeding 15,000 sf gross floor area shall be permitted where provided with total (complete) coverage automatic smoke detection in accordance with 9.6.2.9 and 18.3.4.
18.2.5.7.3.3 Patient Care Nonsleeping Suite Travel Distance.
(A) Travel distance within a nonsleeping suite to an exit access door to another suite, an exit access corridor door, or a horizontal exit door from the suite shall not exceed 100 ft.
(B) Travel distance between any point in a nonsleeping suite and an exit shall not exceed 200 ft.
18.3.6.1. Corridor Separation. Corridors shall be separated from all other areas by partitions complying with
18.3.6.2. through 18.3.6.5.
18.3.6.3.1. Doors, including doors or panels to nurse servers and pass-through openings, protecting corridor openings shall be constructed to resist the passage of smoke
18.3.6.3.5. Doors shall be self-latching and provided with positive latching hardware.
18.3.7.1. Buildings containing health care facilities shall be subdivided by smoke barriers (see 18.2.4.3) unless otherwise permitted by 18.3.7.2 and 18.3.7.3…
18.3.7.3. Any required smoke barrier shall be constructed in accordance with Section 8.5 and shall have a minimum 1 hour fire resistance rating unless otherwise permitted by one of the exceptions (see the code book).
Chapter 43, Building Rehabilitation This project is a Modification as defined in 43.2.2.1.3.
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N
36"
V
PYXIS
ROOF
F.H.C.
PROCEDURE ROOM
CONTROL AREA
SUTURE PROCEDURE
CORRIDOR
CORRIDOR
GENERAL
#9
#10
FOYER
DUCT
SPACE
DUCT
SPACE
MECHANICAL
COVERED
CORRIDOR
STERILE SUPPLY STORAGE ROOM
SPD DECONTAMINATION
F.H.C.
SPD
F. TOILET
M. TOILET
PREPARATION AREA
CORRIDOR
ANTE
MECH."
"OPEN
F.H.C.
SUPPLY
F.H.C.
STATION
CENTRAL
HOUSEKEEPING
CHIEF SPD
SPD ADMINISTRATION
ASSISTANT
CHIEF SPD
TEL. CL.ELECTRICAL
CLOSET
F.H.C.
SPD/O.R. SUPPLY ROOM
DECONTAMINATION
SUPPLY
SPACE
DUCT
SPACE
DUCT
STEAM STERILIZER
ELECT. CLOSET
ED. COORD.
TANK STOR.
DECONTANINATION
STAIR
STAIR
MEA-39
MEA-38
MEA-44
CLOSET
WASHER/DISINFECTOR
BREAKOUT
STORAGE AREA
EQUIPMENT ROOM
CORRIDOR
FILM LIBRARY
CR READING
STATION 4
RAMP UP
UP
CR READING
STATION 3
CR READING
STATION 2
CR READING
STATION 1
FOYER 2
LIBRARY
OFFICE
COMM. CL.
COMPUTER CENTER
SPD/O.R. DECONTAMINATION
STAIR
ELECT. CL. COMPUTER ROOM
STAIR
ROOM
STERILIZER
ROOM
FOYER
SIEMENS ELECTRICAL
MECH."
"OPEN
LOCKERS VEST.
LOCKER ROOM
LOUNGE AREA
LOCKER ROOM
NOURISHMENT
KITCHEN
DICTATION
H.A.C.
SHOWER AREA
(MALE)
(FEMALE)
(MALE)
CYSTOSCOPY ROOM #1
CYSTOSCOPY ROOM #2
INST. PREP. & STOR.
CONTROL
SUB-STER.
SCUB-UP
F.H.C.
TELEPHONE
CLOSET
ELECT. ROOM HEAD NURSE
PASSAGE
PASSAGE
CORRIDOR
ANESTHESIA OFF.
P.A.C.U.
NURSE STATION
MED. PREP.
ISOLATION ROOM
SOILED
CLEAN
TOILET
ANESTHESIA WORKROOM
CONTROL ROOM
ANESTHESIA EQUIPMENT ROOM
GENERAL OR-1 GENERAL OR-2SCRUB-UP AREA
CLEAN CORE-1
SCRUB-UP AREA
CORRIDOR
SCRUB-UP AREA
PASSAGE PASSAGE
PASSAGE
H.A.C.
GURNEY ALCOVE
SCRUB-UP AREA
PASSAGE
F.H.C. CLEAN CORE-2
CLEAN CORE
BLOOD GAS
HEART/LUNG
MACH PREP.
SPECIAL OR-5
(NEURO)
SPECIAL OR-6
(CARDIAC)
SPECIAL OR-7
(ORTHO)
SUPPORT
F.H.C.
CLEAN CORE-2
GENERAL
STORAGE
GENERAL OR-3
(EYE)
GENERAL OR-4
(ENT)
MEDICAL SUPPLY
ELECTRICAL
CLOSET
EQUIPMENT
CLEANING
STERILE SURGICAL
INSTRUMENTS
ROOM
CORRIDOR
TEL. CL.
MEDICAL GAS
CONTROL VALVES
STORAGE ROOM STORAGE ROOM
EQUIPMENT
STORAGE
ROOM
ROOM
OFFICE
FOYER
SOFFIT
STORAGE
PASSAGE PASSAGE PASSAGE
C303
C304
C3 3-1
C308
C301 C301B
C301A
C3 6-1
B325C
B325D1
B325D
B328
B329
B325E
C3 4B-1
B317N
B317L
B327
B326A2
B326
B327A
B324
T3-2E3-2
B325J
B325D4
#7
#8
B325F
E3-1
B320
C302A22 C302A22A
S3 1
S3 8
M3 4 1
M3 8 1
M3 11 1
B325D3
B319
B325G
B325K
C3 3A-1
C301F
C306F
C306EC306D
C306C
C306
C306B
C306A
C306A1
C303
B325D2
C307C
S3 7
E3 6 C304B
S3 6
B325
B325D5
B326A
B325L
C304B
B336
B336A
B339
B336B
B339B339A
B338
B336B1
B337D
B337B
B337C B337A
B337
B337E
T3 3
B335 B334
C3 6A-1
C3 6A-1B
B333 B332
B331
B331A
B331B
B331C
B331D
B331E
B331F
C309
C309B
C309
B354 B351B352
B341A
B341
C3 7-1
B353
C3 71A-1 C3 71B-1
C3 71C-1
B350
B343
B346
C3 7-1C
B346C
B349
B346B B346A
B344 B347
B348
B345
B346C
C3 C15-1
C3 6A1A-1
C3 71C-1
C3 3A-1
C3 13D-1 C3 13D-1
B340A B354B
C307BB330
C308
B339A1
C306
C3 4B-1
C307
C307A
C301C
C301D
C307
B327B
C307D
KEY PLAN
TOWER
MICU AMB
T 1-14
AE102
2,3,4
AE102
8,9,10
AE102
5,6,7
AE102
28.1
8.05
T1.0
T1.0
T1.0
T1.0
T1.0
PHASE I
WORK AREAS
PHASE II
WORK AREA
C3-6A-1
C3-7-1A
28.1
PHASE III
WORK AREAS
T1.0 T1.0
T1.0
T1.0
T1.0
ABOVE
CEILING
PHOTO
C3-7-1C
FIELD VERIFY
PRESENCE OF
LATCHING
HARDWARE
Area of work:
B01 3rd Floor
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
J A S
ON
H. RO
S S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:0
:5
A M
Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor
10/18/2024
3RD FLOOR PLAN
AE101
JWCS
546-22-143
Miami, FL
B01
Matthew King
BID DOCUMENTS
24119.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N Scale: 1/8" = 1'-0"
PARTIAL 3RD FLOOR PLAN N
1. All doors in suite perimeter walls shall be self-latching.
2. All new walls shall be type S1.0-N unless noted otherwise.
3. All new finishes shall match existing, including but not limited to wall finishes, wall base, corner guard, railings, et al, as required to provide a complete finished appearance.
4. Provide prefabricated, reusable, temporary non-rated construction partitions to separate construction areas from other spaces. Coordinate exact locations with COR.
5. Temporarily remove and/or modify existing ceilings and other obstructing pipes, conduits, and other items/devices as required to perform work. Reinstall the same afterward. Replace damaged ceiling tile to match existing.
6. All work shall be performed between Friday evening (6:00 pm) and Monday morning (6:00 am) as coordinated with the COR. Outside of these work hours the site shall be free of all obstructions to exit access routes.
7. Cut voids in existing ceilings, wall protection wall base, and hand/crash rail as required to construct new walls at new door openings. Provide matching end/closure pieces as required to maintain finished appearance.
8. Provide temporary directional signage to exits during construction.
9. Infection Prevention and Control Risk classification: Class 3 and 4. See specification section 01 35 26, Safety Requirements.
GENERAL NOTES
8.05 Extend existing portion of cross-corridor wall to the underside of deck as required per wall type S1.0-S. Provide 1-HR firestopping system at penetrations similar to UL SYSTEM NO. W-L-8093 or approved equal. The contractor shall field measure the existing cable tray size, locations and all other conduits, pipes which will penetrate the extended wall. The contractor shall provide this information to the firestopping manufacturer prior to order of firestopping product for an engineering judgement.
28.1 Remove and relocate scrubex dispenser to room B339A. Remove workstations noted unless identified to remain.
KEY NOTES
ABOVE CEILING PHOTO AT CABLE TRAY
A. For temporay partition locations see Demolition Plans. Temporary partitions are suggested locations. Coordinate final location in field with C.O.R.
B. Verify all conditions in the field prior to fabrication, erection and construction.
C. Coordinate phase completion and start-up with requirements as set forth by the C.O.R. to maintain daily operations to near as normal as possible.
D. Coordinate location of job dumpster with the C.O.R. so as to disrupt daily operations as little as possible.
E. Coordinate access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.
F. Temporary door locations and sizes are as required by the General Contractor. Doors will interfere with daily operations as little as possible. Confirm all locations with the C.O.R.
PHASING NOTES
G
Existing HVAC, medical gases, sprinklers and water supply to be maintained throughout as required during each phase of construction.Coordinate phasing with Mechanical and Plumbing contractor. Support and protect all lines during each phase of construction.
H. Provide and maintain negative air pressure at all construction.
Coordinate with HVAC contractor. See HVAC plans for temporary venting requirements and duct locations.
I. Existing power must be maintained throughout as required during each phase of construction.
J. Coordinate sequence construction with C.O.R. so that only one side of any corridor in use is obstructed at any one time.
KEY PLAN
TOWER
MICU AMB
T 1-14
DICTATION
B339A
Protect Existing Built-In Desk
Protect Existing Built-In Desk
Remove existing workstation
28.1
2.502.50
T1.0
S1.0-N
9.019.01
8.01
27.1
C3-6A-1
CORRIDOR
C3 6A1A-1
EQ EQ
/4
T O
C O
R N
E R
T1.0
ACTACT
8'-0"
CORRIDOR
C3 6A1A-1
2.01T1.0
2.01
8'-0"
/8
2.01
2.51
2.01
CORRIDOR
C3 6A1A-1
2.52
2.01
GURNEY AREA
B343
PASSAGE
C3 71A-1
PASSAGE
C3 71B-1
PASSAGE
C3 71A-1
/2
/8
2.01
8'-0"
T1.0
T1.0
T1.0
S1.0-N
2.01
2.012.01
2.51
GURNEY AREA
B343
PASSAGE
C3 71A-1
PASSAGE
C3 71B-1
PASSAGE
C3 71A-1
27.1
8.01
9.01
Align wall to corner
S1.0-N C3-7-1A
9.01
EQ 7'-0" EQ
PASSAGE
C3 71A-1
HALL
C3 71B-1
GURNEY AREA
B343
T1.0
T1.0
T1.0
PASSAGE
C3 7-1C
Protect Existing Wall-Mounted TV
Protect Existing Med Gas Valve Box
T1.0 T1.0
C3-7-1C
27.1
8'-0"
2.012.01
PASSAGE
C3 7-1C
PASSAGE
C3 7-1C-1
T1.0T1.0 S1.0-N
9.10
8'-0"
2.012.01
PASSAGE
C3 7-1C
PASSAGE
C3 7-1C-1
2.512.51
F1
2"
SEE
SCHED. 2"
S E
E S
C H
E D
U L E
3 1/4" SEE SCHEDULE 3 1/4"
/4
S E
E S
C H
E D
U L E
F3
SEE SCHED.
S E
E S
C H
E D
U L E
N
Tempered, clear glass to match lite size at existing cross-corridor doors.
SEE PLAN
1/2" 1/2"
H1J1
8.02
9.21
9.80
8.02
9.09
9.21
9.80
8.04
S1
9.08
7.827.82 1/2" 1/2"
SEE PLAN
1/2"1/2"
8.08
9.21
9.80
8.08
9.09
9.21
9.80
H3J3
7.82
9.08
7.82
1/2" 1/2"
/4
/4
S1.0-N
NON-RATED
SMOKE PARTITION
4 7/8"
9.219.21
9.02
9.80
7.82
7.82
4 7/8"
9.219.21
9.02
9.80
7.82
7.82
S1.0-S
1-HR RATED
SMOKE BARRIER,
UL Design #U465
NON-RATED
TEMPORARY
PREFABRICATED
PARTITION
8.06
T1.0
Ceiling
3rd Floor
Underside of Existing Structure
Area of work:
B01 3rd Floor
REFLECTED CEILING PLAN LEGEND
Supply Air Diffuser
Return Air Grille
2' x 4' light fixture
2' x 2' acoustical tile ceiling
Gypsum board / portland cement plaster ceiling / soffit - painted
DEMOLITION LEGEND
Wall to be Demolished
Existing Wall to Remain
Door and Frame to be Demolished
S T A
T E
OF FLO
R
I D A
R E G
IS
TERED ARC
H
IT
E C T
J A S
ON
H. RO
S S
AR101907
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1 /2
:0
:5
A M
Upgrade Existing OR Suite for Fire Code Compliance Building 1, 3rd Floor
10/18/2024
DOOR SCHEDULE AND DETAILS
AE102
JWCS
546-22-143
Miami, FL
B01
Matthew King
BID DOCUMENTS
24119.00
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
Scale: 1/4" = 1'-0"1 Enlarged Floor Plan -B339A
Scale: 1/4" = 1'-0"2 Enlarged Floors Plan -Suite #1
Scale: 1/4" = 1'-0"3 RCP New Work- Suite #1
Scale: 1/4" = 1'-0"4 RCP Demolition - Suite #1
Scale: 1/4" = 1'-0"6 RCP New Work- Suite #2
Scale: 1/4" = 1'-0"7 RCP Demolition - Suite #2
Scale: 1/4" = 1'-0"5 Enlarged Floor Plan- Suite #2
Scale: 1/4" = 1'-0"8 Enlarged Floor Plan - Suite #2
Scale: 1/4" = 1'-0"9 RCP New Work Suite #2 South
Scale: 1/4" = 1'-0"10 RCP Demolition - Suite #2 South
DOOR SCHEDULE
DOOR #
DOOR DESCRIPTION FRAME DESCRIPTION
FIRE
RATING
HDWE
SETTYPE MAT'L
SIZE
TYPE MAT'L HEAD JAMB# W H T
C3-6A-1 N HM 2 3'-6" 7'-0" 1 3/4" 1 HM H1 J1 1
C3-7-1A N HM 2 3'-6" 7'-0" 1 3/4" 1 HM H1 J1 1
C3-7-1C N HM 2 3'-6" 7'-0" 1 3/4" 3 HM H3 J3 2
2.01 Existing ACT ceiling to remain. Modify as required to perform new work. Any damaged tile shall be replaced to match existing.
2.50 Patch, repair, and paint disturbed walls to match existing.
2.51 Temporarily remove existing ACT ceiling and grid.
2.52 Remove and salvage existing light fixture for reinstallation.
7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.
8.01 Provide new exit access door(s). Provide magnetic hold open that ties into the fire alarm.
8.02 Hollow metal frame.
8.04 Hospital stops @ all interior hollow metal frames.
8.06 Prefabricated, reusable, temporary non-rated construction partition with door.
8.08 Double egress hollow metal frame.
9.01 Modify corner guard and/or wall protection as required.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.08 Metal framing box header.
9.09 Double metal framing at jambs, typ.
9.10 Abutt new wall to existing soffit.
9.21 5/8" Type X gypsum board.
9.80 Acoustic insulation
27.1 Ceiling mounted exit sign.
28.1 Remove and relocate scrubex dispenser to room B339A. Remove workstations noted unless identified to remain.
KEY NOTES
N
FIRE ALARM ABBREVIATIONS
1PH SINGLE-PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
AMB OR A AMBIENT
ARCH ARCHITECT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BPIP BOILER PLANT INSTRUMENTATION PANEL
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
OC ON CENTER
OD OUTSIDE DIAMETER
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
REQD REQUIRED
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SURF SURFACE
SW SWITCH
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
WP WEATHERPROOF
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISTR DISTRIBUTION
DN DOWN
DRSW DOOR SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EXIST EXISTING
FLEX FLEXIBLE METALLIC CONDUIT
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HT HEIGHT
HZ HERTZ
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
J-BOX JUNCTION BOX
LF LINEAR FEET (FOOT)
LTNG LIGHTING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MT MOUNT
MTD MOUNTED
MTG MOUNTING
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEUT OR N NEUTRAL
NIC NOT IN CONTRACT
NS NO SCALE
NTS NOT TO SCALE
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
FA1. ALL FIRE ALARM EQUIPMENT IS TO BE NEW, UL LISTED FOR FIRE SERVICE,
AND SHALL BE COMPATIBLE WITH THE EXISTING SIMPLEX FIRE ALARM
SYSTEM.
FA2. ALL WIRING AND CONDUIT IS TO CONFORM TO NEC ARTICLE 760. WIRING
SHALL BE UL LISTED, MINIMUM 300V TYPE FPLP PLENUM RATED SOLID
COPPER OR STANDARD COPPER WITH MAXIMUM 19 STRANDS.
FA3. LOW VOLTAGE CONDUCTORS: PROVIDE CONDUCTORS IN ACCORDANCE WITH
NFPA 70 AND NFPA 72, AND AS RECOMMENDED BY THE FIRE ALARM SYSTEM
MANUFACTURER. CONDUCTORS SHALL BE COPPER, MINIMUM NO. 14 AWG,
TWISTED SHIELDED PAIR.
FA4. SURVIVABILITY: PER AUTHORITY HAVING JURISDICTION, WIRING INSTALLED IN
METAL RACEWAY WITHIN BUILDINGS THAT ARE PROTECTED THROUGHOUT BY
SPRINKLERS SHALL BE CONSIDERED TO MEET THE REQUIREMENTS FOR
PATHWAY SURVIVABILITY LEVEL 2 IN ACCORDANCE WITH NFPA 72 (2010) AS A
2-HOUR PERFORMANCE ALTERNATIVE.
FA5. PROVIDE FIRE ALARM RELAY AND DUCT DETECTOR CONNECTED TO FIRE
ALARM SYSTEM, WITHIN 5' OF ALL DUCT PENETRATIONS THROUGH
FIRE/SMOKE WALLS, WHETHER INDICATED ON ELECTRICAL OR MECHANICAL
PLANS OR NOT.
FA6. ALL FIRE ALARM POWER CIRCUITS SHALL HAVE A DEDICATED 120V 20A
BREAKER THAT SHALL BE RED IN COLOR AND MECHANICALLY PROTECTED
(LOCKABLE IN THE "ON" POSITION), MARKED AS "FIRE ALARM CIRCUIT".
FA7. MINIMUM CANDELA RATING OF STROBES IS 15CD UNLESS NOTED OTHERWISE;
"##" ADJACENT TO DEVICE INDICATES THE CANDELA RATING. PROVIDE
SYNCHRONIZATION OF STROBES IN ALL ADJACENT AREAS WHERE STROBES
ARE VISIBLE TO EACH OTHER.
FA8. FIRE ALARM DESIGN IS IN ACCORDANCE WITH THE NATIONAL FIRE
PROTECTION ASSOCIATION (NFPA 72 - 2019) AND NATIONAL FIRE CODES (NFC).
WHERE A FIRE ALARM RISER IS INDICATED, IT IS DIAGRAMMATIC IN NATURE
AND NOT INTENDED TO REPRESENT A COMPLETE WIRING AND DEVICE
DISPLAY. ALL WIRING AND DEVICES SHALL BE IN ACCORDANCE WITH
SELECTED VENDOR'S POINT-BY-POINT WIRING DIAGRAM. REFER TO FLOOR
PLAN FOR DESIGN INTENT AND PROPOSED QUANTITY OF FIRE ALARM SYSTEM
COMPONENTS.
FA9. THESE DRAWINGS ARE SCHEMATIC IN NATURE AND ARE NOT INTENDED TO
SHOW ALL POSSIBLE CONDITIONS. IT IS INTENDED THAT A COMPLETE FIRE
ALARM SYSTEM BE PROVIDED WITH ALL THE NECESSARY EQUIPMENT,
WIRING, CONDUIT, AND CONTROLS, COMPLETELY COORDINATED WITH ALL
DISCIPLINES. THE MINIMUM FIRE ALARM DESIGN CRITERIA IN THESE
DOCUMENTS SHALL BE STRICTLY CONFORMED TO IN ACCORDANCE WITH
61G15-30.008. ANY ITEMS AND LABOR REQUIRED FOR A COMPLETE FIRE
ALARM SYSTEM, IN ACCORDANCE WITH ALL APPLICABLE CODES, STANDARDS,
LOCAL AUTHORITIES AND THESE CONTRACT DOCUMENTS SHALL BE
FURNISHED AT NO ADDITIONAL COST TO THE OWNER. THE FIRE ALARM
CONTRACTOR SHALL CAREFULLY REVIEW ALL CONTRACT DOCUMENTS AND
THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS.
FA10. FIRE ALARM CONTRACTOR SHALL BE AWARE OF THE TYPE OF FINISHES,
DECOR AND OCCUPANCY. COORDINATION WITH THE STAKEHOLDERS(S)
SHALL BE PERFORMED BY THE FIRE ALARM CONTRACTOR FOR PLACEMENT
OF FIRE ALARM DEVICES.
FA11. FIRE ALARM SYSTEM SHALL COMPLY WITH NFPA 70 AND 72 FOR PROPER
INSTALLATION PRACTICES.
FA12. FIRE ALARM PATHWAYS IN ALL AREAS SHALL BE IN 3/4" EMT, AND SHALL BE
FACTORY COATED RED. ALL FIRE ALARM WIRING SHALL BE ROUTED THROUGH
CONDUIT THAT IS STRICTLY DEDICATED FOR FIRE ALARM. NO OTHER
SYSTEMS MAY UTILIZE FIRE ALARM WIRING CONDUIT OR EMT.
FA13. ALL FIRE ALARM JUNCTION BOX AND PULL BOX COVERS SHALL BE FACTORY
COATED RED.
FA14. INCREASE BATTERY CAPACITY OF FIRE ALARM SYSTEMS TO ACCOMMODATE
ADDITIONAL LOAD.
FA15. PERFORM RE-ACCEPTANCE TESTING IN ACCORDANCE WITH NFPA 72.
FA16. FIRE ALARM CIRCUITS SHALL NOT HAVE SPLICES. CIRCUITS SHALL BE
EXTENDED FROM DEVICE AND APPLIANCE SCREW TERMINALS.
FIRE ALARM SYSTEM NOTESELECTRONIC SAFETY AND SECURITY SYMBOLS
SYMBOL DESCRIPTION
ALARM, FIRE, PANEL; LETTERS INDICATE AS FOLLOWS:
FACP = CONTROL PANEL
FACP
ALARM, SPEAKER/LIGHT, ONE ASSEMBLY. ADJUSTABLE
15CD, 30CD, 75CD UNLESS OTHERWISE NOTED
DETECTOR, SMOKESD
DETECTOR, SMOKE, FOR DUCT
DOOR HOLD OPEN
THIRD FLOOR
EXISTING
SIMPLEX
FIRE ALARM
PANEL
SS
ADDRESSABLE FIRE
ALARM PANEL WITH
BATTERY BACK UP
R R
P
TYPICAL CONTROL RELAYS
INDICATING DEVICES
TYPICAL INITIATION DEVICESSD
MANUAL PULL STATION
WATERFLOW SWITCH
SMOKE DETECTOR - SPOT TYPE
INPUTS
A C
T
IV
A T
E S
T R
O B
E S
T H
R O
U G
H O
U T
B U
IL
D
IN
G
D
IS
P
LA
Y A
LA
R
M C
O N
D
IT
IO
N
A T
F
IR
E A
LA
R
M C
O N
T R
O L
P A
N E
L
D
IS
P
LA
Y S
U P
E R
V
IS
O R
Y C
O N
D
IT
IO
N
A T
F
IR
E A
LA
R
M C
O N
T R
O L
P A
N E
L
D
IS
P
LA
Y S
U P
E R
V
IS
O R
Y C
O N
D
IT
IO
N
A T
F
IR
E A
LA
R
M A
N N
U N
C
IA
T O
R P
A N
E L
D
IS
P
LA
Y T
R O
U B
LE
C
O N
D
IT
IO
N
A T
F
IR
E A
LA
R
M C
O N
T R
O L
P A
N E
L
D
IS
P
LA
Y T
R O
U B
LE
C
O N
D
IT
IO
N
A T
F
IR
E A
LA
R
M A
N N
U N
C
IA
T O
R P
A N
E L
T R
A N
S M
IT
C
O N
T A
C T
ID
T
O S
U P
E R
V
IS
IN
G
S T
A T
IO
N
R E
C A
LL
E
LE
V
A T
O R
T O
F
IR
S T
F
LO
O R
R E
C A
LL
E
LE
V
A T
O R
T O
S E
C O
N D
F
LO
O R
A C
T
IV
A T
E F
LA
S
H
IN
G E
LE
V
A T
O R
H A
T L
IG
H
T
A C
T
IV
A T
E E
LE
V
A T
O R
S H
U N
T T
R
IP
OUTPUTS
NOTIFICATION
D E
-A C
T
IV
A T
E S
O U
N D
E R
B A
S E
A C
T
IV
A T
E S
O U
N D
E R
B A
S E
A B C D E F G H I J K L M N O P
INTERFACE
X X
X X
X X
X
X
X
NOTE: THIS MATRIX IS ONLY INTENDED TO SHOW THE MAJOR SYSTEM FUNCTIONS. SYSTEM SHALL ALSO
PERFORM INPUTS/OUTPUTS REQUIRED BY NFPA 72 AND THE MANUFACTURER.
X
X
REMOTE POWER SUPPLY TROUBLE
AC POWER FAILURE
LOW BATTERY
ANY OPEN CIRCUIT
ANY GROUND FAULT
ANY NOTIFICATION APPLIANCE CIRCUIT SHORT
ANY TROUBLE
XXX
XXX
XXX
XXX
XXX
XXX
XXX
FIRE ALARM CONTROL PANEL INTERFACE X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /F lo ri d a M ia m i V
A /0
M ia m i V
A O
R F ir e
C o d e C o m p lia n c e
R
M
E F
A .r v t
/1 /2
:5
:1
P M
FA001
FIRE ALARM LEGENDS &
SYMBOLS
Miami VAMC OR Fire Code Compliance
MIAMI VA
10/16/2024 TDB WWS
100% CONSTRUCTION
DOCUMENTS
0124021
546-22-143
SHEET LIST
SHEET NUMBER SHEET NAME
FA001 FIRE ALARM LEGENDS & SYMBOLS
FA103 FLOOR PLAN - FIRE ALARM - NEW WORK
FA501 FIRE ALARM DETAILS
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N.T.S
FIRE ALARM RISER DIAGRAM
N.T.S
FIRE ALARM MATRIX
Revisions Date
B
A N D
R G E
N T
P R
O F
E S
S
IONA L EN
G I N
E E
R
L I CENSE
F
LO R I D A
STATE OF
No. 92822
R
ON
M SA.
V
PYXIS
ROOF
F.H.C.
PROCEDURE ROOM
CONTROL AREA
SUTURE PROCEDURE
CORRIDOR
CORRIDOR
ROOF
GENERAL
#9
MECHANICAL
COVERED
SPD DECONTAMINATION
SPD
F. TOILET
M. TOILET
PREPARATION AREA
ANTE
MECH."
"OPEN
F.H.C.
SUPPLY
HOUSEKEEPING
ASSISTANT
CHIEF SPD
F.H.C.
SPD/O.R. SUPPLY ROOM
DECONTAMINATION
SUPPLY
DECONTANINATION
STAIR
MEA-38
MEA-44
CLOSET
WASHER/DISINFECTOR
EQUIPMENT ROOM
CR READING
STATION 4
RAMP UP
CR READING
STATION 3
CR READING
STATION 2
OFFICE
COMM. CL.
SPD/O.R. DECONTAMINATION
STAIR
ELECT. CL. COMPUTER ROOM
STAIR
STERILIZER
ROOM
SIEMENS ELECTRICAL
MECH."
"OPEN
LOCKERS VEST.
LOCKER ROOM
SHOWER AREA
LOUNGE AREA
LOCKER ROOM
NOURISHMENT
KITCHEN
DICTATION
H.A.C.
SHOWER AREA
(MALE)
(FEMALE)
(MALE)
CYSTOSCOPY ROOM #1
CYSTOSCOPY ROOM #2
INST. PREP. & STOR.
CONTROL
SUB-STER.
SCUB-UP
F.H.C.
TELEPHONE
CLOSET
ELECT. ROOM HEAD NURSE
PASSAGE
PASSAGE
CORRIDOR
ANESTHESIA OFF.
P.A.C.U.
NURSE STATION
MED. PREP.
ISOLATION ROOM
SOILED
CLEAN
TOILET
ANESTHESIA WORKROOM
CONTROL ROOM
ANESTHESIA EQUIPMENT ROOM
GENERAL OR-1 GENERAL OR-2SCRUB-UP AREA
CLEAN CORE-1
SCRUB-UP AREA
CORRIDOR
SCRUB-UP AREA
PASSAGE PASSAGE
PASSAGE
H.A.C.
GURNEY ALCOVE
SCRUB-UP AREA
PASSAGE
F.H.C. CLEAN CORE-2
CLEAN CORE
BLOOD GAS
HEART/LUNG
MACH PREP.
SPECIAL OR-5
(NEURO)
SPECIAL OR-6
(CARDIAC)
SPECIAL OR-7
(ORTHO)
SUPPORT
F.H.C.
CLEAN CORE-2
GENERAL
STORAGE
GENERAL OR-3
(EYE)
GENERAL OR-4
(ENT)
MEDICAL SUPPLY
ELECTRICAL
CLOSET
EQUIPMENT
CLEANING
STERILE SURGICAL
INSTRUMENTS
ROOM
CORRIDOR
TEL. CL.
MEDICAL GAS
CONTROL VALVES
STORAGE ROOM STORAGE ROOM
EQUIPMENT
STORAGE
ROOM
ROOM
STORAGE
PASSAGE PASSAGE PASSAGE
C303
C304
C3 3-1
C308
B325D1
B325D
B328
B329
B325E
B317N
B317L
B327
B327A
B325J
B325D4
#8
S3 8
M3 8 1
M3 11 1
B325D3
B319
B325K
C306F
C306EC306D
C306A
C306A1
B325D2
C307C
S3 7
E3 6 C304B
S3 6
B325D5
B325L
C304B
B336
B336A
B336A1
B339
B336B
B339B339A
B338
B336B1
B337D
B337B
B337C B337A
B337
B337E
T3 3
B335 B334
C3 6A-1
C3 6A-1B
B333 B332
B331
B331A
B331B
B331C
B331D
B331E
B331F
C309
C309B
C309
B354 B351B352
B341A
B341
C3 7-1
B353
C3 71A-1 C3 71B-1
C3 71C-1
B350
B343
B346
C3 7-1C
B346C
B349
B346B B346A
B344 B347
B348
B345
B346C
C3 C15-1
C3 6A1A-1
C3 71C-1C3 13D-1 C3 13D-1
B340A B354B
C307BB330
C308
B339A1
C306
C3 4B-1
C307
C307A
C307
B327B
C307D
P
SD
SD
SD
SD
SD
SD
SD
SD
P
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
T1.0
ETR 15CD
ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETR ETR
ETR
ETR
ETR
15CD
15CD
ETR
ETR
15CD
15CD
ETR
ETR
ETR
ETR
ETR
ETR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /F lo ri d a M ia m i V
A /0
M ia m i V
A O
R F ir e
C o d e C o m p lia n c e
R
M
E F
A .r v t
/1 /2
:5
:1
P M
FA103
FLOOR PLAN - FIRE ALARM - NEW
WORK
Miami VAMC OR Fire Code Compliance
MIAMI VA
10/16/2024 TDB WWS
100% CONSTRUCTION
DOCUMENTS
0124021
546-22-143
DRAWING NOTES:
1. REFER TO SHEET FA501 FOR ADDITIONAL DETAILS.
NN
0 4' 8' 16' 24'
1/8" = 1'-0"
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
1/8" = 1'-0"1
THIRD FLOOR PLAN - FIRE ALARM - NEW WORK
CODED NOTES:
PROVIDE FIRE ALARM CONNECTION TO NEW DOOR HOLD OPEN.
NEW DUCT DETECTOR FOR SMOKE DAMPER LOCATION. DETECTOR AND WIRED BY ELECTRICAL
CONTRACTOR AND INSTALLED IN DUCT BY MECHANICAL CONTRACTOR.
EXISTING FIRE ALARM DEVICE TO BE RELOCATED TO NEW LOCATION SHOWN. STROBE SHALL BE NO MORE THAN 15' FROM THE END OF THE CORRIDOR PER NFPA 72. EXTEND ALL FIRE ALARM WIRING AS
REQUIRED FOR DEVICE RELOCATION.
Revisions Date
B
A N D
R G E
N T
P R
O F
E S
S
IONA L EN
G I N
E E
R
L I CENSE
F
LO R I D A
STATE OF
No. 92822
R
MOTORIZED FIRE/SMOKE
DAMPER BY DIVISION 23
TYPICAL SUPPLY/
RETURN AIR
DUCT
CLOSE IN ALARM AND
VERIFY CLOSED POSITION
COMMUNICATIONS
DEVICE IN DUCT SMOKE
DETECTOR
DUCT-MOUNTED
SMOKE DETECTOR
120V POWER
A
LA
R M
S
IG
N A
L
D A
M P
E R
IS
O
P E
N /C
LO
S
E D
S
IG
N A
L
C
LO
S E
D A
M P
E R
S
IG
N A
L
FCP
ASSOCIATED
SUPPLY/RETURN
FAN
MOTOR
STARTER
BAS
N O
R M
A L
C O
N T
R O
L
BY DIVISION 26 BY DIVISION 23
BY DIVISION 26 BY DIVISION 23
SHUT-DOWN IN ALARM
1'-0" MAX.
FINISHED
FLOOR
6'-8" MIN. TO 8'-0" MAX.
FROM STROB LENS TO
FLOOR, OR
WITHIN 0'-6" OF
FINISHED CEILING,
WHICHEVER IS
LOWER
STROBE
DEVICE
SPEAKER/STROBE
COMBINATION
DEVICE
0'-4" MIN. 3'-0" MIN.
SMOKE
DETECTOR
MOUNT DETECTOR
ON APPROVED BOX 6'-0" MAX. LENGTH FLEXIBLE RACEWAY TO DEVICE MOUNTED
ON SUSPENDED CEILING
AIR SUPPLY DIFFUSER OR
RETURN AIR OPENING
JUNCTION BOX
CONDUIT
INSTALL PER NATIONAL
ELECTRIC CODE
FLOOR-CEILING
ASSEMBLY
SUSPENDED
CEILING
SMOKE
DETECTOR
NOTE: MOUNT FIRE ALARM DEVICES ON APPROVED BOXES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
VA Project No.
AG Project No.
A u to d e s k D o c s /F lo ri d a M ia m i V
A /0
M ia m i V
A O
R F ir e
C o d e C o m p lia n c e
R
M
E F
A .r v t
/1 /2
:5
:2
P M
FA501
FIRE ALARM DETAILS Miami VAMC OR Fire Code Compliance
MIAMI VA
10/16/2024 TDB WWS
100% CONSTRUCTION
DOCUMENTS
0124021
546-22-143
524 Fernwood Drive, Altamonte Springs, Florida 32701 |www.rdcjpa.com| 800.362.1523
N.T.S.
FIRE/SMOKE DAMPER SMOKE DETECTOR
2N.T.S.
FIRE ALARM DEVICE MOUNTING DETAIL
DRAWING NOTES:
1. HALF-TONE DETAILS ARE EXISTING TO REMAIN
Revisions Date
B
A N D
R G E
N T
P R
O F
E S
S
IONA L EN
G I N
E E
R
L I CENSE
F
LO R I D A
STATE OF
No. 92822
R
SPININ TAKE-OFF
RECTANGLE-TO-ROUND TAKE-OFF
DNUP
TRANSITION, SQUARE TO ROUND
CEILING EXHAUST
CEILING RETURN
STANDARD BRANCH TAKE-OFF
RADIUS ELBOW
TRANSITION, ECCENTRIC
CHANGE OF ELEVATION
TRANSITION, CONCENTRIC
SQUARE THROAT ELBOW W/ TURNING VANES
RECTANGULAR / ROUND BRANCH TAKE-OFF
OR ROUND / ROUND BRANCH TAKE-OFF
SQUARE THROAT TEE W/ TURNING VANES
RADIUS TEE
SUPPLY DIFFUSER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
RETURN / EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
CEILING DIFFUSER, ROUND NECK
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)
CEILING DIFFUSER, RECTANGULAR OR SQUARE
NECK (CEILING DIFFUSERS ARE 4-WAY THROW
UNO)
HVAC ABBREVIATIONSHVAC SYMBOL LEGEND
SYMBOL DESCRIPTIONSYMBOLSYMBOL DESCRIPTION SYMBOL SYMBOL DESCRIPTION
CONDENSATE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
PIPING LEGEND
SYMBOL DESCRIPTION
CHWS
CHWR
CD
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLYHHWS
HHWR
ELBOW, TURNED DOWN
CAP
ELBOW, 90°
ELBOW, TURNED UP
TEE, OUTLET DOWN
ELBOW, 45°
TEE, OUTLET UP
45° PIPE RISE (R)/DROP (D)
R R
FLOW DIRECTION
BASIC MATERIALS
MANUAL BALANCING DAMPER
MOTOR OPERATED CONTROL DAMPER
(MOD)
ACCESS DOORS, VERTICAL OR
HORIZONTAL
DUCT ELBOW, RETURN AIR
DUCT ELBOW, EXHAUST AIR
DUCT ELBOW, SUPPLY OR OUTSIDE AIR
NEW DUCTWORK, FIRST DIMENSION IS
SIDE SHOWN
MOTORIZED CONTROL DAMPER
HUMIDISTAT / HUMIDITY SENSOR
THERMOSTAT / TEMPERATURE SENSOR
DUCT SMOKE DETECTOR
T
H
DOWN UP
M
CONNECT TO EXISTING
DEMOLISH TO POINT INDICATED
CARBON DIOXIDE SENSORCO2
FIRE DAMPER (WITH ACCESS PANEL)
SMOKE DAMPER (WITH ACCESS PANEL)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
EXISTING TO REMAIN (THIN, HALFTONED, SOLID LINE)
NEW (HEAVY, SOLID LINE)
DRAWING SYMBOLS
REVISION REFERENCE1
SHEET NOTE CALLOUT1
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE
COMPONENTS INDICATED IN DETAILS, RISER DIAGRAMS, CONTROL DIAGRAMS, AND/OR FLOW
DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR
CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND
APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN
GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY
CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR
OWNER'S DESIGN STANDARDS SHALL GOVERN.
CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS.
TRANSITIONS TO ALL EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
DIMENSIONS SHALL BE FIELD-VERIFIED AND COORDINATED PRIOR TO PROCUREMENT OR
FABRICATION. COORDINATE THE WORK WITH OTHER TRADES INVOLVED. FIELD MODIFICATIONS SUCH
AS OFFSETS IN PIPING OR DUCTWORK (INCLUDING DIVIDED DUCTWORK) NEEDED DUE TO
OBSTRUCTIONS OR INTERFERENCES SHALL BE PROVIDED AT NO ADDITIONAL COST.
DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE SMACNA HVAC
DUCT CONSTRUCTION STANDARD.
INSTALL ALL FIRE DAMPERS, SMOKE DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS IN
ACCORDANCE WITH MANUFACTURE'S INSTALLATION DIRECTIONS. PROVIDE ACCESS DOORS TO
ALLOW COMPLETE INSPECTION AND MAINTENANCE OF ALL DEVICES.
PROVIDE 1.5R ELBOWS IN DUCTWORK AS INDICATED. IF 1.5R ELBOWS DO NOT FIT, PROVIDE 1.0R ELBOWS. IF 1.0R ELBOWS DO NOT FIT, PROVIDE 90-DEGREE RECTANGULAR DUCT ELBOWS WITH
TURNING VANES.
DUCT SIZES AND ALL OPENINGS THROUGH BUILDING CONSTRUCTION SHALL SUIT EQUIPMENT
FURNISHED.
ALL EQUIPMENT, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE
ADDITIONAL SUPPORTS AS REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION.
ALL DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR
OPERATION, BALANCING OR MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, TURNING VANES, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOTH FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO
FULL SIZE OF THE SUM OF BOTH BRANCHES, UPSTREAM OF SPLIT.
SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS.
MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND FIRE/SMOKE RATED PARTITIONS, TO ALLOW FOR INSPECTIONS OF RATED WALLS.
GENERAL NOTES
24x12
SD
FD
MOD
VD
APPLICABLE CODES
1.
2.
3.
4.
A.
5.
A.
B.
C.
D.
E.
6.
A.
B.
C.
D.
E.
F.
7.
VA HVAC DESIGN MANUAL (HVACDM) REV. MARCH 2024
VA SEISMIC DESIGN REQUIREMENTS (SDR) 2023 EDITION
VA SUSTAINABLE DESIGN MANUAL (SDM) REV. AUGUST 18, 2017
AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING ENGINEERS (ASHRAE):
VENTILATION OF HEALTH CARE FACILITIES (ASHRAE 170) 2024 EDITION
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):
NATIONAL ELECTRICAL CODE (NEC) 2023 EDITION
NATIONAL FIRE ALARM CODE (NFPA 72) 2022 EDITION
STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS (NFPA 90A)
2024 EDITION
HEALTH CARE FACILITIES CODE (NFPA 99) 2024 EDITION
LIFE SAFETY CODE (NFPA 101) 2024 EDITION
APPLICABLE PUBLICATIONS INCLUDING BUT NOT LIMITED TO:
AIR MOVEMENT AND CONTROL ASSOCIATION (AMCA)
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS INDUSTRY, INC. (MSS)
OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA)
APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER
DESCRIPTIONDESCRIPTION
A/E ARCHITECT / ENGINEER
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFR ABOVE FINISHED ROOF
AHU AIR HANDLING UNIT
AP ACCESS PANEL
APPROX APPROXIMATE
ASTM AMERICAN STANDARDS TESTING MATERIALS
BAS BUILDING AUTOMATION SYSTEM
BOP BOTTOM OF PIPE
BHP BRAKE HORSEPOWER
BFV BUTTERFLY VALVE
BTU BRITISH THERMAL UNIT
CAV CONSTANT AIR VOLUME
CD CONDENSATE
CFM CUBIC FEET PER MINUTE
CL CENTER LINE
CO CLEAN OUT
COR CONTRACTING OFFICER'S REPRESENTATIVE
CT COOLING TOWER
CU CONDENSING UNIT
DB DRY BULB
DDC DIRECT DIGITAL CONTROLS
DN DOWN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATING
EQUIP EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
ETR EXISTING TO REMAIN
EWT ENTERING WATER TEMPERATURE
EX EXISTING
ºF DEGREES FAHRENHEIT
FAS FIRE ALARM SYSTEM
FD FIRE DAMPER
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
HP HORSEPOWER
HR HOUR
HZ HERTZ
IPLV INTEGRATED PART-LOAD VALUE
IN INCHES
KW KILOWATT
LAT LEAVING AIR TEMPERATURE
LD LINEAR DIFFUSER
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTUs PER HOUR
MCA MINIMUM CIRCUIT AMPS
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
MOD MOTORIZED CONTROL DAMPER
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAT OUTSIDE AIR TEMPERATURE
PH PHASE
PRV PRESSURE REDUCING VALVE
PRS PRESSURE REDUCING STATION
PSI POUNDS PER SQUARE INCH
PSIG PSI GAUGE
PTAC PACKAGED TERMINAL AIR CONDITIONER
PVC POLYVINYL CHLORIDE PIPE
RA RETURN AIR
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SD SMOKE DAMPER
SF SQUARE FEET
SP STATIC PRESSURE
SPEC SPECIFICATION
SS STAINLESS STEEL
STD STANDARD
TA TRANSFER AIR
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
U/G UNDERGROUND
UNO UNLESS NOTED OTHERWISE
V/PH VOTS/PHASE
VA U.S. DEPARTMENT OF VETERANS AFFAIRS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
W WATTS
W/ WITH
WB WET BULB
NOTE: SOME SYMBOLS AND ABBREVIATIONS SHOWN MAY NOT PERTAIN TO THIS PROJECT
HOSE CONNECTION
TEE, SIDE CONNECTION
GATE VALVE
BALL VALVE
12X10 SA
INTERIOR DUCT DIMENSIONS IN INCHES. FIRST DIMENSION IS SIDE
SHOWN.
TYPICAL DUCTWORK TAG
SYSTEM TYPE (SA = SUPPLY AIR , RA = RETURN AIR, OA = OUTSIDE AIR,
EA = EXHAUST AIR, SS EA = STAINLESSSTEEL EXHAUST)
HANGERS MUST NOT DEFORM DUCT SHAPE
TRAPEZE HANGERS
SIZE BOLTS FOR LOAD
STRAP OR
ANGLE
OPTIONAL ATTACHMENTS STRAP
HANGER RODS,
WIRES OR
STRAPS
BAND; ONE HALF-
ROUND MAY BE USED IF
DUCT SHAPE IS
MAINTAINED
10" DIA. MAX. 36" DIA. MAX. 24" DIA. MAX.
SECURE
WIRE
HANGER LOAD
FASTENERS
6" MAX.
FIRE RESISTIVE
MATERIAL
METAL STUD
CONSTRUCTION
CAULKING (TYP.
OF 2)
DUCT MOUNTED SMOKE
DETECTOR TO BE INSTALLED
WITHIN 5'-0" OF DAMPER PER
MANUFACTURER'S
RECOMMENDATIONS, WITH
NO AIR INLETS OR OUTLETS
BETWEEN THE DETECTOR
AND THE DAMPER.
RETAINING ANGLES 1-1/2" x 1-1\2" x 1/4" MIN.
ALL SIDES
MANUFACTURER OR FIELD
FABRICATED
STEEL SLEEVE 16 GA. MIN.
WRAPPED SHEET METAL
DUCT
U.L. (555S) LABELED
FIRE/SMOKE DAMPER,
SECURE TO SLEEVE
PLAIN "S" SLIP (TYP. BREAK-
AWAY CONNECTION)
MOUNTING ANGLE 1"
MIN. OVERLAP ALL
SIDES
CLOSURE TAPE
DUCT WRAP W/VAPOR
BARRIER (TYP.)
CLEARANCE 1/4" PER
LINEAR
FOOT BOTH DIMENSIONS.
NOTES:
D…