About this file
This file is a Construction Cost Estimate Breakdown template for a naval construction project. The document is associated with Solicitation Number N6426726R1025 for constructing two 80-foot towers at the Necedah, Wisconsin Hardwood Range for the Naval Surface Warfare Center (NSWC) Corona Division. The template provides a detailed framework for contractors to itemize project costs, including columns for material costs, labor costs, other direct costs, quantities, and line-item totals across multiple contract options (Option 0001, Option 0002). The cost breakdown allows for granular pricing of construction elements, with instructions for completing each column, and includes sections for calculating total material costs, labor costs, overhead, profit, bonds, and the total project cost. The procurement is an all-or-none requirement with a Firm-Fixed-Price contract type, and proposals must be submitted electronically in PDF format to julian.p.garibay.civ@us.navy.mil by the specified response date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2_N6426726R1025_20260113.pdf | ||
| Solicitation Amendment_N6426726R10250001_Conformed Copy.pdf | ||
| C9_SF30_N6426726R1025_0001.pdf | ||
| Questions and Answers_N6426726R1025_20260115.pdf | ||
| Attachment 1_N6426726R1025.pdf | ||
| Attachment 2_N6426726R1025.pdf | ||
| Attachment 4_N6426726R1025.pdf | ||
| C8_RFP_N6426726R1025.pdf | ||
| Attachment 3_N6426726R1025.pdf | ||
| A5_CDRL_A001-A004_N6426726R1025.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |
| $0 | ||
| SOLICITATION NUMBER | PROJECT NUMBER | WORK LOCATION |
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | QTY | UOM | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) |
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Option 0001
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |
| $0 | ||
| SOLICITATION NUMBER | PROJECT NUMBER | WORK LOCATION |
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | QTY | UOM | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) |
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
Option 0002
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |
| $0 | ||
| SOLICITATION NUMBER | PROJECT NUMBER | WORK LOCATION |
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | ||||||
| LINE NO. | ITEM | QTY | UOM | UNIT | TOTAL | UNIT | TOTAL | ||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) |
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | ||
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 |
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
&"Arial,Bold"&16FOR OFFICIAL USE ONLY
BACK
INSTRUCTIONS FOR COMPLETING
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to |
| permit itemizing of all direct costs. |
Col 2 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 3).
| Col 3 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square |
| feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB). |
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for the item listed in column 1.
Col 6 and 7 Labor Costs. Enter in col 6 the average rate per manhour or manday and in col 7 the total cost needed to perform the work listed in column 1.
| Col 8 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract |
| and of significant dollar value. |
Col 9 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total plus overhead and profit will be shown on the last page as follows.
| TOTAL MATERIAL COSTS | $0.00 | |
| TOTAL LABOR COSTS | $0.00 | |
| TOTAL OTHER DIRECT COSTS | $0.00 | |
| TOTAL DIRECT COSTS | $0.00 | |
| OVERHEAD | % | $0.00 |
| PROFIT | % | $0.00 |
| SUBTOTAL | $0.00 | |
| BOND | % | $0.00 |
| TOTAL PROJECT COST | $0.00 |