Attachment 5 LOCUST BID DOCUMENT 20220429.pdf
PDF 33 MB Posted
- Solicitation number
- 36C77623B0033
About this file
This federal contract opportunity solicitation requests construction services to convert residential lots to paved parking areas at a Veterans Affairs facility in Reno, Nevada. The Department of Veterans Affairs Technology Acquisition Center Austin issued solicitation number 36C77623B0033 seeking offers for minor construction work including site preparation, paving, curb and gutter installation, and signage. Offerors must submit proposals by April 29, 2022 to be considered for award of a fixed-price contract with an anticipated period of performance between June and August 2022. The solicitation targets small businesses and encourages responses from Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Additional Technical Questions 2.docx | DOCX document | |
| 36C77623B0033 0002.docx | DOCX document | |
| Copy of Parking Lot Sign In.xlsx | XLSX spreadsheet | |
| 36C77623B0033 0001.docx | DOCX document | |
| S05 - Contractor Technical Questions - answers.pdf | ||
| Reno VAMC Asbestos Survey (Draft).pdf | ||
| Reno VAMC LBP Screening Report (Draft).pdf | ||
| Attachment 1 Statement of Work.pdf | ||
| Attachment 3 Site Visit.docx | DOCX document | |
| Attachment 2 Specifications Bid 20220429.pdf | ||
| 36C77623B0033_1.docx | DOCX document | |
| Attachment 9 - DBA Wage Rate.pdf | ||
| Attachment 7 TAYLOR BID DOCUMENT PART 1 20220429.pdf | ||
| Attachment 4 - Contractor Safety - Environmental Form.docx | DOCX document | |
| Attachment 8 TAYLOR BID DOCUMENT PART 2 20220429.pdf | ||
| Attachment 6 WILSON BID DOCUMENT 20220429.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
COVER SHEET
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
GI000
STRUBLEPERKINS04/29/2022
VA Sierra Nevada Health Care System
BID DOCUMENTS
APRIL 29, 2022
NORTH
VICINITY MAP
LOCATION MAP
NORTH
SHEET INDEX
SHEET NUMBER SHEET DESCRIPTION
GI000 COVER SHEET
VF101 CIVIL SITE SURVEY PLAN
CD101 CIVIL DEMOLITION PLAN
CS101 CIVIL SITE PLAN
CG101 CIVIL GRADING PLAN
CG102 STORMWATER PROTECTION PLAN
CG501 CIVIL GRADING DETAILS 1
CG502 CIVIL GRADING DETAILS 2
CG503 CIVIL GRADING DETAILS 3
CT101 CIVIL UTILITY AND TRAFFIC PLAN
CT501 CALL BOX DETAILS
LP100 PLANTING NOTES
LP101 PLANTING PLAN
LP501 PLANTING DETAILS
LI100 IRRIGATION NOTES
LI101 IRRIGATION PLAN
LI501 IRRIGATION DETAILS
A-001 SYMBOLS, AND GENERAL NOTES
AD101 SITE DEMOLITION - 524 & 530 TAYLOR STREET
A-201 EXTERIOR ELEVATIONS - 530 TAYLOR STREET
ED101 ELECTRICAL DEMOLITION PLAN - 524/530 TAYLOR STREET
E-101 ELECTRICAL SITE PLAN - 524/530 TAYLOR STREET
E-102 LIGHTING PHOTOMETRIC PLAN
PROJECT LOCATION
PROJECT LOCATION
VISN 21 PROJECT NO.: 654-19-823
CONTRACT NO.: VA261-17-D-0088
CONVERT PROCURED RESIDENTIAL LOTS TO
SURFACE LEVEL ASPHALT PAVED PARKING
524/530 EAST TAYLOR STREET
APN: 013-171-05, 013-171-06
PROJECT SCOPE
CLIENT:
VA Sierra Nevada Health Care System - VISN 21
Contracting Officer (CO) - Charee Harris Contracting Officer's Representative (COR) - Mike Rowley
975 Kirman Avenue Reno, NV 89502
U.S. Department of Veterans Affairs
THIS SET OF CONSTRUCTION DOCUMENTS PERTAINS ONLY TO THE 524/530 E. TAYLOR PROJECT SITE.
As described in the VA scope of work (SOW) document, the SOW shall include the following:
Description:
1. 1.a The project intent is to complete design documents (drawings, specifications and cost estimates) to allow for conversion of five(5) separate property lots currently housing approximately ten (10) separate structures (including one rental apartment four-plex) into paved asphalt surface parking lots. Priority is to provide the maximum number of new parking spaces. Construction shall include any associated new structures, sidewalks, curbs, foundations, pavement, driveways, signage, utilities, metering, ancillary equipment, etc.
1.b Given the age of some of the existing structures it's likely that asbestos abatement, lead paint elimination, PCB removal and other similar remediation efforts will be necessary at some, if not all, of the structures procured by the facility. Therefore, the design project scope shall include a hazardous material abatement portion to assure these items are removed from the structures and properly disposed of. Additionally, it must be assumed that some if not all of the properties to be covered within the design scope contain underground fuel tanks which served furnaces to heat the structures. The design documents shall include all information necessary to allow for removal and proper disposal of any underground fuel tanks and piping systems.
1.c The design package shall include complete demolition documents to assure complete removal of the existing structures, substructures, foundations, slabs, sidewalks, driveways, utilities, metering, etc. which served the structures to be removed as part of this design scope. All new drive approaches, sidewalks, signage and drainage shall conform to City of Reno design standards where applicable.
1.d All recent projects on facility grounds which have required below surface work have resulted in a stoppage of the project when the contractor encountered unforeseen below surface conditions. The design scope shall include a geotechnical report for the areas under consideration as necessary to reduce the probability that, once below surface work begins, unforeseen conditions will result in project delays.
1.e The design package shall include all documents necessary to allow for the conversion of all the lots to asphalt paved surface level parking sloped to drain with storm water pollution prevention plan per local requirements. The parcels are federal property and shall comply with all Veterans Affairs (DVA) standards for Surface Level Parking including the Parking Design Manual, Parking Lot and Exterior Signage, Physical Security Design Manual, Telecommunications and Special Telecommunications and other DVA design guides and manuals. City of Reno design standards apply for public easement areas, i.e. driveways, sidewalk, curbs, etc.
Where DVA standards differ or conflict with City standards, the design shall follow the more stringent of the two standards. Lots are to be complete, asphalt paved, striped, lighted and sloped for proper drainage. Additionally, 1030 Wilson shall include:
Fully striped and marked lot, sloped to drain with storm-water pollution prevention per local requirements Parking bumpers at the head of each stall with adequate separation.
space to accommodate two DUV with approximate dimensions of 30'L x 9'W x 13'H each. Provide dedicated 120volt, 20amp GFI receptacles as shown on the electrical plans.
This lot shall be enclosed with CMU walls, vehicular gates and pedestrian doors with corresponding security access. Gates and operating motors shall have vehicle impact protection.
type II, charging stations to support PEV (plug-in electric vehicles) with designated signage for dedicated PEV parking only as shown on the plans Provide security camera system connecting to the VA police facility's existing main security control center on the main campus.
Scope of Work also includes installing a key-box off-site in the VA Medical Center Lobby, and a Security Camera for monitoring purposes. These devices shall be incorporated into the Existing Lenel Security System. Coordinate location, equipment requirements, and access with the COR. See utility and electrical plans for additional information.
1.f Landscaping shall comply with local zoning ordinances and VA landscaping requirements, compatible with current neighborhood aesthetics per State Preservation Historic Office (e.g., landscaping, foliage, trees, lighting, etc.) and to minimize adverse effects on surrounding historic properties to the extent practicable. Landscaping irrigation shall have a dedicated water meter where applicable. The Landscape Architect shall have specific experience in landscape design with High Desert environments, similar to the design location or be able to demonstrate equivalent design experience. Lots shall be properly lighted, per ASHRAE
90.1 and applicable IES standards.
1.g The three locations where the work is to occur are the following resident lots in Reno, Nevada:
1. 1000-1040 Wilson Street (4-unit apartment complex)
2. 524 and 526 East Taylor(adjoined lots - four residential structures), 530 East Taylor Street and 925 Locust Street (adjoined lots - four residential structures)
3. 633 Eat Taylor, 635 and 635A East Taylor Street (three residential structures) The Wilson Street lot is the location that has been designated for use by Government Vehicles and DUV (dual use vehicle) only.
1.h The Government Vehicle Lot will be designed to incorporate the following features:
Fully striped and marked lot, with a minimum of two van accessible parking spaces.
Parking bumpers at the head of each stall with adequate separation.
One stall sized to accommodate a DUV with approximate dimensions of 30'L x 9'W x 13'H. Provide a dedicated 120volt, 20amp GFI receptacle with exact location
TBD.
This lot shall be walled to provide additional security for the vehicles located therein. Wall to consist of precast concrete or CMU or other rigid fencing TBD. A-E to provide a minimum of three options to prevent access by unauthorized persons. One access gate into the lot with keypad entry and one access gate out of the lot with sensor operation. Gates and operating motors shall have vehicle impact protection. KeyBank system, www.morsewatchmans.com (Brand Name or Equal)
A total of (16) type II, charging stations to support PEV (plug-in electric vehicles) with designated signage for dedicated PEV parking only.
ttps://avt.inl.gov/sites/default/files/pdf/presentations/InterfuelsDCJune2016.pdf
Provide security stored loop feed cameras or cameras connecting the VA police facility's existing main security control center on the main campus. Design shall incorporate wireless technology as much as feasible within VA requirements for physical security. Provide adequate separation between bumper stops and adjacent signage, charging station equipment and other appurtenances. Provide heavy duty or flexible posts, and/or bollards where required. Signage may be located on fencing or other structures, where appropriate to prevent damage from vehicular traffic.
1.i The other two lots will include the following features:
Fully striped, marked with ADA compliant parking including a minimum 3% of stalls for handicap parking per VA standards. Parking bumpers at the head of each stall with adequate separation.
CONTRACTOR NOTE
ALL WORK WITHIN CITY OF RENO RIGHT OF WAY TO MEET CITY OF
RENO STANDARDS AND SPECIFICATIONS. ALL WORK WITHIN VA
PROPERTY TO MEET VA STANDARDS AND SPECIFICATIONS
/29
/20
N89° 56' 21.64"W 50.01'
N89° 55' 59.52"W 50.03'
N0 ° 5
0' 1 7.4
0"E
0.1 4'
S0 ° 5
0' 4 2.6
5"W
0.1 1'
S0 ° 5
1' 1 3.2
5"W
0.1 0'
5' SPPCO EASEMENT
PER DOC NO. 713181
EXISTING BUILDING EXISTING BUILDING
N89° 58' 51.27"W 50.02'
N89° 56' 33.87"W 50.03'
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE PROPERTY LINE
EX. WATER
EX. WATER
EX. WATER
EX
. W
AT
ER
EX
. W
AT
ER
EX
. W
AT
ER
EX. SAN. SEWER
EX
. S
AN
. S
EW
ER
EX. S.D.
EX
. S
.D
EX
. G
AS
EX. GAS
EX
. G
AS
EX
. G
AS
EX
. W
AT
ER
EX
. W
AT
ER
EX
. W
AT
ER
EX
. W
AT
ER
EX
. G
AS
EX
. O
VH
D
TE
LE
EX
. O
VH
D
TE
LE
EX
. E
LE
CT
RI
CA
L
CONSTRUCT SAFETY SIGN
1"=10'F1 CIVIL SITE SURVEY PLAN
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CIVIL SITE SURVEY PLAN
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
VF101
STRUBLEPERKINS04/29/2022
010' 10' 20'5'
F/F FACE TO FACE
FF EL FINISH FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOW LINE
FOC FACE OF CURB
FT FEET OR FOOT
FTG FOOTING
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HNDRL HANDRAIL
HORIZ HORIZONTAL
ID INSIDE DIAMETER OR INSIDE
DIMENSION
INFO INFORMATION
INV INVERT
INV EL INVERT ELEVATION
LAT LATITUDE
LF LINEAR FEET (FOOT)
LOC LOCATION
LP LOW POINT
LS LUMP SUM
MATL MATERIAL
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MON MONUMENT
MTG MEETING
MULT MULTIPLE
N NORTH
NA NOT APPLICABLE
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
PC POINT OF CURVE
PCT PERCENT
PI POINT OF INTERSECTION
PL PROPERTY LINE
PRKG PARKING
PROJ PROJECT
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE (PLASTIC)
QTY QUANTITY
R RADIUS
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RD ROAD OR ROOF DRAIN
REQD REQUIRED
ROW RIGHT OF WAY
RT RIGHT
RW ROADWAY
ABBRV ABBREVIATION
ABC AGGREGATE BASE COURSE
AC ASPHALTIC CONCRETE
ACP ASPHALTIC CONCRETE PAVING
ADA AMERICANS WITH DISABILITIES ACT
AGGR AGGREGATE
APPROX APPROXIMATE
ASPH ASPHALT
ASSY ASSEMBLY
AVE AVENUE
BC BACK OF CURB
BDRY BOUNDARY
BITUM BITUMINOUS
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BRG BEARING
CB CATCH BASIN
CFS CUBIC FEET PER SECOND
CL CENTER LINE
CLASS CLASSIFICATION
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO SEWER CLEAN OUT
CONC CONCRETE
CONSTR CONSTRUCTION
COORD COORDINATE
CORR CORRIDOR
CU FT CUBIC FEET
CU YD CUBIC YARD
DA DRAINAGE AREA
DAT DATUM
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESCR DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DIST DISTANCE
DWG DRAWING
E EAST
EA EACH
EC EDGE OF CURB
EG EXISTING GRADE
EL ELEVATION
ENGR ENGINEER
ENTR ENTRANCE
EP EDGE OF PAVEMENT (PAVING)
EPA ENVIRONMENTAL PROTECTION
AGENCY
EQUIP EQUIPMENT
ERD EXISTING ROOF DRAIN
ES EDGE OF SHOULDER
ESMT EASEMENT
EST ESTIMATE
EX EXISTING
EXIST EXISTING
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SECT SECTION
SF SQUARE FOOT (FEET)
SHLDR SHOULDER
SMH STEAM MANHOLE
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ YD SQUARE YARD
SS SANITARY SEWER
SSMH SANITARY SEWER
MANHOLE
ST STREET
STLT STREETLIGHT
STA STATION
STD STANDARD
STM STEAM
SURF SURFACE
SURV SURVEY
SW SIDEWALK
SWR SEWER
SYM SYMBOL
TAN TANGENT
TC TOP OF CURB
TD TRENCH DRAIN
TE TOP ELEVATION
TEMP TEMPORARY
THK THICKNESS
THRU THROUGH
TMH TOP OF MANHOLE
TOC TOP OF CURB
TOC WALL TOP OF CONCRETE
WALL
TOF TOP OF FOOTING
TOP TOP OF WALL
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TYP TYPICAL
UGND UNDERGROUND
UNPV RD UNPAVED ROAD
UON UNLESS OTHERWISE
NOTED
UTIL UTILITY
VAR VARIES
VC VERTICAL CURVE
VERT VERTICAL
VIC VICINITY
VOL VOLUME
W WEST
W/ WITH
W/O WITHOUT
CIVIL SHEET ABBREVIATIONS
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED CITY OF RENO
SUPPLIED AS-BUILT DRAWINGS AND SURFACE SCANS. CONDITION
OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY
LOCATIONS ARE IN APPROXIMATE LOCATION, CONTRACTOR TO
VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO
CONSTRUCTION TO PROVIDE NON-INTERRUPTION OF SERVICE, TO
ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE
THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE
CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED
OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
LEGEND
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
EX. CONCRETE
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
SIDEWALK
UNDERGROUND GAS LINE
EXISTING PROPOSED
CURB
SEWER CLEAN-OUT
STORM DRAIN INLET
UTILITY LINE CAP
CONSTRUCTION FENCING
N.T.S.E7 FRONT OF HOUSE
F7
VF101
N.T.S.F7 SIDE OF HOUSE
E7
VF101
N.T.S.B7 FRONT OF HOUSE
B7
VF101
N.T.S.C7 REAR OF HOUSE
C7
VF101
/29
EX. GAS LINE
TO BE REMOVED
EX. OVERHEAD ELECTRICAL LINE
TO BE REMOVED
EX. SHED
TO BE REMOVED
EX. SHED
TO BE REMOVED
EX. CONCRETE DRIVE
TO BE REMOVED
EX. CONCRETE DRIVE
TO BE REMOVED
EX. CONCRETE DRIVE
TO BE REMOVED
EX. CONCRETE WALK
TO BE REMOVED
EX. CONCRETE WALK
TO BE REMOVED
EX. PAVERS
TO BE REMOVED
EX. CONCRETE DRIVE
TO BE REMOVED
EX. CONCRETE STEM WALL
TO BE REMOVED
EX. CONCRETE STEM WALL
TO BE REMOVED
EX. CONCRETE STEM WALL
TO BE REMOVED
EX. FENCE
TO BE REMOVED
EX. RETAINING WALL
TO BE REMOVED
EX. FENCE
TO BE REMOVED
EX. TREE
TO BE REMOVED
(TYP)
EX. BUILDING WITH BASEMENT
TO BE REMOVED
EX. BUILDING
TO BE REMOVED
EX. FENCE
TO BE REMOVED
EX. FENCE
TO BE REMOVED
EX. CONCRETE STEPS/PATIO
TO BE REMOVED
EX. CONCRETE CURB
TO BE REMOVED
EX. CONCRETE SIDEWALK
TO BE REMOVED
EX. TREE
TO BE REMOVED
(TYP)
EX. CONCRETE CURB
TO BE REMOVED
EX. CONCRETE SIDEWALK
TO BE REMOVED
STUB AD CAP
GAS LINE AT
MAIN
EX. TREE
TO BE REMOVED
(TYP)
EX. TREE
TO BE REMOVED
(TYP)
EX. GAS METER
TO BE REMOVED
EX. GAS METER
TO BE REMOVED
STUB AND CAP WATER
LINE AT METER - METER
TO REMAIN
STUB AND CAP
WATER LINE AT
MAIN - METER TO
BE REMOVED
EX. CONCRETE SIDEWALK
TO BE REMOVED
EX. CONCRETE DRIVE
TO BE REMOVED
EX. FENCE
TO BE REMOVED
EXISTING STRUCTURE
TO BE REMOVED
EXISTING STRUCTURE
TO BE REMOVED
EX. CONCRETE SIDEWALK
TO BE REMOVED
STUB AD CAP
SEWER LATERAL AT
PROPERTY LINE
STUB AD CAP
SEWER LATERAL AT
PROPERTY LINE
EX. GAS METER
TO BE REMOVED
EX. GAS METER
TO BE REMOVED
EX. TREE
TO BE REMOVED
(TYP)
EX. POWER POLE
TO BE REMOVED
EX. OVERHEAD ELECTRICAL LINE
TO BE REMOVED
EX. TREE
TO BE REMOVED
(TYP)
EX. BUILDING
TO BE REMOVED
EX. BUILDING
TO BE REMOVED
EX. WATER
EX. WATER
EX. WATER
EX
. W
AT
ER
EX
. W
AT
ER
EX
. W
AT
ER
EX. SAN. SEWER
EX
. S
AN
. S
EW
ER
EX. S.D.
EX
. S
.D
EX
. G
AS
EX. GAS
EX
. G
AS
EX
. G
AS
EX
. W
AT
ER
EX
. W
AT
ER
EX
. W
AT
ER
EX
. W
AT
ER
EX
. G
AS
EX
. O
VH
D
TE
LE
EX
. O
VH
D
TE
LE
EX. OVHD TELE
TO BE REMOVED
EX. OVHD ELEC
TO BE REMOVED
EX. BRICK FIRE PIT
TO BE REMOVED
EX. OVHD ELEC/TELE
TO BE REMOVED
EX. TREE TO REMAIN
- PROTECT IN PLACE
EX. TREE TO REMAIN
- PROTECT IN PLACE
EX. TREE
TO BE REMOVED
(TYP)
EX
. E
LE
CT
RI
CA
L
CONSTRUCT SAFETY SIGN
EX. OVHD ELEC
TO BE REMOVED
1"=10'F1 CIVIL DEMOLITION PLAN
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CIVIL DEMOLITION PLAN
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CD101
STRUBLEPERKINS04/29/2022
1. ALL WORK DETAILED ON THESE PLANS AND PERFORMED UNDER THIS CONTRACT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND THE GEOTECHNICAL REPORT. WHERE APPLICABLE, CITY OF RENO PUBLIC WORKS STANDARDS SHALL APPLY.
2. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, RULES AND REGULATIONS WHICH APPLY TO THE CONSTRUCTION OF THESE IMPROVEMENTS, INCLUDING EPA REGULATIONS WITH RESPECT TO STORM WATER DISCHARGE.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL POTENTIAL OBSTRUCTIONS INCLUDING ALL UNDERGROUND UTILITIES. THE CONTRACTOR'S SURVEYOR SHALL DOCUMENT THE HORIZONTAL LOCATION AND ELEVATION OF UTILITIES THAT ARE EXPOSED. SHOULD A CONFLICT EXIST, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OR ENGINEER SO THE CONFLICT CAN BE RESOLVED WITH A MINIMUM AMOUNT OF DELAY.
4. ALL ELECTRICAL, TELEPHONE, CABLE TV, GAS AND OTHER UTILITY LINES, CABLES, AND APPURTENANCES ENCOUNTERED DURING CONSTRUCTION THAT REQUIRE RELOCATION, SHALL BE COORDINATED WITH THE COR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL NECESSARY UTILITY ADJUSTMENTS. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR DELAYS OR INCONVENIENCES CAUSED BY UTILITY COMPANY WORK CREWS. THE CONTRACTOR MAY BE REQUIRED TO RESCHEDULE HIS ACTIVITIES TO
ALLOW UTILITY CREWS TO PERFORM THEIR REQUIRED WORK.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITY LINES WITHIN THE CONSTRUCTION AREA. ANY DAMAGE TO EXISTING FACILITIES CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE AND
APPROVED BY THE COR.
6. CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE PROPERTY AND/OR PROJECT LIMITS. ANY DAMAGE TO ADJACENT PROPERTIES RESULTING FROM CONSTRUCTION PROCESS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
7. OVERNIGHT PARKING OF CONSTRUCTION EQUIPMENT SHALL NOT OBSTRUCT DRIVEWAYS OR DESIGNATED TRAFFIC LANES. THE CONTRACTOR SHALL NOT STORE ANY EQUIPMENT OR MATERIAL WITHIN THE PUBLIC RIGHT-OF-WAY.
8. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR THE PROJECT PRIOR TO COMMENCING CONSTRUCTION (I.E. BARRICADING, TOPSOIL DISTURBANCE, EXCAVATION PERMITS, EPA STORM WATER PERMITS, ETC.)
9. ALL PROPERTY CORNERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. ALL PROPERTY
CORNERS MUST BE RESET BY A REGISTERED LAND SURVEYOR.
10. THE CONTRACTOR SHALL PREPARE A CONSTRUCTION TRAFFIC CONTROL AND SIGNING PLAN AND OBTAIN APPROVAL OF SUCH PLAN FROM THE CONTRACT OFFICER'S REPRESENTATIVE (COR), PRIOR TO BEGINNING ANY CONSTRUCTION WORK ON OR ADJACENT TO EXISTING
STREETS.
11. ALL BARRICADES AND CONSTRUCTION SIGNING SHALL CONFORM TO APPLICABLE SECTIONS OF THE "MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES" (MUTCD), US DEPARTMENT OF TRANSPORTATION, LATEST EDITION.
12. THE CONTRACTOR SHALL MAINTAIN ALL CONSTRUCTION BARRICADES AND SIGNING AT ALL TIMES. THE CONTRACTOR SHALL VERIFY THE
PROPER LOCATION OF ALL BARRICADING AT THE END AND BEGINNING OF EACH DAY.
13. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO CONFORM WITH EPA REQUIREMENTS, INCLUDING COMPLIANCE WITH NPDES PHASE 2 REQUIREMENTS. THIS INCLUDES PREPARATION OF A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), FILING THE NOTICE OF
INTENT AND MAINTENANCE OF SWPPP BEST MANAGEMENT PLANS (BMP'S).
GENERAL NOTES
APPROXIMATE DEMOLITION QUANTITIES
*CONTRACTOR TO FIELD VERIFY
30" CONCRETE CURB AND GUTTER REMOVAL
QUANTITY UNITS
LF
DESCRIPTION
EXISTING CONCRETE SIDEWALK REMOVAL
SAW-CUT LF
A.C. PAVEMENT REMOVAL SF
010' 10' 20'5'
EXISTING TREE REMOVAL
EXISTING CONCRETE DRIVEWAY REMOVAL SF
SF
EA
EXISTING WATER LINE LATERAL REMOVAL
EXISTING SEWER LATERAL REMOVAL
EXISTING GAS METER REMOVAL
EXISTING GAS LINE REMOVAL
EXISTING FENCE REMOVAL
EXISTING BUILDING REMOVAL
LF
LF
LF
LF
SF
EA
3,115
LEGEND
LIMITS OF CONSTRUCTION
BACK OF CURB
EDGE OF PAVEMENT
EX. CONCRETE
EX. A.C. PAVEMENT
SIDEWALK
EXISTING PROPOSED
CENTERLINE
SLOPE AND FLOW DIRECTION
PROPERTY FENCING
CONSTRUCTION FENCING
SAW-CUT LINE
DEMOLITION NOTE
SEE ARCHITECTURAL DEMOLITION SHEETS FOR ADDITIONAL
INFORMATION ON BUILDING DEMOLITION.
EXISTING OVERHEAD POWER LINE REMOVAL LF200
EXISTING OVERHEAD TELEPHONE/COMM LINE REMOVAL LF170
EXISTING OVERHEAD POWER POLE REMOVAL EA1
EXISTING WATER METER REMOVAL EA3
/29
6.00'
5.0
6.5 0'
6.0'
14.00'
10.00' 10.00'
STA:7+50.58
END CONSTRUCTION
STA:45+12.53
END CONSTRUCTION
STA:44+41.27
END CONSTRUCTION
STA:44+25.53
BEG. CONSTRUCTION
STA:44+99.88
BEG. CONSTRUCTION
L1
L1
STA:7+11.78
BEG. CONSTRUCTION
L1
L2 C1 L3
L4
L5
C2
L6
L7
L8 C3 L9
L10
L1
L1
L15C4
C5
L16
L17 L18
24.00'
8.0 0'
8.0 0'
5.0 0'
9.0 0'
18.95'
21.90'
.00
18.00'
9.0 0'
9.0 0'
18.00'
2.00'
4.00'
5.0 0'
5.0 0'
60°
14.00'
CONSTRUCT SAFETY SIGN
2.00'
.50
.80
5.1 3'
C6
L1
L2
C7
L2
L22
8.0 0'
5.0 0'
STA:7+35.58
DRIVEWAY
STA:7+49.78
DRIVEWAY
6.6 7'
9.00'
5.0 0'
9.00'
0.50'
2.94'
3.45'
3.31'
2.81'
0.50'
1"=10'F1 CIVIL SITE PLAN
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CIVIL SITE PLAN
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CS101
STRUBLEPERKINS04/29/2022
CONTRACTOR NOTE
"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH
CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY
INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.
"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY
WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.
"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR
CONTRACTOR TO TEMPORARILY STAGE MATERIALS.
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED CITY OF RENO SUPPLIED AS-BUILT DRAWINGS AND SURFACE SCANS.
CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION, CONTRACTOR TO VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO.
UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
010' 10' 20'5'
LEGEND
EXISTING PROPOSED
LIMITS OF CONSTRUCTION
EX. CONCRETE
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
SIDEWALK
FENCE
SEWER/STORM PVC CLEAN-OUT
STORM DRAIN INLET
CONTRACTOR STAGING AREA
CONSTRUCTION FENCING
SAW-CUT LINE
6' COMPOSITE FENCING
/29
STA:7+50.58
END CONSTRUCTION
STA:45+12.53
END CONSTRUCTION
STA:44+41.27
END CONSTRUCTION
STA:44+25.53
BEG. CONSTRUCTION
STA:44+99.88
BEG. CONSTRUCTION
4471.00
EX TC
STA:7+11.78
BEG. CONSTRUCTION
TYP.
TYP.
TYP.
1.3 3%
3.82% 0.24%2.04%
3.34%
0.9 7% 0.9
7% 2.0
7%
1.7 8%
2.2 9%
1.5 9%
1.5 8%
2.2 9%
2.2 9%
2.56%
0.51%
0.99%
4.5 3%
1.1 5%
CONSTRUCT SAFETY SIGN
4471.11
EX TC
4470.22
EX TC
4470.11
EX TC
4469.22
EX TC
4468.84
EX TC
4469.13
EX SW
4469.51
EX SW
STA:7+35.58
DRIVEWAY
STA:7+49.78
DRIVEWAY
4471.96
EX SW HP
4471.45
EX SW
4471.83
EX SW
4469.92
TC
4471.92
TC
4472.36
TC
4472.55
TC
4472.04
TC
4472.94
TC
4472.66
TC
4472.99
TC
4473.21
TC4473.46
TC
4472.13
TC
4471.88
TC
4471.67
TC
4471.30
TC
4471.25
TC
4471.40
TC
4471.11
TC
4472.13
TC
4472.38
TC
4472.40
EX TC
4472.00
EX TC
4472.78
EX SW
4472.12
EX TC
4472.09
EX SW
4473.83
TC/HP
4471.40
TC
4472.52
TC
4472.91
TC
4473.31
TC
4473.70
TC
4471.80
TC
4471.23
TC
4470.65
TC
4470.08
TC
1"=10'F1 CIVIL GADING PLAN
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CIVIL GRADING PLAN
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CG101
STRUBLEPERKINS04/29/2022
010' 10' 20'5'
CONSTRUCTION NOTES LEGEND
APPROXIMATE GRADING AND PAVING QUANTITIES
*CONTRACTOR TO FIELD VERIFY
QUANTITY UNITSDESCRIPTION
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED CITY OF RENO
SUPPLIED AS-BUILT DRAWINGS AND SURFACE SCANS. CONDITION
OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY
LOCATIONS ARE IN APPROXIMATE LOCATION, CONTRACTOR TO
VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO
CONSTRUCTION TO PROVIDE NON-INTERRUPTION OF SERVICE, TO
ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE
THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE
CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED
OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
NOTE:
THE CONTRACTOR SHALL PROVIDE A "QUALIFIED SWPPP DEVELOPER" (QSD) WHO WILL
BE RESPONSIBLE FOR DEVELOPING A STORMWATER POLLUTION PREVENTION PLAN
FOR THIS PROJECT. THE QSD WILL ACT AS A DATA SUBMITTER FOR THE VA, WITH THE
FILING OF THE NOTICE OF INTENT TO THE NEVADA STATE WATER RESOURCES
CONTROL BOARD FOR COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT. THE
CONTRACTOR SHALL BE RESPONSIBLE TO PAY ALL FEES ASSOCIATED WITH THIS
PERMIT, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE NOTICE OF INTENT FILING AND
ANNUAL FEES FOR MAINTAINING COVERAGE UNDER THIS PERMIT. THE CONTRACTOR
WILL BE RESPONSIBLE FOR REVIEWING AND IMPLEMENTING THE PROVISIONS
SPECIFIED IN THE SWPPP AND THE EROSION CONTROL PLANS. THE CONTRACTOR
SHALL ALSO PROVIDE A "QUALIFIED SWPPP PRACTITIONER" (QSP) WHO WILL BE
RESPONSIBLE FOR IMPLEMENTING THE SWPPP, AND WILL ASSIST THE VA IN THE FILING
OF A NOTICE OF TERMINATION TO THE STATE WATER RESOURCES CONTROL BOARD
AT THE END OF THE PROJECT.
CONSTRUCT TYPE 1A CONCRETE CURB PER DETAIL F7, SHEET CG501
CONSTRUCT CONCRETE PARKING BUMPER PER DETAIL B9, SHEET CG501
CONSTRUCT CONSTRUCTION FENCING
CONSTRUCT CONSTRUCTION YARD ENTRANCE GATE - (2) 6' CENTER LOCKING
CONSTRUCT BOLLARD POLE PER DETAIL F9, SHEET CG502
CONSTRUCT UTILITY TRENCH PER DETAILS C5 & C7, SHEET CG501
NOT USED
CONSTRUCT HEAVY DUTY ASPHALT PAVEMENT PER DETAIL A7, SHEET CG501
SAW-CUT LINE AT 2LF OFFSET FROM PROPOSED CURB / DROP CURB
CONNECT TO EXISTING SIDEWALK - MATCH GRADE PER DETAIL C5, SHEET CG502
CONNECT TO EXISTING CURB - MATCH GRADE PER DETAIL C5, SHEET CG502
52 LF
12,412 SF
263 LF
480 SF
CONSTRUCT TYPE 2 P.C.C. MEDIAN CURB PER DETAIL C1, SHEET CG501
CONSTRUCT P.C.C. DRIVEWAY APRON PER DETAIL F9, SHEET CG501
TYPE 1A CONCRETE CURB
HEAVY DUTY ASPHALT PAVEMENT
TYPE 2 P.C.C. MEDIAN CURB
P.C.C. DRIVEWAY APRON
LEGEND
LIMITS OF CONSTRUCTION
BACK OF CURB
CONCRETE
SIDEWALK
EXISTING PROPOSED
SLOPE AND FLOW DIRECTION
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
STREET LIGHT
STORM DRAIN INLET
FLOW LINE
CONSTRUCTION FENCING
SAW-CUT LINE
CONSTRUCT TYPE 1 CONCRETE CURB PER DETAIL F7, SHEET CG501
CONNECT TO EXISTING ALLEY - MATCH GRADE
NOT USED
204 LFTYPE 1 CONCRETE CURB
314 SF4" CONCRETE SIDEWALK
EARTHWORK FILL
-NET, UNADJUSTED 122 CY
CONSTRUCT 4" CONCRETE SIDEWALK PER DETAIL F1, SHEET CG501
8 EABOLLARD POLE
22 EACONCRETE PARKING BUMPER
- CONTRACTOR TO REMOVE AT COMPLETION OF PROJECT
- CONTRACTOR TO REMOVE AT COMPLETION OF PROJECT
CONSTRUCT STANDARD FOUNDATION STREETLIGHT
CONSTRUCT SAFETY SIGN PER DETAIL F4, SHEET CG501
TOPOGRAPHY CONTOUR MAJOR (5')
TOPOGRAPHY CONTOUR MINOR (1')
1. EXCEPT AS PROVIDED HEREIN, GRADING SHALL BE PERFORMED AT THE ELEVATIONS SHOWN
AND IN ACCORDANCE WITH THE DETAILS SHOWN ON SHEET CG501.
2. THE COST FOR REQUIRED CONSTRUCTION DUST AND EROSION CONTROL MEASURES SHALL BE
INCIDENTAL TO THE PROJECT COST.
3. ALL WORK RELATIVE TO FOUNDATION CONSTRUCTION, SITE PREPARATION, AND PAVEMENT
INSTALLATION, AS SHOWN ON THIS PLAN, SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
PROJECT, (FIRST PRIORITY) SPECIFICATIONS, AND/OR THE CITY OF RENO CODE OF ORDINANCES
(SECOND PRIORITY, AND WITHIN CITY OF RENO RIGHT-OF-WAY).
4. EARTH SLOPES SHALL NOT EXCEED 3 HORIZONTAL TO 1 VERTICAL UNLESS SHOWN OTHERWISE.
5. IT IS THE INTENT OF THESE PLANS THAT THIS CONTRACTOR SHALL NOT PERFORM ANY WORK
OUTSIDE OF THE PROPERTY BOUNDARIES EXCEPT AS REQUIRED BY THIS PLAN.
6. THE CONTRACTOR IS TO ENSURE THAT NO SOIL ERODES FROM THE SITE ONTO ADJACENT
PROPERTY OR PUBLIC RIGHT-OF-WAY. THIS SHOULD BE ACHIEVED BY CONSTRUCTING
TEMPORARY BERMS OR SILT FENCE AT THE PROPERTY LINES AND WETTING THE SOIL TO PROTECT
IT FROM WIND EROSION.
7. A DISPOSAL SITE FOR ANY & ALL EXCAVATION MATERIAL, AND UNSUITABLE MATERIAL AND/OR A
BORROW SITE CONTAINING ACCEPTABLE FILL MATERIAL SHALL BE OBTAINED BY THE
CONTRACTOR IN COMPLIANCE WITH APPLICABLE ENVIRONMENTAL REGULATIONS AND APPROVED
BY THE COR. ALL COSTS INCURRED IN OBTAINING A DISPOSAL OR BORROW SITE AND HAUL TO OR
FROM SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AND NO SEPARATE MEASURE OR
PAYMENT SHALL BE MADE.
8. PAVING AND ROADWAY GRADES SHALL BE +/- 0.1' FROM PLAN ELEVATIONS. PAD ELEVATIONS
SHALL BE +/- 0.05' FROM BUILDING PLAN ELEVATION.
9. VERIFY ALL ELEVATIONS SHOWN ON PLAN FROM BASIS OF ELEVATION CONTROL STATION PRIOR
TO BEGINNING CONSTRUCTION. (SEE SITE PLAN SHEET CS101).
GRADING NOTES
- CONTRACTOR TO REMOVE AT COMPLETION OF PROJECT
-SEE SHEET CT101 AND DETAIL D1, SHEET CG502
CONSTRUCT EXTENDED FOUNDATION STREETLIGHT
-SEE SHEET CT101 AND DETAIL F1, SHEET CG502
21 CONSTRUCT TREX SECLUSION COMPOSITE FENCING OR APPROVED EQUAL
-FENCE POSTS INSTALLED WITH 3' MIN. OFFSET TO STREETLIGHT FOUNDATIONS.
-SEE DETAIL F5, SHEET CG503
140 LF6' COMPOSITE PRIVACY FENCE
6' COMPOSITE FENCE
/29
1"=20'F1 STORMWATER PROTECTION PLAN
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
STORMWATER PROTECTION PLAN
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CG102
STRUBLEPERKINS04/29/2022
020' 20' 40'10'
CONSTRUCTION NOTES LEGEND
APPROXIMATE SWPPP QUANTITIES
*CONTRACTOR TO FIELD VERIFY
QUANTITY UNITSDESCRIPTION
SURVEY DISCLAIMER
SURVEY INFORMATION OF SITE DETERMINED CITY OF RENO
SUPPLIED AS-BUILT DRAWINGS AND SURFACE SCANS. CONDITION
OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY
LOCATIONS ARE IN APPROXIMATE LOCATION, CONTRACTOR TO
VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO
CONSTRUCTION TO PROVIDE NON-INTERRUPTION OF SERVICE, TO
ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE
THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE
CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE REPAIRED
OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
NOTE:
THE CONTRACTOR SHALL PROVIDE A "QUALIFIED SWPPP DEVELOPER" (QSD) WHO WILL
BE RESPONSIBLE FOR DEVELOPING A STORMWATER POLLUTION PREVENTION PLAN
FOR THIS PROJECT. THE QSD WILL ACT AS A DATA SUBMITTER FOR THE VA, WITH THE
FILING OF THE NOTICE OF INTENT TO THE NEVADA STATE WATER RESOURCES
CONTROL BOARD FOR COVERAGE UNDER THE CONSTRUCTION GENERAL PERMIT. THE
CONTRACTOR SHALL BE RESPONSIBLE TO PAY ALL FEES ASSOCIATED WITH THIS
PERMIT, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE NOTICE OF INTENT FILING AND
ANNUAL FEES FOR MAINTAINING COVERAGE UNDER THIS PERMIT. THE CONTRACTOR
WILL BE RESPONSIBLE FOR REVIEWING AND IMPLEMENTING THE PROVISIONS
SPECIFIED IN THE SWPPP AND THE EROSION CONTROL PLANS. THE CONTRACTOR
SHALL ALSO PROVIDE A "QUALIFIED SWPPP PRACTITIONER" (QSP) WHO WILL BE
RESPONSIBLE FOR IMPLEMENTING THE SWPPP, AND WILL ASSIST THE VA IN THE FILING
OF A NOTICE OF TERMINATION TO THE STATE WATER RESOURCES CONTROL BOARD
AT THE END OF THE PROJECT.
CONSTRUCT GRAVEL BAG PROTECTION PER DETAIL C9, SHEET CG502
5 EAGRAVEL BAG
LEGEND
LIMITS OF CONSTRUCTION
BACK OF CURB
CONCRETE
SIDEWALK
EXISTING PROPOSED
FLOW DIRECTION
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
GRAVEL BAG
STORM DRAIN INLET
FLOW LINE
CONSTRUCTION FENCING
SAW-CUT LINE
1. EXCEPT AS PROVIDED HEREIN, GRADING SHALL BE PERFORMED AT THE ELEVATIONS SHOWN
AND IN ACCORDANCE WITH THE DETAILS SHOWN ON SHEET CG501.
2. THE COST FOR REQUIRED CONSTRUCTION DUST AND EROSION CONTROL MEASURES SHALL BE
INCIDENTAL TO THE PROJECT COST.
3. ALL WORK RELATIVE TO FOUNDATION CONSTRUCTION, SITE PREPARATION, AND PAVEMENT
INSTALLATION, AS SHOWN ON THIS PLAN, SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
PROJECT, (FIRST PRIORITY) SPECIFICATIONS, AND/OR THE CITY OF RENO CODE OF ORDINANCES
(SECOND PRIORITY, AND WITHIN CITY OF RENO RIGHT-OF-WAY).
4. EARTH SLOPES SHALL NOT EXCEED 3 HORIZONTAL TO 1 VERTICAL UNLESS SHOWN OTHERWISE.
5. IT IS THE INTENT OF THESE PLANS THAT THIS CONTRACTOR SHALL NOT PERFORM ANY WORK
OUTSIDE OF THE PROPERTY BOUNDARIES EXCEPT AS REQUIRED BY THIS PLAN.
6. THE CONTRACTOR IS TO ENSURE THAT NO SOIL ERODES FROM THE SITE ONTO ADJACENT
PROPERTY OR PUBLIC RIGHT-OF-WAY. THIS SHOULD BE ACHIEVED BY CONSTRUCTING
TEMPORARY BERMS OR SILT FENCE AT THE PROPERTY LINES AND WETTING THE SOIL TO PROTECT
IT FROM WIND EROSION.
7. A DISPOSAL SITE FOR ANY & ALL EXCAVATION MATERIAL, AND UNSUITABLE MATERIAL AND/OR A
BORROW SITE CONTAINING ACCEPTABLE FILL MATERIAL SHALL BE OBTAINED BY THE
CONTRACTOR IN COMPLIANCE WITH APPLICABLE ENVIRONMENTAL REGULATIONS AND APPROVED
BY THE COR. ALL COSTS INCURRED IN OBTAINING A DISPOSAL OR BORROW SITE AND HAUL TO OR
FROM SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AND NO SEPARATE MEASURE OR
PAYMENT SHALL BE MADE.
8. PAVING AND ROADWAY GRADES SHALL BE +/- 0.1' FROM PLAN ELEVATIONS. PAD ELEVATIONS
SHALL BE +/- 0.05' FROM BUILDING PLAN ELEVATION.
9. VERIFY ALL ELEVATIONS SHOWN ON PLAN FROM BASIS OF ELEVATION CONTROL STATION PRIOR
TO BEGINNING CONSTRUCTION. (SEE SITE PLAN SHEET CS101).
GRADING NOTES
6' COMPOSITE FENCE
/29
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CIVIL GRADING DETAILS 1
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CG501
STRUBLEPERKINS04/29/2022
4'-0" MAX.
1'-0" MAX.1'-0" MAX.
NOT TO SCALE VA STD. SD010000-01F4
SITE SAFETY PLAN VIEW
2" x 4" FRAMING
4" x 6"POSTS
FACE
48.00'
4.0 0'
4.00'
U.S. Department of Veterans Affairs
THIS PROJECT HAS WORKED
CL
.00
.00
3" 3"
4" 1"
1" 5"
1"
.00
8.0 0'
48.00'
000 DAYS
WITHOUT A LOST TIME ACCIDENT
THE LIFE YOU SAVE MAY BE YOUR OWN
GENERAL CONTRACTORS FIRM NAME
ZERO IN ON
SAFETY
ALL VISIBLE SURFACES TO BE
PRIMED AND PAINTED
SIGN ATTACHED TOGETHER WITH
WOOD SCREW & LAG BOLTS
CHANGEABLE NUMBERS
FACE PANEL TO BE AN EXTERIOR GRADE. MDO
SHEERT OR AN ALUMINU M SKIN LAMINATED TO
A WOOD OR PLASTIC CORE IS PREFERRED
WITH EDGES PHYSICALLY SEALED.
4" x 4" POSTS
DEPTH & TYPE OF FOOTING
DETERMINED BY EXISTING
SOIL CONDITIONS.
TYPE 1
TYPE 1A
TYPE 2 P.C.C. MEDIAN CURB
P.C.C. MEDIAN CURB (ALTERNATE)
A
PLAN
SECTION A-A
A
NOT TO SCALEC1
NOT TO SCALEF1 NOT TO SCALEF7
SECTION A-A
PLAN
A
A
NOT TO SCALEF9
NOT TO SCALEB9
NOT TO SCALE
MIN
6"
MI
N
EXIST GRADE
C5
TAMPED BACKFILL
3"
MIN
SEE SHEET CT101 FOR
NUMBER AND SIZE OF CONDUITS.
CONDUIT CENTERED IN TRENCH
WHEN SINGLE CONDUIT.
/29
6" 4'-0"
10'-0"TO TOP O
F LIGHT
4" ROUND STEEL POLE
POST-MOUNT LED
LIGHT FIXTURE WHERE
SHOWN ON PLANS
CONCRETE FOUNDATION
SEE DETAIL D1, THIS
SHEET
GRADE
UNDERGROUND CONDUIT -
COORDINATE WITH
ELECTRICAL
12"
6"
4'-0"
10'-0"
4" ROUND STEEL POLE
POST-MOUNT LED
LIGHT FIXTURE WHERE
SHOWN ON PLANS
CONCRETE FOUNDATION
SEE DETAIL F1, THIS
SHEET
GRADE
UNDERGROUND CONDUIT -
COORDINATE WITH
ELECTRICAL
24"
4'-6"
10'-0"
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CIVIL GRADING DETAILS 2
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CG502
STRUBLEPERKINS04/29/2022
TYPE 4R CATCH BASIN
TYPE 1 CATCH BASIN
INLET TYPE CATCH BASIN
TRANSVERSE LONGITUDINAL
DOWELS AT MATCH ISOLATION JOINT
JOINT SEALANT DETAIL
EXPANSION JOINT
NOT TO SCALEC5 NOT TO SCALEC9
MATERIALS:
1. PERFORATED POSTS SHALL BE SQUARE TUBE FORMED FROM 0.105 U.S.S. GAUGE
ASTM A-366 COLD ROLLED CARBON STEEL. THE SQUARE TUBES SHALL BE WELDED
DIRECTLY IN THE CORNER BY HIGH FREQUENCY RESISTANCE WELDING OR EQUAL.
THE POSTS SHALL BE EXTERNALLY SCARFED TO AGREE WITH STD. CORNER RADII OF
5/32" [4mm] TO 1/64" [.3mm].
2. PERFORATED POSTS SHALL BE GALVANIZED TO CONFORM TO ASTM A-525. COATING
DESIGNATION G-90.
3. ALL HARDWARE SHALL CONFORM TO ASTM A-307 CLASS A.
4. ALL HARDWARE SHALL BE GALVANIZED TO CONFORM TO ASTM A-153 OR CADMIUM
PLATED TO CONFORM TO ASTM A-165.
5. ALL CONCRETE SHALL BE 2500 PSI.
NOTES:
1. FOUNDATION WILL BE CONSTRUCTED WITH 1 3/4"x1 3/4" STARTER SIGN POST.
STARTER SIGN POST SHALL BE REMOVED AFTER CONCRETE HAS SET AND
EXPOSED SQUARE TUBING WRAPPED AND SEALED WITH DUCT TAPE.
2. FOUNDATION LOCATED 1' FROM EDGE OF PAVEMENT.
3. FOUNDATION LOCATION TO BE APPROVED BY ENGINEERING.
4. POST FOUNDATIONS SHALL BE PERPENDICULAR TO THE PAVED SURFACE.
5. BOLT WITH NUT AND LOCK WASHER TO BE 7/16"x3" GALVANIZED.
6. REFER TO SIGN POST LOCATION DETAIL, DETAIL 4, THIS SHEET FOR INSTALLATION
LOCATION.
7/16" [10mm] HOLE DIAMETER SPACED AT 1" [25mm] 0.C.
EXPANSION
MATERIAL TYP. IN
CONCRETE AREAS.
FINISH WITH
LANDSCAPE
MATERIAL.
FINISHED
GRADE
4" [100mm]
12" SQUARE
[300mm]
8" [20
0m m]
2 1 /2"
[63 mm
[50 mm
12" SQUARE
[300mm]
2 1 /2"
[63 mm
[10
0m m]
[30 5m m]
2'- 2 1
/2" [67
3m m]
2'- 8 1
/2" [82
6m m]
[15 2m m]
2"x2" [50x50mm]
PERFORATED POST
2 1/4"x2 1/4" [57x57mm]
PERFORATED POST
1 3/4"x1 3/4" [40x40mm]
PERFORATED POST
2'- 9"
[83 8m m]
8" SQUARE
[200mm]
[25 mm
] 1
[25 mm
NOT TO SCALEF5
LOCKING BAR SECTION A-A
A A
NOT TO SCALEF9NOT TO SCALEF3
R5-1 30"x30"
NOT TO SCALE
5'
R= 1'-
4"
PAINTED 'WHITE'
SYMBOL
2"
5"
3½
9"
1'-4"
BORDER
4" WHITE
3½
2"
2'- 4"
2"
R=5"
1'-0"4"
4' 10-1/2"
BACKGROUND
3½
PAINTED 'BLUE'
NOT TO SCALE
RESERVED
STATE DISABLED PARKING
PARKING
PERMIT REQUIRED
R7-801
NOT TO SCALE
9' MIN.
1. SEE SITE AND ENGINEERING DESIGN MANUAL FOR PARKING BAY WIDTHS.
NOTE:
REGULAR SPACES
.04
' M
IN
TY
PE
CU
RB
GU
TT
ER
/W
HE
EL
S
TO
P
PE
R
DE
TA
IL
F7 , T
HI
S
SH
EE
T
4" PAINTED PARKING STALL
LINES
TY
PE
CU
RB
W
HE
EL
S
TO
P
PE
R
DE
TA
IL
C1
, T
HI
S
SH
EE
T
SIDEWALK
PLAN
LC
SECTION A SECTION B
LC
8'
5'
6'
B A A
4'
5' 1'
3'
TOP OF CURBGUTTER
6"
PAVEMENT
WALK FLUSH
WITH CURB
1/2"
EXPANSION JOINT
B
A
TOP OF CURB
5'CU
RB
G
UT
TE
R
4"
PAINTED DIAGONAL LINES
LC
1'
CROSS SLOPE OF
GUTTER SAME AS
PAVEMENT
2' MODIFIED
CURB &
GUTTER
6"
NOT TO SCALEC3
ACCESSIBILITY SYMBOL
1. SEE SITE AND ENGINEERING DESIGN MANUAL FOR PARKING BAY WIDTHS.
NOTE:
REGULAR SPACES
.00
' M
IN
TY
PE
CU
RB
GU
TT
ER
/W
HE
EL
S
TO
P
PE
R
DE
TA
IL
F7 , T
HI
S
SH
EE
T
4" PAINTED PARKING STALL
LINES
TY
PE
CU
RB
W
HE
EL
S
TO
P
PE
R
DE
TA
IL
C1
, T
HI
S
SH
EE
T
9' MIN.
NOT TO SCALEF1
3 1 /2"
MI
N
LIGHT POLE BY OTHERS
2'-6"
#3 HORIZ TIES @ 12"OC
#5 VERTS @ 12"OC
1" NON-SHRINK GROUT
3"
CLR
24"
(4) 3/4"Ø AB'S EMBED 18" PROVIDE DBL
NUT & PLATE WASHER
STANDARD FOUNDATION EXTENDED FOUNDATION
PVC CONDUIT ADAPTER
COUPLING
PVC CONDUIT
RIGID STEEL CONDUIT
1" EMPTY CONDUIT WITH CAP
(WHERE SHOWN ON PLANS)
2'- 0"
M
IN
UNDISTURBED SOIL OR
SELECT BACKFILL
COMPACTED.
4" ROUND STEEL POLE
PVC CONDUIT ADAPTER
COUPLING
PVC CONDUIT
RIGID STEEL CONDUIT
FINISHED GRADE
1"
2'- 0"
M
IN
UNDISTURBED SOIL OR SELECT
BACKFILL COMPACTED.
UTILITY CONCRETE PER VA
SPECIFICATIONS
4' 6"
12"
NOT TO SCALED1
/29
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CIVIL GRADING DETAILS 3
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CG503
STRUBLEPERKINS04/29/2022
96" O.C.
91"
Concrete Fill
8"
6'
FE
NC
E
HE
IG
HT
30"" Min. Typ.
Consult local conditions, codes, and standard building practices for post depth
12" Typ
ARCHITECTURAL DRAWING:
TREX SECLUSIONS FENCING
PROFILE VIEW
6' 2 1
/4"
PO
ST
H
EI
GH
T
96" O.C.
91"
PLAN
ELEVATION
A
B
A B
SECTIONS
A
QUANTITY
COMPONENTS
LENGTH
* Length may vary
4"
Top Rail
Interlocking Picket
Post Cap
Aluminum Bottom Rail
Fence Bracket Bottom Rail Cover 3
8" Concrete Fill
1"x5.75" Interlocking Picket 19 67" *
1 5/8" (Typ) Exterior Wood Screws
4" x 4.9" Top Rail 1 91" *
Fence Bracket
Aluminum Bottom Rail 1 90 1/2"
1" x 5.75" Bottom Rail Cover
2 91" *
5" x 5" Post 1 106" *
Post Cap: Pyramid, Flat, or Crown
NOT TO SCALEF8
/29
TYP.
TYP.
TYP.
TYP.
TYP.
CONSTRUCT SAFETY SIGN
1"=10'F1 CIVIL UTILITY AND TRAFFIC PLAN
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CIVIL UTILITY AND TRAFFIC PLAN
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CT101
STRUBLEPERKINS04/29/2022
010' 10' 20'5'
APPROXIMATE QUANTITIES
*CONTRACTOR TO FIELD VERIFY
PARKING STALL STRIPING
QUANTITY UNITS
ACCESSIBLE PARKING STALLS - STRIPING EA
EA
DESCRIPTION
CONTRACTOR NOTE
"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN
WHICH CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MAY BE IMPACTED BY
UTILITY INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.
LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO
COMPLY WITH VA STANDARDS) AROUND THE BUILDING CONSTRUCTION AREA.
COORDINATE WITH COR.
OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS
FOR CONTRACTOR TO TEMPORARILY STAGE MATERIALS.
EXISTING ROAD ACCESS (1 LANES) IS TO BE MAINTAINED DURING BUSINESS HOURS.
COORDINATE WITH COR.
KEYED NOTES
CONSTRUCT ACCESSIBLE PARKING STALL STRIPING PER DETAIL C3, SHEET CG502
CONSTRUCT 4" WHITE PAINTED PARKING STALL STRIPING PER DETAIL B1, SHEET CG502
CONSTRUCT 'NO PARKING ZONE' STRIPING
NO PARKING ZONE STRIPING SF828
CONSTRUCT 'DO NOT ENTER' SIGN PER DETAIL F5, SHEET CG502
'DO NOT ENTER' SIGN EA2
LEGEND
LIMITS OF CONSTRUCTION
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
CONCRETE SIDEWALK
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
SIDEWALK
UNDERGROUND GAS LINE
FENCE
SEWER/STORM PVC CLEAN-OUT
STORM DRAIN INLET
UTILITY LINE CAP
FIRE HYDRANT
FIRE DEPARTMENT CONNECTION
EXISTING PROPOSED
SAW-CUT LINE
'ADA PARKING' SIGN EA3
CONSTRUCT ACCESSIBLE PARKING SIGN PER DETAIL F5, SHEET CG502
CONSTRUCT REMOTE ELECTRICAL METER
CONSTRUCT ELECTRICAL SERVICE PEDESTAL
CONSTRUCT NV ENERGY POLE RISER
CONSTRUCT NV ENERGY UNDERGROUND ELECTRICAL SERVICE LINE - 4" PVC CONDUIT
CONSTRUCT STREETLIGHT CONDUIT 1 1/4" PVC
CONSTRUCT LED STREETLIGHT FIXTURE ON 7.5' POLE PER DETAIL D1 & F3, SHEET CG502
CONSTRUCT REMOTE ELECTRICAL METER
CONSTRUCT ELECTRICAL SERVICE PEDESTAL
CONSTRUCT NV ENERGY POLE RISER
CONSTRUCT NV ENERGY UNDERGROUND ELEC. SERVICE LINE - 4" PVC CONDUIT
CONSTRUCT STREETLIGHT CONDUIT 1 1/4" PVC
CONSTRUCT LED STREETLIGHT FIXTURE ON 7.5' POLE
EA1
EA1
EA1
LF5
LF409
EA11
STREETLIGHT
CONSTRUCT 4" WHITE PAINTED PARKING STALL STRIPING PER DETAIL C1, SHEET CG502
CONSTRUCT REDI- CALL BOX PER DETAILS SHEET CT501
CONSTRUCT 3/4" PVC ELECTRICAL CONDUIT
CONSTRUCT ELECTRICAL CONDUIT 3/4" PVC LF164
REDI-CALL BOX EA1
IRRIGATION POINT OF CONNECTION - SEE SHEET LI101 FOR IRRIGATION PIPING AND SLEEVING
CONSTRUCT LED STREETLIGHT FIXTURE ON EXTENDED POLE BASE W/ 5.0' POLE
PER DETAIL F1 & F3, SHEET CG502
6' COMPOSITE FENCE
/29
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
CALL BOX DETAILS
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
CT501
STRUBLEPERKINS04/29/2022
/29
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
BID DOCUMENTS
A/E:
TRIPLE C THE A/E GROUP
1839 S. Alma School Rd., Ste 300 Mesa AZ, 85210 307-460-2054 Mat Perkins
654-823-B
975 Kirman Ave, Reno, NV 89502
CONVERT PROCURED RESIDENTIAL
LOTS TO SURFACE LEVEL
ASPHALT PAVED PARKING
PLANTING NOTES
524/530 EAST TAYLOR STREET
APN: 013-171-05 & 06
LP100
STRUBLEPERKINS04/29/2022
1. THE CONTRACTOR AND OWNER'S REPRESENTATIVE SHALL CONTACT THE COR FOR A
PRE-CONSTRUCTION MEETING PRIOR TO START OF ANY WORK SHOWN ON THESE PLANS.
2. THESE PLANS SHALL NOT BE UTILIZED FOR CONSTRUCTION OR PERMITTING UNLESS STATED
FOR SUCH USE IN THE TITLE BLOCK.
3. DRAWINGS ARE INTENDED TO BE PRINTED ON 30" X 42" PAPER. PRINTING THESE DRAWINGS
AT A DIFFERENT SIZE WILL IMPACT THE SCALE. VERIFY THE GRAPHIC SCALE BEFORE
REFERENCING ANY MEASUREMENTS ON THESE SHEETS. THE RECIPIENT OF THESE
DRAWINGS SHALL BE RESPONSIBLE FOR ANY ERRORS RESULTING FROM INCORRECT
PRINTING, COPYING, OR ANY OTHER CHANGES THAT ALTER THE SCALE OF THE DRAWINGS.
4. VERIFY ALL PLAN DIMENSIONS PRIOR TO START OF CONSTRUCTION. NOTIFY THE OWNER'S
REPRESENTATIVE TO ADDRESS ANY QUESTIONS OR CLARIFY ANY DISCREPANCIES.
5. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS.
6. SUBMIT A CHANGE ORDER FOR APPROVAL FOR ANY CHANGES TO WORK SCOPE RESULTING
FROM FIELD CONDITIONS OR DIRECTION BY OWNER'S REPRESENTATIVE WHICH REQUIRE
ADDITIONAL COST TO THE OWNER PRIOR TO PERFORMANCE OF WORK.
7. THE CONTRACTOR SHALL PROVIDE A STAKED LAYOUT OF ALL SITE IMPROVEMENTS FOR
INSPECTION BY THE OWNER'S REPRESENTATIVE AND MAKE MODIFICATIONS AS REQUIRED.
ALL LAYOUT INFORMATION IS AVAILABLE IN DIGITAL FORMAT FOR USE BY THE CONTRACTOR.
8. IF A GEOTECHNICAL SOILS REPORT IS NOT AVAILABLE AT THE TIME OF CONSTRUCTION,
NORRIS DESIGN RECOMMENDS A REPORT BE AUTHORIZED BY THE OWNER AND THAT ALL
RECOMMENDATIONS OF THE REPORT ARE FOLLOWED DURING CONSTRUCTION. THE
CONTRACTOR SHALL USE THESE CONTRACT DOCUMENTS AS A BASIS FOR THE BID. IF THE
OWNER ELECTS TO PROVIDE A GEOTECHNICAL REPORT, THE CONTRACTOR SHALL REVIEW
THE REPORT AND SUBMIT AN APPROPRIATE CHANGE ORDER TO THE OWNER'S
REPRESENTATIVE IF ADDITIONAL COSTS ARE REQUESTED.
9. CONTRACTOR SHALL CONFIRM THAT SITE CONDITIONS ARE SIMILAR TO THE PLANS, WITHIN
TOLERANCES STATED IN THE CONTRACT DOCUMENTS, AND SATISFACTORY TO THE
CONTRACTOR PRIOR TO START OF WORK. SHOULD SITE CONDITIONS BE DIFFERENT THAN
REPRESENTED ON THE PLANS OR UNSATISFACTORY TO THE CONTRACTOR, THE
CONTRACTOR SHALL CONTACT THE OWNER'S REPRESENTATIVE FOR CLARIFICATION AND
FURTHER DIRECTION.
10. CONTRACTOR IS RESPONSIBLE TO PAY FOR, AND OBTAIN, ANY REQUIRED APPLICATIONS,
PERMITTING, LICENSES, INSPECTIONS AND METERS ASSOCIATED WITH WORK.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FINES OR PENALTIES ASSESSED TO THE
OWNER RELATING TO ANY VIOLATIONS OR NON-CONFORMANCE WITH THE PLANS,
SPECIFICATIONS, CONTRACT DOCUMENTS, JURISDICTIONAL CODES, AND REGULATORY
AGENCIES.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL UTILITY LOCATES
PRIOR TO ANY EXCAVATION. REFER TO ENGINEERING UTILITY PLANS FOR ALL PROPOSED
UTILITY LOCATIONS AND DETAILS. NOTIFY OWNER'S REPRESENTATIVE IF EXISTING OR
PROPOSED UTILITIES INTERFERE WITH THE ABILITY TO PERFORM WORK.
13. UNLESS IDENTIFIED ON THE PLANS FOR DEMOLITION OR REMOVAL, THE CONTRACTOR IS
RESPONSIBLE FOR THE COST TO REPAIR UTILITIES, ADJACENT OR EXISTING LANDSCAPE,
ADJACENT OR EXISTING PAVING, OR ANY PUBLIC AND PRIVATE PROPERTY THAT IS DAMAGED
BY THE CONTRACTOR OR THEIR SUBCONTRACTOR'S OPERATIONS DURING INSTALLATION,
ESTABLISHMENT OR DURING THE SPECIFIED MAINTENANCE PERIOD. ALL DAMAGES SHALL BE
REPAIRED TO PRE-CONSTRUCTION CONDITIONS AS DETERMINED BY THE OWNER'S
REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR LOGGING ANY DAMAGES
PRIOR TO START OF CONSTRUCTION AND DURING THE CONTRACT PERIOD.
14. ALL WORK SHALL BE CONFINED TO THE AREA WITHIN THE CONSTRUCTION LIMITS AS SHOWN
ON THE PLANS. ANY AREAS OR IMPROVEMENTS DISTURBED OUTSIDE THESE LIMITS SHALL BE
RETURNED TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. IN THE EVENT
THE CONTRACTOR REQUIRES A MODIFICATION TO THE CONSTRUCTION LIMITS, WRITTEN
PERMISSION MUST BE OBTAINED FROM THE OWNER'S REPRESENTATIVE PRIOR TO ANY
DISTURBANCE OUTSIDE OF THE LIMITS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .