Attachment 5_N6426726R1025.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Hardwood Range WISS v5 Tower Federal contract opportunity
Solicitation number
N6426726R1025
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This file is a Construction Cost Estimate Breakdown template for a naval construction project. The document is associated with Solicitation Number N6426726R1025 for constructing two 80-foot towers at the Necedah, Wisconsin Hardwood Range for the Naval Surface Warfare Center (NSWC) Corona Division. The template provides a detailed framework for contractors to itemize project costs, including columns for material costs, labor costs, other direct costs, quantities, and line-item totals across multiple contract options (Option 0001, Option 0002). The cost breakdown allows for granular pricing of construction elements, with instructions for completing each column, and includes sections for calculating total material costs, labor costs, overhead, profit, bonds, and the total project cost. The procurement is an all-or-none requirement with a Firm-Fixed-Price contract type, and proposals must be submitted electronically in PDF format to julian.p.garibay.civ@us.navy.mil by the specified response date.

View the file

Other files for this federal contract opportunity

Other files attached to Hardwood Range WISS v5 Tower, newest first.
File Type Posted
Attachment 2_N6426726R1025_20260113.pdf PDF
Solicitation Amendment_N6426726R10250001_Conformed Copy.pdf PDF
C9_SF30_N6426726R1025_0001.pdf PDF
Questions and Answers_N6426726R1025_20260115.pdf PDF
Attachment 1_N6426726R1025.pdf PDF
Attachment 2_N6426726R1025.pdf PDF
Attachment 4_N6426726R1025.pdf PDF
C8_RFP_N6426726R1025.pdf PDF
Attachment 3_N6426726R1025.pdf PDF
A5_CDRL_A001-A004_N6426726R1025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Option 0001

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

Option 0002

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
$0
SOLICITATION NUMBERPROJECT NUMBERWORK LOCATION
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
LINE NO.ITEMQTYUOMUNITTOTALUNITTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
SUBTOTALS$0.00$0.00$0.00$0.00

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

BACK

INSTRUCTIONS FOR COMPLETING

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.

Col 2 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 3).

Col 3 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square
feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB).

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for the item listed in column 1.

Col 6 and 7 Labor Costs. Enter in col 6 the average rate per manhour or manday and in col 7 the total cost needed to perform the work listed in column 1.

Col 8 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.

Col 9 Line Total. Self-explanatory.

NOTE: In addition to other totals entered on various pages, the grand total plus overhead and profit will be shown on the last page as follows.

TOTAL MATERIAL COSTS$0.00
TOTAL LABOR COSTS$0.00
TOTAL OTHER DIRECT COSTS$0.00
TOTAL DIRECT COSTS$0.00
OVERHEAD%$0.00
PROFIT%$0.00
SUBTOTAL$0.00
BOND%$0.00
TOTAL PROJECT COST$0.00

DATE FIRM NAME

TITLEBY
(Signature)

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

&"Arial,Bold"&16FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .